Q4 2025 AXT Inc Earnings Call
Speaker #1: Good afternoon, everyone, and welcome to AXT fourth quarter 2025 financial conference call. Leading the call today is Dr. Morris Young, Chief Executive Officer, and Gary Fischer, Chief Financial Officer.
Operator: Good afternoon, everyone, and welcome to AXT's Q4 2025 Financial Conference Call. Leading the call today is Dr. Morris Young, Chief Executive Officer, and Gary Fischer, Chief Financial Officer. In addition, Tim Bettles, VP of Business Development, will be participating in the Q&A portions of the call. My name is Audra, and I will be your coordinator today. I would now like to turn the call over to Leslie Green, Investor Relations for AXT. Please go ahead.
Speaker #1: In addition , Tim Bettles , VP of business Development , will be participating in the Q&A portions of the call My name is Audra , and I will be your coordinator today .
Speaker #1: I would now like to turn the call over to Leslie Green, Investor Relations for AXT. Please go ahead.
Speaker #2: Thank you , Audra , and good afternoon , everyone . Before we begin , I would like to remind you that during the course of this conference call , including comments made in response to your questions , we will provide projections or make other forward looking statements regarding , among other things , the future financial performance of the company .
Leslie Green: Thank you, Audra, and good afternoon, everyone. Before we begin, I would like to remind you that during the course of this conference call, including comments made in response to your questions, we will provide projections or make other forward-looking statements regarding, among other things, the future financial performance of the company, market conditions and trends, emerging applications using chips or devices fabricated on our substrates, our product mix, global economic and political conditions, including trade tariffs and import and export restrictions, ability to obtain China export permits, timing of receipt of export permits, our plan to list our subsidiary, Tongmei, in China, our ability to increase orders in succeeding quarters, to control costs and expenses, to improve manufacturing yields and efficiencies, or to utilize our manufacturing capacity. We wish to caution you that such statements deal with future events....
Leslie Green: Thank you, Audra, and good afternoon, everyone. Before we begin, I would like to remind you that during the course of this conference call, including comments made in response to your questions, we will provide projections or make other forward-looking statements regarding, among other things, the future financial performance of the company, market conditions and trends, emerging applications using chips or devices fabricated on our substrates, our product mix, global economic and political conditions, including trade tariffs and import and export restrictions, ability to obtain China export permits, timing of receipt of export permits, our plan to list our subsidiary, Tongmei, in China, our ability to increase orders in succeeding quarters, to control costs and expenses, to improve manufacturing yields and efficiencies, or to utilize our manufacturing capacity. We wish to caution you that such statements deal with future events....
Speaker #2: Market conditions and trends , emerging applications using chips or devices fabricated on our substrates , our product mix , global economic and political conditions , including trade tariffs and import and export restrictions .
Speaker #2: Ability to obtain China export permits . Timing of receipt of export permits . Our plan to list our subsidiary Tong May in China , our ability to increase orders and succeeding quarters to control costs and expenses to .
Speaker #2: Improve manufacturing yields and efficiencies, or to utilize our manufacturing capacity. We wish to caution you that such statements deal with future events, are based on management's current expectations, and are subject to risks and uncertainties that could cause actual results or events to differ materially.
Leslie Green: are based on management's current expectations and are subject to risks and uncertainties that could cause actual results or events to differ materially. In addition to the matters just listed, these uncertainties and risks include, but are not limited to, the financial performance of our partially owned supply chain companies and increased environmental regulations in China. In addition to the factors just mentioned or that may be discussed in this call, we refer you to the company's periodic reports filed with the Securities and Exchange Commission. These are available online by link from our website and contain additional information on risk factors that could cause actual results to differ materially from our current expectations. This conference call will be available on our website through 19 February 2027.
Leslie Green: are based on management's current expectations and are subject to risks and uncertainties that could cause actual results or events to differ materially. In addition to the matters just listed, these uncertainties and risks include, but are not limited to, the financial performance of our partially owned supply chain companies and increased environmental regulations in China. In addition to the factors just mentioned or that may be discussed in this call, we refer you to the company's periodic reports filed with the Securities and Exchange Commission. These are available online by link from our website and contain additional information on risk factors that could cause actual results to differ materially from our current expectations. This conference call will be available on our website through 19 February 2027.
Speaker #2: In addition to the matters just listed , these uncertainties and risks include , but are not limited to , the financial performance of our partially owned supply chain companies and increased environmental regulations in China In addition to the factors just mentioned .
Speaker #2: Or that may be discussed in this call, we refer you to the company's periodic reports filed with the Securities and Exchange Commission.
Speaker #2: These are available online by link from our website and contain additional information on risk factors that could cause actual results to differ materially from our current expectations .
Speaker #2: This conference call will be available on our website through February 19th , 2027 . Also , I want to note that shortly following the close of market today , we issued a press release reporting financial results for the fourth quarter of 2025 .
Leslie Green: Also, I want to note that shortly following the close of market today, we issued a press release reporting financial results for Q4 2025. This information is available on the investor relations portion of our website. I would now like to turn the call over to Gary Fischer for a review of our Q4 results. Gary?
Leslie Green: Also, I want to note that shortly following the close of market today, we issued a press release reporting financial results for Q4 2025. This information is available on the investor relations portion of our website. I would now like to turn the call over to Gary Fischer for a review of our Q4 results. Gary?
Speaker #2: This information is available on the Investor Relations portion of our website. I would now like to turn the call over to Gary Fischer for a review of our fourth quarter results.
Speaker #2: Gary
Speaker #3: Thank you, Leslie, and good afternoon to everyone. Revenue for the fourth quarter of 2025 was $23.0 million, compared with $28.0 million in the third quarter of 2025.
Gary Fischer: Thank you, Leslie, and good afternoon to everyone. Revenue for the fourth quarter of 2025 was $23.0 million, compared with $28.0 million in the third quarter of 2025, and $25.1 million in the fourth quarter of 2024. To break down our Q4 '25 revenue for you by product category, indium phosphide was $8.0 million, primarily from data center applications. Gallium arsenide was $7.0 million. Germanium substrates were $231,000. Finally, revenue from our consolidated raw material joint venture companies in Q4 was $7.6 million. In the fourth quarter of 2025, revenue from Asia Pacific was 81.5%, Europe was 17.5%, and North America was 1%.
Gary Fischer: Thank you, Leslie, and good afternoon to everyone. Revenue for the Q4 of 2025 was $23.0 million, compared with $28.0 million in the Q3 of 2025, and $25.1 million in the Q4 of 2024. To break down our Q4 '25 revenue for you by product category, indium phosphide was $8.0 million, primarily from data center applications. Gallium arsenide was $7.0 million. Germanium substrates were $231,000. Finally, revenue from our consolidated raw material joint venture companies in Q4 was $7.6 million. In the Q4 of 2025, revenue from Asia Pacific was 81.5%, Europe was 17.5%, and North America was 1%.
Speaker #3: And 25.1 million in the fourth quarter of 2020 . For . To break down our Q4 25 revenue for you by product category , indium phosphide was 8.0 million , primarily from data center applications Gallium arsenide was 7.0 million .
Speaker #3: Germanium substrates were 231,000 . Finally , revenue from our consolidated raw material joint venture companies in Q4 was 7.6 million . In the fourth quarter of 2025 , revenue from Asia Pacific was 81.5% .
Speaker #3: Europe was 17.5% , and North America was 1% . The top five customers generated approximately 22.6% of total revenue , and no customers were over the 10% level .
Gary Fischer: The top five customers generated approximately 22.6% of total revenue, and no customers were over the 10% level. Non-GAAP gross margin in the fourth quarter was 21.5%. For comparison, we reported 22.6% gross margin in Q3 of 2025 and 18.0% gross margin in Q4 of last year. For those who prefer to track results on a GAAP basis, gross margin in the fourth quarter was 22.09%, compared with 22.3% in Q3 of 2025 and 17.6% in Q4 of 2024. We continue to be highly focused on driving continued improvement, including further recovery in Q1. Moving to operating expenses, our total non-GAAP operating expense in Q4 was $7.8 million, compared with $6.5 million in Q3 of 2025.
Gary Fischer: The top five customers generated approximately 22.6% of total revenue, and no customers were over the 10% level. Non-GAAP gross margin in the Q4 was 21.5%. For comparison, we reported 22.6% gross margin in Q3 of 2025 and 18.0% gross margin in Q4 of last year. For those who prefer to track results on a GAAP basis, gross margin in the Q4 was 22.09%, compared with 22.3% in Q3 of 2025 and 17.6% in Q4 of 2024. We continue to be highly focused on driving continued improvement, including further recovery in Q1. Moving to operating expenses, our total non-GAAP operating expense in Q4 was $7.8 million, compared with $6.5 million in Q3 of 2025.
Speaker #3: Non-GAAP gross margin in the fourth quarter was 21.5%. For comparison, we reported a 22.6% gross margin in Q3 of 2025 and an 18.0% gross margin in Q4 of last year. For those who prefer to track results on a GAAP basis, gross margin in the fourth quarter was 22.9%, compared with 22.3% in Q3 of 2025 and 17.6% in Q4 of 2024.
Speaker #3: For . We continue to be highly focused on driving continued improvement , including further recovery in Q1 , moving to operating expenses . Our total non-GAAP operating expense in Q4 was 7.8 million , compared with 6.5 million in Q3 of 2025 .
Speaker #3: As a reminder , Q3 included some favorable adjustments in R&D that brought our OpEx down to a lower than normal level . non-GAAP opex in Q4 of 24 was 9.8 million .
Gary Fischer: As a reminder, Q3 included some favorable adjustments in R&D that brought our OpEx down to a lower than normal level. Non-GAAP OpEx in Q4 of 2024 was $9.8 million. On a GAAP basis, total operating expense in Q4 2025 was $8.8 million, compared with $7.3 million in Q3 and $10.6 million in Q4 of 2024. Our non-GAAP operating loss in the fourth quarter of 2025 was $2.6 million, compared with a non-GAAP operating loss in Q3 of 2025 of $384,000, and a non-GAAP operating loss of $5.4 million in Q4 of 2024.
Gary Fischer: As a reminder, Q3 included some favorable adjustments in R&D that brought our OpEx down to a lower than normal level. Non-GAAP OpEx in Q4 of 2024 was $9.8 million. On a GAAP basis, total operating expense in Q4 2025 was $8.8 million, compared with $7.3 million in Q3 and $10.6 million in Q4 of 2024. Our non-GAAP operating loss in the Q4 of 2025 was $2.6 million, compared with a non-GAAP operating loss in Q3 of 2025 of $384,000, and a non-GAAP operating loss of $5.4 million in Q4 of 2024.
Speaker #3: On a GAAP basis, total operating expense in Q4 '25 was $8.8 million, compared with $7.3 million in Q3 and $10.6 million in Q4 of 2020.
Speaker #3: Our non-GAAP operating loss in the fourth quarter of 2025 was $2.6 million, compared with non-GAAP operating loss in Q3 of 2025.
Speaker #3: Of 384,000 and a non-GAAP operating loss of 5.4 million in Q4 of 2024 . For reference , our GAAP operating line for the fourth quarter of 2025 was a loss of 3.8 million compared with an operating loss of 1.1 million in Q3 of 2025 .
Gary Fischer: For reference, our GAAP operating line for Q4 of 2025 was a loss of $3.8 million, compared with an operating loss of $1.1 million in Q3 of 2025, and an operating loss of $6.2 million in Q4 of 2024. Non-operating other income and expense and other items below the operating line for Q4 of 2025 was a net gain of $285 thousand. The details can be seen in the P&L included in our press release today. For Q4 of 2025, we had a non-GAAP net loss of $2.6 million, or $0.06 per share, compared with a non-GAAP net loss of $1.2 million, or $0.02 per share, in Q3 of 2025.
Gary Fischer: For reference, our GAAP operating line for Q4 of 2025 was a loss of $3.8 million, compared with an operating loss of $1.1 million in Q3 of 2025, and an operating loss of $6.2 million in Q4 of 2024. Non-operating other income and expense and other items below the operating line for Q4 of 2025 was a net gain of $285 thousand. The details can be seen in the P&L included in our press release today. For Q4 of 2025, we had a non-GAAP net loss of $2.6 million, or $0.06 per share, compared with a non-GAAP net loss of $1.2 million, or $0.02 per share, in Q3 of 2025.
Speaker #3: And an operating loss of $6.2 million in Q4 of 2024. Non-operating other income and expense and other items below the operating line for the fourth quarter of 2025 was a net gain of $285,000.
Speaker #3: The details can be seen in the PNL , included in our press release today for Q4 of 2025 , we had a non-GAAP net loss of 2.6 million , or $0.06 per share , compared with a non-GAAP net loss of 1.2 million , or $0.02 per share , in the third quarter of 2025 .
Speaker #3: non-GAAP net loss in Q4 2024 was 4.2 million , or $0.10 per share , on a GAAP basis , net loss in Q4 was 3.6 million , or $0.08 per share , by comparison , net loss was 1.9 million , or $0.04 per share , in the third quarter of 2025 .
Gary Fischer: Non-GAAP net loss in Q4 of 2024 was $4.2 million, or $0.10 per share. On a GAAP basis, net loss in Q4 was $3.6 million, or $0.08 per share. By comparison, net loss was $1.9 million, or $0.04 per share, in the third quarter of 2025. GAAP net loss in Q4 of 2024 was $5.1 million, or $0.12 per share. Weighted basic shares outstanding for the quarter was 44.7 million. Cash, cash equivalents, and investments increased by $97.2 million to $128.4 million as of 31 December. This is primarily the result of our public offering of common stock, which closed on 30 December and generated approximately $93.9 million.
Gary Fischer: Non-GAAP net loss in Q4 of 2024 was $4.2 million, or $0.10 per share. On a GAAP basis, net loss in Q4 was $3.6 million, or $0.08 per share. By comparison, net loss was $1.9 million, or $0.04 per share, in the Q3 of 2025. GAAP net loss in Q4 of 2024 was $5.1 million, or $0.12 per share. Weighted basic shares outstanding for the quarter was 44.7 million. Cash, cash equivalents, and investments increased by $97.2 million to $128.4 million as of 31 December. This is primarily the result of our public offering of common stock, which closed on 30 December and generated approximately $93.9 million.
Speaker #3: GAAP net loss in Q4 of 2024 was 5.1 million , or $0.12 per share . Weighted basic shares outstanding for the quarter was 44.7 million .
Speaker #3: Cash . Cash equivalents and investments increased by 97.2 million to 128.4 million as of December 31st . This primarily the result of our public offering of common stock , which closed on December 30th and generated approximately 93.9 million .
Speaker #3: By comparison, at September 30th, cash was $31.2 million. Accounts receivable and accounts payable decreased in the quarter by $2.6 million.
Gary Fischer: By comparison, at 30 September, cash was $31.2 million, accounts receivable, and accounts receivable decreased in the quarter by $2.6 million. Depreciation and amortization in the fourth quarter was $2.3 million. Total stock comp was $1.3 million. Net inventory was up by approximately $4 million in the fourth quarter to $81.7 million. This continues to be a focus for us, and we expect to bring it down in coming quarters. This concludes our discussion or comments about the quarterly financials. Turning to our plan to list our subsidiary, Tongmei, in China on the STAR Market in Shanghai. We remain very interested in completing the IPO, particularly in light of the rapidly evolving AI infrastructure build-out in China, which is fueling increased China-based demand for indium phosphide substrates.
Gary Fischer: By comparison, at 30 September, cash was $31.2 million, accounts receivable, and accounts receivable decreased in the quarter by $2.6 million. Depreciation and amortization in the fourth quarter was $2.3 million. Total stock comp was $1.3 million. Net inventory was up by approximately $4 million in the Q4 to $81.7 million. This continues to be a focus for us, and we expect to bring it down in coming quarters. This concludes our discussion or comments about the quarterly financials. Turning to our plan to list our subsidiary, Tongmei, in China on the STAR Market in Shanghai. We remain very interested in completing the IPO, particularly in light of the rapidly evolving AI infrastructure build-out in China, which is fueling increased China-based demand for indium phosphide substrates.
Speaker #3: Depreciation and amortization in the fourth quarter was $2.3 million. Total stock comp was $1.3 million. Net inventory was up by approximately $4 million in the fourth quarter to $81.7 million.
Speaker #3: This continues to be a focus for us, and we expect to bring it down in the coming quarters. This concludes our discussion or comments about the quarterly financials.
Speaker #3: Turning to our planned to list , our subsidiary , Tang May , in China on the Star Market in Shanghai . We remain very interested in completing the IPO , particularly in light of the rapidly evolving AI infrastructure build out in China , which is fueling increased China based demand for indium phosphide substrates .
Speaker #3: We've continued to keep our IPO application current, and Tang May remains. Quote in process as part of a much more selective and smaller group of prospective listings than a few years ago.
Gary Fischer: We've continued to keep our IPO application current, and Tongmei remains, quote, "In process," as part of much of a more selective and smaller group of prospective listings than a few years ago. Though the current geopolitical environment is dynamic, Tongmei is considered a Chinese company and continues to be regarded in China as a good IPO candidate. We will keep you informed of any updates. With that, I'll now turn the call over to Dr. Morris Young for a review of our business and markets. Morris?
Gary Fischer: We've continued to keep our IPO application current, and Tongmei remains, quote, "In process," as part of much of a more selective and smaller group of prospective listings than a few years ago. Though the current geopolitical environment is dynamic, Tongmei is considered a Chinese company and continues to be regarded in China as a good IPO candidate. We will keep you informed of any updates. With that, I'll now turn the call over to Dr. Morris Young for a review of our business and markets. Morris?
Speaker #3: Though the current geopolitical environment is dynamic , Tang May is considered a Chinese company and continues to be regarded in China as a good IPO candidate .
Speaker #3: We will keep you informed of any updates. With that, I'll now turn the call over to Dr. Morris Young for a review of our business and markets.
Speaker #3: Morris
Speaker #4: Thank you, Gary. We were disappointed.
Morris Young: Thank you, Gary. We were disappointed-
Morris Young: Thank you, Gary. We were disappointed-
Speaker #1: And pardon the interruption, this is the operator. We have lost our speakers. Give me one moment to reconnect.
Operator: Pardon the interruption, this is the operator. We have lost our speakers. Give me one moment to reconnect.
Operator: Pardon the interruption, this is the operator. We have lost our speakers. Give me one moment to reconnect.
Speaker #4: Hello
Morris Young: Hello?
Morris Young: Hello?
Speaker #1: Yes .
Operator: Yes, we can hear you now.
Operator: Yes, we can hear you now.
Speaker #4: We can .
Speaker #1: Now . Yes you are . Thank you
Morris Young: Am I back on?
Morris Young: Am I back on?
Operator: Yes, you are. Thank you.
Operator: Yes, you are. Thank you.
Speaker #4: Okay, let me start from the beginning again, just in case I missed part of it. We were disappointed that we didn't receive as many export permits in Q4 as we had hoped.
Morris Young: Okay, let me start from the beginning again, just in case I missed part of it. We were disappointed that we didn't receive as many export permits in Q4 as we had hoped, based on the average processing time we had seen up to that point in October. The good news is now that we have received permits in Q1, and we are in a stronger position today than we were at the same time in October in the prior quarter. Gary will take you through our full quarter guidance in a few minutes, but we do expect to achieve sequential growth in revenue in Q1, driven primarily by growth in indium phosphide for data center build-out for AI. We're also very pleased to know that we are seeing a welcome expansion of our customer base for indium phosphide.
Morris Young: Okay, let me start from the beginning again, just in case I missed part of it. We were disappointed that we didn't receive as many export permits in Q4 as we had hoped, based on the average processing time we had seen up to that point in October. The good news is now that we have received permits in Q1, and we are in a stronger position today than we were at the same time in October in the prior quarter. Gary will take you through our full quarter guidance in a few minutes, but we do expect to achieve sequential growth in revenue in Q1, driven primarily by growth in indium phosphide for data center build-out for AI. We're also very pleased to know that we are seeing a welcome expansion of our customer base for indium phosphide.
Speaker #4: Based on the average processing time we had seen up to that point in October . The good news is , now that we have received permits in Q1 and we are in a stronger position today than we were at the same time , in in the prior quarter Gary will take you through our full quarter guidance in a few minutes , but we do expect to achieve sequential growth in revenue in Q1 driven primarily by growth in Indian phosphide for data center build for AI .
Speaker #4: We also very pleased to note that we are seeing a welcome expansion of our customer base for eating phosphide . We're beginning to support leading customers in the optical space that we have not we have limited exposure to prior to this time This includes tier one laser manufacturers and optical transceiver module makers , both in China and around the world .
Morris Young: We're beginning to support leading customers in the optical space that we have not—we had limited exposure to prior to this time. This includes tier one laser manufacturers and optical transceiver module makers, both in China and around the world. We're excited to be able to demonstrate the technological advantage of our low EPD wafers as the market moves to optical devices with higher speed and greater sophistication for both scale-up and scale-out applications. In total, our backlog for indium phosphide wafers has reached a new high of over $60 million. As we mentioned last quarter, customers are planning for longer lead time by placing longer-term orders and giving us more visibility into their expected demand. As many of you know, the supply chain for optical transceiver is quite complex and highly globalized.
Morris Young: We're beginning to support leading customers in the optical space that we have not—we had limited exposure to prior to this time. This includes tier one laser manufacturers and optical transceiver module makers, both in China and around the world. We're excited to be able to demonstrate the technological advantage of our low EPD wafers as the market moves to optical devices with higher speed and greater sophistication for both scale-up and scale-out applications. In total, our backlog for indium phosphide wafers has reached a new high of over $60 million. As we mentioned last quarter, customers are planning for longer lead time by placing longer-term orders and giving us more visibility into their expected demand. As many of you know, the supply chain for optical transceiver is quite complex and highly globalized.
Speaker #4: We're excited to be able to demonstrate the technological advantage of our low EPT wafers as the market moves to optical devices with higher speed and greater sophistication for both scale up and scale out applications In total .
Speaker #4: Our backlog for indium phosphide wafers has reached a new high of over $60 million. As we mentioned last quarter, customers are planning for longer lead times by placing longer-term orders and giving us more visibility into their expected demand.
Speaker #4: As many of you know , the supply chain for optical transceiver is quite complex and highly globalized We believe this geographical interdependence is providing both opportunity and incentives for the ecosystem to work together in new ways to solve global supply chain shortages Beyond pluggable receivers , we are seeing a very large developing market for co-packaged optics for both scale up and scale out applications We're actively engaging in discussions with our customers about their technical and timing requirements and believe this could be represent yet another inflection point in our business developing in late 2027 and beyond For geographic demand perspective , the massive AI infrastructure build out and planned CapEx spending by cloud services and AI platform providers in United States is the primary driver for ML and silicon photonics based optical transceivers .
Morris Young: We believe this geographical interdependence is providing both opportunity and incentives for the ecosystem to work together in new ways to solve global supply chain shortages. Beyond pluggable receivers, we're seeing a very large developing market for co-packaged optics for both scale-up and scale-out applications. We're actively engaging in discussions with our customers about their technical and timing requirements, and believe this could represent yet another inflection point in our business, developing in late 2027 and beyond. From a geographic demand perspective, the massive AI infrastructure build-out and planned CapEx spending by cloud services and AI platform providers in the United States is the primary driver for EML and silicon photonics-based optical transceivers. We believe that today, our materials are being used in multiple US hyperscale, and we expect that end customers' use will continue to broaden.
Morris Young: We believe this geographical interdependence is providing both opportunity and incentives for the ecosystem to work together in new ways to solve global supply chain shortages. Beyond pluggable receivers, we're seeing a very large developing market for co-packaged optics for both scale-up and scale-out applications. We're actively engaging in discussions with our customers about their technical and timing requirements, and believe this could represent yet another inflection point in our business, developing in late 2027 and beyond. From a geographic demand perspective, the massive AI infrastructure build-out and planned CapEx spending by cloud services and AI platform providers in the United States is the primary driver for EML and silicon photonics-based optical transceivers. We believe that today, our materials are being used in multiple US hyperscale, and we expect that end customers' use will continue to broaden.
Speaker #4: We believe that today our material are being used in multiple US hyperscale , and we expect that end customers use will continue to broaden in China .
Morris Young: In China, the data center build-out is early in its ramp, but we are seeing rapid growth as China moves to accelerate its data center expansion and AI capabilities. Our revenue related to the data center market in China are expected to grow by more than 60% in Q1 over Q4, highlighting both increased investment in these tier one data centers, as well as the strong desire for Chinese domestic suppliers to secure local source at every level of the AI infrastructure supply chain. Given the strong demand environment, it is important to know that AXT is well positioned to handle increased demand for indium phosphide wafers. Since we have last reported to you in October, we have already added approximately 25% more capacity, and we are on track with our current plan to double our capacity from Q4 2025 level by the end of this year.
Morris Young: In China, the data center build-out is early in its ramp, but we are seeing rapid growth as China moves to accelerate its data center expansion and AI capabilities. Our revenue related to the data center market in China are expected to grow by more than 60% in Q1 over Q4, highlighting both increased investment in these tier one data centers, as well as the strong desire for Chinese domestic suppliers to secure local source at every level of the AI infrastructure supply chain. Given the strong demand environment, it is important to know that AXT is well positioned to handle increased demand for indium phosphide wafers. Since we have last reported to you in October, we have already added approximately 25% more capacity, and we are on track with our current plan to double our capacity from Q4 2025 level by the end of this year.
Speaker #4: The data center build out is early in its ramp , but we are seeing rapid growth as China moves to accelerate its data center expansion and AI capabilities Our revenue related to the data center market in China are expected to grow by more than 60% in Q1 over Q4 , highlighting both increased investment in these tier one data centers as well as the strong desire for Chinese domestic suppliers to secure local source at every level of the AI infrastructure supply chain Given the strong demand environment , it is important to know that AXT is well positioned to .
Speaker #4: To handle increased demand for indium phosphide wafers, since we last reported to you in October, we have already added approximately 25% more capacity, and we are on track with our current plan to double our capacity by Q4 2025.
Speaker #4: Level by the end of this year . Beyond our current plan for capacity expansion , we're working closely with our customer base to understand their long term requirement and to align our plans globally Our recent capital raise will be a fundamental to our future expansion as we enter our next significant phase of growth A major focus of this expansion will be an increase investment in our six inch indium phosphide product , and we are excited to work with our customers to meet the vigorous requirements of next generation ML and silicon based devices .
Morris Young: Beyond our current plan for capacity expansion, we're working closely with our customer base to understand their long-term requirement and to align our plans globally. Our recent capital raise will be fundamental to our future expansion as we enter our next significant phase of growth. A major focus of this expansion will be an increased investment in our six-inch indium phosphide product. We are excited to work with our customers to meet the vigorous requirements of next-generation EML and silicon photonics-based devices. Now turning to gallium arsenide. We continue to see demand for semi-insulating wafers for wireless RF devices, and believe that we have strong opportunity for market share expansion, gated primarily by our ability to obtain export permits. In Q4, we saw an uptick in semiconducting wafers for both industrial laser applications and data center laser applications.
Morris Young: Beyond our current plan for capacity expansion, we're working closely with our customer base to understand their long-term requirement and to align our plans globally. Our recent capital raise will be fundamental to our future expansion as we enter our next significant phase of growth. A major focus of this expansion will be an increased investment in our six-inch indium phosphide product. We are excited to work with our customers to meet the vigorous requirements of next-generation EML and silicon photonics-based devices. Now turning to gallium arsenide. We continue to see demand for semi-insulating wafers for wireless RF devices, and believe that we have strong opportunity for market share expansion, gated primarily by our ability to obtain export permits. In Q4, we saw an uptick in semiconducting wafers for both industrial laser applications and data center laser applications.
Speaker #4: Now, turning to gallium arsenide. We continue to see demand for semi-insulating wafers for wireless RF devices, and believe that we have a strong opportunity for market share expansion.
Speaker #4: Gated primarily by our ability to obtain export permits in Q4 , we saw an uptick in semiconductor wafers for both industrial laser applications and data center laser applications .
Speaker #4: Vixel lasers are data center for data center applications , typically do not require a lot of gallium arsenide material , as the device are small , so they don't move the needle much .
Morris Young: VCSEL lasers for data center applications typically do not require a lot of gallium arsenide material, as the devices are small, so they don't move the needle much as a growth driver for us. However, we're seeing an increased demand for VCSEL for autonomous vehicles in China, Chinese automobile market, which is currently expanding rapidly. High growth expansions, in addition to our watching, we are watching with interest an emerging application in robotics for VCSELs that increase the precision and dexterity of a modern robotic hand. Counter to VCSEL used in data center applications, machine vision VCSELs tend to be very large and use more gallium arsenide substrates. They also require high-quality material, which we are very well positioned to supply.
Morris Young: VCSEL lasers for data center applications typically do not require a lot of gallium arsenide material, as the devices are small, so they don't move the needle much as a growth driver for us. However, we're seeing an increased demand for VCSEL for autonomous vehicles in China, Chinese automobile market, which is currently expanding rapidly. High growth expansions, in addition to our watching, we are watching with interest an emerging application in robotics for VCSELs that increase the precision and dexterity of a modern robotic hand. Counter to VCSEL used in data center applications, machine vision VCSELs tend to be very large and use more gallium arsenide substrates. They also require high-quality material, which we are very well positioned to supply.
Speaker #4: As a growth driver . For us However , we are seeing an increased demand for vixel for autonomous vehicles in China . Chinese automobile market , which is currently expanding rapidly .
Speaker #4: High growth expansions in addition to our watching in , we are watching with interest and emerging applications in robotics for Vexos that are increase the precision and dexterity of a modern robotic hand counter .
Speaker #4: The Vixel used in data center applications Machine vision vixel tend to be very large and use more gallium oxide substrates . They also require high quality material , which we are well , very well positioned to supply .
Speaker #4: Again , demand is more today , primarily China based and covers a diverse set of customers , but the breadth of use case and the development is very exciting Finally , our raw material business is was up in Q4 with growth from our subsidiary Boyu , which manufactures PBN crucibles used in manufacturing of Indian phosphide crystal balls .
Morris Young: Again, demand is small today, primarily China-based, and covers a diverse set of customers, but the breadth of use case and the development is very exciting. Finally, our raw material business was up in Q4, with growth from our subsidiary, Boyu, which manufactures PBN crucibles used in manufacturing of indium phosphide. In addition, we're pleased to report that our subsidiary, Jinmei, has begun to refine high-quality indium, which give us now direct control of a guaranteed supply of yet another critical material for our indium phosphide substrates. Globally, there continues to be a greater awareness of the importance of various materials, and we are ahead of the curve in developing our unique integrated supply chain. In closing, this is a very dynamic, exciting time for our company.
Morris Young: Again, demand is small today, primarily China-based, and covers a diverse set of customers, but the breadth of use case and the development is very exciting. Finally, our raw material business was up in Q4, with growth from our subsidiary, Boyu, which manufactures PBN crucibles used in manufacturing of indium phosphide. In addition, we're pleased to report that our subsidiary, Jinmei, has begun to refine high-quality indium, which give us now direct control of a guaranteed supply of yet another critical material for our indium phosphide substrates. Globally, there continues to be a greater awareness of the importance of various materials, and we are ahead of the curve in developing our unique integrated supply chain. In closing, this is a very dynamic, exciting time for our company.
Speaker #4: In addition , we're pleased to report that our subsidiary , Jingmei has begun to refine high quality Indian , which gives us now direct control of a guarantee supply of yet another critical material for our indium phosphide substrates globally .
Speaker #4: There continues to be a greater awareness of the importance of materials , and we are ahead of the curve in developing our unique integrated supply chain , including .
Speaker #4: This is a very dynamic and exciting time for our company as we enter into 2026 , we are fundamental supplier to the multi multi-year optical build out in the AI infrastructure market .
Morris Young: As we enter into 2026, we're a fundamental supplier to the multi-year optical build-out in the AI infrastructure market. We have a broadening customer base of tier one companies and a strong balance sheet to support our continued business expansion. With growing backlog, the receipt of indium phosphide and gallium arsenide export license remains the single most significant gating factor for our growth. As such, we are highly focused on ensuring that we are proactive, organized, and disciplined about managing the process on behalf of our customers. We also know that we must be laser-focused on running our business with the greatest efficiency. This includes our continued effort to drive gross margin improvement, CapEx disciplines, and inventory reduction.
Morris Young: As we enter into 2026, we're a fundamental supplier to the multi-year optical build-out in the AI infrastructure market. We have a broadening customer base of tier one companies and a strong balance sheet to support our continued business expansion. With growing backlog, the receipt of indium phosphide and gallium arsenide export license remains the single most significant gating factor for our growth. As such, we are highly focused on ensuring that we are proactive, organized, and disciplined about managing the process on behalf of our customers. We also know that we must be laser-focused on running our business with the greatest efficiency. This includes our continued effort to drive gross margin improvement, CapEx disciplines, and inventory reduction.
Speaker #4: We have a broadening customer base of tier one companies and a strong balance sheet to support our continued business expansion . And with growing backlog , the receipt of indium phosphide and gallium oxide export license are remains .
Speaker #4: The single most significant gating factor for our growth . As such , we are highly focused on ensuring that we are proactive , organized and disciplined about managing the process on behalf of our customers .
Speaker #4: We also know that we must be laser focused on running our business with the greatest efficiency . This includes our continued efforts to drive gross margin improvement , OpEx disciplines and inventory reduction with strong ongoing market trends fueling the data center upgrade cycle .
Morris Young: With strong ongoing market trends fueling the data center upgrade cycle, we believe that we have tremendous opportunity in 2026 to drive significant meaningful growth in our business and to return to profitability. I would like to personally thank our employees for their dedication and tireless effort during this singular moment in AXT history. I would also like to express my sincere gratitude to our customers, partners, and shareholders for their ongoing support, and believe that in the future, we are building together. We look forward to reporting to you on our progress. With that, I will turn the call back to Gary for our fiscal quarter guidance.
Morris Young: With strong ongoing market trends fueling the data center upgrade cycle, we believe that we have tremendous opportunity in 2026 to drive significant meaningful growth in our business and to return to profitability. I would like to personally thank our employees for their dedication and tireless effort during this singular moment in AXT history. I would also like to express my sincere gratitude to our customers, partners, and shareholders for their ongoing support, and believe that in the future, we are building together. We look forward to reporting to you on our progress. With that, I will turn the call back to Gary for our fiscal quarter guidance.
Speaker #4: We believe that we have tremendous opportunity in 2026 to drive meaningful growth in our business and return to profitability . I would like to personally thank our employees for their dedication and tireless effort during this singular moment in AXT history , and I would also like to express my sincere gratitude to our customers , partners and shareholders for their ongoing support and believe that in the future , we are building together We look forward to reporting to you on our progress with that , I will turn the call back to Gary for our fiscal quarter guidance .
Speaker #3: Thank you. Maurice, to really reiterate a couple of key points from Maurice's commentary: we are seeing a strong increase in our indium phosphide wafer demand related to AI and the ongoing data center upgrade cycle.
Gary Fischer: Thank you, Morris. To reiterate a couple of key points from Morris's commentary, we are seeing a strong increase in our indium phosphide wafer demand related to AI and the ongoing data center upgrade cycle. Given the geopolitical complexity surrounding this market trend, our customer base is diversifying and expanding, and customers are placing longer-term orders and providing greater visibility into their needs. With all of these positive market and AXT-specific growth drivers, the most significant single factor to our growth in Q1 and beyond is the success and timing of getting export permits. Therefore, guiding for the future is somewhat tricky for us right now, as we cannot predict future timing of permits or our success in obtaining them for any customer or individual order.
Gary Fischer: Thank you, Morris. To reiterate a couple of key points from Morris's commentary, we are seeing a strong increase in our indium phosphide wafer demand related to AI and the ongoing data center upgrade cycle. Given the geopolitical complexity surrounding this market trend, our customer base is diversifying and expanding, and customers are placing longer-term orders and providing greater visibility into their needs. With all of these positive market and AXT-specific growth drivers, the most significant single factor to our growth in Q1 and beyond is the success and timing of getting export permits. Therefore, guiding for the future is somewhat tricky for us right now, as we cannot predict future timing of permits or our success in obtaining them for any customer or individual order.
Speaker #3: Given the geopolitical complexity surrounding this market trend , our customer base is diversifying and expanding , and customers are placing longer term orders and providing greater visibility into their needs With all of these positive market and AXT specific growth drivers , the most significant single factor to our growth in Q1 and beyond is the success and timing of getting export permits Therefore , guiding for the future is somewhat tricky for us right now , as we cannot predict future timing of permits or a success in obtaining them for any customer or individual order .
Speaker #3: But drawing on what we know and what we've experienced thus far in the export permitting process, we can offer the following insight to our expectations for Q1.
Gary Fischer: But drawing on what we know and what we've experienced thus far in the export permitting process, we can offer the following insight to our expectations for Q1. As of today, we have approximately $26 million in revenue that can be realized in Q1 across our substrate product lines and raw materials, for which we either already have a permit to ship or for which an export permit is not required. We have a high degree of confidence in recognizing this revenue in Q1. We could see significant upside to this number in Q1, should we receive more permits for additional orders between now and the end of the quarter. But we want to stress that as we experienced in Q4, the timing for permit issuance is not predictable nor in our control, and doesn't necessarily align with our quarterly reporting.
Gary Fischer: But drawing on what we know and what we've experienced thus far in the export permitting process, we can offer the following insight to our expectations for Q1. As of today, we have approximately $26 million in revenue that can be realized in Q1 across our substrate product lines and raw materials, for which we either already have a permit to ship or for which an export permit is not required. We have a high degree of confidence in recognizing this revenue in Q1. We could see significant upside to this number in Q1, should we receive more permits for additional orders between now and the end of the quarter. But we want to stress that as we experienced in Q4, the timing for permit issuance is not predictable nor in our control, and doesn't necessarily align with our quarterly reporting.
Speaker #3: As of today , we have approximately $26 million in revenue that can be realized in Q1 across our substrate product lines and raw materials , for which we either have already already have a permit to ship or for which an export permit is not required .
Speaker #3: We have a high degree of confidence in recognizing this revenue in Q1 , we could see significant upside to this number in Q1 should we receive more permits for additional orders between now and the end of the quarter .
Speaker #3: But we want to stress that as we experienced in Q4 , the timing for permit issuance is not predictable , nor in our control .
Speaker #3: And doesn't necessarily align with our quarterly reporting . As Maurice mentioned , we continue to focus strongly on gross margin , further improvement depends on a number of factors , including total revenue as it relates to absorption of fixed costs , revenue and mixed by product .
Gary Fischer: As Morris mentioned, we continue to focus strongly on gross margin. Further improvement depends on a number of factors, including total revenue as it relates to absorption of fixed costs, revenue mix by product, and our ability to continue to drive better manufacturing efficiency. With regards to OpEx, we expect that it will remain at approximately $9.0 million in Q1. With these factors in mind, we believe our non-GAAP net loss will be in the range of $0.02 to $0.04, and GAAP net loss will be in the range of $0.04 to $0.06. This represents substantial year-over-year progress towards our return to profitability. We estimate share count in Q1 will be approximately 53.2 million shares. Okay, this concludes our prepared comments. We'd be glad to answer your questions now. Audra, Operator?
Gary Fischer: As Morris mentioned, we continue to focus strongly on gross margin. Further improvement depends on a number of factors, including total revenue as it relates to absorption of fixed costs, revenue mix by product, and our ability to continue to drive better manufacturing efficiency. With regards to OpEx, we expect that it will remain at approximately $9.0 million in Q1. With these factors in mind, we believe our non-GAAP net loss will be in the range of $0.02 to $0.04, and GAAP net loss will be in the range of $0.04 to $0.06. This represents substantial year-over-year progress towards our return to profitability. We estimate share count in Q1 will be approximately 53.2 million shares. Okay, this concludes our prepared comments. We'd be glad to answer your questions now. Audra, Operator?
Speaker #3: And our ability to continue to drive better manufacturing efficiency. With regards to OpEx, we expect that it will be approximately $9.0 million in Q1.
Speaker #3: With these factors in mind, we believe our non-GAAP net loss will be in the range of $0.02 to $0.04, and GAAP net loss will be in the range of $0.04 to $0.06.
Speaker #3: This represents substantial year over year progress towards our return to profitability . We estimate share count in Q1 will be approximately 53.2 million shares .
Speaker #3: Okay . This concludes our prepared comments . We'd be glad to answer your questions . Now . Audra . Operator .
Speaker #1: Thank you . We will now begin the question and answer session . If you have dialed in and would like to ask a question , please press star One on your telephone keypad to raise your hand and join the queue .
Operator: Thank you. We will now begin the question-and-answer session. If you have dialed in and would like to ask a question, please press star one on your telephone keypad to raise your hand and join the queue. If you would like to withdraw your question, simply press star one again. We'll go first to Richard Shannon at Craig-Hallum.
Operator: Thank you. We will now begin the question-and-answer session. If you have dialed in and would like to ask a question, please press star one on your telephone keypad to raise your hand and join the queue. If you would like to withdraw your question, simply press star one again. We'll go first to Richard Shannon at Craig-Hallum.
Speaker #1: If you would like to withdraw your question, simply press star one again. We'll go first to Richard Shannon at Craig-Hallum.
Speaker #5: Well , great . Thanks , Morrison Gary , for taking my questions here . Gary , I'm going to do a quick request to give me the revenue number you gave for the quarter .
Richard Shannon: Well, great. Thanks, Morris and Gary, for taking my questions here. Gary, I'm going to do a quick request to give me the revenue number you gave for the quarter. My line got garbled here. I heard about $26 that you believe you can get, highly likely to get. Was there a number to the upside there? Apologies for needing to ask this.
Richard Shannon: Well, great. Thanks, Morris and Gary, for taking my questions here. Gary, I'm going to do a quick request to give me the revenue number you gave for the quarter. My line got garbled here. I heard about $26 that you believe you can get, highly likely to get. Was there a number to the upside there? Apologies for needing to ask this.
Speaker #5: It got my line got garbled here . I heard about 26 that you believe you can get highly likely to get . Was there a number to the upside there ?
Speaker #5: Apologies for needing to ask this .
Speaker #3: No . We we normally give you guys a range , but we discussed before the call today that we're very , very confident at the 26 number .
Gary Fischer: No, we normally give you guys a range, but we discussed before the call today that we're very, very confident at the 26 number. We did say just a moment ago that we believe we could go higher if we get more permits, but it wouldn't even – it could even be more than just a normal range, which we usually have a $2 or 3 million range for you guys.
Gary Fischer: No, we normally give you guys a range, but we discussed before the call today that we're very, very confident at the 26 number. We did say just a moment ago that we believe we could go higher if we get more permits, but it wouldn't even – it could even be more than just a normal range, which we usually have a $2 or 3 million range for you guys.
Speaker #3: We we did say just a moment ago that we believe we could go higher if we get more permits , but we it it wouldn't even it could even be more than just a normal range which would usually have a 2 or $3 million range for you guys
Speaker #4: Well , let me , let me try to add on to this point . That is our manufacturing are doing the manufacturing as if we could get permit .
Morris Young: Well, let me try to add on to this point. That is, our manufacturing are doing the manufacturing as if we could get the permit. So there is a lot of these so-called semi-finished goods or finished goods staging in our clean room, ready to be shipped if we can get a export permit.
Morris Young: Well, let me try to add on to this point. That is, our manufacturing are doing the manufacturing as if we could get the permit. So there is a lot of these so-called semi-finished goods or finished goods staging in our clean room, ready to be shipped if we can get a export permit.
Speaker #4: So there's a lot of these so-called semi-finished goods or finished goods staging in our clean room, ready to be shipped, if we can get an actual permit.
Speaker #3: Yeah , we we are building to forecast and to the backlog whether or not we're not building to permits , we're not waiting until we get a permit and then say , okay , let's get going Yeah .
Gary Fischer: Yeah, we are building to forecast and to the backlog, whether or not. We're not building to permits. We're not waiting till we get a permit and then say, "Okay, let's get going.
Gary Fischer: Yeah, we are building to forecast and to the backlog, whether or not. We're not building to permits. We're not waiting till we get a permit and then say, "Okay, let's get going.
Richard Shannon: Yeah.
Richard Shannon: Yeah.
Speaker #3: And so it's it's it's building . And , you know , it's we're we're enthusiastic . We're excited . And of course , yeah , we're a little bit frustrated because it would be pretty big numbers if we can get some more of these permits .
Gary Fischer: And so it's-
Gary Fischer: And so it's-
Richard Shannon: Okay.
Richard Shannon: Okay.
Gary Fischer: It's building, and you know, we're enthusiastic, we're excited, and of course, yeah, we're a little bit frustrated because it would be pretty big numbers if we can get some more of these permits, and we think that we will.
Gary Fischer: It's building, and you know, we're enthusiastic, we're excited, and of course, yeah, we're a little bit frustrated because it would be pretty big numbers if we can get some more of these permits, and we think that we will.
Speaker #3: And we think that we will , we can comment more on this in this call . But we're we're hanging in there . You know , we're not we're not discouraged in giving up .
Richard Shannon: Okay.
Richard Shannon: Okay.
Gary Fischer: We can comment more on this in this call, but, we're hanging in there. You know, we're not discouraged and giving up, so.
Gary Fischer: We can comment more on this in this call, but, we're hanging in there. You know, we're not discouraged and giving up, so.
Speaker #3: So
Richard Shannon: Mm-hmm. Okay. I appreciate understanding your approach to the guidance, and certainly makes a lot of sense in this environment. Let me ask about the licensing process here. Last quarter, you said it was about a 60 business day or 3 months process here, and obviously that didn't turn out, as we saw from your pre-announcement, which, unfortunate, but, we all know how governments can work from time to time here. Do you have any new insights as to how they're working here? And I guess, are there any permits that are being rejected that you don't think should be? Just more insights here on this, on this licensing process.
Richard Shannon: Mm-hmm. Okay. I appreciate understanding your approach to the guidance, and certainly makes a lot of sense in this environment. Let me ask about the licensing process here. Last quarter, you said it was about a 60 business day or 3 months process here, and obviously that didn't turn out, as we saw from your pre-announcement, which, unfortunate, but, we all know how governments can work from time to time here. Do you have any new insights as to how they're working here? And I guess, are there any permits that are being rejected that you don't think should be? Just more insights here on this, on this licensing process.
Speaker #5: Okay . Appreciate understanding your approach to the guidance and certainly makes a lot of sense in this environment . Let me ask about the licensing process here .
Speaker #5: Last quarter you said it was about a 60 business day or three month process here . And obviously that didn't turn out as we saw from your pre-announcement , which unfortunate , but we all know how governments can work from time to time here .
Speaker #5: Have any new insights as to how they're working here ? And I guess , are there are there any permits that are being rejected that you don't think should be just more insights here on this , on this licensing process ?
Speaker #6: Yeah , I can answer that one . So this this process is not transparent at all . And we're seeing quite a lot of variability .
Tim Bettles: Yeah, I can answer that one. So this process is not transparent at all, and we're seeing quite a lot of variability. You know, we started off in the end of Q3 by saying it was looking like we're seeing a fairly consistent 60 business day process cycle. We're now seeing a lot more variability as we go through there. And as I say, there's just no transparency to that. It's reasonable to assume that there's geopolitics playing into this as well. It's really hard to determine what and why, and it's difficult, therefore, to figure out which permits are coming in on time, which are taking longer. I'll answer the second question as well, which you asked whether there had been any permits that have been denied and why.
Tim Bettles: Yeah, I can answer that one. So this process is not transparent at all, and we're seeing quite a lot of variability. You know, we started off in the end of Q3 by saying it was looking like we're seeing a fairly consistent 60 business day process cycle. We're now seeing a lot more variability as we go through there. And as I say, there's just no transparency to that. It's reasonable to assume that there's geopolitics playing into this as well. It's really hard to determine what and why, and it's difficult, therefore, to figure out which permits are coming in on time, which are taking longer. I'll answer the second question as well, which you asked whether there had been any permits that have been denied and why.
Speaker #6: You know, we started off in the end of Q3 by saying it was looking like we're seeing a fairly consistent 60-business-day process cycle.
Speaker #6: We're now seeing a lot more variability as we go through there . And as I say , there's just no transparency to that .
Speaker #6: It's reasonable to assume that there's geopolitics playing into this as well. It's really hard to determine what and why, and it's difficult.
Speaker #6: There to figure out which permits are coming in on time , which are taking longer . I'll answer the second question as well , which you asked whether there had been any permits that had been denied and why we have actually received a couple of denials with the instruction that we can resubmit that application with more information .
Tim Bettles: We have actually received a couple of denials with the instruction that we can resubmit that application with more information. So this is the first time we've actually received denials on permits, and we're not utterly sure why. Again, no transparency to this. We don't see any particular reason why any of these permits should not be approved, and it's a process that we're just working through. So these permits that have been denied, we've already resubmitted with MOFCOM, and we're hopeful that we continue to talk to MOFCOM, and they will get reviewed quickly and could potentially turn around fairly quickly.... could even make an impact on Q1 numbers, if we can get a quick turnaround on them.
Tim Bettles: We have actually received a couple of denials with the instruction that we can resubmit that application with more information. So this is the first time we've actually received denials on permits, and we're not utterly sure why. Again, no transparency to this. We don't see any particular reason why any of these permits should not be approved, and it's a process that we're just working through. So these permits that have been denied, we've already resubmitted with MOFCOM, and we're hopeful that we continue to talk to MOFCOM, and they will get reviewed quickly and could potentially turn around fairly quickly.... could even make an impact on Q1 numbers, if we can get a quick turnaround on them.
Speaker #6: So this is the first time we've actually received denials on permits . And we're not utterly sure why . Again , no transparency to this .
Speaker #6: We don't see any particular reason why any of these permits should not be approved. And it's a process that we're just working through.
Speaker #6: So these these permits that have been denied , we've we've already resubmitted with Mofcom and we're hopeful that we continue to talk to Mofcom .
Speaker #6: And they will get reviewed quickly . And could potentially turn around fairly quickly . Could even make an impact on on Q1 Q1 numbers .
Speaker #6: If we can get a quick turnaround on them.
Speaker #3: And what does Mofcom stand for?
Richard Shannon: What does MOFCOM stand for?
Richard Shannon: What does MOFCOM stand for?
Speaker #6: Oh, that's the Ministry of Commerce in China. Yeah.
Tim Bettles: Oh, that's the Ministry of Commerce in China.
Tim Bettles: Oh, that's the Ministry of Commerce in China.
Morris Young: Yeah.
Morris Young: Yeah.
Speaker #4: So let me add
Tim Bettles: Got it.
Tim Bettles: Got it.
Morris Young: Let me add what optimistic viewpoint the comment about the team just give you. That is, although there is a denial of an application, they come with a specific instruction how to strengthen the application, which we think is a good indication. In other words, if they really want to deny this, they just want to—they can just let it sit there. I mean, the fact that they want more information about a—actually, I think it's a sizable permit application we have, and that means, hey, you know, they are taking a very serious look at it, and hopefully that, you know, will turn to be a permit. Yeah.
Morris Young: Let me add what optimistic viewpoint the comment about the team just give you. That is, although there is a denial of an application, they come with a specific instruction how to strengthen the application, which we think is a good indication. In other words, if they really want to deny this, they just want to—they can just let it sit there. I mean, the fact that they want more information about a—actually, I think it's a sizable permit application we have, and that means, hey, you know, they are taking a very serious look at it, and hopefully that, you know, will turn to be a permit. Yeah.
Speaker #6: What
Speaker #4: Optimistic viewpoint the comment about team just give you that is although there is a denial of a application , but they come with a specific instruction how to strengthen the application , which we think is a good indication .
Speaker #4: In other words , if they really want to deny , they just want to , they can just let it sit there . And the fact that they want more information about a actually , I think it's a sizable permit application .
Speaker #4: We have . And that means , hey , you know , they are taking a very serious look at it and hopefully that , you know , will turn out to be a permit .
Speaker #4: Yeah .
Richard Shannon: Mm-hmm. Okay. That is helpful. Thanks for that insight. Second question here is, kind of the backlog here and also following up on, Morris, your comments about customers booking farther out. So we went from a backlog of $49 to above $60 here, and you also commented that, people or, customers are ordering farther out. Can you suggest how far out they're going right now? And also, how far out are you hearing forecasts from these customers as well?
Richard Shannon: Mm-hmm. Okay. That is helpful. Thanks for that insight. Second question here is, kind of the backlog here and also following up on, Morris, your comments about customers booking farther out. So we went from a backlog of $49 to above $60 here, and you also commented that, people or, customers are ordering farther out. Can you suggest how far out they're going right now? And also, how far out are you hearing forecasts from these customers as well?
Speaker #5: Okay . That is helpful . Thanks for that insight . Second question here is kind of the backlog here . And also following up on on Maurice , your comments about customers booking further out .
Speaker #5: So we went from a backlog of 49 to above 60 here . And you also commented that people or customers are ordering farther out .
Speaker #5: Can you suggest how far out they're going right now ? And also how far out are you hearing forecasts from these customers as well
Speaker #4: Yeah . Let me see how to answer that . Actually , let me first answer my part of the question , and I will turn it over to Tim Well , and the reason why is that , you know , Tim really works with customers hearing what their demand is actually , you know , one of the interesting comments we have was that we have important meetings with our customers this week .
Morris Young: Yeah. Let me see how to answer that. Actually, let me first answer my part of the question, and I will turn it over to Tim. Well, and the reason why is that, you know, Tim really works with customers hearing what their demand is. Actually, you know, one of the interesting comments we have was that we have important meetings with our customers this week, and they're telling us, Tim, at least in two occasions, people are saying, "Gee, you know, our, our demand forecast increases every week." So that, that's the kind of level I think...
Morris Young: Yeah. Let me see how to answer that. Actually, let me first answer my part of the question, and I will turn it over to Tim. Well, and the reason why is that, you know, Tim really works with customers hearing what their demand is. Actually, you know, one of the interesting comments we have was that we have important meetings with our customers this week, and they're telling us, Tim, at least in two occasions, people are saying, "Gee, you know, our, our demand forecast increases every week." So that, that's the kind of level I think...
Speaker #4: They're telling us Tim , at least two occasions , people are saying , gee , you know , our our demand forecast increases every week so that that's the kind of level I think .
Speaker #4: I mean , we know it is tight and we know it's going up , but I think , you know , people are upsizing their demand and they're telling us , you know , what they want to do .
Morris Young: I mean, we know it is tight, and we know it's going up, but I think, you know, people are upsizing their demand, and they're telling us, you know, what they want to do, whether they're gonna go to 4-inch, how much they want to switch from between 3 to 4 and from 4 to 6. Okay? And as far as how much inventory they're building, I think that depends upon customers. Some of the customers, we suspect that they're buying into the inventory, but they also tell us, "You know, I'm gonna take it all, if you can deliver." Whereas others, I think they are telling us the real demand in the quarter, because I think, you know, as of now, we cannot deliver enough of their demand.
Morris Young: I mean, we know it is tight, and we know it's going up, but I think, you know, people are upsizing their demand, and they're telling us, you know, what they want to do, whether they're gonna go to 4-inch, how much they want to switch from between 3 to 4 and from 4 to 6. Okay? And as far as how much inventory they're building, I think that depends upon customers. Some of the customers, we suspect that they're buying into the inventory, but they also tell us, "You know, I'm gonna take it all, if you can deliver." Whereas others, I think they are telling us the real demand in the quarter, because I think, you know, as of now, we cannot deliver enough of their demand.
Speaker #4: What are they're going to go to for four inch , how much they want to switch from , from 3 to 4 . And , and from 4 to 6 .
Speaker #4: Okay . And as far as how much inventory they're building , I think that depends upon customers . Some of the customers , we suspect that they're buying into inventory , but they also tell us , you know , I'm going to take it all if you can cover , whereas others , I think they are telling us the real demand in the quarter , because I think , you know , as of now , we cannot deliver enough of their demand .
Speaker #4: So they are giving us longer lead time to give us more incentive to , you know , build up the expansion plan and build the capacity for them .
Morris Young: So they are giving us longer lead time to give us more incentive to, you know, build up the expansion plan and build the capacity for them. And also, I think the other thing is, Tim, you want to comment on long-term commitment that you're talking to customer about?
Morris Young: So they are giving us longer lead time to give us more incentive to, you know, build up the expansion plan and build the capacity for them. And also, I think the other thing is, Tim, you want to comment on long-term commitment that you're talking to customer about?
Speaker #4: And also , I think the other thing is , Tim , you want to comment on long term commitment that you're talking to customer about .
Speaker #6: Yeah , I'll definitely I'll comment a little bit on that . And I'll also comment a little bit more on on backlog and , and what we're seeing from this .
Tim Bettles: Yeah, I'll definitely, I'll comment a little bit on that, and I'll also comment a little bit more on backlog and what we're seeing from this. So a lot of this backlog, remember, is scaled up based on the permit dynamics, right? So the permit dynamics, once we receive a permit to export material, we have a 6-month window to export. So a lot of backlog is built the moment that permit comes in. We have a 6-month window maximum to deliver. And in many cases, that window, the window of which the customers are looking to receive material is a lot shorter than 6 months. So really and truthfully, this is all being gated by permits, as we mentioned during the discussion.
Tim Bettles: Yeah, I'll definitely, I'll comment a little bit on that, and I'll also comment a little bit more on backlog and what we're seeing from this. So a lot of this backlog, remember, is scaled up based on the permit dynamics, right? So the permit dynamics, once we receive a permit to export material, we have a 6-month window to export. So a lot of backlog is built the moment that permit comes in. We have a 6-month window maximum to deliver. And in many cases, that window, the window of which the customers are looking to receive material is a lot shorter than 6 months. So really and truthfully, this is all being gated by permits, as we mentioned during the discussion.
Speaker #6: So a lot of this backlog , remember is , is scaled up based on the , the permit dynamics . Right . So the permit dynamics , once we receive a permit to export material , we have a six month window to export .
Speaker #6: So a lot of backlog is built at the moment that permit comes in . We have a six month window maximum to deliver .
Speaker #6: And in many cases that window the window of which the customers are looking to receive material , is a lot shorter than six months .
Speaker #6: So really and truthfully , this this is all being dated by by permits . As we mentioned during the discussion , in terms of of what we're seeing in , in build out for inventory , I think at this moment in time , you know , people would like to keep more inventory .
Tim Bettles: In terms of what we're seeing in build out for inventory, I think at this moment in time, you know, people would like to keep more inventory, but as Morris mentioned, just about everybody we're talking to is telling us that the demand is growing literally on a weekly basis. So we just see the numbers expanding and expanding over and over. Now, turning to forecasts and what kind of visibility we have, we are definitely talking about long-term supply agreements with a number of customers right now, and we're planning our business according to those long-term supply agreements. We're seeing forecasts out beyond 2030 for many of these customers, but of course, as I've just said, those numbers are increasing on a week-by-week basis.
Tim Bettles: In terms of what we're seeing in build out for inventory, I think at this moment in time, you know, people would like to keep more inventory, but as Morris mentioned, just about everybody we're talking to is telling us that the demand is growing literally on a weekly basis. So we just see the numbers expanding and expanding over and over. Now, turning to forecasts and what kind of visibility we have, we are definitely talking about long-term supply agreements with a number of customers right now, and we're planning our business according to those long-term supply agreements. We're seeing forecasts out beyond 2030 for many of these customers, but of course, as I've just said, those numbers are increasing on a week-by-week basis.
Speaker #6: But as Maurice mentioned , just about everybody we're talking to is telling telling us that the demand is growing literally on a weekly basis .
Speaker #6: So we just see the numbers expanding and expanding over and over . Now , turning to forecasts and what kind of visibility we have , we are definitely talking about long term supply agreements with a number of customers right now .
Speaker #6: And we are we're we're planning our business according to those long term supply agreements . We we're seeing forecasts out beyond 2030 for many of these customers .
Speaker #6: But of course , as I've just said , those numbers are increasing on a on a week by week basis . So it's it's difficult to keep track of things .
Tim Bettles: So, it's difficult to keep track of things, but people are talking about minimum demand requirements moving forward for at least the next two to three years, giving us forecasts out beyond 2030. So, all in all, I think this backlog is real, it's achievable, and it's kind of being limited by our permits at the moment.
Tim Bettles: So, it's difficult to keep track of things, but people are talking about minimum demand requirements moving forward for at least the next two to three years, giving us forecasts out beyond 2030. So, all in all, I think this backlog is real, it's achievable, and it's kind of being limited by our permits at the moment.
Speaker #6: But people are are talking about minimum minimum demand requirements moving forward for at least the next 2 to 3 years , given us forecasts out beyond 2030 .
Speaker #6: So all in all , I think this this backlog is real . It's achievable . And it's it's kind of being limited by our our permits at the moment
Speaker #5: Okay . Makes sense . I'll ask one more question and jump out of line here guys . This is on capacity additions . Just a few kind of multi-part question here .
Richard Shannon: Okay. Makes sense. I'll ask one more question and jump out of line here, guys. This is on capacity additions. Just a few kind of multi-part question here. I think I heard you say you're gonna double your capacity from the end of 2025 to the end of 2026.
Richard Shannon: Okay. Makes sense. I'll ask one more question and jump out of line here, guys. This is on capacity additions. Just a few kind of multi-part question here. I think I heard you say you're gonna double your capacity from the end of 2025 to the end of 2026.
Speaker #5: I think I heard you say you're going to double your capacity from the end of 25 to the end of 26 . You could verify that .
Gary Fischer: ... If you could verify that, and if so, can you help us understand what level of CapEx this is going to be requiring? And then looking beyond that, Tim, you just mentioned forecasts going out beyond 2030, which is interesting to hear. How much more capacity beyond that could you need? Let our minds wander about what kind of scale of opportunity you're thinking about here. Thank you.
Richard Shannon: ... If you could verify that, and if so, can you help us understand what level of CapEx this is going to be requiring? And then looking beyond that, Tim, you just mentioned forecasts going out beyond 2030, which is interesting to hear. How much more capacity beyond that could you need? Let our minds wander about what kind of scale of opportunity you're thinking about here. Thank you.
Speaker #5: And if so , can you help us understand what level of CapEx is going to be requiring ? And then looking beyond that ?
Speaker #5: And , Tim , you just mentioned forecast going out beyond 2030 , which is interesting to hear how much more capacity beyond that could you need ?
Speaker #5: Let us let our minds wander about what kind of scale of opportunity you're thinking about here . Thank you
Speaker #4: Yeah , I think I think we just said we we have increased our capacity by 25% . Now , and we do expect to double our capacity by the end of this year .
Morris Young: Yeah, I think we just said we have increased our capacity by 25%, now, and we do expect to double our capacity by the end of this year. Okay? And how much budget do we need? It could be about $30 million, and that is sort of on the low end, in a way, because the first phase of the expansion, which is doubling our capacity, mainly use brownfield. In other words, in our existing Tongmei facility, we already have a clean room available. We have the building there already, power supply, and clean water. So I think that budget is lower.
Morris Young: Yeah, I think we just said we have increased our capacity by 25%, now, and we do expect to double our capacity by the end of this year. Okay? And how much budget do we need? It could be about $30 million, and that is sort of on the low end, in a way, because the first phase of the expansion, which is doubling our capacity, mainly use brownfield. In other words, in our existing Tongmei facility, we already have a clean room available. We have the building there already, power supply, and clean water. So I think that budget is lower.
Speaker #4: Okay . And how much budget would we need ? It could be about $30 million . And that is sort of on the low end in a way , because the first phase of the expansion , which is doubling our capacity mainly used brownfield .
Speaker #4: In other words , in our existing tome facility , we already have clean room available . We have the building there already and power supply and clean water .
Speaker #4: So I think that budget is lower . Be looking beyond 2026 . We are looking at possibly doubling it again in 2027 . And that budget is lying somewhere around 100 to $150 million depends upon how we want to build it , because then we're talking about a greenfield .
Morris Young: Looking beyond 2026, we are looking at possibly doubling it again in 2027, and that budget is lying somewhere around $100 to 150 million, depends about how we want to build it, because then we're talking about a greenfield. We need building, we need clean room, we need power, et cetera.
Morris Young: Looking beyond 2026, we are looking at possibly doubling it again in 2027, and that budget is lying somewhere around $100 to 150 million, depends about how we want to build it, because then we're talking about a greenfield. We need building, we need clean room, we need power, et cetera.
Speaker #4: We need building . We need clean room . We need power , etc.
Speaker #5: Okay , great . Thank you guys .
Gary Fischer: Okay, great. Thank you, guys.
Gary Fischer: Okay, great. Thank you, guys.
Speaker #3: Thanks , Richard
Morris Young: Thanks, Richard.
Morris Young: Thanks, Richard.
Speaker #1: We'll move next to Tim Savageau at Northland Securities
Operator: We'll move next to Tim Savageaux at Northland Securities.
Operator: We'll move next to Tim Savageaux at Northland Securities.
Speaker #7: Hey good afternoon . Let's continue with that capacity discussion . But maybe try to put some numbers around it . If I look at where you've peaked historically and I think we're .
Tim Savageaux: Hey, good afternoon. Let's continue with that capacity discussion, but maybe try to put some numbers around it. You know, if I look at where you've peaked historically, and I think we're talking exclusively about indium phosphide here, that's, you know, getting up toward $20 million a quarter in substrate revenue. And I imagine your capacity is now slightly above that, given the, the increase you talked about in Q4. I guess question one, is that reasonable, and should we, you know, should we expect you to exit calendar 2026 with, you know, revenue capacity roughly double those levels? And, you know, would you anticipate having the demand to, to fulfill that at that time, or you're building maybe a little bit ahead? Thanks.
Tim Savageaux: Hey, good afternoon. Let's continue with that capacity discussion, but maybe try to put some numbers around it. You know, if I look at where you've peaked historically, and I think we're talking exclusively about indium phosphide here, that's, you know, getting up toward $20 million a quarter in substrate revenue. And I imagine your capacity is now slightly above that, given the, the increase you talked about in Q4. I guess question one, is that reasonable, and should we, you know, should we expect you to exit calendar 2026 with, you know, revenue capacity roughly double those levels? And, you know, would you anticipate having the demand to, to fulfill that at that time, or you're building maybe a little bit ahead? Thanks.
Speaker #7: Talking exclusively about indium phosphide here , that's getting up toward 20 million a quarter in substrate revenue . And I imagine your capacity is now slightly above that , given the the increase you talked about in Q4 , I guess .
Speaker #7: Question one , is that reasonable ? And should we should we expect you to exit calendar 26 with revenue capacity roughly double those levels ?
Speaker #7: And would you anticipate having a demand to to fulfill that at that time , or you're building maybe a little bit ahead ? Thanks
Morris Young: Let me first answer the question. I think we calculated, I think, it's approximately $35 million a quarter, by the end of the year, run rate. Okay? It could be a little bit more, given the price environment is dynamic, as we, you know, the cost of indium are going up. And can we, can we use up all this capacity? I think looking at the backlog, we can certainly do, but the problem is the gating factor is the permits.
Speaker #4: Let me first answer the question . The I think we calculated I think it's approximately $35 million a quarter By the end of the year , run rate .
Morris Young: Let me first answer the question. I think we calculated, I think, it's approximately $35 million a quarter, by the end of the year, run rate. Okay? It could be a little bit more, given the price environment is dynamic, as we, you know, the cost of indium are going up. And can we, can we use up all this capacity? I think looking at the backlog, we can certainly do, but the problem is the gating factor is the permits.
Speaker #4: Okay , it could be a little bit more Given the the price environment is dynamic as we , you know , the cost of Indian are going up And can we can we use up all these capacity ?
Speaker #4: I think looking at the backlog , we can certainly do . But the problem is the gating factor is the permits
Speaker #6: Yeah . I'll , I'll add something in here as well , irrespective of permits . You know , we we mentioned we are seeing growth in this business in China as well .
Tim Bettles: I'll add something in here as well.
Tim Bettles: I'll add something in here as well.
Tim Savageaux: Okay.
Tim Savageaux: Okay.
Tim Bettles: Irrespective of permits, you know, we mentioned we are seeing growth in this business in China as well.
Tim Bettles: Irrespective of permits, you know, we mentioned we are seeing growth in this business in China as well.
Speaker #6: Yeah . And and look at it quarter to quarter . Q4 was probably double revenue in China than Q1 in 2025 . And we would expect we're looking at potentially doubling again through 2026 .
Morris Young: Yep.
Morris Young: Yep.
Tim Bettles: Looking at it quarter to quarter, Q4 was probably double revenue in China than Q1 in 2025. We would expect, we're looking at potentially doubling again through 2026. So we're definitely seeing growth there in China, that warrants expansion, as well as growth outside of China, where we would need permits for.
Tim Bettles: Looking at it quarter to quarter, Q4 was probably double revenue in China than Q1 in 2025. We would expect, we're looking at potentially doubling again through 2026. So we're definitely seeing growth there in China, that warrants expansion, as well as growth outside of China, where we would need permits for.
Speaker #6: So we're definitely seeing growth there in China that warrants expansion, as well as growth outside of China, where we would need permits for.
Speaker #4: Yeah , I , I agree with you . But then don't want to minimize the importance of outside of China . Right ? I think the AI growth , the budget we're seeing is really fueling the demand for Indian phosphide substrates .
Morris Young: Yeah. Tim, I agree with you, but then I don't want to minimize the importance of outside of China.
Morris Young: Yeah. Tim, I agree with you, but then I don't want to minimize the importance of outside of China.
Tim Bettles: Right.
Tim Bettles: Right.
Morris Young: I think the AI growth, the budget we're seeing, is really fueling the demand for indium phosphide substrates.
Morris Young: I think the AI growth, the budget we're seeing, is really fueling the demand for indium phosphide substrates.
Speaker #3: Yeah , Tim , this is this is Gary and I , you know , I'm I'm supposed to be conservative , but and I am I'm not sure you guys are getting the point is that every customer is worried about getting enough for their needs .
Gary Fischer: Yeah, Tim, this is Gary, and, you know, I'm supposed to be conservative, but, and I am. But I'm not sure you guys are getting the point is that every customer is worried about getting enough for their needs. There's a general concern where the meetings we've had this week, we're not meeting with the purchasing manager; we're meeting with CEOs and general managers. They all want to talk to Morris about capacity and about future growth. So, there's a phenomenon going on here that all of us, it's unusual for no matter what we do for our jobs, including the analysts; this is a very unique and unusual situation. I mean, I've been around the block a few times, and Morris has, and this is very, very unusual, and it's actually intense.
Gary Fischer: Yeah, Tim, this is Gary, and, you know, I'm supposed to be conservative, but, and I am. But I'm not sure you guys are getting the point is that every customer is worried about getting enough for their needs. There's a general concern where the meetings we've had this week, we're not meeting with the purchasing manager; we're meeting with CEOs and general managers. They all want to talk to Morris about capacity and about future growth. So, there's a phenomenon going on here that all of us, it's unusual for no matter what we do for our jobs, including the analysts; this is a very unique and unusual situation. I mean, I've been around the block a few times, and Morris has, and this is very, very unusual, and it's actually intense.
Speaker #3: They're there's a general concern . The meetings we've had this week , we're not meeting with the purchasing manager . We're meeting with CEOs and general managers .
Speaker #3: They all want to talk to Morris about capacity and about future growth . So there's a phenomenon going on here that all of us , it's unusual for no matter what we do for our jobs , including the analysts , this is a very unique and unusual situation .
Speaker #3: I mean , I'm I've been around the block a few times , and Morris has and this is very , very unusual . And it's it's actually intense .
Speaker #3: It's we're excited , but we're scrambling . We're scrambling . And I don't I don't see any into it near term . This is this is people are telling us that the their demand is going to be going up three , 4 or 5 x over the next 4 or 5 years .
Gary Fischer: It's -- we're excited, but we're scrambling. We're scrambling, and I don't see any end to it near term. This is people are telling us that their demand is gonna be going up 3x, 4x, 5x over the next 4 or 5 years. You know, there's not -- How many suppliers are there? You know the answer to that. 2, and we're one of them, so.
Gary Fischer: It's -- we're excited, but we're scrambling. We're scrambling, and I don't see any end to it near term. This is people are telling us that their demand is gonna be going up 3x, 4x, 5x over the next 4 or 5 years. You know, there's not -- How many suppliers are there? You know the answer to that. 2, and we're one of them, so.
Speaker #3: And , you know , there's not how many suppliers are there . You know , the answer to that . Two . And we're one of them .
Speaker #3: So
Speaker #4: Yeah , I think let me add to that . I think , you know , the investor usually ask the CEO the toughest question is what keeps what keeps you up at night ?
Morris Young: Yeah, I think, let me add to that. I think, you know, investors usually ask the CEO, the toughest question is: What keeps you up at night? I think what's keeping me up at night is calculating how we're gonna expand that capacity, how we're gonna get that product to our customers, and how to develop the technology that customer wants. I mean, it's very exciting, but it's also very straining. You know, we need to be very much aware of what the customer wants and satisfy their demand.
Morris Young: Yeah, I think, let me add to that. I think, you know, investors usually ask the CEO, the toughest question is: What keeps you up at night? I think what's keeping me up at night is calculating how we're gonna expand that capacity, how we're gonna get that product to our customers, and how to develop the technology that customer wants. I mean, it's very exciting, but it's also very straining. You know, we need to be very much aware of what the customer wants and satisfy their demand.
Speaker #4: I think what's keeping you up at night is calculating how we're going to expand that capacity , how we're going to get that product to our customers , and how to develop the technology that customer wants .
Speaker #4: I mean , it's very exciting , but it's also very straining , you know , we need to be very much aware of what the customer wants .
Speaker #4: And satisfy the demand .
Speaker #3: Fortunately , we have recent experience at adding capacity . What you know , it was almost a back ten years ago when we learned that we needed to get gallium arsenide moved out of Beijing .
Gary Fischer: Fortunately, we have recent experience at adding capacity. You know, it was almost about 10 years ago, when we learned that we needed to get Gary and Morris and I moved out of Beijing. And, you know, so we had, you know, 2017, 2018 kind of time period where we, we did add capacity from green grass fields. So we have some strengths here, but it's gonna tax us even though we are experienced.
Gary Fischer: Fortunately, we have recent experience at adding capacity. You know, it was almost about 10 years ago, when we learned that we needed to get Gary and Morris and I moved out of Beijing. And, you know, so we had, you know, 2017, 2018 kind of time period where we, we did add capacity from green grass fields. So we have some strengths here, but it's gonna tax us even though we are experienced.
Speaker #3: And , you know , so we had , you know , 2017 , 18 and kind of time period where we we did add capacity from from green grass fields .
Speaker #3: So we have some strengths here . But it's going to tax us even though we are experienced .
Speaker #4: Yeah , I do want to give the analyst a point to ask the question , but I think I'm we're talking to each other .
Morris Young: Yeah, I don't want to give the analyst a point to ask the question, but I think we're talking to each other.
Morris Young: Yeah, I don't want to give the analyst a point to ask the question, but I think we're talking to each other.
Speaker #3: We're too excited . Yeah .
Gary Fischer: We're too excited, yeah.
Gary Fischer: We're too excited, yeah.
Speaker #4: Too excited . But but I think , you know , it is a very good point . I mean I think we prior to this , we probably overspent because the IPO preparation , we actually expand from one facility to three facilities .
Morris Young: We're too excited. But I think, you know, it is a very good point. I mean, I think we, prior to this, we probably overspent because the IPO preparation, we actually expanded from one facility to three facilities. But now I think we're looking at, you know, a great demand for indium phosphide, which I think it's, you know, it's really meeting our challenge. And I think Gary is right. We're, we are very well positioned to meet that demand. I think we are probably the best suited to increase capacity, and also because the vertical integration we have in terms of supply chain, and we're in control of a lot of other material, which could ensure supply, you know, if indium phosphide substrate continue to grow, like what we're talking about, and we have plans for that as well.
Morris Young: We're too excited. But I think, you know, it is a very good point. I mean, I think we, prior to this, we probably overspent because the IPO preparation, we actually expanded from one facility to three facilities. But now I think we're looking at, you know, a great demand for indium phosphide, which I think it's, you know, it's really meeting our challenge. And I think Gary is right. We're, we are very well positioned to meet that demand. I think we are probably the best suited to increase capacity, and also because the vertical integration we have in terms of supply chain, and we're in control of a lot of other material, which could ensure supply, you know, if indium phosphide substrate continue to grow, like what we're talking about, and we have plans for that as well.
Speaker #4: But now I think we're looking at , you know , a great demand for Indian phosphide , which I think is , you know , it's really meeting our challenge .
Speaker #4: And I think Gary is right where we are very well positioned to meet that demand . I think we are probably the best suited to increase capacity and also because the vertical integration we have in terms of supply chain and we're in control of a lot of other material , which could be in short supply .
Speaker #4: You know, if India qualifies, continues to grow like what we're talking about, and we have planned for that as well.
Speaker #3: A good example is our subsidiary Jinmei Jinmei makes the Indian phosphide poly for Tongmai . So , you know , we have in our supply chain is supporting this growth process Next question , Tim
Gary Fischer: A good example is our subsidiary, Jinmei. Jinmei makes the indium phosphide poly for Tongmei. So, you know, we have our supply chain is supporting this growth process. Next question, Tim?
Gary Fischer: A good example is our subsidiary, Jinmei. Jinmei makes the indium phosphide poly for Tongmei. So, you know, we have our supply chain is supporting this growth process. Next question, Tim?
Speaker #7: Oh , I'm a little bit afraid now , but I was I was I was You actually highlighted you highlighted in the release even the increased presence with some big tier one customers , I guess in the commentary you mentioned , you know , maybe some in China , but elsewhere , you know , in terms of what's going on there , are we talking about orders with with major new customers , qualification , any specific programs ?
Tim Savageaux: Oh, I'm a little bit afraid now, but I was... You actually highlighted in the release, even the increased presence with some big tier one customers. I guess in the commentary you mentioned, you know, maybe some in China, but elsewhere. You know, in terms of what's going on there, are we talking about orders with major new customers, qualification, any specific programs? And I'm not sure these two comments were related or not, but I'll ask if they were with regard to your increased investment in six-inch indium phosphide, if you can maybe cover both of those points. Appreciate it. Thanks.
Tim Savageaux: Oh, I'm a little bit afraid now, but I was... You actually highlighted in the release, even the increased presence with some big tier one customers. I guess in the commentary you mentioned, you know, maybe some in China, but elsewhere. You know, in terms of what's going on there, are we talking about orders with major new customers, qualification, any specific programs? And I'm not sure these two comments were related or not, but I'll ask if they were with regard to your increased investment in six-inch indium phosphide, if you can maybe cover both of those points. Appreciate it. Thanks.
Speaker #7: And I'm not sure . These two comments were related or not , but I'll ask if they were with regard to your increased investment in six inch indium phosphide , if you can , maybe cover both of those points , I appreciate it .
Speaker #7: Thanks .
Speaker #6: Yeah , I'll I'll take a stab at that one . Tim . So yes , we are we are gaining more traction with customers .
Tim Bettles: Yeah, I'll take a stab at that one, Tim. So yes, we are gaining more traction with customers, as we've said on previous calls as well, that we've not been so prolific in. So we are gaining design in, we're gaining qualifications on existing products as well as new products, as we move forward, and the customers are looking to expand on their demand for indium phosphide. As Morris mentioned in the call, there's already been a big move from 3-inch to 4-inch, so we've spent a lot of time and effort on scaling up our 4-inch business. And we're also seeing a lot of interest now, and of course, we all know one customer that's really driving 6-inch demand.
Tim Bettles: Yeah, I'll take a stab at that one, Tim. So yes, we are gaining more traction with customers, as we've said on previous calls as well, that we've not been so prolific in. So we are gaining design in, we're gaining qualifications on existing products as well as new products, as we move forward, and the customers are looking to expand on their demand for indium phosphide. As Morris mentioned in the call, there's already been a big move from 3-inch to 4-inch, so we've spent a lot of time and effort on scaling up our 4-inch business. And we're also seeing a lot of interest now, and of course, we all know one customer that's really driving 6-inch demand.
Speaker #6: As we've said on previous calls as well that we've we've not we've not been so prolific in . So we are gaining we're gaining designing .
Speaker #6: We're gaining qualifications on existing products as well as new products . As we move forward . And the customers are looking to expand on their demand for indium phosphide .
Speaker #6: As Maurice mentioned in the call , there's there's already been been a big move from 3 inch to 4 inch . So we've spent a lot of time and effort on scaling up our four inch business .
Speaker #6: And we're also seeing a lot of interest now . And of course , we all know one customer that's really driving six inch demand .
Speaker #6: So we're we're really taking six inch very , very seriously . And we're expanding as we expand capacity , both now in our doubling capacity through 26 and beyond , we're looking at adding significant six inch capacity in there during that expansion .
Tim Bettles: So we're really taking six-inch very, very seriously, and we're expanding. As we expand capacity, both now and our doubling capacity through 2026 and beyond, we're looking at adding significant six-inch capacity in there during that expansion. And we're just plowing through the numbers right now to see what we need to drive six-inch, and how we scale six-inch compared to 3 and 4 and more of the traditional wafer sizes.
Tim Bettles: So we're really taking six-inch very, very seriously, and we're expanding. As we expand capacity, both now and our doubling capacity through 2026 and beyond, we're looking at adding significant six-inch capacity in there during that expansion. And we're just plowing through the numbers right now to see what we need to drive six-inch, and how we scale six-inch compared to 3 and 4 and more of the traditional wafer sizes.
Speaker #6: And we're just we're just plowing through the numbers right now to to see what we need to to drive six inch and how we scale six inch compared to three and four and more of the traditional wafer sizes
Speaker #4: Yeah , I think , you know
Morris Young: Yeah, I think, you know-
Morris Young: Yeah, I think, you know-
Speaker #7: Sorry , Maurice , please .
Tim Bettles: Sorry, Morris, please continue.
Tim Bettles: Sorry, Morris, please continue.
Speaker #4: Sure . Tim , I think you know , one part of it perhaps , is the cooperative effort . You know , usually when you're customer don't go to me .
Morris Young: Sure, Tim. I think, you know, one part of it, perhaps, is the cooperative effort. You know, usually, when your customer does not go to me, they probably talk to the sales guy and give us orders. I think now the dynamics is such that we sort of need to interact more to make sure that we're putting the right amount of attention to both in terms of development and capacity expansion to where they need it.
Morris Young: Sure, Tim. I think, you know, one part of it, perhaps, is the cooperative effort. You know, usually, when your customer does not go to me, they probably talk to the sales guy and give us orders. I think now the dynamics is such that we sort of need to interact more to make sure that we're putting the right amount of attention to both in terms of development and capacity expansion to where they need it.
Speaker #4: They probably talk to the sales guy and give us orders. But I think now the dynamics is such that we sort of need to interact more to make sure that we're putting the right amount of attention to both, in terms of development and capacity expansion, to where they need it.
Tim Bettles: Mm-hmm.
Tim Bettles: Mm-hmm.
Speaker #4: Okay . And then , you know , virtually also to convince us this is the right investment , we should have that . Right ?
Morris Young: Okay. And then, you know, it's vital also to convince us this is the right investment we should have. Is that right?
Morris Young: Okay. And then, you know, it's vital also to convince us this is the right investment we should have. Is that right?
Speaker #6: That's correct . We're also getting a lot more customer buy in with with commitments . And our purchase orders to drive that business forward as well
Tim Bettles: That's correct.
Tim Bettles: That's correct.
Morris Young: Yeah.
Morris Young: Yeah.
Tim Bettles: We're also getting a lot more customer buy-in, with commitments NRE purchase orders to drive that business forward as well.
Tim Bettles: We're also getting a lot more customer buy-in, with commitments NRE purchase orders to drive that business forward as well.
Morris Young: Yep. Okay. Thank you.
Morris Young: Yep. Okay. Thank you.
Speaker #7: Okay . Thank you
Speaker #1: We'll move next to Matt Bryson at Wedbush Securities
Operator: We'll move next to Matt Bryson at Wedbush Securities.
Operator: We'll move next to Matt Bryson at Wedbush Securities.
Speaker #8: Hey , thanks for taking the question . Just can you talk a little bit about what might have been unfettered demands or shipments in Q4 , or what you might be guiding to in Q1 if you weren't restricted by premise
Matthew Bryson: Thanks for taking the question. Just, can you talk a little bit about what might have been unfettered demands or, or shipments in, in Q4, or what you might be guiding to in Q1, if you weren't restricted by permits?
Matthew Bryson: Thanks for taking the question. Just, can you talk a little bit about what might have been unfettered demands or, or shipments in, in Q4, or what you might be guiding to in Q1, if you weren't restricted by permits?
Speaker #3: If we're not restricted by permits , then the basic question is our ability to manufacture high volume because there's there's no issue about demand or backlog .
Gary Fischer: If we're not restricted by permits, then the basic question is our ability to manufacture high volume, because there's no issue about demand or backlog. So the variable that you're really focusing on is manufacturing capability. So-
Gary Fischer: If we're not restricted by permits, then the basic question is our ability to manufacture high volume, because there's no issue about demand or backlog. So the variable that you're really focusing on is manufacturing capability. So-
Speaker #3: So the the variable that you really focusing on is manufacturing capability . So
Speaker #4: Yeah , I don't know whether the customer are telling us more demand than we can deliver , but I think we definitely have more orders than we can actually now as we as we added the capacity , we're counting on who we can supply to .
Morris Young: Yeah, I don't know whether the customer are telling us more demand than we can deliver, but I think we definitely have more orders than we can actually-
Morris Young: Yeah, I don't know whether the customer are telling us more demand than we can deliver, but I think we definitely have more orders than we can actually-
Gary Fischer: Yeah.
Gary Fischer: Yeah.
Morris Young: - manufacture now. As we add the capacity, we're counting on who we can supply to, but of course, there's the other gating factor, which is the permits.
Morris Young: - manufacture now. As we add the capacity, we're counting on who we can supply to, but of course, there's the other gating factor, which is the permits.
Speaker #4: But of course , there's other gating factor , which is permits
Matthew Bryson: Got it. So I mean, hypothetically, assuming you could be manufacturing around $20 million worth of indium phosphide, you could ship it all if you could get permitted?
Matthew Bryson: Got it. So I mean, hypothetically, assuming you could be manufacturing around $20 million worth of indium phosphide, you could ship it all if you could get permitted?
Speaker #8: So I mean , hypothetically assuming you could be manufacturing around $20 million worth of on , you could ship it all if you could get permanent .
Speaker #4: Yes . Correct . And that will that will we expect it to increase it to about $35 million a quarter by the end of the year .
Morris Young: Yes, correct. And that will. We expect it to increase it to about $35 million a quarter by the end of the year. And then we are making sure-
Morris Young: Yes, correct. And that will. We expect it to increase it to about $35 million a quarter by the end of the year. And then we are making sure-
Speaker #4: And then we are making sure every , every point along the supply chain receive equal attention in terms of , you know , poly in terms of crucibles , furnaces , etcetera , etcetera
Matthew Bryson: Sure.
Matthew Bryson: Sure.
Morris Young: Every point along the supply chain receives equal attention in terms of, you know, poly, in terms of crucibles, furnaces, et cetera, et cetera.
Morris Young: Every point along the supply chain receives equal attention in terms of, you know, poly, in terms of crucibles, furnaces, et cetera, et cetera.
Speaker #8: Understood . And then so you're completely confident that of that 35 million in capacity , if you can bring it on and you can get permits that come , come to the end of this year , you could possibly be shipping 30 million , 35 million in orders .
Matthew Bryson: Understood. So you're completely confident that of that $35 million in capacity, if you can bring it on and you can get permits, that by the end of this year, you could possibly be shipping $30 million, $35 million in orders. I guess, is there – are there any customer commitments or LTAs or anything else that kind of solidifies that demand?
Matthew Bryson: Understood. So you're completely confident that of that $35 million in capacity, if you can bring it on and you can get permits, that by the end of this year, you could possibly be shipping $30 million, $35 million in orders. I guess, is there – are there any customer commitments or LTAs or anything else that kind of solidifies that demand?
Speaker #8: I guess . Is there are there any customer commitments or ltas or anything else that kind of solidifies that , that demand
Morris Young: What's that term you're saying, LTA?
Speaker #4: What's that term you're saying ?
Morris Young: What's that term you're saying, LTA?
Speaker #6: This is we've we've got a lot of purchase orders in there to cover that . Right ? We've we've got a lot of purchase orders in there right now .
Tim Bettles: It's as we, we've got a lot of purchase orders in there to cover. Right. We've got a lot of purchase orders in there right now, and we're going through long-term agreements.
Tim Bettles: It's as we, we've got a lot of purchase orders in there to cover. Right. We've got a lot of purchase orders in there right now, and we're going through long-term agreements.
Speaker #6: And we're we're going through long term agreements . Yeah . You know , long term agreements . I think are in terms of locking up capacity are are easy .
Morris Young: Yes.
Morris Young: Yes.
Tim Bettles: You know, long-term agreements, I think, are in terms of locking up capacity, easy. And we're talking to customers to lock that capacity up. The gating factor, and we've reiterated this a lot today and previously, gating factor with long-term agreements is how much can we actually ship out of the country? What can we get permits for? So we're trying to address that through LTAs, but, for sure, we can definitely cover this kind of revenue volume with purchase orders and LTAs.
Tim Bettles: You know, long-term agreements, I think, are in terms of locking up capacity, easy. And we're talking to customers to lock that capacity up. The gating factor, and we've reiterated this a lot today and previously, gating factor with long-term agreements is how much can we actually ship out of the country? What can we get permits for? So we're trying to address that through LTAs, but, for sure, we can definitely cover this kind of revenue volume with purchase orders and LTAs.
Speaker #6: And we're talking to customers that capacity up the the gating factor . And we've reiterated this a lot today . And previously gating factor with long term agreements is how much can we actually ship out of the country .
Speaker #6: What can we get permits for . So we're we're trying to we're trying to address that through Ltas . But for sure we can definitely cover this kind of this kind of .
Speaker #6: Revenue volume with , with purchase orders and ltas
Speaker #8: Thanks , Tim . And then , Gary , I think the last one I have is for you . If you get to those those numbers in terms of shipments for new phosphide .
Matthew Bryson: Thanks, Tim. And then, Gary, I think the last one I have is for you. If you get to those numbers in terms of shipments for indium phosphide, so, 30 million plus, can you give us some of the parameters we should be thinking about in terms of gross margins? What are the puts and takes? And, you know, hypothetically, would you be able to get back to the kind of COVID, COVID-era highs that you were reporting back in 2021, 2022?
Matthew Bryson: Thanks, Tim. And then, Gary, I think the last one I have is for you. If you get to those numbers in terms of shipments for indium phosphide, so, 30 million plus, can you give us some of the parameters we should be thinking about in terms of gross margins? What are the puts and takes? And, you know, hypothetically, would you be able to get back to the kind of COVID, COVID-era highs that you were reporting back in 2021, 2022?
Speaker #8: So 30 million plus , can you give us some of the parameters we should be thinking about in terms of gross margins ? What are the puts and takes .
Speaker #8: And you know , hypothetically , would you be able to get back to the kind of Covid , Covid era highs ? The reporting back in 2021 , 2022 ?
Speaker #3: Yes . I mean , we we always like Indian phosphide and , you know , if you have to pick one of our three substrate product that you want to see , go through the ceiling in terms of volume and demand , it's the right one for us .
Gary Fischer: Yes, I mean, we, we always like indium phosphide. And, you know, if you have to pick of our three substrate products that you want to see go through the ceiling in terms of volume and demand, it's the right one for us. I think, I think getting somewhere at, you know, $40 million a quarter in aggregate, not just indium phosphide, but, we should, we should be getting hopefully somewhere close to 35%, gross margin. So-
Gary Fischer: Yes, I mean, we, we always like indium phosphide. And, you know, if you have to pick of our three substrate products that you want to see go through the ceiling in terms of volume and demand, it's the right one for us. I think, I think getting somewhere at, you know, $40 million a quarter in aggregate, not just indium phosphide, but, we should, we should be getting hopefully somewhere close to 35%, gross margin. So-
Speaker #3: I think I think getting somewhere at , you know , 40 million a quarter in aggregate , not just indium phosphide , but we should we should be getting hopefully somewhere close to 35% .
Speaker #3: Gross margin . So
Speaker #4: I will add another point . You know , I always describe AXT It's a fairly unique company because we I describe our substrate business as the locomotive engine in the front .
Morris Young: Oh, I will add another point. You know, I always describe AXT; it's a fairly unique company because we. I describe our substrate business as the locomotive engine in the front. But we have a lot of cars in the back following us, such as indium, such as phosphorus, quartz, pBN and crucibles, furnaces we make. So if our business is good, we're pulling these guys along, and that should help us. So what you're seeing, you know, here, I'm more optimistic, and Gary, is that I think that 35% is, you know, the normal substrate business. If we can pull those guys along, that should help us even further.
Morris Young: Oh, I will add another point. You know, I always describe AXT; it's a fairly unique company because we. I describe our substrate business as the locomotive engine in the front. But we have a lot of cars in the back following us, such as indium, such as phosphorus, quartz, pBN and crucibles, furnaces we make. So if our business is good, we're pulling these guys along, and that should help us. So what you're seeing, you know, here, I'm more optimistic, and Gary, is that I think that 35% is, you know, the normal substrate business. If we can pull those guys along, that should help us even further.
Speaker #4: But we have a lot of cars in the back following us , such as Indian , such as phosphorus , quartz , pvb and crucibles furnaces .
Speaker #4: We make . So if our business is good , we're pulling these guys along . That should help us . So what you're seeing here , I'm more optimistic .
Speaker #4: And Gary , is that I think that 35% is , you know , the normal substrate business . If we can pull those guys along , that should help us even further .
Speaker #3: Yeah , yeah . Our internal goal is higher . Matt . But so that we don't overstate expectations from , you know , for your community , you know , we want to be a little bit cautious .
Gary Fischer: Yeah. Yeah. Our internal goal is higher, Matt, but-
Gary Fischer: Yeah. Yeah. Our internal goal is higher, Matt, but-
Morris Young: Yep
Morris Young: Yep
Gary Fischer: ... so that we don't overstate expectations from, you know, for your community, you know, we want to be a little bit cautious. We are very optimistic, though. It's pretty exciting.
Gary Fischer: ... so that we don't overstate expectations from, you know, for your community, you know, we want to be a little bit cautious. We are very optimistic, though. It's pretty exciting.
Speaker #3: So we're very optimistic. So it's pretty exciting.
Matthew Bryson: And just one quick follow-up on the shift to 4-inch and 6-inch. Does that change the parameters at all on a gross margin perspective?
Speaker #8: Is just one quick follow up . The shift to four inch and six inch does that does that change the parameters at all on a on a gross margin perspective
Matthew Bryson: And just one quick follow-up on the shift to 4-inch and 6-inch. Does that change the parameters at all on a gross margin perspective?
Speaker #4: I think normally the larger the size we go , the better margin we will get . On the other hand , I'll be more cautious about six inches .
Morris Young: I think normally, the larger the size we go, the better margin we will get.
Morris Young: I think normally, the larger the size we go, the better margin we will get.
Morris Young: ...On the other hand, I'll be more cautious about 6 inches. We are still a little bit in development stage, so I think initially we're looking at lower margin, but we're looking for ways to compensate that. Right, get Tim?
Morris Young: ...On the other hand, I'll be more cautious about 6 inches. We are still a little bit in development stage, so I think initially we're looking at lower margin, but we're looking for ways to compensate that. Right, get Tim?
Speaker #4: We are still a little bit in the development stage, so I think initially we're looking at lower margin, but we're looking for ways to compensate for that.
Speaker #4: Right ? Tim .
Speaker #6: Right . And product mix is still very much geared towards three inch and four inch at the moment . And and you know , as Maurice says , we're running six inch up .
Tim Bettles: Right. Product mix is still very much geared towards 3 inch and 4 inch at the moment. You know, as Morris says, we're running 6 inch up. It is still a bit of a development project at the moment. It will be growing through this year. Again, remember, as we do that, 3 inch and 4 inch are still a big percentage of our business.
Tim Bettles: Right. Product mix is still very much geared towards 3 inch and 4 inch at the moment. You know, as Morris says, we're running 6 inch up. It is still a bit of a development project at the moment. It will be growing through this year. Again, remember, as we do that, 3 inch and 4 inch are still a big percentage of our business.
Speaker #6: It is still a bit of a development project at the moment . It will be growing through this year . But again . Remember , as as we do that three inch and four inch are still a big percentage of our business
Morris Young: Understood. Thank you.
Morris Young: Understood. Thank you.
Speaker #8: Thank you .
Speaker #3: Thanks , Matt
Leslie Green: Thanks, Matt.
Leslie Green: Thanks, Matt.
Speaker #1: And that concludes our Q&A session . I will now turn the conference back over to Leslie Green for closing remarks .
Operator: That concludes our Q&A session. I will now turn the conference back over to Leslie Green for closing remarks.
Operator: That concludes our Q&A session. I will now turn the conference back over to Leslie Green for closing remarks.
Speaker #2: Thank you , Audra , and thank you all for participating in our conference call . We will be participating virtually in the Loop Capital Conference in March and hope to see many of you there .
Leslie Green: Thank you, Audra, and thank you all for participating in our conference call. We will be participating virtually in the Loop Capital Conference in March and hope to see many of you there. As always, feel free to contact us if you would like to set up a call, and we look forward to speaking with you soon. Thanks.
Leslie Green: Thank you, Audra, and thank you all for participating in our conference call. We will be participating virtually in the Loop Capital Conference in March and hope to see many of you there. As always, feel free to contact us if you would like to set up a call, and we look forward to speaking with you soon. Thanks.
Speaker #2: As always, feel free to contact us if you would like to set up a call, and we look forward to speaking with you soon.
Speaker #2: Thanks .
Operator: This concludes today's conference call. Thank you for your participation. You may now disconnect.