Ladies and gentlemen, and welcome to the Dominion Energy first quarter earnings Conference call. At this time each of your lines is in a listen only mode. At the conclusion of today's presentation. We will open the floor for questions instructions will be given for the procedure to follow if you would like to ask a question I would now like to turn the call over to David Mcpartland, Vice President of Investor Relations.
Good work.
David McFarland: Investor Relations and Treasurer
Good morning, and thank you for joining today's call earnings materials, including today's prepared remarks contain forward looking statements and estimates that are subject to various risks and uncertainties. Please refer to our S E SEC filings, including our most recent annual reports on Form 10-K, and our quarterly reports on Form 10-Q for a disc.
David McFarland: Good morning, and thank you for joining today's call. Earnings materials, including today's prepared remarks, contain forward-looking statements and estimates that are subject to various risks and uncertainties. Please refer to our SEC filings, including our most recent annual reports on Form 10-K and our quarterly reports on Form 10-Q for a discussion of factors that may cause results to differ from management's estimates and expectations. This morning, we will discuss some measures of our company's performance that differ from those recognized by GAAP.
David McFarland: The factors that may cause results to differ from management's estimates and expectations. This morning, we will discuss some measures of our company's performance that differ from those recognized by GAAP reconciliation of our non-GAAP measures to the most directly comparable GAAP financial measures, which we can calculate are contained in the earnings release kit.
David McFarland: I encourage you to visit our Investor Relations website to review webcast slides as well as the earnings release kit.
David McFarland: Reconciliation of our non-GAAP measures to the most directly comparable GAAP financial measures, which we can calculate, is contained in the Earnings Release Kit. I encourage you to visit our Investor Relations website to review the webcast slides, as well as the Earnings Release Kit. Joining today's call are Bob Blue, Chairman, President, and Chief Executive Officer; Steven Ridge, Executive Vice President and Chief Financial Officer; and Diane Leopold, Executive Vice President and Chief Operating Officer. I will now turn the call over to Steven. Thank you, David, and good morning, everyone.
David McFarland: Joining today's call are Bob Blue Chair, President and Chief Executive Officer, Steven Ridge, Executive Vice President and Chief Financial Officer, and Diane Leopold Executive Vice President and Chief Operating Officer, I will now turn the call over to Steven.
Steven D. Ridge: Our first quarter 2024 operating earnings, as shown on slide three, were 55 cents per share, which included six cents of wet headwind from worse than normal weather in our utility service areas. Offsets to weather included modest interest savings, driven by an earlier than budgeted close of the East Ohio Gas Company sale, as well as O&M timing. Relative to last year, positive factors for the quarter were higher sales, regulated investment growth, and better weather.
Steven: You, David and good morning, everyone.
Steven D. Ridge: Our first quarter 2024 operating earnings as shown on slide three where 55 cents per share, which included six cents of wet headwind from worse than normal weather in our utility service areas.
Steven D. Ridge: Sets to weather included modest interest savings driven by an earlier than budgeted closed the east, Ohio gas company sale as well as O&M timing.
Steven D. Ridge: Relative to last year positive factors for the quarter were higher sales regulated investment growth and better weather recall that we experienced a 10 cent weather headwind in the first quarter last year. So by comparison, our six cent weather headwind. This quarter is actually a positive year over year driver.
Steven D. Ridge: Recall that we experienced a $0.10 weather headwind in the first quarter last year, so by comparison, a $0.06 weather headwind this quarter is actually a positive year-over-year driver. Other factors include higher interest expense and the revenue reduction at Dominion Energy Virginia related to moving certain riders to base rates.
Steven D. Ridge: Other factors include higher interest expense and the revenue reduction at Dominion Energy, Virginia related to moving certain writers to base rates.
Steven D. Ridge: A summary of all drivers for earnings relative to the prior year period is included in Schedule 4 of the earnings release. First quarter gap results were $0.78 per share, which includes the net benefit from discontinued operations primarily associated with the sale of gas distribution operations, unrealized non-cash net gains on nuclear decommissioning trust funds, and the Unrealized Non-Cash Mark-to-Market Impact of Economic Hedging Activities. A summary of all adjustments between operating and reported results is included in Schedule 2 of the Earnings Release Kit. Turning to guidance on page 4.
Steven D. Ridge: Summary of all drivers for earnings relative to the prior year period is included in schedule four of the earnings release kit.
Steven D. Ridge: First quarter GAAP results were <unk> 78 per share, which includes the net benefit from discontinued operations, primarily associated with the sale of gas distribution operations unrealized noncash net gains on nuclear decommissioning trust funds.
Steven D. Ridge: And the unrealized noncash mark to market impact of economic hedging activities. The summary of all the adjustments between operating and reported results is included in schedule two of the earnings release kit.
Steven D. Ridge: Turning to guidance on page four.
Steven D. Ridge: We are affirming all of the financial guidance we provided at our March 1st investor meeting. As such, we continue to expect 2024 operating earnings per share to be between $2.62 and $2.87 with a midpoint of $2.75. As discussed at the March Investor Meeting, we're no longer providing quarterly earnings guidance.
Steven D. Ridge: We are affirming all of the financial guidance, we provided at our March 1st Investor meeting.
Steven D. Ridge: As such we continue to expect 2024 operating earnings per share to be between $2.62 and $2.87 with a midpoint of $2.75.
Steven D. Ridge: As discussed at the March Investor meeting, we're no longer providing quarterly earnings guidance. We are however, replicating in the appendix of todays materials. The expected cadence of earnings across 2024, including anticipated year over year drivers by quarter, there haven't been any changes to that guidance from the investor meeting.
Steven D. Ridge: We are, however, replicating in the appendix of today's materials the expected cadence of earnings across 2024, including anticipated year-over-year drivers by quarter. There haven't been any changes to that guidance from the investor meeting. We continue to expect 2025 operating earnings per share to be between $3.25 and $3.54, inclusive of the impact of R&G 45Z credits, with a midpoint of $3.40. We also continue to forecast an operating earnings annual growth rate range of 5 to 7% through 2029, excluding the impact of the RNG45Z credits. As a reminder, authorizing legislation applies to produced R&G volumes in 2025, 2026, and 2027 but sunsets thereafter.
Steven D. Ridge: <unk>.
Steven D. Ridge: We continue to expect 2025 operating earnings per share to be between $3 25, and $3.54 inclusive of the impact of RMG forty-five Z credits with a midpoint of $3.40. We also continue to forecast operating earnings annual growth rate range of 5% to 7% through 'twenty.
Steven D. Ridge: 29 off a midpoint of $3 30, which excludes the impact of the R&D forty-five Z credits as.
Steven D. Ridge: As a reminder, authorizing legislation applies to produced RMG volumes in 2025, 2026, and 2027, but sunsets thereafter.
Steven D. Ridge: For the avoidance of doubt, there were no changes to any of the other financial guidance we provided on March 1st, including credit, dividend, and financing guidance. Turning now to a status update on our business review initiatives, as shown on slide five. During the review, we announced transactions that represent approximately $21 billion of debt reduction. With the closings of the Cove Point and East Ohio Gas sales and completion of the DEV fuel securitization, we've now achieved 53% of the targeted debt reduction, representing over $11 billion.
Steven D. Ridge: For the avoidance of doubt no changes to any of the other financial guidance, we provided on March 1st including credit dividend and financing guidance.
Steven D. Ridge: With regard to the remaining 47 percent, we're working methodically towards timely closings for the sales of Questar Gas, WEXPRO, and Public Service of North Carolina, as well as the non-controlling equity financing for the Coastal Virginia Offshore Wind Project. In all cases, no changes have been made to our original timing expectations.
Steven D. Ridge: Turning now to a status update on our business review initiatives as shown on slide five during the review, we announced transactions that represent approximately $21 billion of debt reduction with the closings of the Cove point in East, Ohio gas sales and completion of the D E fuel securitization, we've now achieved 53%.
Steven D. Ridge: Of the targeted debt reduction representing over $11 billion with regard to the remaining 47% were working with the best methodically towards timely closings for the sales of Questar gas works Pro and public service in North Carolina, as well as the Noncontrolling equity financing for the coastal Virginia offshore wind.
Steven D. Ridge: In all cases, no changes to our original timing expectations.
Steven D. Ridge: We look forward to continuing to work with involved parties and expect regulatory proceedings to conclude and transaction closings to occur during 2024. For a little more color, in Utah, parties to the merger proceeding agreed to a comprehensive settlement in late March, which was followed by an evidentiary hearing in front of the commission on April 11th. In Wyoming, a commission hearing is currently scheduled for May 23rd, and in North Carolina, a commission hearing is currently scheduled for June 11th.
Steven D. Ridge: We look forward to continuing to work with involved parties and expect regulatory proceedings to conclude and transaction closings to occur during 2024.
Steven D. Ridge: For a little more color in Utah parties to the merger proceeding agreed to a comprehensive settlement in late March which was followed by an evidentiary hearing in front of the commission on April 11th in Wyoming. A commission hearing is currently scheduled for May 23rd and in North Carolina Commission hearing is currently scheduled for June 11th.
Steven D. Ridge: As relates to our announced offshore wind partnership, the transaction requires approvals from the Virginia State Corporation Commission and the North Carolina Utilities Commission, as well as certain consents from the BOEM and other regulatory agencies. All regulatory filings have now been submitted, and procedural schedules have been published in both Virginia and North Carolina. We are excited to have a well-capitalized and experienced financing partner on terms that significantly de-risk the project for Dominion Energy customers and shareholders.
Steven D. Ridge: As it relates to our announced offshore wind partnership the transaction requires approvals from the Virginia State Corporation Commission, and North Carolina Utilities Commission as well as certain consents from the bone and other regulatory agencies, all regulatory filings have now been submitted and procedural schedules have been published in both for.
Steven D. Ridge: Junior and North Carolina, we are excited to have a well capitalized and experienced financing partner on terms that significantly derisk the project for Dominion energy customers and shareholders.
Steven D. Ridge: On credit, the business review resulted in a significant quantitative and qualitative improvement in our credit profile. Recent comments by the rating agencies, with whom we maintain frequent engagement, highlighted the credit-positive nature of the business review results. As a result of the review, we have strengthened the company's credit position within existing consolidated rating categories at each of our three rating agencies. Turning to financing on slide 6, there were no changes to the financing plans that we shared at the investor meeting.
Steven D. Ridge: On credit the business review resulted in significant quantitative and qualitative improvement to our credit profile recent comments by the rating agencies with whom we maintain frequent engagement highlighted the credit positive nature of the business review results as a result of the review we have strengthened the company's credit position within existing consolidated rating.
Steven D. Ridge: <unk> at each of our three rating agencies.
Steven D. Ridge: Turning to financing on slide six no changes to the financing plans that we shared at the Investor meeting.
Steven D. Ridge: Specific to 2024, we have normal course long-term debt issuance at DEV in the plan for later this year. We expect to issue between $600 and $800 million of common equity during 2024, including $200 million through our DRIP program and between $400 and $600 million via ATM. We view this level of steady common equity issuance as prudent, EPS secretive, and, in the context of our sizable growth capital spending program, appropriate to keep our consolidated credit metrics within the guidelines for our strong credit ratings category.
Steven D. Ridge: Specific to 2024, we have normal course, longterm debt issuance of D V and the planned for later this year, we expect to issue between 600 and $800 million of common equity during 2024, including $200 million through our drip program and between 400 and 600 million via a T. M. We view this level of steady common equity.
Steven D. Ridge: Issuance is prudent EPS accretive and in the context of our sizeable growth capital spending program appropriate to keep our consolidated credit metrics within the guidelines for our strong credit ratings category.
Steven D. Ridge: Our plan includes the ongoing utilization of hybrid securities in our capital structure. We have $700 million of junior subordinated notes that will mature in August, and, as a reminder, we expect to issue between $700 million and $1.5 billion of hybrids this year. We expect to structure any new hybrids to qualify for 50% equity treatment from the Credit Rating Agency. In conclusion, I'll reiterate that I'm highly confident in our ability to deliver on our financial plan. The post-review guidance has been built to be appropriately but also not unreasonably conservative to weather unforeseen challenges that may come our way. With that, I'll turn the call over to Bob.
Steven D. Ridge: Our plan includes the ongoing utilization of hybrid securities in our capital structure, we have $700 million of junior subordinated notes that will mature in August and as a reminder, we expect to issue between $700 million and $1 $5 billion of hybrids. This year.
Bob: We expect to structure any new hybrids to qualify for 50% equity treatment from the credit rating agencies.
Bob: In conclusion, I'll reiterate that I'm highly confident in our ability to deliver deliver on our financial plan.
Steven D. Ridge: The post review guidance has been built to be appropriately, but also not unreasonably conservative to weather unforeseen challenges that may come our way with that I'll turn the call over to Bob Thanks, Steve and good morning, I'll begin my remarks by highlighting our safety performance as shown on slide seven our employee Osha injury.
Robert M. Blue: I'll turn the call over to Bob. Thanks, Steven. Good morning. I'll begin my remarks by highlighting our safety performance. As shown on slide 7, our employee OSHA injury recordable rate for the first three months of the year was.32, a significant improvement relative to our already strong historical performance. I commend my colleagues for their consistent focus on employee safety, which is our first core value. On March 1, we announced the results of our Comprehensive Business Review.
Bob: Portable rate for the first three months of the year was 0.3 to.
Bob: A significant improvement relative to already strong historical performance I commend my colleagues for their consistent focus on employee safety, which is our first core value.
Speaker Change: On March one we announced the results of our comprehensive business review, we thank all those who were able to participate and provide feedback following the event. Please note that those meeting materials, including the webcast replay continue to be available on our website and we encourage all to review thoroughly.
Robert M. Blue: We thank all those who were able to participate and provide feedback following the event. Please note that the meeting materials, including the webcast replay, continue to be available on our website, and we encourage all to review them thoroughly.
Robert M. Blue: Throughout the review, I met extensively and directly with many of our shareholders to better understand their perspectives on our company's fundamental opportunities and challenges, as well as changes they wanted to see affected as a result of the review. Since the conclusion of the review, I've continued that deliberate campaign of investor engagement, and I'd like to share what I believe represents, by and large, the consensus among those shareholders. First, we delivered a truly comprehensive result. This was not a half-way review.
Bob: Throughout the review I met extensively and directly with many of our shareholders to better understand their perspectives on our company's fundamental opportunities and challenges as well as changes they wanted to see affected as a result of the review.
Robert M. Blue: Since the conclusion of the review I've continued that deliberate campaign of investor engagement and I'd like to share what I believe represents by and large the consensus among those shareholders.
Robert M. Blue: First we delivered a truly comprehensive result, this was not a partway review instead, we fully address head on the challenges that our company has faced in the past.
Robert M. Blue: Instead, we fully addressed head-on the challenges that our company faced in the past. Second, recognition that we have taken significant steps to enhance transparency and that we have developed a financial plan that is more durable and more appropriately conservative than in the past. Third, acknowledgement of material changes to my compensation structure, full details of which are now available in our proxy statement, and to our governance more generally that demonstrate a strong commitment to shareholder alignment.
Robert M. Blue: Second recognition that we've taken significant steps to enhance transparency and that we have developed a financial plan that is more durable and more appropriately conservative than in the past.
Robert M. Blue: Third acknowledgment of material changes to my compensation structure full details of which are now available in our proxy statement into our governance more generally the demonstrate a strong commitment to shareholder alignment and.
Robert M. Blue: And finally, and perhaps most importantly, a clear expectation that the company must be one hundred percent committed to executing and delivering on the operational and financial guidance we have provided. On that last point, we are unwavering. Let me repeat what I have said before.
Robert M. Blue: And finally, and perhaps most importantly, a clear expectation that the company must be 100% committed to executing and delivering on the operational and financial guidance we have provided.
Robert M. Blue: On that last point, we are unwavering, let me repeat what I have said before I am accountable for and my entire leadership team has embraced our commitment to execute and deliver I am very excited for the next chapter of our company.
Robert M. Blue: I am accountable for, and my entire leadership team has embraced, our commitment to execute and deliver. I am very excited for the next chapter of our company. With that in mind, let me provide a few updates on the execution of our plan. Turning to offshore wind, I'd like to start with a few remarks related to inaccurate news releases circulating yesterday regarding the status of our project. There has been no delay ordered. Our construction schedule has not been altered.
Robert M. Blue: With that let me provide a few updates on the execution of our plan.
Robert M. Blue: We expect to begin monopile installation between May 6 and May 8. On April 29th, a motion was filed in the U.S. District Court for the D.C. Circuit requesting a preliminary injunction in connection with a complaint filed related to the administrative process for certain permits and approvals received. The judge has not ruled on the preliminary injunction motion and, in fact, has issued no orders other than the following schedule.
Robert M. Blue: Turning to offshore wind I'd like to start with a few remarks related to inaccurate news releases circulating yesterday regarding the status of our project. There has been no delay ordered our construction schedule has not been altered we expect to begin mono pilot installation between may six and may 8th.
Robert M. Blue: On April 29th emotion was filed in the U S District Court for the D. C circuit requesting a preliminary injunction in connection with a complaint filed related to the administrative process for certain permits and approvals received the judge has not ruled on the preliminary injunction motion and in fact has issued no.
Robert M. Blue: Orders other than the following schedule, we will file a status report tomorrow regarding the various mitigation plans being finalized with Boeing and other agencies prior to beginning mono pile installation and provide the estimated date for such installation work to begin we and the government will file our brief in response to plaintiff's motion on Monday.
Robert M. Blue: We'll file a status report tomorrow regarding the various mitigation plans being finalized with BOEM and other agencies prior to the beginning of monopile installation and provide the estimated date for such installation work to begin. We and the government will file our brief in response to the plaintiff's motion on Monday. The plaintiffs have until May 9th to file any reply. The biological opinion was thorough and complied with all legal requirements, which is true of all other permitting actions for this project.
Robert M. Blue: <unk> have until may 9th to file any reply.
Robert M. Blue: The biological opinion was thorough and complied with all legal requirements, which is true of all other permitting actions for this project similar arguments to those made by the plaintiffs in this case have been rejected by courts when raised with respect to other projects. Most recently by the U S Court of Appeals for the first circuit, just last week and the challenge brought against the.
Robert M. Blue: Similar arguments to those made by the plaintiffs in this case have been rejected by courts when raised with respect to other projects, most recently by the U.S. Court of Appeals for the First Circuit just last week in a challenge brought against the permit for Vineyard Wind. We believe this lawsuit has no merit, and we expect the court to deny the plaintiff's request for a preliminary injunction.
Robert M. Blue: Permit for vineyard wind.
Robert M. Blue: We believe this lawsuit has no merit and we expect the court to deny the plaintiffs request for a preliminary injunction. Let me just reiterate the project is proceeding on time and on budget consistent with the timelines on estimates previously provided.
Robert M. Blue: Let me just reiterate, the project is proceeding on time and on budget, consistent with the timelines and estimates previously provided. As shown on slide 8, last month, the project received its 11th and final federal permit for materials and equipment. We're on track and making excellent progress. We've received 36 monopiles from our supplier, EEW, at the Portsmouth Marine Terminal, representing 20% of the total. We expect deliveries to continue steadily in the coming weeks. These monopiles will begin to be installed next week.
Robert M. Blue: As shown on slide eight last month, the project received its 11th and final federal permit.
Robert M. Blue: On materials and equipment, we're on track and making excellent progress. We've received 36 Mana piles from our supplier EW at the Portsmouth Breen terminal, representing 20% of the total we expect deliveries to continue steadily in coming weeks. These monetize will begin to be installed next week.
Robert M. Blue: DMA will use their heavy lift crane vessel, Orion, which is currently at the Portsmouth Marine Terminal in Virginia. Recall that we've scheduled monopile installation across two seasons, 2024 and 2025, which allows us to better mitigate any potential delays or disruptions without impacting the final schedule. The first of three offshore substation topside structures has been completed and delivered to CS Wynn SEMCO for outfitting. The first six transition pieces have been loaded and are on their way to Virginia, expected to arrive in late May.
Robert M. Blue: <unk> will use their heavy lift crane vessel Orion, which is currently at the Portsmouth Marine terminal in Virginia recall that we've scheduled mono pilot installation across two seasons, 2024, and 2025, which allows us to better mitigate any potential delays or disruptions without impacting final schedule.
Robert M. Blue: The first of three offshore substation topside structures have been completed and delivered to see us win some co to be outfit at the first six transition pieces have been loaded and are on their way to Virginia and expected to arrive in late May all 161 miles of onshore underground cable has been manufactured and over a third of the 600 miles of offshore.
Robert M. Blue: All 161 miles of onshore underground cable have been manufactured, and over a third of the 600 miles of offshore cable has been produced. The schedule for the manufacturing of our turbines remains on track. It's worth noting that even though we won't begin turbine installation until 2025 per our schedule, DMA recently finished supporting an installation campaign for Moray West, a project off the coast of Scotland that has now successfully installed the same Siemens Gamesa wind turbine model that CVAL will use.
Robert M. Blue: Cable has been produced scheduled for the manufacturing of our turbines remains on track, it's worth noting that even though we won't began turbine installation until 2025 per our schedule than a recently finished supporting an installation campaign for Moray West a project off the coast of Scotland that has now successfully installed the same Siemens Gamesa wind.
Robert M. Blue: Urban model that CEVA will use the lessons learned from that project will benefit our project installation in the future moving onshore construction activities remain on track, including civil work horizontal directional drills and the boards, where the export cables come ashore on.
Robert M. Blue: The lessons learned from that project will benefit our project installation in the future. Moving onshore, construction activities remain on track, including civil work, horizontal directional drills, and the boards where the export cables come ashore on Regulatory. Last November, we made our 2023 rider filing, representing $486 million of annual revenue. The hearing is scheduled for later this month, and we expect a final order by August.
Robert M. Blue: On regulatory last November we made our 2023 rider filing representing $486 million of annual revenue.
Robert M. Blue: A hearing is scheduled for later this month and we expect a final order by August.
Robert M. Blue: Turning to slide 9, as reflected in our standard status report filed with the SCC yesterday, we've updated the project's expected LCOE to be $73 per megawatt hour, down modestly relative to our last update. The drivers for the lower LCOE include about $1.50 related to an updated REC price forecast, which produces a larger project benefit for customers, as well as other factors. There have been no changes to the capital cost, the capacity factor, or the interest rate.
Robert M. Blue: Turning to slide nine as reflected in our standard status report filed with the FCC yesterday, we've updated the project's expected LCR, we need to be $73 per megawatt hour down modestly relative to our last update the drivers for the lower LCR. We include about a dollar and a half related to an updated rec price forecast, which.
Robert M. Blue: Produces a larger project benefit for customers as well as other factors there've been no changes to the capital cost capacity factor or interest rates.
Robert M. Blue: We've again provided sensitivities to show how the average lifetime cost to our customers is affected by these key assumptions. We remain well below the legislative prudence cap on this metric, and I would point out that it is well below the PPA prices being considered in other parts of the country. To date, we've invested approximately $3.5 billion and remain on target to spend approximately $6 billion by year-end 2024. 93% of project costs are now fixed.
Robert M. Blue: We've again provided sensitivities to show how the average lifetime cost to our customers is affected by these key assumptions, we remain well below the legislative prudency cap on this metric and I would point out well below the PPA prices being considered in other parts of the country project.
Robert M. Blue: Project to date, we've invested approximately $3 $5 billion and remain on target to send spend approximately $6 billion by year end 2024, 93% of project cost are now fixed will gradually increase that percentage over the remainder of the project construction timeline.
Robert M. Blue: We'll gradually increase that percentage over the remainder of the project construction timeline. I'm very pleased that, per the filing, the current unused contingency of $284 million is equal to the original contingency filed in November 2021, despite being some 30 months further along with the project. Slightly lower contingency relative to our prior update is not unexpected, and changes of this kind are considered normal as we move further towards project completion.
Robert M. Blue: I'm very pleased that part of the filing current unused contingency of $284 million is equal to the original contingency filed in November 2021, Despite being some 30 months further along with the project slightly lower contingency relative to our prior update is not unexpected and changes of this kind are considered normal as we move.
Robert M. Blue: Further towards project completion.
Robert M. Blue: The current contingency level continues to benchmark competitively as a percentage of total budgeted costs when compared to other large infrastructure projects we've studied and ones that we've completed in the past. We've been very clear with our team and with our suppliers and partners that delivery of an on-budget project is the expectation. Lastly, the project is currently 28% complete, and we've highlighted remaining major project milestones on slide 10. Let me now provide a few updates on Charybdis, as shown on slide 11. The vessel is currently 85% complete, up from 82% as of our last update. Last month, we announced that Charybdis was successfully launched from land to water, marking a major milestone in the vessel's construction.
Robert M. Blue: The current contingency level continues to benchmark competitively as a percentage of total budgeted cost when compared to other large infrastructure projects. We've studied and ones that we've completed in the past we've been very clear with our team and with our suppliers and partners that delivery of an on budget project is the expectation.
Robert M. Blue: Lastly, the project is currently 28% complete and we've highlighted remaining project major milestones on slide 10.
Robert M. Blue: To achieve this milestone, the welding of the ship's hull and commissioning of the vessel's forelegs and related jacking system were successfully completed. I encourage you to watch the short video of this successful launch included in today's material. There is no change to the expected delivery time frame of late 2024 or early 2025, which will be marked by the successful completion of C-trials. There is also no change to the vessel's expected availability to support the current CVAL construction schedule.
Robert M. Blue: I'll provide a few updates on charybdis as shown on slide 11. The vessel is currently 85% complete up from 82% as of our last update.
Robert M. Blue: Last month, we announced the Charybdis was successfully launched from land to water, marking a major milestone in the vessels construction.
Robert M. Blue: To achieve this milestone welding of the ship's hull and commissioning of the vessels four legs and related jacking system were successfully completed I encourage you to access the short video of this successful launch included in today's materials. There's no change to the expected delivery timeframe of late 2024, or early 2025, which will be marked by the success.
Robert M. Blue: Full completion of sea trials.
Robert M. Blue: Also no change to the vessels expected availability to support the current sieve out construction schedule.
Robert M. Blue: In April, we agreed to terminate a charter agreement under which Charybdis would have serviced a third party until returning to CVAL in the second half of 2025 to begin turbine installation. As a result of the mutually-agreed termination, CVAL currently has sole and exclusive access to the vessel in 2025, and we're exploring options to further de-risk the project's timeline by potentially accelerating its deployment to CVAL. The termination does not have a meaningful impact on our financial plan, earnings, cash, or credit, and there's no change to our financial guidance as a result. Finally, there's no change to the project's current estimated cost of $625 million.
Robert M. Blue: In April we agreed to terminate a charter agreement under which Charybdis would have service a third party until returning to see value in the second half of 2025 to begin turbine installation.
Robert M. Blue: As a result of the mutually agreed termination Steve out currently has sole and exclusive access to the vessel in 2025, and we're exploring options to further derisk the project timeline by potentially accelerating its deployment to see that.
Robert M. Blue: The termination does not have a meaningful impact on our financial plan earnings cash or credit and there is no change to our financial guidance as a result, finally theres no change change to the projects current estimated cost of $625 million.
Robert M. Blue: Charybdis is vital, not only to CVAL but also to the growth of the offshore wind industry along the U.S. East Coast and is key to the continued development of a domestic supply chain by providing a homegrown solution for the installation of offshore wind turbines. We continue to see strong interest in the use of the vessel after the SeaVal project is complete. Turning to slide 13, let me address affordability as well as provide a few regulatory updates. At DEV, current rates are approximately 14% below the national average.
Robert M. Blue: <unk> is vital not only to see Val but also to the growth of the offshore wind industry, along the U S East Coast and is key to the continued development of a domestic supply chain by providing a homegrown solution for the installation of offshore wind turbines. We continue to see strong interest and use of the vessel. After the <unk> project is complete.
Robert M. Blue: Turning to slide 13, let me address affordability as well as provide a few regulatory updates at D. E. V. Current rates are approximately 14% below the national average yesterday, we made several filings related to fuel and transmission riders that would result in a net bill reductions for a typical residential customer of roughly three per.
Robert M. Blue: Yesterday, we made several filings related to fuel and transmission riders that would result in a net bill reduction for a typical residential customer of roughly 3%. At DESC, our recently approved fuel cost settlement and related filings reduced customer bills by over $13 a month. Current residential rates are now approximately 18% below the national average.
Robert M. Blue: Sent at.
Robert M. Blue: D C. A recently approved fuel cost settlement related filings reduced customer bills by over $13. A month current residential rates are now approximately 18% below the national average.
Robert M. Blue: And in March, we initiated an electric general rate case representing the first filing in the past four years, during which time we've invested $1.6 billion in our system to the benefit of our customers. We expect new rates based on a typical procedural schedule to be effective in September. Being very focused on affordability allows us to ensure customers are getting compelling value coupled with high reliability. Turning to slide 14 in the growth outlook for Virginia, let me share a few thoughts on first, our customers' needs, second, what's being done to support them, and third, the impact on our long-term financial plan. First, we consider customers' needs.
Robert M. Blue: And in March we initiated an electric general rate case, representing the first filing in the past four years during which time, we've invested $1 $6 billion in our system to the benefit of our customers.
Robert M. Blue: We expect new rates based on a typical procedural scheduled to be effective in September.
Robert M. Blue: Being very focused on affordability allows us to ensure customers are getting compelling value coupled with high reliability.
Robert M. Blue: Turning to slide 14, and the growth outlook in Virginia, Let me share a few thoughts on first our customers' needs.
Robert M. Blue: What's being done to support them and third the impact to our long term financial plan first customers' needs, we're ramping into the very substantial and growing multi decade utility investment required to address resiliency and de carbonization public policy goals plus the very robust demand growth we're observing in <unk>.
Robert M. Blue: We're ramping into the very substantial and growing multi-decade utility investment required to address resiliency and decarbonization public policy goals, plus the very robust demand growth we're observing in real time across our system. DEV's weather-normal year-over-year sales growth rate through March was 4.8 percent, precisely in line with our full-year 2024 growth rate expectation of 4.5 to 5.5 percent, driven by economic growth, electr The data center industry has grown substantially in Northern Virginia in recent years.
Robert M. Blue: Real time across our system Dev's weather normal year over year sales growth rate through March was four 8% precisely in line with our full year 2024 growth rate expectation of four five to five 5% driven by economic growth electrification and accelerating data center expansion the.
Robert M. Blue: The data center industry has grown substantially in northern Virginia in recent years in aggregate. We've connected 94 data centers with over four gigawatts of capacity over the last approximately five years, we expect to connect an additional 15 data centers in 2020 for Northern Virginia leads the world in data Center markets.
Robert M. Blue: In aggregate, we've connected 94 data centers with over 4 gigawatts of capacity over the last approximately five years. We expect to connect an additional 15 data centers in 2024. Northern Virginia leads the world in data center markets.
Robert M. Blue: In recent years, this growth has accelerated by orders of magnitude, driven by 1, the number of data centers requesting to be connected to our system, 2, the size of each facility, and 3, the acceleration of each facility's ramp scheduled to reach full capacity. For some context, historically, a single data center typically had a demand of 30 megawatts or greater. However, we're now receiving individual requests for demand of 60 to 90 megawatts or greater, and it hasn't stopped there. We get regular requests to support larger data center campuses that include multiple buildings and require total capacity ranging from 300 megawatts to as many as several gigawatts. Last month, PJM released its capacity auction planning parameters.
Robert M. Blue: In recent years this growth has accelerated and orders of magnitude driven by one the number of data centers requesting to be connected to our system to the size of each facility.
Robert M. Blue: And three the acceleration of each facility's ramp scheduled to reach full capacity for.
Robert M. Blue: For some context historically, a single datacenter typically had a demand of 30 megawatts or greater however, we're now receiving individual requests for demand of 60 to 90 megawatts or greater and it hasn't stopped there we get regular requests to support larger data center campuses that include multiple buildings and require total <unk>.
Robert M. Blue: Apache ranging from 300 megawatts to as many as several gigawatts.
Robert M. Blue: Last month PJM released its capacity auction planning parameters the results align with our analysis of load growth and the need for a requisite dispatch will supply resources included in our 2023 IOP. This.
Robert M. Blue: The results align with our analysis of load growth and the need for requisite dispatchable supply resources included in our 2023 IRP. This independent modeling also validates the need to expediently progress the recurring local and PJM regional transmission planning and expansion process in our decision to expedite numerous projects over the last two years. Second, what are we doing today?
Robert M. Blue: This independent modeling also validates the need to Expediently progress the recurring local in PJM regional transmission planning and expansion process and our decision to expedite numerous projects over the last two years.
Robert M. Blue: Second what are we doing today, we will take the steps necessary to ensure our system remains resilient and reliable we'd already accelerated plans for new 500 kv transmission lines and other infrastructure in northern Virginia and that remains on track we've been awarded over 150 electric transmission projects totaling $2 5 billion.
Robert M. Blue: We will take the steps necessary to ensure our system remains resilient and reliable. We had already accelerated plans for new 500 kV transmission lines and other infrastructure in Northern Virginia, and that remains on track. We've been awarded over 150 electric transmission projects totaling $2.5 billion during the PJM open window last December.
Robert M. Blue: During the PJM open window last December we're working expeditiously with PJM, the FCC local officials and other stakeholders to fast track. These along with several other critical projects were committed to pursuing solutions that support our customers and the continued growth of the region. This includes assessing dispatch more.
Robert M. Blue: We're working expeditiously with PJM, the SCC, local officials, and other stakeholders to fast-track these, along with several other critical projects. We're committed to pursuing solutions that support our customers and the continued growth of the region. This includes assessing dispatchable generation needs, especially during winter, and onsite backup fuel stores. Finally, what's the impact on our financial plan?
Robert M. Blue: Generation needs, especially during winter and onside onsite backup fuel storage finally, whats the impact to our financial plan. Our capital plan is driven by demand reliability and customer needs. When we consider this demand growth, we think about the full value chain transmission distribution and generation infrastructure investment that has.
Robert M. Blue: Our capital plan is driven by demand, reliability, and customer needs. When we consider this demand growth, we think about the full value chain, transmission, distribution, and generation infrastructure investment that has and will continue to drive utility rate-based growth. We believe there may be opportunities for incremental regulated capital investment toward the back end of our plan and beyond. As I've said before, we will look at this capital through the lenses of customer affordability, system reliability, balance sheet conservatism, and our low-risk profile.
Robert M. Blue: And we will continue to drive utility rate base growth. We believe there may be opportunities for incremental regulated capital investment towards the backend of our plan and beyond as I've said before we will look at incremental capital through the lenses of customer affordability system reliability balance sheet conservatism and our low risk profile.
Robert M. Blue: Our IRPs take a longer-term view. For example, the 2023 IRP factored in significant load growth and investment in generation and transmission over the next 15 years to meet that load growth while keeping the cumulative average growth in customer bills below 3%. The most recent PJM load projections, along with our work to optimize the best ways to meet this load, will be factored into our planning for this year's IRP. The 2024 IRP will be submitted to the SEC and NCUC in October 2024.
Robert M. Blue: Our IRR piece take a longer term view the 2023 IR P factored in significant load growth and investment in generation and transmission over the next 15 years to meet that load growth, while keeping the cumulative average growth in customer bill below 3%.
Robert M. Blue: The most recent PJM load projections, along with our work to optimize the best ways to meet the slow will be factored into our planning for this year's IOP. The 'twenty 'twenty four <unk> will be submitted to the SEC and NC UC in October 2024, we will continue to provide updates as things develop we remained focused on our core responsible.
Robert M. Blue: We will continue to provide updates as things develop. Meanwhile, we remain focused on our core responsibility of safely providing reliable energy to our customers. With that, let me summarize our remarks on slide 15. Our safety performance this quarter was outstanding, but there's more work to do to drive injuries to zero. We have affirmed all financial guidance. Our offshore wind project is on time and on budget. We continue to make the necessary investments to provide the reliable, affordable, and increasingly clean energy that powers our customers every day, and we are 100% focused on execution. We know we must deliver, and we will. With that, we're ready to take your questions.
Robert M. Blue: <unk> of safely providing reliable energy to our customers.
Robert M. Blue: With that let me summarize our remarks on slide 15, our safety performance. This quarter was outstanding but there's more work to do to drive injuries to zero, we affirmed all financial guidance. Our offshore wind project is on time and on budget, we continue to make the necessary investments to provide a reliable affordable and increasingly clean energy that.
Robert M. Blue: Power's our customers every day and we are 100% focus on execution, we know we must deliver and.
Robert M. Blue: And we will with that we're ready to take your questions.
Operator: At this time, we will open the floor for questions. If you would like to ask a question, please press the star key followed by the 1 on your touchtone phone now. If at any time you would like to remove yourself from the question queue, simply press star 2. Again, to ask a question at this time, please press star and 1 on your telephone keypads now. We'll take our first question today from Shahriar Pourreza at Guggenheim Partners.
Speaker Change: At this time, we will open the floor for questions. If you would like to ask a question. Please press the star key followed by the one on your Touchtone phone now if at any time, you would like to remove yourself from the question queue simply press Star two again to ask a question at this time, Please press star and one on your telephone keypads now.
Shahriar Pourreza: We will take our first question today from Shar <unk> Guggenheim partners.
Shahriar Pourreza: Hey, guys good morning.
Shahriar Pourreza: Good morning Shar.
Shahriar Pourreza: Morning. Maybe I can start with a two-part question on data centers. Bob, I know you made prior comments and media around self-generation and self-supply. What are you seeing within the pipeline you just discussed as it relates to these two items, which can obviously mitigate some of the low growth you highlight? And secondly, how are you sort of thinking about rate design and tariff changes to make sure Virginia customers benefit or are at least held, you know, harmless on things like interconnection costs? Thanks.
Shahriar Pourreza: Good morning.
Shahriar Pourreza: Yeah, I can start with a two part question on data centers, Bob I know you've made prior comments and media around self generation and self supply.
Shahriar Pourreza: What are you seeing within the pipeline you just discussed as it relates to these two items, which can obviously mitigate some of the load growth you highlight and secondly, how are you can sort of thinking about rate design and tariff changes to make sure Virginia customers benefit or at least held harmless on things like interconnection costs. Thanks.
Robert M. Blue: Yeah, Shahriar, both really good questions. I may take them a little bit in reverse order.
Bob: Yeah Shar are both really good questions I may take them a little bit in reverse order.
Robert M. Blue: You know, we've worked with data centers for many years, and we have very strong relationships with them. As you know, Loudoun County is home to the largest data center market in the world. And we have had an opportunity to work with our data center customers for 15 or more years. So, with those relationships, we're certainly looking into alternative rate designs and discussing potential structures with them. Obviously, anything that we would do there would need to be approved by the FCC.
Bob: We've worked with data centers for many years and we have very strong relationships with them as you know.
Robert M. Blue: Loudoun County is home to the largest data center market in the World and we've had we have had an opportunity to work with our data center customers for 15 or more years.
Robert M. Blue: So with those relationships, we're certainly looking into alternative rate designs.
Robert M. Blue: In discussing potential structures with them, obviously anything that we would do there would need to be approved by the FCC. So nothing specific to offer but we certainly continue conversations with these customers that we've worked with so well for so long.
Robert M. Blue: So, nothing specific to offer, but we certainly continue conversations with these customers that we've worked with so well for so long. As to behind-the-meter solutions or some sort of self-supply, I suppose there could be some specific situations where that might make sense for some customers. But, given their need for reliability and affordability, we think the majority of those solutions are going to want to access the broader network of system resources that are in front of the meter.
Robert M. Blue: As the behind the meter solutions or some sort of self supply I suppose there could be some specific situations where that might make sense for some customers, but we think.
Robert M. Blue: Given their need for reliability and affordability, we think the majority of those solutions are going to want to access.
Robert M. Blue: The broader network of system resources that are in front of the meter and I think it's really important to keep in mind, regardless of the source of generation.
Robert M. Blue: And I think it's really important to keep in mind, regardless of the source of generation, substantial transmission investment, which we've noted before. So fundamentally, given our long history with data center customers, we're quite confident in our ability to find solutions that work for them, for other customers, and for our shareholders.
Robert M. Blue: Substantial transmission investment, which we've noted before so you know fundamentally given our long history with data center customers are we're quite confident in our ability to find solutions that work for them for other customers and for our shareholders.
Robert M. Blue: Got it. Perfect. And then maybe just touch on resource adequacy for a second and your plans as it relates to the upcoming capacity auction. Are you electing the FRR, which is due by the 17th of this month? And more importantly, just elaborate a bit more on the IRP update and incremental generation spent. Could this kind of be accreted to the plan? Thanks, guys.
Robert M. Blue: Got it perfect and then maybe just touch on resource adequacy for a second and kind of your plans as it relates to the upcoming capacity auction are you electing the F. R. R, which is due by the 17th of this month and more importantly, just elaborate a bit more on the IRB update and incremental generation spend.
Robert M. Blue: Could this be accretive to the Atlanta, thanks, guys.
Robert M. Blue: Yeah, again, I'll take the second part first. So, as to potential incremental capital, as we said in our prepared remarks. Toward the end of the plan, we could certainly see some additional capacity. We described the way data centers are ramping up faster than they have before, and their requests are bigger than they've been before. But we don't forecast demand based on engineering assessments.
Speaker Change: Yeah again I'll take the second part first so as to a potential incremental.
Robert M. Blue: Our capital as we said in our prepared remarks.
Robert M. Blue: Toward the end of the plan, we could certainly see some additional capacity we described the way.
Robert M. Blue: Data centers are ramping and faster than they have before that their requests are bigger than they've been before.
Robert M. Blue: We don't forecast demand based on engineering assessments, we do that based on signed contracts.
Robert M. Blue: We do that based on signed contracts, and then in later years, customer intelligence. We're pretty confident in our ability to do that. So, there may be potentially some upside there as we go out. As I said in our prepared remarks, our investments are going to be driven by policy and customer needs. We'll be very thoughtful about our balance sheet and our business risk profile as we make additional investment decisions.
Robert M. Blue: And then in the later years customer intelligence, we're pretty confident in our ability to do that so there may be potentially some upside there as we go out.
Robert M. Blue: As I said in our prepared remarks, our investments are going to be driven by policy and customer needs will be very thoughtful about our balance sheet and our business risk profile as we make additional investments.
Robert M. Blue: Investment decisions fundamental fundamentally it's just a very exciting time for the industry, particularly for us given our experience with data centers.
Robert M. Blue: Fundamentally, it's just a very exciting time for the industry, particularly for us given our experience with data centers. As for PJM, as I expect you know, Shahriar, from 2007 to 2022, we participated in the PJM capacity market through the reliability pricing model. In 2021, we announced we were going to elect FRR because that made the most sense for our customers. Now, with PJM's most recent capacity market reforms and assumptions, it makes sense for us to return to the capacity auction starting with the 2025-2026 auction.
Robert M. Blue: As to PJM.
Robert M. Blue: I expect you know Shar from 2007 to 2022, we participated in the PJM capacity market through the reliability pricing model 2021, we announced we were going to elect fr because that made the most sense for our customers now.
Robert M. Blue: Now with Pjm's, most recent capacity market reforms and assumptions it makes sense for us to return to the capacity auction starting with the 'twenty five 'twenty six auction returns us to the way we did business for many years. It doesn't change guidance doesn't change the way we operate our system or the way we think about.
Robert M. Blue: Returns us to the way we did business for many years, doesn't change guidance, doesn't change the way we operate our system or the way we think about the world. In fact, all the auction planning parameters released by PJM in April are quite consistent with our view. We're going to see substantial load growth driven by electrification data centers for the foreseeable future.
Robert M. Blue: The World in fact, all the auction planning parameters released by PJM in April are quite consistent with our view, we're going to see substantial load growth driven by electrification data centers for the foreseeable future.
Robert M. Blue: Yeah.
Shahriar Pourreza: Got it. Thank you very much. It was super helpful. Congratulations on the result.
Speaker Change: Got it. Thank you very much super helpful. Congrats on the results guys.
Speaker Change: Thanks Shar.
Operator: We will take our next question from the line of Nick Campanella at Barclays.
Shahriar Pourreza: We will take our next question from the line of Nick Campanella at Barclays.
Nicholas Joseph Campanella: Hey, good morning, everyone. Thanks for taking my questions. Morning, Nick. Good morning. Hey, I wanted to ask about South Carolina. I think, you know, HB 5118 has been kind of progressing through, and it's our understanding that it can maybe kind of change, you know, a few things about the regulatory footprint there. Can you just kind of talk through if that affects your capital plans or your assumptions at all and how we should kind of think about that?
Nicholas Joseph Campanella: Hey, good morning, everyone. Thanks for taking my questions.
Nick: Good morning.
Nicholas Joseph Campanella: Good morning, Hey, I wanted to ask on.
Nicholas Joseph Campanella: On South Carolina, I think HP <unk>.
Nicholas Joseph Campanella: <unk> hundred eighteens and kind of progressing through and it's our understanding that could maybe kind of change a few things.
Nicholas Joseph Campanella: On the regulatory footprint. There can you just kind of talk through if that affects your capital plans are your assumptions at all and how we should kind of think about that.
Robert M. Blue: Yeah, Nick, I appreciate that question. You know, the legislature is scheduled to adjourn next week, in keeping with our standard practice. I'm not going to talk about pending legislation today. We'll know where everything lands next week. I can tell you what we're very focused on in South Carolina. First, the constructive outcome in our electric base rate case that's pending right now. As we mentioned in our opening remarks, we've invested $1.6 billion on behalf of our customers since the last case. And our rates in South Carolina are low. Our reliability is outstanding.
Nicholas Joseph Campanella: Yeah. Nick appreciate that question the legislature scheduled to adjourn next week.
Robert M. Blue: In keeping with our standard practice I'm not going to talk about pending legislation today, we'll know where everything lands next week and I can tell you what we're very focused on in South Carolina first a constructive outcome.
Robert M. Blue: In our electric base rate case, Thats pending right now as we mentioned in our opening remarks, we've invested $1 6 billion on behalf of our customers since the last case our rates in South Carolina, our LOE. Our reliability is outstanding. So we think we're in a very good place with respect to that case and then beyond.
Robert M. Blue: So we think we're in a very good place with respect to that case. And then, beyond that, we're very focused on continuing to serve our customers well and getting closer to earning our authorized return in South Carolina. If you just sort of look at the big picture, South Carolina is a great state to do business. We want to be in a position to continue to invest in growth capital as the state grows. So that's what we're focused on, and we'll see how the legislature lands here in a week or so.
Robert M. Blue: And that we're very focused on continuing to serve our customers well.
Robert M. Blue: And getting closer to earning our authorized return in South Carolina.
Robert M. Blue: Just sort of look Big picture South Carolina is a great state to do business, we want to be in a position to continue to invest in growth capital as the state grows. So that's what we're focused on and we'll see how the legislature lands.
Robert M. Blue: Ear in a week or so.
Nicholas Joseph Campanella: Hey, I appreciate that. And then I guess just on the ship, D's ship, to be certain, you kind of talked about de-risking the project timeline, and you seem ahead of schedule. Is that versus the ISD, the 24 to early 25, or is that more relative to where it falls in your kind of current offshore wind construction schedule? Maybe you can kind of remind us what's in the plan today for future contracting opportunities for that ship after you're done with Virginia offshore wind.
Speaker Change: Hey, I appreciate that.
Nicholas Joseph Campanella: And then I guess just on the on.
Nicholas Joseph Campanella: On the ship these deal shifted into the to be certain you kind of talked about Derisking. The project timeline and you've seen that ahead of schedule is that is that versus the.
Nicholas Joseph Campanella: The I S D.
Nicholas Joseph Campanella: <unk> 24 to early 'twenty, five or is that more relative to where.
Nicholas Joseph Campanella: It falls in your kind of current offshore wind construction schedule and then maybe you can kind of remind us what's in the plan today for future contracting opportunities for that ship after you're done with Virginia offshore wind.
Robert M. Blue: Hey, Nick. I'll take the second part first with regard to what we've assumed. So, we've made some assumptions about the ability to contract the vessel to third parties at the conclusion of the work it does for CVAL, and we continue to see robust interest in that vessel given the unique nature of what it provides. So, we feel like we've made reasonably conservative, not unduly conservative assumptions about that, and that's included in the guidance that we provided with regard to the Dominion Energy contracted energy segment and the investor day materials.
Speaker Change: Hey, Nick I'll take the second part first with regard to what we've assumed so we've made some assumptions of of the ability to contract the vessel to third parties at the conclusion of the work it does for <unk>.
Robert M. Blue: And we continue to see robust interest in that and that vessel given sort of the unique nature of what it provides so are.
Robert M. Blue: We feel like we've made reasonable.
Robert M. Blue: Reasonably conservative not unduly conservative assumptions on that and that's included in the guidance that we provided with regard to the Dominion energy contracted.
Robert M. Blue: Energy segment, and the Investor day materials.
Robert M. Blue: With regard to the timeline and sort of what it all means, there is no change to the expectation that the vessel will complete its sea trials in late 2024 or early 2025. And with the termination of the charter that we discussed in the call, that doesn't change. What it does is it allows us to make sure that we can stay on track of that schedule. It gives us opportunities to begin installation when the weather is most favorable.
Robert M. Blue: With regard to the timeline and sort of what it all means no no change to the expectation that the vessel will complete its sea trials in late 'twenty for early 2025.
Robert M. Blue: And with the termination of the charter that we discussed in the call.
Robert M. Blue: That doesn't change the broader expectation for timeline for the project.
Robert M. Blue: What it does is it allows us to.
Robert M. Blue: Make sure that we can stay on track of that schedule. It gives us opportunities to begin installation when weather is most favorable.
Robert M. Blue: And it'll allow us without that first charter, we wont need the time to reconfigure the vessels outfitting between charters to accommodate our projects turbine size.
Robert M. Blue: It'll allow us, without that first charter, we won't need the time to reconfigure the vessels' outfitting between charters to accommodate our project's turbine size. So think about the vessel availability as on track, consistent with how we've thought. To the extent we're able to bring it forward, that's great for the vessel, and for the project, but I wouldn't think of it as bringing the back end of the project It's just another way that we can mitigate what will be, I'm sure, things that happen along the way that we don't currently foresee, but we want to build as much cushion as we possibly can, and that's what this will accomplish for us. All right, all very well
Robert M. Blue: Think about the vessel availability is on track consistent with how we've thought about it in the past.
Robert M. Blue: To the extent, we're able to bring it forward that's great to the vessel to the project, but I wouldn't think of it as bringing that back into the project in its just another way that we can mitigate what will be I'm sure things that happen along the way that we don't currently foresee, but we want to build as much cushion as we possibly can and that's what this will accomplish for us.
Nicholas Joseph Campanella: All right, all very clear. Thanks for your time.
Speaker Change: Alright, I'll very clear thanks for the time.
Speaker Change: Thanks, Nick.
Operator: Steve Fleishman with Wolf Research. Please pose your question.
Nicholas Joseph Campanella: Steve Fleishman with Wolfe research. Please pose your question.
Steven Isaac Fleishman: Yeah, thank you. Good morning. Just one quick, hey, just one quick... Question, do you have a number for kind of where you stand on the ATM for this year as of now? All right, I'm going to share it with your bishop. Yeah, we do.
Speaker Change: Yes. Thank you good morning.
Steven Isaac Fleishman: It's just just one quick hey, just one quick.
Steven Isaac Fleishman: Question do you ever.
Steven Isaac Fleishman: <unk> for kind of where you stand on the ATM.
Steven Isaac Fleishman: For this year as of now.
Steven Isaac Fleishman: How many shares you issued.
Steven D. Ridge: Yeah, we haven't issued any shares of the ATM yet, Steve. And that's a function of during the business review, our ATM shelf registration expired, and so we actually didn't have the registration statement available to us. So we will be implementing that here very, very shortly, and that will allow us to begin that program.
Speaker Change: Yeah, we haven't we haven't issued any shares of the ATM, yet, Steve and and that's a function of during the business review, our ATM shelf registration expired in men.
Steven D. Ridge: So we actually didn't have the registration statement available to us. So we will be implementing that are here very very shortly and then that will allow us to begin that program.
Steve: Okay, Great and then just going back to the kind of tie in with the data center in ERP and the like.
Steven Isaac Fleishman: Great. And then just going back to the kind of tie-in with the data center and IRP and the like. Bob, you mentioned, you know, dispatchable generation and then potentially gas storage. Could you just give me a little? It sounds like maybe you've got like a winter. Tightness that maybe we need to deal with and just would you be investing in the storage and yeah, just how we should think about those. Yeah, just to be clear, we're looking
Steven Isaac Fleishman: The pop you mentioned.
Steven Isaac Fleishman: Dispatcher ball.
Steven Isaac Fleishman: Ration and then potentially gas storage could you just.
Steven Isaac Fleishman: Give a little it sounds like maybe you've got like a winter.
Steven Isaac Fleishman: Tightness that maybe need to deal with it just would you be investing in the storage or.
Steven Isaac Fleishman: Yes, just how we should think about those needs yeah, just just to be clear, we're looking potentially at.
Steven Isaac Fleishman: Okay, great. I will leave it there. Thank you.
Robert M. Blue: Yeah, just to be clear, we're looking potentially at, you know, we got a couple big combined cycle plants, not too far away from each other, being able to have some gas LNG storage that is available to those two. That's the kind of thing that we're talking about. You know, more broadly, as we've discussed, we're building a lot of renewable energy, which all of our customers are looking for, but we need to make sure that we can operate the system reliably. That's why we've been talking about that storage I just described, as well as some combustion turbines at our Chesterfield site.
Robert M. Blue: We've got a couple of big combined cycle plants are not too far away from each other being able to have some.
Robert M. Blue: Gas LNG storage.
Robert M. Blue: That is available to those two that's.
Robert M. Blue: That's the kind of thing that we're talking about.
Robert M. Blue: You know more broadly as.
Robert M. Blue: As we've discussed.
Robert M. Blue: We're building a lot of renewables.
Robert M. Blue: Which all of our customers are looking for but we need to make sure that we can operate the system reliably.
Robert M. Blue: That's why we've been talking about that as storage I, just described as well as.
Robert M. Blue: Some combustion turbines.
Robert M. Blue: At our Chesterfield site.
Robert M. Blue: Okay.
Speaker Change: Okay, Great I will leave it there thank you.
Speaker Change: Thanks, Steve.
Operator: Our next question this morning will come from Jeremy Tonet at J.P. Morgan. I hope I said your name correctly, sir. Your line is open.
Robert M. Blue: Our next question. This morning will come from Jeremy Tonet at J P. Morgan I Hope I said your name correctly, Sir your line is open.
Jeremy Bryan Tonet: Hi, thanks, it's Jeremy Tonet.
Operator: Hi, Thanks, it's Jeremy Tonet from JP Morgan.
Unknown Executive: Good morning, Jeremy. Hey, Jeremy. You've got competition on this call, Jeremy.
Jeremy Bryan Tonet: Good morning, Jeremy Hey, Jeremy.
Jeremy Bryan Tonet: You've got competition on this call Jeremy.
Jeremy Bryan Tonet: [laughter], Yeah, I guess, so that's right.
Jeremy Bryan Tonet: I guess so, that's right. But, you know, continuing on the data center line of thought, if I could, and I appreciate that this is a sensitive topic overall, but any thoughts that you could provide with regard to the uncontracted millstone capacity that could possibly supply power to data centers, and how have conversations with stakeholders evolved there?
Unknown Executive: But.
Jeremy Bryan Tonet: <unk> I guess with the datacenter line of thought if I could and I. Appreciate that this is a sensitive topic overall, but just any thoughts that you can provide with regards to the uncontrolled millstone capacity.
Jeremy Bryan Tonet: And that could possibly supply power to data centers and how have conversations with stakeholders evolve there.
Diane G. Leopold: Hi Jeremy, this is Diane. There is really nothing new to report from what we said before. In February 23, we signed an MOU with NE Edge to work together on the development of a data center on Millstone property, and they are continuing to work with state agencies and legislators to gain approvals to move that project forward. If the permits are granted, then we remain ready to support the project, and that would include providing land and a long-term PPA for power from a portion of Millstone, which would be about a few hundred megawatts. Jeremy Ivers
Jeremy Bryan Tonet: Hi, Jeremy This is Diane really nothing new to report from what we said before in February of 'twenty three.
Diane G. Leopold: We signed an Mou with <unk> edge.
Diane G. Leopold: Work together on development of a data center on Millstone property.
Diane G. Leopold: And they are continuing to work with the state agencies and legislators to gain approvals to move that project forward.
Diane G. Leopold: The permits are granted then we remain ready to support the project and that would include providing land and a long term PPA for power from a portion of milestone which will be about a few hundred megawatts.
Robert M. Blue: And Jeremy, I would just note, and I think we disclosed this earlier, we've not made any assumptions in our financial plan associated with the co-located data center at the Millstone Power Facility.
Speaker Change: And Jeremy I would just note.
Robert M. Blue: And I think we disclosed this earlier, we've not made any assumptions in our financial plan associated with it.
Robert M. Blue: Co located data center.
Robert M. Blue: At the Millstone power facility so.
Jeremy: Got it that's very helpful and continuing with this line of thought if I could I believe there is legislation passed in Virginia two.
Jeremy Bryan Tonet: Got it. That's very helpful. And continuing with this line of thought, if I could, I believe there's legislation passed in Virginia to possibly recover some costs of SMR development in the state. And just given how Nucor provides the 24-7, you know, baseload, that seems to match up well with data center needs. Just wondering any thoughts you see there on the potential over time. We see Ontario Power, you know, really moving forward swiftly on SMR development. And I was just wondering any high-level thoughts you might be able to share there.
Jeremy Bryan Tonet: Possibly recover some costs of <unk> development in the state and just given how nucor provides the $24 seven baseload that seems to match up well with data center needs.
Jeremy Bryan Tonet: Just wondering any thoughts you see there on the potential over time.
Jeremy Bryan Tonet: C, Ontario power.
Jeremy Bryan Tonet: Really moving forward swiftly on FMR development, and just wondering any high level thoughts you might be able to share there.
Robert M. Blue: Yeah, Jeremy, first, I think that legislation confirms a continued commitment in Virginia among policymakers in support of nuclear power. You know, we operate four units in Virginia and have done so well for many years. The Navy has a substantial nuclear fleet; many of those vessels are ported in Virginia. And there are other parts of the nuclear industry that are all represented in Virginia. So I think it was a very positive sign that legislation passed that continues to support nuclear power in Virginia.
Speaker Change: Yes, Jeremy first I think that legislation that confirms a continued commitment in Virginia among policymakers.
Robert M. Blue: In support of nuclear power.
Robert M. Blue: We operate a four units in Virginia and have well for many years.
Robert M. Blue: The Navy.
Robert M. Blue: <unk> has a substantial nuclear fleet.
Robert M. Blue: Many of those vessels.
Robert M. Blue: Vessels ported in Virginia.
Robert M. Blue: And there are other <unk>.
Robert M. Blue: Parts of the nuclear industry that are all represented in Virginia. So I think it was a very positive sign.
Robert M. Blue: That legislation passed that continues to support nuclear power in Virginia. We included <unk> in our last IRB out towards the end of the plan. We continue to investigate the opportunity to be able to deploy <unk> on behalf of our <unk>.
Robert M. Blue: You know, we included SMRs in our last IRP out toward the end of the plan. We continue to investigate the opportunity to be able to deploy SMRs on behalf of our customers. But I would add, just like with every other investment that we think about, we need to make sure that it's customer-friendly, that it fits within the parameters of our balance sheet and our business risk profile. So we're continuing to explore SMRs. As you point out, they are dispatchable and non-emitting, but we've got a ways to go yet.
Robert M. Blue: Customers, but I would add just like with every other investment that we think about we need to make sure that it's customer friendly.
Robert M. Blue: That it fits within the parameters of our balance sheet and our business risk profile. So we're continuing to explore <unk> as you point out are they.
Robert M. Blue: They are dispatch will in non emitting.
Robert M. Blue: We've got a ways to go yet.
Jeremy Bryan Tonet: That makes sense. Thank you for that.
Speaker Change: That makes sense. Thank you for that.
Operator: And next, we will also hear from Bill Apicelli at UBS.
Jeremy Bryan Tonet: And next we will also hear from Bill <unk> at UBS.
William Appicelli: Yeah, hi, good morning. I have most of my questions answered, but on the data center, just a couple of comments that you made there. You commented that the ramp times have been accelerating. Can you maybe just describe how that's playing out? Like, for example, the 15 that you're connecting this year, when would you expect them to be at full run rate?
William Appicelli: Yes, hi, good morning.
Bill: Bill questions Dan.
Speaker Change: Hi, most of my questions have been answered, but just piling on the data center just a couple of comments that you made there.
William Appicelli: Commented the ramp times have been accelerating can you maybe just.
William Appicelli: Can you describe how that how that's playing out like for example, the 15 that youre connecting this year when would you expect them to be at full run rate.
Robert M. Blue: Yeah, Bill, I don't think we know specifically how quickly they're going to be at full run rate. It really is just a matter of the amount of time that some of them that we've seen in the past would take to ramp fully into the capacity they asked for. They're expecting to ramp up quite a bit faster, but we don't have specifics regarding those 15 that we expect to connect this year.
Speaker Change: Yeah, Bill I don't think we know specifically on those 15, how quickly theyre going to be at full run rate.
Robert M. Blue: It really is just a matter of.
Robert M. Blue: The amount of time that some of them that we've seen in the past would take to ramp fully into the capacity they asked for.
Robert M. Blue: We're expecting to ramp and quite a bit faster, but we don't have specifics regarding those 15 that we expect to connect this year.
William Appicelli: Okay, I mean, is there a historical precedent for how long it took for prior data centers?
Robert M. Blue: Okay, I mean is there.
Speaker Change: I guess historical precedent of how long it's taken on prior data centers.
Diane G. Leopold: So this is Diane Leopold again. Typically, when they had capacity, they might ramp up that capacity over like a four to five year period. And now that same capacity that we're interconnecting could be closer to a two to three year period.
William Appicelli: So this is Diane Leopold again, so typically.
William Appicelli: Okay, that's helpful. Thank you.
William Appicelli: They had capacity they might ramp into that capacity over like a four to five year type of period and now that same capacity.
William Appicelli: We're interconnecting can be closer to two to three year period.
William Appicelli: And then I guess it's more broadly on the same topic. Can you just share a little bit about the process of evaluation with the data center developers and how you, you know, structure the contracts and their commitments in terms of, you know, having the load show up. And so that, you know, you're structuring the cost profile appropriately to, you know, protect repairs.
William Appicelli: Okay. That's helpful. Thank you.
William Appicelli: And then I guess just more broadly again on the same topic can you just share a little bit about the process of.
William Appicelli: Evaluation with the data center.
William Appicelli: Developers and how you.
William Appicelli: The structure of the contracts and their commitments in terms of.
William Appicelli: Having to load show up and so that youre structuring the cost profile appropriately.
William Appicelli: To protect.
William Appicelli: Great players.
Robert M. Blue: Yeah, Bill, great question. They are data centers on the rate schedule that applies to all our large customers. And that's been that way for some time. And the State Corporation Commission would have to make any changes if we were talking about approving any changes if we're talking about any changes to that which are not on the table at the moment, sort of thinking about the way we structure contracts. They have contract minimum demands that they are obligated to achieve in order to cover the incremental cost of the infrastructure that we're building for them. And that has been in place for us for some time.
Speaker Change: Yeah Bill Great question.
Robert M. Blue: They are data centers are on.
Robert M. Blue: The right schedule.
Robert M. Blue: That applies to all of our large customers.
Robert M. Blue: And that's been that way for some time.
Robert M. Blue: And the State Corporation Commission.
Robert M. Blue: Would have to make any changes if we were talking about approve any changes if we're talking about any changes to that which.
Robert M. Blue: Not on the table at the moment.
Robert M. Blue: The.
Robert M. Blue: Sort of thinking about the way we structure contracts they have contract minimum demands that.
Robert M. Blue: There they are obligated to achieve in order to cover the.
Robert M. Blue: Incremental cost of the infrastructure that we're building for them and that has been in place for us for some time.
William Appicelli: Okay, great. Thanks very much.
Speaker Change: Okay, great. Thanks very much.
Operator: Ladies and gentlemen, this does conclude this morning's conference call. You may disconnect your lines, and we hope that you enjoy the rest of your day.
Speaker Change: Ladies and gentlemen, thank you. This does conclude this morning's conference call. You may disconnect your lines and we hope that you enjoy the rest of your day.
unknown: ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ??
unknown: Okay.
unknown: Hum.
unknown: Hum.
unknown: Okay.
unknown: [music].
unknown: Okay.
unknown: [music].
unknown: Uh-huh.
unknown: [music].
unknown:
unknown: Hum.
unknown: Mhm.
unknown: Okay.
unknown: Okay.
unknown: [music].
unknown: Hum.
unknown: Hmm.
unknown: [music].
unknown: Yeah.
unknown: Yeah.
unknown: Yes.
unknown: Yeah.
unknown: Okay.