Q4 2025 Tecogen Inc Earnings Call

Operator 3: Greetings, and welcome to the Tecogen Fiscal Year 2025 conference call. At this time, all participants are in listen-only mode. A question and answer session will follow the formal presentation, and you may be placed into question queue at any time by pressing star one on your telephone keypad. As a reminder, this conference is being recorded, and if anyone should require operator assistance, please press star zero. It's now my pleasure to turn the call over to John Whiting, General Counsel and Secretary. Please go ahead, John.

Operator: Greetings, and welcome to the Tecogen Fiscal Year 2025 conference call. At this time, all participants are in listen-only mode. A question and answer session will follow the formal presentation, and you may be placed into question queue at any time by pressing star one on your telephone keypad. As a reminder, this conference is being recorded, and if anyone should require operator assistance, please press star zero. It's now my pleasure to turn the call over to John Whiting, General Counsel and Secretary. Pleae go ahead, John.

Speaker #2: As a reminder, this conference is being recorded, and if anyone should require operator assistance, please press star 0. It's now my pleasure to turn the call over to Jack Wedding, General Counsel and Secretary.

Speaker #2: Please go ahead, Jack. Morning. This is Jack Wedding, General Counsel and Secretary of TECOGEN. This call is being recorded and will be archived on our website at tecogen.com.

John Whiting: Morning. This is Jack Whiting, General Counsel and Secretary of Tecogen. This call is being recorded and will be archived on our website at tecogen.com. The press release regarding our Q4 and year-end 2025 earnings and the presentation provided this morning are available in the investors section of our website. I'd like to direct your attention to our safe harbor statement included in our earnings, press release, and presentation. Various remarks that we may make about the company's expectations, plans, and prospects constitute forward-looking statements for purposes of the safe harbor provisions under the Private Securities Litigation Reform Act of 1995.

John Whiting: Morning. This is Jack Whiting, General Counsel and Secretary of Tecogen. This call is being recorded and will be archived on our website at tecogen.com. The press release regarding our Q4 and year-end 2025 earnings and the presentation provided this morning are available in the investors section of our website. I'd like to direct your attention to our safe harbor statement included in our earnings, press release, and presentation. Various remarks that we may make about the company's expectations, plans, and prospects constitute forward-looking statements for purposes of the safe harbor provisions under the Private Securities Litigation Reform Act of 1995.

Speaker #2: The press release regarding our fourth quarter and year-end 2025 earnings, and the presentation provided this morning, are available in the Investor section of our website.

Speaker #2: I’d like to direct your attention to our Safe Harbor statement included in our earnings press release and presentation. Various remarks that we may make about the company’s expectations, plans, and prospects constitute forward-looking statements for purposes of the Safe Harbor provisions under the Private Securities Litigation Reform Act of 1995.

Speaker #2: Actual results may differ materially from those indicated by forward-looking statements as a result of various factors, including those discussed in the company's most recent annual and quarterly reports on Forms 10-K and 10-Q under the caption 'Risk Factors' filed with the Securities and Exchange Commission, and available in the investor section of our website under the heading 'SEC Filings.'

John Whiting: Actual results may differ materially from those indicated by forward-looking statements as a result of various factors, including those discussed in the company's most recent annual and quarterly reports on Forms 10-K and 10-Q under the caption Risk Factors filed with the Securities and Exchange Commission and available in the Investors section of our website under the heading SEC Filings. While we may elect to update forward-looking statements, we specifically disclaim any obligation to do so. You should not rely on any forward-looking statements as representing our views as of any future date. During this call, we will refer to certain financial measures not prepared in accordance with generally accepted accounting principles or GAAP. A reconciliation of non-GAAP financial measures to the most directly comparable GAAP measures is provided in the press release regarding our Q4 and year-end 2025 earnings and on our website.

John Whiting: Actual results may differ materially from those indicated by forward-looking statements as a result of various factors, including those discussed in the company's most recent annual and quarterly reports on Forms 10-K and 10-Q under the caption Risk Factors filed with the Securities and Exchange Commission and available in the Investors section of our website under the heading SEC Filings. While we may elect to update forward-looking statements, we specifically disclaim any obligation to do so. You should not rely on any forward-looking statements as representing our views as of any future date. During this call, we will refer to certain financial measures not prepared in accordance with generally accepted accounting principles or GAAP. A reconciliation of non-GAAP financial measures to the most directly comparable GAAP measures is provided in the press release regarding our Q4 and year-end 2025 earnings and on our website.

Speaker #2: While we may elect to update forward-looking statements, we specifically disclaim any obligation to do so. So you should not rely on any forward-looking statements as representing our views as of any future date.

Speaker #2: During this call, we will refer to certain financial measures not prepared in accordance with general accepted accounting principles or GAAP. A reconciliation of non-GAAP financial measures to the most directly comparable GAAP measures is provided in the press release regarding our Q4 and year-end 2025 earnings and on our website.

Speaker #2: I'll turn the call over to Abhinav Rajesh, TECOGEN CEO, who will provide an overview of fourth quarter and year-end 2025 activity and results and Roger Deschênes, TECOGEN CFO, who will provide additional information regarding Q4 and year-end 2025 financial results.

John Whiting: I'll now turn the call over to Abhinand Rangesh, Tecogen's CEO, who will provide an overview of Q4 and year-end 2025 activity and results, and Roger Deschenes, Tecogen's CFO, who will provide additional information regarding Q4 and year-end 2025 financial results. Abhinand?

John Whiting: I'll now turn the call over to Abhinand Rangesh, Tecogen's CEO, who will provide an overview of Q4 and year-end 2025 activity and results, and Roger Deschenes, Tecogen's CFO, who will provide additional information regarding Q4 and year-end 2025 financial results. Abhinand?

Speaker #2: Abhinav? Thank you, Jack. Welcome to TECOGEN's fiscal year 2025 call. I know many of you would like an update on how the data center cooling strategy is progressing.

Abhinand Rangesh: Thank you, Jack. Welcome to Tecogen's Fiscal Year 2025 Call. I know many of you would like an update on how the data center cooling strategy is progressing. Today I'm going to start with an update on the Vertiv partnership. There have been some key positive developments that I'll share, including their opportunities for our chillers. I'm going to walk you through Tecogen's data center opportunity pipeline outside the Vertiv partnership. After that, I will provide an update on the other avenues we are working on, including expanding our manufacturing throughput, increasing service revenue and margin, and the non-data center pipeline. We have seen significant forward momentum with the Vertiv relationship. First, Vertiv has designed or is in the process of designing between 25 and 50 MW of our chillers into various projects.

Abhinand Rangesh: Thank you, Jack. Welcome to Tecogen's Fiscal Year 2025 Call. I know many of you would like an update on how the data center cooling strategy is progressing. Today I'm going to start with an update on the Vertiv partnership. There have been some key positive developments that I'll share, including their opportunities for our chillers. I'm going to walk you through Tecogen's data center opportunity pipeline outside the Vertiv partnership. After that, I will provide an update on the other avenues we are working on, including expanding our manufacturing throughput, increasing service revenue and margin, and the non-data center pipeline. We have seen significant forward momentum with the Vertiv relationship. First, Vertiv has designed or is in the process of designing between 25 and 50 MW of our chillers into various projects.

Speaker #2: So today, I'm going to start with an update on the Vertiv partnership. They have been some key positive developments that I'll share. Including their opportunities for our chillers.

Speaker #2: Then I'm going to walk you through Tecogen's data center opportunity pipeline outside the Vertiv partnership. After that, I will provide an update on the other avenues we are working on, including expanding our manufacturing throughput, increasing service revenue and margin, and the non-data center pipeline.

Speaker #2: We have seen significant forward momentum with the Vertiv relationship. First, Vertiv has designed, or is in the process of designing, between 25 and 50 megawatts of our chillers into various projects.

Speaker #2: This is equivalent to 50 to 100 of our 150-ton dual power source air-cooled chillers. our master partnership agreement that expands the marketing agreement that we signed last year.

Abhinand Rangesh: This is equivalent to 50 to 100 of our 150-ton dual power source air-cooled chillers. Second, we have been negotiating our master partnership agreement that expands the marketing release agreement that we signed last year. Third, we have discussed bringing Tecogen's Hybrid Drive technology to Vertiv's chillers. As the sales grow, this may allow Tecogen to scale manufacturing very quickly because we would focus on the dual power source and mate this to the refrigeration system that is already built in volume in Vertiv's factories. Last and most exciting of all, we have secured a demonstration project with Vertiv. This is expected to ship sometime toward the end of Q2 for 1 megawatt of cooling, or 2 times our 150-ton dual power source chillers.

Abhinand Rangesh: This is equivalent to 50 to 100 of our 150-ton dual power source air-cooled chillers. Second, we have been negotiating our master partnership agreement that expands the marketing release agreement that we signed last year. Third, we have discussed bringing Tecogen's Hybrid Drive technology to Vertiv's chillers. As the sales grow, this may allow Tecogen to scale manufacturing very quickly because we would focus on the dual power source and mate this to the refrigeration system that is already built in volume in Vertiv's factories. Last and most exciting of all, we have secured a demonstration project with Vertiv. This is expected to ship sometime toward the end of Q2 for 1 megawatt of cooling, or 2 times our 150-ton dual power source chillers.

Speaker #2: Third, we have discussed bringing TECOGEN's hybrid drive technology to Vertiv's chillers. As the sales grow, this may allow TECOGEN to scale manufacturing very quickly, because we would focus on the dual power source and make this to the refrigeration system that is already built in volume in Vertiv's factories.

Speaker #2: Last, and most exciting of all, we have secured a demonstration project with Vertiv. This is expected to ship sometime toward the end of Q2 for 1 megawatt of cooling, or two times our 150-ton dual power source chillers.

Speaker #2: Our chiller will go to the Vertiv controlled environment test chamber where it will operate under simulated AI data center conditions and various outside ambient temperatures.

Abhinand Rangesh: Our chiller will go to the Vertiv controlled environment test chamber, where it will operate under simulated AI data center conditions and various outside ambient temperatures. This technology demonstration project gives prospective customers data on how the chiller will operate under real world data center conditions across a range of ambient temperatures. While we have been furthering the Vertiv partnership, we have also been expanding our own data center pipeline. In this list, we have only included opportunities where the end customer has told us they plan to use Tecogen chillers and have made significant progress on signing data center tenants. This list is sorted based on our current project confidence. Developers that have existing data center experience and financing are higher on the list. Based on past experience, customers typically want chiller equipment delivered 6 to 9 months before the site needs to be operational.

Abhinand Rangesh: Our chiller will go to the Vertiv controlled environment test chamber, where it will operate under simulated AI data center conditions and various outside ambient temperatures. This technology demonstration project gives prospective customers data on how the chiller will operate under real world data center conditions across a range of ambient temperatures. While we have been furthering the Vertiv partnership, we have also been expanding our own data center pipeline. In this list, we have only included opportunities where the end customer has told us they plan to use Tecogen chillers and have made significant progress on signing data center tenants. This list is sorted based on our current project confidence. Developers that have existing data center experience and financing are higher on the list. Based on past experience, customers typically want chiller equipment delivered 6 to 9 months before the site needs to be operational.

Speaker #2: This technology demonstration project gives prospective customers data on how the chiller will operate under real-world data center conditions across a range of ambient temperatures.

Speaker #2: While we have been furthering the Vertiv partnership, we have also been expanding our own data center pipeline. In this list, we have only included opportunities where the end customer has told us they plan to use TECOGEN chillers and have made significant progress on signing data center tenants.

Speaker #2: This list is sorted based on our current project confidence. Developers that have existing data center experience and financing are higher on the list. Based on past experience, customers typically want chiller equipment delivered six to nine months before the site needs to be operational.

Speaker #2: For sites that are expected to be operational in early 2027, this was suggest equipment orders no later than Q2 or Q3 this year. Timing is always difficult to predict because there are multiple moving pieces on the customer side, but the timeline we have seen to date is completely consistent with our historic sales cycles.

Abhinand Rangesh: For sites that are expected to be operational in early 2027, this would suggest equipment orders no later than Q2 or Q3 this year. Timing is always difficult to predict because there are multiple moving pieces on the customer side, but the timeline we have seen to date is completely consistent with our historic sales cycles. Projects can also go through stop start cycles before closing. For example, in the past five months alone, we've had two instances where potential customers have told us they were ready to place the purchase order but then hit unforeseen delays on their end. However, as you can see, we have multiple opportunities of various sizes, thereby increasing the odds in our favor. One project is an expansion of an existing data center. They plan to use our dual power source chiller to handle new tenants.

Abhinand Rangesh: For sites that are expected to be operational in early 2027, this would suggest equipment orders no later than Q2 or Q3 this year. Timing is always difficult to predict because there are multiple moving pieces on the customer side, but the timeline we have seen to date is completely consistent with our historic sales cycles. Projects can also go through stop start cycles before closing. For example, in the past five months alone, we've had two instances where potential customers have told us they were ready to place the purchase order but then hit unforeseen delays on their end. However, as you can see, we have multiple opportunities of various sizes, thereby increasing the odds in our favor. One project is an expansion of an existing data center. They plan to use our dual power source chiller to handle new tenants.

Speaker #2: Projects can also go through stop-start cycles before closing. For example, in the past five months alone, we have had two instances where potential customers have told us they were ready to place the purchase order but then hit unforeseen delays on their end.

Speaker #2: However, as you can see, we have multiple opportunities of various sizes, thereby increasing the odds in our favor. One project is an expansion of an existing data center.

Speaker #2: They plan to use our dual power source chiller to handle new tenants. Another is in the final stages of tenant negotiations and expects to use our DTX chillers to maximize IT capacity.

Abhinand Rangesh: Another is in the final stages of tenant negotiations and expects to use our DTX chillers to maximize IT capacity. The same developer also has a second project of a similar size and another of a larger scale. Next, there is an opportunity for a demonstration project with an established data center owner for up to 40 chillers. This developer evaluated the cost of power from our chillers against the alternatives and found the value highly compelling. However, they were also looking for some independent validation of our chillers. We believe that the Vertiv demonstration project will be instrumental in unlocking this opportunity. The remaining projects have filed for environmental permits and are in active discussions with tenants. They represent 100 to 200 chillers collectively. We expect more clarity on construction timing as permits are granted and tenant negotiations progress.

Abhinand Rangesh: Another is in the final stages of tenant negotiations and expects to use our DTX chillers to maximize IT capacity. The same developer also has a second project of a similar size and another of a larger scale. Next, there is an opportunity for a demonstration project with an established data center owner for up to 40 chillers. This developer evaluated the cost of power from our chillers against the alternatives and found the value highly compelling. However, they were also looking for some independent validation of our chillers. We believe that the Vertiv demonstration project will be instrumental in unlocking this opportunity. The remaining projects have filed for environmental permits and are in active discussions with tenants. They represent 100 to 200 chillers collectively. We expect more clarity on construction timing as permits are granted and tenant negotiations progress.

Speaker #2: The same developer also has a second project of a similar size, and another of a larger scale. Next, there is an opportunity for a demonstration project with an established data center owner, for up to 40 chillers.

Speaker #2: This developer evaluated the cost of power from our chillers against the alternatives. And found the value highly compelling. However, they were also looking for some independent validation of our chillers.

Speaker #2: We believe that the Vertiv demonstration project will be instrumental in unlocking this opportunity. The remaining projects have filed for environmental permits and are in active discussions with tenants.

Speaker #2: They represent 100 to 200 chillers collectively. We expect more clarity on construction timing as permits are granted and tenant negotiations progress. In our previous call, we had mentioned an opportunity where we have an LOI for six STX chillers.

Abhinand Rangesh: In our previous call, we had mentioned an opportunity where we have an LOI for 6 DTx chillers. Although this opportunity is progressing, we have moved this further down the list because we believe the others outlined above are moving faster and have more near-term potential. In addition to this list, we also have ongoing discussions with multiple hyperscalers and multiple other data center developers. The current timeline on these projects are completely in line with projects in other industries. We also believe that closing the first few opportunities will unlock significant demand. Based on conversations with prospects, even if we have chillers in other critical cooling applications, many data center owners would still like to see our chillers in other data centers or cooling AI loads. We believe this concern will be addressed with the Vertiv demonstration project and some of the near-term opportunities.

Abhinand Rangesh: In our previous call, we had mentioned an opportunity where we have an LOI for 6 DTx chillers. Although this opportunity is progressing, we have moved this further down the list because we believe the others outlined above are moving faster and have more near-term potential. In addition to this list, we also have ongoing discussions with multiple hyperscalers and multiple other data center developers. The current timeline on these projects are completely in line with projects in other industries. We also believe that closing the first few opportunities will unlock significant demand. Based on conversations with prospects, even if we have chillers in other critical cooling applications, many data center owners would still like to see our chillers in other data centers or cooling AI loads. We believe this concern will be addressed with the Vertiv demonstration project and some of the near-term opportunities.

Speaker #2: Although this opportunity is progressing, we have moved this further down the list because we believe the others outlined above are moving faster and have more near-term potential.

Speaker #2: In addition to this list, we also have ongoing discussions with multiple hyperscalers and multiple other data center developers. The current timeline on these projects is completely in line with projects in other industries.

Speaker #2: We also believe that closing the first few opportunities will unlock significant demand. Based on conversations with prospects, even if we have chillers in other critical cooling applications, many data center owners would still like to see our chillers in other data centers or cooling AI loads.

Speaker #2: We believe this concern will be addressed with the Vertiv demonstration project and some of the near-term opportunities. Aside from data center projects, we are expecting chiller orders from other segments such as cannabis, hospitals, and comfort cooling.

Abhinand Rangesh: Aside from data center projects, we are expecting chiller orders from other segments such as cannabis, hospitals, and comfort cooling. These represent at least another 6 DTx chillers. Expected delivery is the fall and winter of this year. We're also seeing a gradual resurgence in cogeneration leads as utility rates rise across the United States. Given the significant amount of interest in our dual power source chiller, we wanted to make sure we could handle a step change in order volume. We have now qualified a vendor for the sheet metal and refrigeration assembly. This vendor already built hundreds of similar refrigeration and sheet metal assemblies for a large chiller company. We have also qualified an electrical assembly vendor for the power electronics and are in the process of qualifying a second vendor. We are also presently building some inventory of both the dual power source chillers and DTx chillers.

Abhinand Rangesh: Aside from data center projects, we are expecting chiller orders from other segments such as cannabis, hospitals, and comfort cooling. These represent at least another 6 DTx chillers. Expected delivery is the fall and winter of this year. We're also seeing a gradual resurgence in cogeneration leads as utility rates rise across the United States. Given the significant amount of interest in our dual power source chiller, we wanted to make sure we could handle a step change in order volume. We have now qualified a vendor for the sheet metal and refrigeration assembly. This vendor already built hundreds of similar refrigeration and sheet metal assemblies for a large chiller company. We have also qualified an electrical assembly vendor for the power electronics and are in the process of qualifying a second vendor. We are also presently building some inventory of both the dual power source chillers and DTx chillers.

Speaker #2: These represent at least another six DTX chillers. Expected delivery is the fall and winter of this year. We're also seeing a gradual resurgence in cogeneration leads as utility rates rise across the United States.

Speaker #2: Given the significant amount of interest in our dual power source chiller, we wanted to make sure we could handle a step change in order volume.

Speaker #2: We have now qualified a vendor for the sheet metal and refrigeration assembly. This vendor already builds hundreds of similar refrigeration and sheet metal assemblies for a large chiller company.

Speaker #2: We have also qualified an electrical assembly vendor for the power electronics and are in the process of qualifying a second vendor. We're also presently building some inventory of both the dual power source chillers and DTX chillers.

Speaker #2: Our engineering team has been iteratively improving our design for manufacturability and to reduce build time. Given the cash usage over the last six months, I would like to provide some context and then the plan for the next nine months.

Abhinand Rangesh: Our engineering team has been iteratively improving our design for manufacturability and to reduce build time. Given the cash usage over the last six months, I would like to provide some context and then the plan for the next nine months. Given the size of the pipeline, one of the concerns we had was being able to handle aggressive delivery schedules. As a result, we expended cash on several fronts simultaneously to get everything we needed to do done. Some of these uses of cash included manufacturing capacity expansion, performing the testing and improvements needed for our dual power source chiller to operate under data center conditions. We also hired a marketing firm that specializes in data centers. In addition to the above, in Q3, we invested significantly in the service group, especially in the greater Manhattan area.

Abhinand Rangesh: Our engineering team has been iteratively improving our design for manufacturability and to reduce build time. Given the cash usage over the last six months, I would like to provide some context and then the plan for the next nine months. Given the size of the pipeline, one of the concerns we had was being able to handle aggressive delivery schedules. As a result, we expended cash on several fronts simultaneously to get everything we needed to do done. Some of these uses of cash included manufacturing capacity expansion, performing the testing and improvements needed for our dual power source chiller to operate under data center conditions. We also hired a marketing firm that specializes in data centers. In addition to the above, in Q3, we invested significantly in the service group, especially in the greater Manhattan area.

Speaker #2: Given the size of the pipeline, one of the concerns we had was being able to handle aggressive delivery schedules. As a result, we expended cash on several fronts simultaneously to get everything we needed to do done.

Speaker #2: Some of these uses of cash included manufacturing capacity expansion, performing the testing and improvements needed for our dual power source chiller to operate under data center conditions, we also hired a marketing firm that specializes in data centers.

Speaker #2: In addition to the above, in Q3, we invested significantly in the service group, especially in the greater Manhattan area. We have found over the last two years, despite increasing our service contract rates greater than inflation, that margin on the cogeneration products has reduced in the greater Manhattan and Toronto service centers.

Abhinand Rangesh: We have found over the last two years, despite increasing our service contract rates greater than inflation, we have found that margin on the cogeneration products has reduced in the greater Manhattan and Toronto service centers. The chiller product continues to maintain solid margins. The cost of labor and increased travel times between sites is one of the biggest contributors to this decline in margin. To counteract this, we invested in new engines in this territory with the latest performance improvements. This allows us to increase service intervals by at least 50%. We expect this to lower labor costs per hour of operation. In Q4, we saw an increase in both run hours and margin compared to Q3 in these territories. We will continue to monitor and, if needed, institute aggressive price increases or cost reductions where needed. Our current cash position is $10 million.

Abhinand Rangesh: We have found over the last two years, despite increasing our service contract rates greater than inflation, we have found that margin on the cogeneration products has reduced in the greater Manhattan and Toronto service centers. The chiller product continues to maintain solid margins. The cost of labor and increased travel times between sites is one of the biggest contributors to this decline in margin. To counteract this, we invested in new engines in this territory with the latest performance improvements. This allows us to increase service intervals by at least 50%. We expect this to lower labor costs per hour of operation. In Q4, we saw an increase in both run hours and margin compared to Q3 in these territories. We will continue to monitor and, if needed, institute aggressive price increases or cost reductions where needed. Our current cash position is $10 million.

Speaker #2: The chiller product continues to maintain solid margins. The cost of labor and increased travel times between sites is one of the biggest contributors to this decline in margin.

Speaker #2: To counteract this, we invested in new engines in this territory with the latest performance improvements. This allows us to increase service intervals by at least 50%.

Speaker #2: We expect this to lower labor costs per hour of operation. In Q4, we saw an increase in both run hours and margin compared to Q3 in these territories.

Speaker #2: We will continue to monitor and, if needed, institute aggressive price increases or cost reductions where needed. Our current cash position is 10 million. By Q2, we plan to cut the cash burn down substantially from 2023 to mid-2025.

Abhinand Rangesh: By Q2, we plan to cut the cash burn down substantially. From 2023 to mid-2025, we managed with $2 million of cash, including a factory move. Roger will discuss the results and the financial plan going forward.

Abhinand Rangesh: By Q2, we plan to cut the cash burn down substantially. From 2023 to mid-2025, we managed with $2 million of cash, including a factory move. Roger will discuss the results and the financial plan going forward.

Speaker #2: We managed with $2 million of cash, including a factory move. Roger will discuss the results and the financial plan going forward.

Speaker #3: Thank you, Amina. And good morning, everybody. I'll start with a fourth-quarter results. Our revenues for the quarter are decreased by $800,000 in the fourth quarter to 5.3 million, which compares to 6.1 million in the fourth quarter of 2024.

Roger Deschenes: Thank you, Abhinand, and good morning, everybody. I'll start with the Q4 results. Our revenues for the quarter decreased by $800,000 in Q4 to $5.3 million, which compares to $6.1 million in Q4 of 2024. This is due to the decrease in product shipments and a reduction in energy production revenue. Our gross profit also decreased by 28% in Q4 compared to the comparable period in the prior period. This is due to the decrease in our products revenue and an increase in our service costs. The gross margin decreased 8.2% to 36.8% in Q4 from 45% in the comparable period in 2024.

Roger Deschenes: Thank you, Abhinand, and good morning, everybody. I'll start with the Q4 results. Our revenues for the quarter decreased by $800,000 in Q4 to $5.3 million, which compares to $6.1 million in Q4 of 2024. This is due to the decrease in product shipments and a reduction in energy production revenue. Our gross profit also decreased by 28% in Q4 compared to the comparable period in the prior period. This is due to the decrease in our products revenue and an increase in our service costs. The gross margin decreased 8.2% to 36.8% in Q4 from 45% in the comparable period in 2024.

Speaker #3: This is due to the decrease in product shipments and a reduction in our energy production revenue. Our gross profit also decreased by 28% in the fourth quarter compared to the comparable period in the prior year.

Speaker #3: And this is due to the decrease in our product's revenue and an increase in our service costs. The gross margin decreased 8.2% to 36.8% in the fourth quarter from 45% in the comparable period in 2024.

Speaker #3: As Aminah touched upon earlier, our services margin was lower compared to the same period last year, but has increased compared to the third quarter of this year.

Roger Deschenes: As Abinand touched upon earlier, our services margin was lower compared to the same period last year, but has increased compared to the third quarter of this year. Quarter-over-quarter changes in revenues and gross margin will be discussed further in our segment performance slide. Our operating expenses increased 57% in Q4 2025 to $6.1 million from $3.9 million in Q4 2024. This is due in part to a $900,000 increase in the asset impairment charge in our energy production segment, increased operating costs in our services segment, an increased cost in our production segment, which we incurred for the manufacturing expansion that we're working towards.

Roger Deschenes: As Abinand touched upon earlier, our services margin was lower compared to the same period last year, but has increased compared to the third quarter of this year. Quarter-over-quarter changes in revenues and gross margin will be discussed further in our segment performance slide. Our operating expenses increased 57% in Q4 2025 to $6.1 million from $3.9 million in Q4 2024. This is due in part to a $900,000 increase in the asset impairment charge in our energy production segment, increased operating costs in our services segment, an increased cost in our production segment, which we incurred for the manufacturing expansion that we're working towards.

Speaker #3: The quarter-over-quarter changes in revenues and gross margin will be discussed further in our segment performance slide. Our operating expenses increased 57% in the fourth quarter of 2025 to 6.1 million from 3.9 million in the fourth quarter of 2024.

Speaker #3: This is due in part to a $900,000 increase in the asset impairment charge in our energy production segment, increased operating costs in our services segment, and increased costs in our production segment, which we incurred to for the manufacturing expansion that we're working towards.

Speaker #3: And we also saw increases in our R&D costs which were incurred to continue the development and refinement of our dual source chiller which is focused on our entry into the data center market.

Roger Deschenes: We also saw increases in our R&D costs, which were incurred to continue the development and refinement of our dual power source chiller, which is focused on our entry into the data center market. Our net loss increased in Q4 to $4 million from $1.1 million in the similar period in 2023, and this is due to the reduction in sales and gross margin, the asset impairment charge, and an overall increase in operating expenses. We'll discuss expenses in more detail in our full year 2024 numbers. Moving to adjusted EBITDA. The adjusted EBITDA loss for Q4 was $2.4 million, which compares to about $700 thousand in the same period last year.

Roger Deschenes: We also saw increases in our R&D costs, which were incurred to continue the development and refinement of our dual power source chiller, which is focused on our entry into the data center market. Our net loss increased in Q4 to $4 million from $1.1 million in the similar period in 2023, and this is due to the reduction in sales and gross margin, the asset impairment charge, and an overall increase in operating expenses. We'll discuss expenses in more detail in our full year 2024 numbers. Moving to adjusted EBITDA. The adjusted EBITDA loss for Q4 was $2.4 million, which compares to about $700 thousand in the same period last year.

Speaker #3: Our net loss increased in the fourth quarter to $4 million from 1.1 million in the similar period in 2024. And this is due to the reduction in sales and gross margin the asset impairment charge and an overall increase in operating expenses.

Speaker #3: We'll discuss expenses in more detail in our full yet 2025 numbers. Moving to adjusted EBIT, the adjusted EBIT loss for the fourth quarter was 2.4 million, which compares to about $700,000 in the same period last year.

Speaker #3: And again, this is due to lower sales and gross margin and the increase in operating expenses that we experienced. Moving to performance by segment, our products revenue decreased 68% to about a half a million.

Roger Deschenes: This is due to lower sales and gross margin and the increase in operating expenses that we experienced. Moving to performance by segment. Our products revenue decreased 68% to about half a million dollars in the current period from $1.4 million in Q4 2024. This is due to a delay, as Abinand suggested earlier, of a couple of projects which we expected to ship in Q4 2025, but we now expect to close these orders in the next few months. As we have discussed in the past, our product revenue has significant variability quarter to quarter, and it's more now this past quarter.

Roger Deschenes: This is due to lower sales and gross margin and the increase in operating expenses that we experienced. Moving to performance by segment. Our products revenue decreased 68% to about half a million dollars in the current period from $1.4 million in Q4 2024. This is due to a delay, as Abinand suggested earlier, of a couple of projects which we expected to ship in Q4 2025, but we now expect to close these orders in the next few months. As we have discussed in the past, our product revenue has significant variability quarter to quarter, and it's more now this past quarter.

Speaker #3: In the current period from 1.4 million in the fourth quarter of 2024. This is due to a delay, as Aminah suggested earlier, of a couple of projects which we expected to ship in the fourth quarter of 2025, but we now expect to close these orders in the next few months.

Speaker #3: As we have discussed in the past, our product revenue has significant variability quarter to quarter. And it's borne out in this past quarter. Our product's gross margin decreased to a negative 6.9% from 30.9% in the fourth quarter of 2024.

Roger Deschenes: Our products gross margin decreased to -6.9% from 30.9% in Q4 2024. This is in, you know, increased unabsorbed labor, and this is labor that we're using to work towards increasing our throughput. An increase in our inventory reserve, slight increase in warranty costs, and all of these costs, which have a disproportionate impact on margin to the revenue decrease. Our services revenue increased 9% quarter-over-quarter to $4.5 million in Q4, compared to $4.1 million in the comparable period in 2024, and this is due to higher billable activity and higher operating hours of the equipment from our existing service contracts.

Roger Deschenes: Our products gross margin decreased to -6.9% from 30.9% in Q4 2024. This is in, you know, increased unabsorbed labor, and this is labor that we're using to work towards increasing our throughput. An increase in our inventory reserve, slight increase in warranty costs, and all of these costs, which have a disproportionate impact on margin to the revenue decrease. Our services revenue increased 9% quarter-over-quarter to $4.5 million in Q4, compared to $4.1 million in the comparable period in 2024, and this is due to higher billable activity and higher operating hours of the equipment from our existing service contracts.

Speaker #3: This is increased to increased unreserved labor. And this is labor that we're using to work towards increasing our throughput. An increase in our inventory reserve slight increase in warranty costs and all of these costs which have a disproportionate impact on margin due to the revenue increased 9% quarter over quarter to 4.5 million in the fourth quarter compared to 4.1 million in the comparable period in 2024.

Speaker #3: And this is due to higher billable activity and higher operating hours of the equipment from our existing service contracts. Our service margin decreased 7.4% to 43.4% in the fourth quarter of 2025 from 50.8% in the fourth quarter of 2024.

Roger Deschenes: Our service margin decreased 7.4% to 43.4% in Q4 2025, from 50.8% in Q4 2024. This is due to increased labor and material costs in the greater New York City area. Our energy production revenue decreased 28% in Q4 2025 to just under $4 million, compared to about $5.555 million in Q4 2024. This is due to you know, contracts that expired early in 2024 and some of which expired late in 2023, and the temporary site closures during the year.

Roger Deschenes: Our service margin decreased 7.4% to 43.4% in Q4 2025, from 50.8% in Q4 2024. This is due to increased labor and material costs in the greater New York City area. Our energy production revenue decreased 28% in Q4 2025 to just under $4 million, compared to about $5.555 million in Q4 2024. This is due to you know, contracts that expired early in 2024 and some of which expired late in 2023, and the temporary site closures during the year.

Speaker #3: And this is due to increased labor and material costs and the greater New York City area. Our energy production revenue decreased 28% in the fourth quarter of 2025 to just under $4 million compared to $5 million I'm sorry.

Speaker #3: About 555,000 in the fourth quarter of 2024. And this is due to contract that expired early in 2024, and some of which expired late in 2023.

Speaker #3: And the temporary site closures during the year. Our energy production gross margin decreased to 13.7% in the fourth quarter of 2025, from 39% in the fourth quarter of 2024.

Roger Deschenes: Our energy production gross margin decreased to 13.7% in Q4 2025 from 39% in Q4 2024, and this is due to, you know, an increase in cost with our energy production business. Moving to the full year 2025 results. Our revenue increased 19.7% or $4.5 million in 2025 to $27.1 million compared to $22.6 million in fiscal 2024. This is due to a significant increase in our products revenue and is an increase in our services revenue.

Roger Deschenes: Our energy production gross margin decreased to 13.7% in Q4 2025 from 39% in Q4 2024, and this is due to, you know, an increase in cost with our energy production business. Moving to the full year 2025 results. Our revenue increased 19.7% or $4.5 million in 2025 to $27.1 million compared to $22.6 million in fiscal 2024. This is due to a significant increase in our products revenue and is an increase in our services revenue.

Speaker #3: And this is due to an increase in cost. With our energy production business. Moving to the full year 2025 results, our revenue increased 19.7% or 4.5 million in 2025 to

Speaker #1: Thu, $7.1 million, compared to $22.6 million in fiscal 2024. And this is due to a significant increase in our products revenue and an increase in our services revenue.

Speaker #1: A gross profit decreased about half a percent in 2025 compared to 2024 , and the decrease in the gross margin margin was 7.3% , which decreased from 43.6% in 2024 to 36.3% in fiscal 2025 , and we'll review year over year changes in revenues and gross profit further in the segment performance slide Our operating expenses increased 25% in 2025 to 18.1 million from 14.4 and 14.4 million in 2024 , due in part to the $900,000 increase in the asset impairment charge .

Roger Deschenes: Our gross profit decreased about 0.5% in 2025 compared to 2024, and the decrease in the gross margin was 7.3%, which decreased from 43.6% in 2024 to 36.3% in fiscal 2025. We'll review year-over-year changes in revenues and gross profit further in the segment performance slide.

Roger Deschenes: Our gross profit decreased about 0.5% in 2025 compared to 2024, and the decrease in the gross margin was 7.3%, which decreased from 43.6% in 2024 to 36.3% in fiscal 2025. We'll review year-over-year changes in revenues and gross profit further in the segment performance slide.

Roger Deschenes: Our operating expenses increased 25% in 2025 to $18.1 million from $14.4 million in 2024, due in part to the $900,000 increase in the asset impairment charge in our energy performance segment, an increased operating cost in our services segment. An increase in cost in our product segment, again, that's geared to the manufacturing expansion and increased R&D costs, which we encourage to continue, again, the development and refinement of our dual source chiller. Again, that we're focused to utilize in the data center market. Our net loss increased in 2025 to $8.2 million from $4.7 million in 2024.

Roger Deschenes: Our operating expenses increased 25% in 2025 to $18.1 million from $14.4 million in 2024, due in part to the $900,000 increase in the asset impairment charge in our energy performance segment, an increased operating cost in our services segment. An increase in cost in our product segment, again, that's geared to the manufacturing expansion and increased R&D costs, which we encourage to continue, again, the development and refinement of our dual source chiller. Again, that we're focused to utilize in the data center market. Our net loss increased in 2025 to $8.2 million from $4.7 million in 2024.

Speaker #1: In our energy performance segment and increased operating costs in our service segment , an increase in costs in our product segment . Again , that's geared to the manufacturing expansion and increased R&D costs , which we incurred to continue again , the development and refinement of our dual source chiller .

Speaker #1: Again , that we're focused to utilize in the data center market . Our net loss increased in 2025 to 8.2 million , from 4.7 million in 2024 .

Roger Deschenes: The loss is due to, again, lower services and energy production and gross margin, the asset impairment charge, and an increase in operating costs. We'd like to point out that we are working on a program to reduce our OpEx to levels that are consistent with levels from 2024. The 2024 spend, I should say. Anticipate to see reductions to commence in Q2 of this year and further expansion of those reductions in Q3 and Q4. Our adjusted EBITDA loss was $5.6 million in 2025, which compares to $3.6 million in the same period last year. This is due to lower services and energy production gross margin and the increase in operating costs.

Speaker #1: And the loss is due to, again, lower services and energy production, gross margin, the asset impairment charge, and an increase in operating cost.

Roger Deschenes: The loss is due to, again, lower services and energy production and gross margin, the asset impairment charge, and an increase in operating costs. We'd like to point out that we are working on a program to reduce our OpEx to levels that are consistent with levels from 2024. The 2024 spend, I should say. Anticipate to see reductions to commence in Q2 of this year and further expansion of those reductions in Q3 and Q4. Our adjusted EBITDA loss was $5.6 million in 2025, which compares to $3.6 million in the same period last year. This is due to lower services and energy production gross margin and the increase in operating costs.

Speaker #1: And we'd like to point out that we are working on program to reduce our opex to levels that are consistent with levels from 2024 .

Speaker #1: The 2024 spend , I should say , and anticipate to see reductions to commence in the second quarter of this year . And further expansion of those reductions in the third quarter and in the fourth quarter .

Speaker #1: Our adjusted EBITDA loss was $5.6 million in 2025 , which compares to $3.6 million in the same period last year . And this is due to lower services and energy production , gross margin , and the increase in operating costs .

Speaker #1: Reviewing our performance by segment, our products revenue increased 105% to $9.1 million in the current period, from $4.4 million in 2024.

Roger Deschenes: Reviewing our performance by segment, our products revenue increased 105% to $9.1 million in the current period from $4.4 million in 2024. This decrease, I'm sorry, this increase is due to an increased chiller and cogeneration revenue that was recognized in the first three quarters of 2025. As we mentioned earlier, this increase was partially reduced by or offset by the decrease in product revenue we experienced in Q4 due to project delays. The gross margin for products improved 1% in 2025 to 33.2% from 32.2% in 2024.

Roger Deschenes: Reviewing our performance by segment, our products revenue increased 105% to $9.1 million in the current period from $4.4 million in 2024. This decrease, I'm sorry, this increase is due to an increased chiller and cogeneration revenue that was recognized in the first three quarters of 2025. As we mentioned earlier, this increase was partially reduced by or offset by the decrease in product revenue we experienced in Q4 due to project delays. The gross margin for products improved 1% in 2025 to 33.2% from 32.2% in 2024.

Speaker #1: And decrease . I'm sorry , this increase is due to increased chiller and cogeneration revenue . That was recognized in the first three quarters of 2025 , and as we mentioned earlier , the it was the decrease was this increase was partially reduced by or offset by the decrease in production revenue we experienced in the fourth quarter to do our project delays , the gross margin for products improved 1% in the 2025 to 33.2% , from 32.2% in 2024 .

Speaker #1: Our services revenue increased 3% year over year to 16.6 million in 2025 , compared to 16.1 million in 2024 . And this is due primarily to higher billable activity and an increase to slight increase in operating hours of the equipment .

Roger Deschenes: Our services revenue increased 3% year-over-year to $16.6 million in 2025, compared to $16.1 million in 2024. This is due primarily to higher billable activity and a slight increase in operating hours of the equipment that's being serviced. Our service gross margin decreased 8.9% to 38.6% in 2025 from 47.5% in 2024. This is due to increased labor material costs incurred as we invested in new engines and new performance upgrades to the sites in New York City. The intention of these investments is expected to reduce labor hours needed per system going forward. The decline in margin is presently only in the cogeneration equipment. Our chillers continue to generate expected and very strong margins.

Roger Deschenes: Our services revenue increased 3% year-over-year to $16.6 million in 2025, compared to $16.1 million in 2024. This is due primarily to higher billable activity and a slight increase in operating hours of the equipment that's being serviced. Our service gross margin decreased 8.9% to 38.6% in 2025 from 47.5% in 2024. This is due to increased labor material costs incurred as we invested in new engines and new performance upgrades to the sites in New York City. The intention of these investments is expected to reduce labor hours needed per system going forward. The decline in margin is presently only in the cogeneration equipment. Our chillers continue to generate expected and very strong margins.

Speaker #1: That's being serviced . Service gross margin decreased 8.9% to 38.6% in 2025 , from 47.5% in 2024 , and this is due to increased labor and material costs incurred as we invested in new engines , new engines and new performance upgrades to the sites in New York City .

Speaker #1: The intention of these investments is expected to reduce labor hours needed per system going forward . The decline in margin is presently only in the cogeneration equipment .

Speaker #1: Our chillers continue to generate expected and very strong margins . Therefore , we plan to institute both price increases for cogeneration equipment in the Greater New York City area area and make significant cost reductions in the territory to .

Roger Deschenes: Therefore, we plan to institute both price increases for cogeneration equipment in the greater New York City area and make significant cost reductions in the territory to restore this region to higher profitability. Our energy production revenue decreased 37% in 2025 to $1.3 million from $2.1 million in 2024. Again, this is due to, you know, contract expirations in the latter part of 2023 and early 2024, and, you know, temporary site closures for repairs. Our energy production gross margins decreased to 28.3% from 38.0% in 2024. That concludes the results review, and I'll turn the call over to Abhinand for his closing remarks.

Roger Deschenes: Therefore, we plan to institute both price increases for cogeneration equipment in the greater New York City area and make significant cost reductions in the territory to restore this region to higher profitability. Our energy production revenue decreased 37% in 2025 to $1.3 million from $2.1 million in 2024. Again, this is due to, you know, contract expirations in the latter part of 2023 and early 2024, and, you know, temporary site closures for repairs. Our energy production gross margins decreased to 28.3% from 38.0% in 2024. That concludes the results review, and I'll turn the call over to Abhinand for his closing remarks.

Speaker #1: I'm sorry , significant cost reductions in the territory to restore this region to higher profitability . Our energy production revenue decreased 37% , 37% in 2025 to $1.3 million from $2.1 million in the fourth in 2024 , and again , this is due to contract expirations in the latter part of 2023 and early 2024 , and , you know , temporary site closures for repairs .

Speaker #1: Our energy production , gross margins decreased . Two 28.3% from 38.0% in 2024 . That concludes the results review , and I'll turn the call over to Abhinav for his closing remarks .

Speaker #2: Thank you , Roger . So I think the single biggest improvement that we have seen in the last five months is really the secure securing of the first demonstration project .

Abhinand Rangesh: Thank you, Roger. I think the single biggest improvement that we've seen in the last five months is really the securing of the first demonstration project. I personally believe that this will be the catalyst for everything else that will come and will also unlock the much broader opportunity that we have been pursuing. In a world where AI tokens are, per unit of power, is the new metric, we provide the simplest and most cost-effective way for a data center to obtain more power, which directly results in more compute and more revenue. We have a robust pipeline of opportunities, the demonstration project, and I think all the pieces are coming together to unlock the larger projects on the multi-billion-dollar data center cooling opportunity. Thanks for listening, and I'll open the floor for questions.

Abhinand Rangesh: Thank you, Roger. I think the single biggest improvement that we've seen in the last five months is really the securing of the first demonstration project. I personally believe that this will be the catalyst for everything else that will come and will also unlock the much broader opportunity that we have been pursuing. In a world where AI tokens are, per unit of power, is the new metric, we provide the simplest and most cost-effective way for a data center to obtain more power, which directly results in more compute and more revenue. We have a robust pipeline of opportunities, the demonstration project, and I think all the pieces are coming together to unlock the larger projects on the multi-billion-dollar data center cooling opportunity. Thanks for listening, and I'll open the floor for questions.

Speaker #2: I personally believe that this will be the catalyst for everything else that will come and , and will also unlock the much broader opportunity that we have been pursuing in a world where AI tokens are per unit of power is the new metric we provide the simplest and most cost effective way for our data center to obtain more power , which directly results in more compute and more revenue .

Speaker #2: We have a robust pipeline of opportunities to demonstration, project, and I think all the pieces are coming together to unlock the larger projects on the multibillion-dollar data center cooling opportunity.

Speaker #2: Thank you for listening, and I'll open the floor for questions.

Speaker #3: Thank you. And I'll be conducting a question and answer session. If you'd like to be placed into the question queue, please press star one on your telephone keypad.

Operator 3: Thank you. We'll now be conducting a question and answer session. If you'd like to be placed into question queue, please press star one on your telephone keypad. A confirmation tone will indicate your line is in the question queue. One moment please while we poll for questions. Once again, that's star one to be placed into question queue. If you'd like to remove your question, please press star two. Our first question is coming from Chip Moore from Roth Capital. Your line is now live.

Operator: Thank you. We'll now be conducting a question and answer session. If you'd like to be placed into question queue, please press star one on your telephone keypad. A confirmation tone will indicate your line is in the question queue. One moment please while we poll for questions. Once again, that's star one to be placed into question queue. If you'd like to remove your question, please press star two. Our first question is coming from Chip Moore from Roth Capital. Your line is now live.

Speaker #3: A confirmation tone will indicate your line is in the question queue. One moment, please, while we pull for questions. Once again, that's star one to be placed into the question queue.

Speaker #3: If you'd like to remove your question , please press star two . Our first question is coming from Chip . More from Roth Capital .

Speaker #3: Your line is now live.

Speaker #4: Hey , good morning . Thanks for taking the question .

Chip Moore: Hey, good morning. Thanks for taking the question.

Chip Moore: Hey, good morning. Thanks for taking the question.

Speaker #2: Morning .

Abhinand Rangesh: Morning, Chip.

Abhinand Rangesh: Morning, Chip.

Speaker #4: Chip . Hey , maybe starting there . Where you where you finished on the vertiv demonstration project ? So , you know , I think you said expect this to ship later in Q2 .

Chip Moore: Hey, Abhinand. Maybe starting there where you finished on the Vertiv demonstration project. You know, I think you said expect this to ship later in Q2. You know, help us think about how quickly that should be up and running and, you know, real world data, you know, when that should flow. I assume this plays a role in the 25 to 50 MW that you mentioned that they're in the process of designing. Just, you know, when could we conceivably see some of those move to orders, you know, once that demonstration project is up and running?

Chip Moore: Hey, Abhinand. Maybe starting there where you finished on the Vertiv demonstration project. You know, I think you said expect this to ship later in Q2. You know, help us think about how quickly that should be up and running and, you know, real world data, you know, when that should flow. I assume this plays a role in the 25 to 50 MW that you mentioned that they're in the process of designing. Just, you know, when could we conceivably see some of those move to orders, you know, once that demonstration project is up and running?

Speaker #4: You know , help us think about how quickly that should be up and running and , and , you know , real world , real world data , you know , when that should flow and I assume this plays a role in the 25 to 50MW that you mentioned that , that they're in the process of designing just , you know , when could we conceivably see some of those move to orders ?

Speaker #4: You know , once that demonstration project is up and running

Speaker #2: So I think the two pieces will move concurrently . So the this unit for chips in Q2 is actually going to go and get tested almost immediately in their thing because what typically happens in a lot of these projects that we , we have is the end customer would like to see , you know , how is this chiller going to run in , let's say 110 degree ambient at a certain , you know , out chilled water output .

Abhinand Rangesh: I think the two pieces will move concurrently. This unit for chips in Q2 is actually going to go and get tested almost immediately in their thing. 'Cause what typically happens in a lot of these projects that we have is the end customer would like to see, you know, how is this chiller going to run in, let's say, a 110-degree ambient at a certain, you know, out-chilled water output. What this does, because we, with our conventional DTx chiller, our own test cell, we can run a lot of those conditions here, but we can't control for a 110-degree ambient or a 120-degree ambient.

Abhinand Rangesh: I think the two pieces will move concurrently. This unit for chips in Q2 is actually going to go and get tested almost immediately in their thing. 'Cause what typically happens in a lot of these projects that we have is the end customer would like to see, you know, how is this chiller going to run in, let's say, a 110-degree ambient at a certain, you know, out-chilled water output. What this does, because we, with our conventional DTx chiller, our own test cell, we can run a lot of those conditions here, but we can't control for a 110-degree ambient or a 120-degree ambient.

Speaker #2: So what this does, because we, with our conventional DTE chiller, our own test cell, we can run a lot of those conditions here.

Speaker #2: But we can't control for 110 degree ambient or 120 degree ambient . So the test chamber allows us to do this , but it also acts as a way for a potential customer to come and see it as well .

Abhinand Rangesh: The Vertiv test chamber allows us to do this, but it also acts as a way for a potential customer to come and see it as well, right? That's usually a very good way to close projects. The designing of the projects in the background, that's gonna happen concurrently, and they're gonna continue marketing, and they're getting opportunities. I can't talk very specifically on timing on their projects because at this point, it's either confidential or we don't yet have enough clarity on it. What I think it's going to do, this demonstration project, the hope is to have it actually running no later actually than the end of Q2.

Abhinand Rangesh: The Vertiv test chamber allows us to do this, but it also acts as a way for a potential customer to come and see it as well, right? That's usually a very good way to close projects. The designing of the projects in the background, that's gonna happen concurrently, and they're gonna continue marketing, and they're getting opportunities. I can't talk very specifically on timing on their projects because at this point, it's either confidential or we don't yet have enough clarity on it. What I think it's going to do, this demonstration project, the hope is to have it actually running no later actually than the end of Q2.

Speaker #2: Right . That's usually a very good way to , to close projects . So the designing of the projects and the background that that's going to happen currently , and they're going to continue marketing and they're getting opportunities .

Speaker #2: I can't talk very specifically on timing on their projects because, at this point, it's either confidential or we don't yet have enough clarity on it.

Speaker #2: What I think it's going to do this , this demonstration project , the hope is to have it actually running no later than the end of Q2 .

Speaker #2: What we think it'll do is act as both providing the feedback for some of the bigger projects that we have , and also for some of the potential customers where they may want to use our chillers in certain environments , like , let's say Texas , they want to know that this chiller would how you , what , how it'll put out a different ambient temperatures .

Abhinand Rangesh: What we think it'll do is act as both providing the feedback for some of the bigger projects that we have and also for some of the potential customers where they may want to use our chillers in, you know, certain environments like let's say, Texas. They wanna know that this chiller would how it, you know, what output it'll put out at different ambient temperatures. That's also what you will get out of this, and it's really a, I would say, an independent validation as well of our chiller, right? A massive load of support from Vertiv that they're essentially putting this together.

Abhinand Rangesh: What we think it'll do is act as both providing the feedback for some of the bigger projects that we have and also for some of the potential customers where they may want to use our chillers in, you know, certain environments like let's say, Texas. They wanna know that this chiller would how it, you know, what output it'll put out at different ambient temperatures. That's also what you will get out of this, and it's really a, I would say, an independent validation as well of our chiller, right? A massive load of support from Vertiv that they're essentially putting this together.

Speaker #2: So that's also what you will get out of this . And it's really a , I would say an independent validation as well of our , our chiller .

Speaker #2: Right . And a massive vote of support from Vertiv that they're essentially putting this together

Speaker #4: Understood that that's helpful . Appreciate that . And maybe , you know , for your own internal pipeline , you know , that slide , you know , your highest , I think you've stacked them in the order that one where you're in final stages of negotiation and you could see orders here .

Chip Moore: Understood. That's helpful. Appreciate that. Maybe, you know, for your own internal pipeline, you know, that slide, you know, your highest. I think you've stacked them in order that, one where you're in final stages of negotiation and you could see orders here. I think you said Q2, Q3 for a 27-type of project. Just any more you can expand on that, you know, where that stands, what they wanna see, you know, when that could move forward.

Chip Moore: Understood. That's helpful. Appreciate that. Maybe, you know, for your own internal pipeline, you know, that slide, you know, your highest. I think you've stacked them in order that, one where you're in final stages of negotiation and you could see orders here. I think you said Q2, Q3 for a 27-type of project. Just any more you can expand on that, you know, where that stands, what they wanna see, you know, when that could move forward.

Speaker #4: I think you said Q2 Q3 for a 27 type of project . Just any more , you can expand on that on , you know , where that stands , what they want to see , you know , when , when that could move forward

Speaker #2: So I don't want to predict timing because I think it's , it's extremely hard to predict the timing . What I will say is the smaller projects actually , firstly , the DBT is a is a , you know , there , there's , we , we've already got the test data and a lot of these .

Abhinand Rangesh: I don't wanna predict timing because I think it's extremely hard to predict the timing. What I will say is the smaller projects, actually, firstly, the DTx is an, you know, we've already got the test data and a lot of these smaller ones, you know, they've seen our equipment in other places. They're the smaller projects also find it easier to get tenants, so the odds of it moving faster is much, much higher. Also things like financing and getting approvals for environmental permits tend to be much easier for the smaller projects.

Abhinand Rangesh: I don't wanna predict timing because I think it's extremely hard to predict the timing. What I will say is the smaller projects, actually, firstly, the DTx is an, you know, we've already got the test data and a lot of these smaller ones, you know, they've seen our equipment in other places. They're the smaller projects also find it easier to get tenants, so the odds of it moving faster is much, much higher. Also things like financing and getting approvals for environmental permits tend to be much easier for the smaller projects.

Speaker #2: Smaller ones , you know , they've seen our equipment in other , other places . They're the smaller projects also find it easier to get tenants .

Speaker #2: So the odds of it moving faster is much , much higher . And also things like financing and getting approvals for environmental permits tend to be much easier for the smaller projects , because some of the , you know , greater than 100 megawatt projects , you've got more hurdles to go through on the back end to make sure the , the , the local site approvals , all of that , that happens without an issue .

Abhinand Rangesh: Because some of the, you know, greater than 100MW projects, you've got more hurdles to go through on the back end to make sure the local site approvals, all of that happens without an issue, and then also having the tenants. What we're seeing more broadly in the data center industry is, you know, you're getting a lot of the Neocloud as potential tenants. There's quite a few of the smaller scale Neoclouds that are interested in these kind of smaller scale projects, which makes it much more likely that these things will go through. I don't wanna predict timing. All I know is that in many of these cases, the customer expects to be operational by early next year.

Abhinand Rangesh: Because some of the, you know, greater than 100MW projects, you've got more hurdles to go through on the back end to make sure the local site approvals, all of that happens without an issue, and then also having the tenants. What we're seeing more broadly in the data center industry is, you know, you're getting a lot of the Neocloud as potential tenants. There's quite a few of the smaller scale Neoclouds that are interested in these kind of smaller scale projects, which makes it much more likely that these things will go through. I don't wanna predict timing. All I know is that in many of these cases, the customer expects to be operational by early next year.

Speaker #2: And then also having the , the tenants , what we're seeing more broadly in the data center industry is , you know , you're getting a lot of the neo cloud on the as potential tenants and there's , there's quite a few of the smaller scale neo clouds that are interested in these kind of smaller scale projects , which makes it much more likely that these things will go through .

Speaker #2: But I don't want to predict timing . All I know is that in many of these cases , the customer expects to be operational by early next year .

Speaker #2: So, to really be able to get equipment in order, get everything delivered in that time, and actually construct it on site.

Abhinand Rangesh: To really be able to get equipment in order, get everything delivered in that time, and actually construct it on site, they need to move quickly.

Abhinand Rangesh: To really be able to get equipment in order, get everything delivered in that time, and actually construct it on site, they need to move quickly.

Speaker #2: They need to move quickly.

Speaker #4: Helpful . Very helpful . And maybe a last one for me just on , you know , the manufacturing side , it sounds like you've made some good strides and you've got some , you know , potential with Vertiv as well .

Chip Moore: Helpful. Very helpful. Maybe a last one for me, just on, you know, the manufacturing side. It sounds like you've made some good strides and you've got some, you know, potential with Vertiv as well. Just, you know, what's the highest priority? What, you know, what are you focused on? What do you need to do, you know, here to get prepared? Thanks.

Chip Moore: Helpful. Very helpful. Maybe a last one for me, just on, you know, the manufacturing side. It sounds like you've made some good strides and you've got some, you know, potential with Vertiv as well. Just, you know, what's the highest priority? What, you know, what are you focused on? What do you need to do, you know, here to get prepared? Thanks.

Speaker #4: Just , you know , what , what's the highest priority ? You know , what are what are you focused on ? What do you need to do ?

Speaker #4: You know, here to get prepared. Thanks.

Speaker #2: I think we've gotten most of the key pieces together now because a lot of that was getting the subcontractors qualified and really get first articles from them , and then get the first article checked internally to make sure that it meets our quality standards and that we can get the different pieces from them .

Abhinand Rangesh: I think we've gotten most of the key pieces together now because a lot of that was getting the subcontractors qualified, and really get first articles from them, and then get the first article checked internally to make sure that meets our quality standards and that we can get the different pieces from them, and it arrives at our factory, we can just do the final assembly, test it, get it out the door. Getting the subcontractors qualified was really the key, and I think we've now done that. Also, these subcontractors have significant scale-up capability already. There is, I believe, like, those pieces are now together, especially for the dual power source chiller. The DTx, I think our supply chain was reasonably robust to start with.

Abhinand Rangesh: I think we've gotten most of the key pieces together now because a lot of that was getting the subcontractors qualified, and really get first articles from them, and then get the first article checked internally to make sure that meets our quality standards and that we can get the different pieces from them, and it arrives at our factory, we can just do the final assembly, test it, get it out the door. Getting the subcontractors qualified was really the key, and I think we've now done that. Also, these subcontractors have significant scale-up capability already. There is, I believe, like, those pieces are now together, especially for the dual power source chiller. The DTx, I think our supply chain was reasonably robust to start with.

Speaker #2: And it arrives at our factory . We can just do the final assembly , test it , get it out the door . So getting the subcontractors qualified was really the , the , the key .

Speaker #2: And I think we've now done that . And also the subcontractors have significant scale up capability already . So there is , I believe , like those pieces are now together , especially for the dual power source chiller .

Speaker #2: The DTE . I think are our supply chain was reasonably robust to start with . So I think we have the ability because a lot of the bigger components on the DTE are built by some very large companies already .

Abhinand Rangesh: I think we have the ability because a lot of the bigger components from the DTx are built by some very large companies already, so we can get scale up from them without too much of a problem. It was a dual power source chiller, really, with both the size of the machine as well as making sure that we weren't having a lot of time on the floor in our factory here to get some of the bigger components built outside and brought in. That was really the key, and I think we've now done that.

Abhinand Rangesh: I think we have the ability because a lot of the bigger components from the DTx are built by some very large companies already, so we can get scale up from them without too much of a problem. It was a dual power source chiller, really, with both the size of the machine as well as making sure that we weren't having a lot of time on the floor in our factory here to get some of the bigger components built outside and brought in. That was really the key, and I think we've now done that.

Speaker #2: So we can get scale up from them without too much of a problem . It was a dual power source chiller , really , with both the size of the machine as well as making sure that we weren't having a lot of time on the floor in our factory here to get some of the bigger components built outside .

Speaker #2: And brought in. That was really the key. And I think we've now done that.

Speaker #4: Got it . And , you know , maybe the follow on , you know , with a lot of that heavy lifting done , it sounds like , you know , maybe you don't need to sacrifice Non-data center orders .

Chip Moore: Got it. You know, maybe the follow on, you know, with a lot of that heavy lifting done, it sounds like, you know, maybe you don't need to sacrifice non-data center orders, you know, if you start to see demand pick up in some of those other areas.

Chip Moore: Got it. You know, maybe the follow on, you know, with a lot of that heavy lifting done, it sounds like, you know, maybe you don't need to sacrifice non-data center orders, you know, if you start to see demand pick up in some of those other areas.

Speaker #4: You know , if you start to see demand pick up in some of those other areas .

Speaker #2: Correct . I think we are going to see quite a bit more in Non-data center projects as well . We on the sales efforts in the marketing efforts , we essentially split the sales team to have some people handling Non-data center and some handling the data center .

Abhinand Rangesh: Correct. I think we are going to see quite a bit more in non-data center projects as well. On the sales efforts and the marketing efforts, we essentially split the sales team to have some people handling non-data center and some handling the data center. Part of the lumpiness on the product side is just what we've seen overall in the industry. We used to get a consistent amount of small multifamily, like one unit, two unit orders that were kind of steady flow. With the anti-gas sentiment in some of the bigger cities like New York and Boston, that portion had declined. It's starting to come back. What we have a very good pipeline of is multi-unit, larger projects that are going into bigger buildings.

Abhinand Rangesh: Correct. I think we are going to see quite a bit more in non-data center projects as well. On the sales efforts and the marketing efforts, we essentially split the sales team to have some people handling non-data center and some handling the data center. Part of the lumpiness on the product side is just what we've seen overall in the industry. We used to get a consistent amount of small multifamily, like one unit, two unit orders that were kind of steady flow. With the anti-gas sentiment in some of the bigger cities like New York and Boston, that portion had declined. It's starting to come back. What we have a very good pipeline of is multi-unit, larger projects that are going into bigger buildings.

Speaker #2: Part of the lumpiness on the product side is just what we've seen overall in the industry is we used to get the consistent amount of small multifamily , like one unit , two unit orders that were kind of steady flow with the anti-gay sentiment in some of the bigger cities like New York and Boston , that portion had declined .

Speaker #2: It's starting to come back . But what we are , what we have a very good pipeline of is multi-unit , larger projects that are going into bigger buildings .

Speaker #2: But the problem with those projects is that if one project gets even slightly delayed, you've basically moved out three or four units at a time.

Abhinand Rangesh: The problem with those projects is that one project gets even slightly delayed, you've basically moved out three or four units at a time. There's a little bit of timing issues there, but I think the pipeline is very, very robust on that.

Abhinand Rangesh: The problem with those projects is that one project gets even slightly delayed, you've basically moved out three or four units at a time. There's a little bit of timing issues there, but I think the pipeline is very, very robust on that.

Speaker #2: So there's a little bit of timing issues there . But I think the pipeline is very , very robust on that

Speaker #4: All right . Appreciate it . Thanks very much .

Chip Moore: All right. Appreciate it. Thanks very much.

Chip Moore: All right. Appreciate it. Thanks very much.

Speaker #2: Thanks , Chip .

Abhinand Rangesh: Thanks, Chip.

Abhinand Rangesh: Thanks, Chip.

Speaker #3: Thank you . Next question . Today is coming from Alexandra Blanton from Clear Harbor Asset Management . Your line is now live .

Operator 3: Thank you. Next question today is coming from Alexander Blanton from Clear Harbor Asset Management. Your line is now live.

Operator: Thank you. Next question today is coming from Alexander Blanton from Clear Harbor Asset Management. Your line is now live.

Speaker #5: Thank you . Good morning . I'm interested . Yes , I'm interested in your outsourcing strategy because clearly to get significant orders from data centers , they're going to have to be sure that you can deliver the quantities that you're talking about .

Alexander Blanton: Thank you. Good morning. I'm interested in the

Alexander Blanton: Thank you. Good morning. I'm interested in the

Abhinand Rangesh: Morning, Alex.

Abhinand Rangesh: Morning, Alex.

David Brown: Yes. I'm interested in your outsourcing strategy, because clearly to get significant orders from data centers, you're gonna have to be sure that you can deliver the quantities that you're talking about. Could you just go into a little more detail about how that's gonna work, what things are gonna be outsourced? As I take it's going to be these components will come to your factory and just be assembled. You have obviously changed your manufacturing process, significantly in doing that. Little more detail.

Alexander Blanton: Yes. I'm interested in your outsourcing strategy, because clearly to get significant orders from data centers, you're gonna have to be sure that you can deliver the quantities that you're talking about. Could you just go into a little more detail about how that's gonna work, what things are gonna be outsourced? As I take it's going to be these components will come to your factory and just be assembled. You have obviously changed your manufacturing process, significantly in doing that. Little more detail.

Speaker #5: So, could you just go into a little more detail about how that's going to work—what things are going to be outsourced? And I take it it's going to be that these components will come to your factory and just be assembled?

Speaker #5: And so, you have obviously changed your manufacturing process significantly in doing that. Can you provide a little more detail?

Speaker #2: Yeah , no , that's a great question . So let me start with the end portion , which is we didn't actually change our manufacturing process necessarily when we designed that , that , you know , the , the dual power source chiller .

Abhinand Rangesh: Yeah. No, that's a great question. Let me start with the end portion, which is we didn't actually change our manufacturing process necessarily. When we designed that, you know, the dual power source chiller, we always designed it with the option of being able to either do all of it in-house or have large portions of it built in subassemblies that then came internally. The other thing that we always did on that product was to use a lot of components that are built in larger volume to start with, so that we could, with volume, also see an increase in margin. In other words, it was. When you think about the dual power source chiller, right, I think of it in sort of certain blocks. You have one big block, which is really the refrigeration assembly. That handles the

Abhinand Rangesh: Yeah. No, that's a great question. Let me start with the end portion, which is we didn't actually change our manufacturing process necessarily. When we designed that, you know, the dual power source chiller, we always designed it with the option of being able to either do all of it in-house or have large portions of it built in subassemblies that then came internally. The other thing that we always did on that product was to use a lot of components that are built in larger volume to start with, so that we could, with volume, also see an increase in margin. In other words, it was. When you think about the dual power source chiller, right, I think of it in sort of certain blocks. You have one big block, which is really the refrigeration assembly. That handles the

Speaker #2: We always designed it with the ability to either do all of it in-house or have large portions of it built in subassemblies.

Speaker #2: That then came internally . The other thing that we did on that product was to use a lot of components that are built in larger volume to start with , so that we could , with volume , also see an increase in margin so that there was it was , but when you think about the dual power source chiller , right .

Speaker #2: I think of it in sort of certain blocks , you have one big block , which is really the , the refrigeration assembly .

Speaker #2: So that handles the if the it's similar to an electric chiller . It has , you know , your compressors , it has your fans , it has your sheet metal assembly .

Abhinand Rangesh: It's similar to an electric chiller. It has, you know, your compressors, it has your fans, it has your sheet metal assembly. You have the power assembly, which has the engine, and the generator. We have the power conversion or the electronics, which is really your, you know, the dual power source technology. The combination of the engine and the inverter and power electronics technology is very similar to our inverter. The biggest challenge we have in our manufacturing space is just in terms of physical footprint on floor space. Also, like, we historically have built, you know, numerous inverter units, so we can build those in volume very, very easily.

Abhinand Rangesh: It's similar to an electric chiller. It has, you know, your compressors, it has your fans, it has your sheet metal assembly. You have the power assembly, which has the engine, and the generator. We have the power conversion or the electronics, which is really your, you know, the dual power source technology. The combination of the engine and the inverter and power electronics technology is very similar to our inverter. The biggest challenge we have in our manufacturing space is just in terms of physical footprint on floor space. Also, like, we historically have built, you know, numerous inverter units, so we can build those in volume very, very easily.

Speaker #2: Then you have the power assembly , which has the engine on the generator . And then we have the power conversion or the electronics , which is really your , you know , the dual power source technology , the combination of the engine and the inverter and power electronics technology is very similar to our inverting the , the biggest challenge we have in our manufacturing space is just in terms of just physical footprint on , on , on floor space and also the like .

Speaker #2: We historically have built , you know , a numerous inverter units so we can , we can build those in volume very , very easily as , as long electronics show up pre-assembled , we can mate it with our engine system , our generator , and essentially build that power electronics and engine package very quickly .

Abhinand Rangesh: As long as those electronics show up preassembled, we can mate it with our engine, system, our generator, essentially build that power electronics and engine package very quickly. The refrigeration assembly, it's, you're dealing with a lot of sheet metal. It's not necessarily, you know, something that is best done in our factory here, 'cause if we can reduce time on the floor by having somebody that builds similar assemblies for other electric chiller companies, then we can essentially have that portion pre-built, pre-tested. It can come to us and get mated with the power electronics assembly. The other big advantage of really focusing on the power electronics and engine assembly is it gives you other options as well, including, you know, beyond just pure chillers.

Abhinand Rangesh: As long as those electronics show up preassembled, we can mate it with our engine, system, our generator, essentially build that power electronics and engine package very quickly. The refrigeration assembly, it's, you're dealing with a lot of sheet metal. It's not necessarily, you know, something that is best done in our factory here, 'cause if we can reduce time on the floor by having somebody that builds similar assemblies for other electric chiller companies, then we can essentially have that portion pre-built, pre-tested. It can come to us and get mated with the power electronics assembly. The other big advantage of really focusing on the power electronics and engine assembly is it gives you other options as well, including, you know, beyond just pure chillers.

Speaker #2: The refrigeration assembly , it's , you're dealing with a lot of sheet metal . It's not necessarily , you know , something that is best done in our factory here , because if we can reduce time on the floor by having somebody that builds similar assemblies for other electric chiller companies , then we can essentially have that portion pretty built pre-tested it can come to us and get mated with the power electronics assembly , the other big advantage of really focusing on the power electronics assembly is it gives you Or power electronics and engine assembly .

Speaker #2: Is . It gives you other options as well , including , you know , beyond just pure chillers , it gives you the option of being able to power things like , you know , fans and a data center or other loads and where you can arbitrage the two power sources .

Abhinand Rangesh: It gives you the option of being able to power things like, you know, fans in a data center or other loads and where you can arbitrage the two power sources. You can not only get a volume boost, but you can also open up a broader market. Going back to your question of, you know, putting these two together, essentially, a lot of that sheet metal assembly, it's better done by people that's all they specialize in. They have the volume throughputs, and usually they're vertically integrated, starting from the sheet metal all the way to all of the different components. They're already buying a lot of those sub-components in volume. Getting that as a single assembly, bringing it into our factory, mating it with the power system, and then shipping it out is one way to do it.

Abhinand Rangesh: It gives you the option of being able to power things like, you know, fans in a data center or other loads and where you can arbitrage the two power sources. You can not only get a volume boost, but you can also open up a broader market. Going back to your question of, you know, putting these two together, essentially, a lot of that sheet metal assembly, it's better done by people that's all they specialize in. They have the volume throughputs, and usually they're vertically integrated, starting from the sheet metal all the way to all of the different components. They're already buying a lot of those sub-components in volume. Getting that as a single assembly, bringing it into our factory, mating it with the power system, and then shipping it out is one way to do it.

Speaker #2: So you not only get a volume boost , but you can also open up a broader market . But going back to your question of , you know , putting these two together , it's a lot of that sheet metal assembly .

Speaker #2: It's better done by people that that's all they specialize in . And they have the volume throughputs and usually they're vertically integrated starting from the sheet metal all the way to all of the different components .

Speaker #2: And they're already buying a lot of those subcomponents . And volume . So getting that as a single assembly , bringing it into our factory , making it with the power system and then shipping it out is one way to do it .

Speaker #2: Eventually , we could even ship that power assembly to the sheet metal manufacturer . They do the final assembly . Everything is pre-tested at each location , and then it's shipped .

Abhinand Rangesh: Eventually, we could even ship that power assembly to the sheet metal manufacturer. They do the final assembly. Everything is pre-tested at each location, and then it's shipped. There's different ways to significantly improve volume and also hit delivery times using that approach.

Abhinand Rangesh: Eventually, we could even ship that power assembly to the sheet metal manufacturer. They do the final assembly. Everything is pre-tested at each location, and then it's shipped. There's different ways to significantly improve volume and also hit delivery times using that approach.

Speaker #2: So there's there's different ways to significantly improve volume and also hit delivery times using that approach .

Speaker #5: So given these, given the constraints, what's your effective capacity if you have your subcontract do the assembly? It seems to me that it expands quite a bit.

David Brown: Well, given the constraints, what's your effective capacity then, if you have your subcontractor do the assembly? It seems to me that it expands quite a bit.

Alexander Blanton: Well, given the constraints, what's your effective capacity then, if you have your subcontractor do the assembly? It seems to me that it expands quite a bit.

Speaker #2: Yeah . I mean , would still today I would use what I our , I think the last call or the call before where I'd say about 100 units is where we're targeting .

Abhinand Rangesh: Yeah. I mean, I would still say today I would use what I said in our, I think, the last call or the call before, where I'd say about 100 units is where we're targeting. I believe it can be increased further from there, but that seems like with a little bit of a ramp up, that's fully achievable. From there, with some optimization, it's likely to. You can increase further from there.

Abhinand Rangesh: Yeah. I mean, I would still say today I would use what I said in our, I think, the last call or the call before, where I'd say about 100 units is where we're targeting. I believe it can be increased further from there, but that seems like with a little bit of a ramp up, that's fully achievable. From there, with some optimization, it's likely to. You can increase further from there.

Speaker #2: I believe it can be increased further from there . But that seems like with a , with a little bit of a ramp up that's fully achievable .

Speaker #2: And then from there with some optimization , it's likely you can you can increase further from there .

Speaker #5: 100 units over what time period ?

David Brown: 100 units over what time period?

Alexander Blanton: 100 units over what time period?

Speaker #2: I would say per year . I think it's possible to go higher than that . But I think this is something that we've we've looked at and looked at the details on what it takes to get there .

Abhinand Rangesh: I would say per year. I think it's possible to go higher than that, but I think this is something that we've looked at and looked at the details on what it takes to get there. You know, it is possible to scale up substantially from there. It's just this, I think, is a good starting point. It'll allow us to get many of the opportunities that we have on that pipeline. Then from there are different ways to figure out how you'd scale from that.

Abhinand Rangesh: I would say per year. I think it's possible to go higher than that, but I think this is something that we've looked at and looked at the details on what it takes to get there. You know, it is possible to scale up substantially from there. It's just this, I think, is a good starting point. It'll allow us to get many of the opportunities that we have on that pipeline. Then from there are different ways to figure out how you'd scale from that.

Speaker #2: And , you know , it is is possible to scale up substantially from there . It's just this , I think is a good starting point .

Speaker #2: It'll allow us to get many of the opportunities that we have on that pipeline . And then from there , there are different ways to figure out how you scale from there .

Speaker #5: And , and what's the dollar volume of , of 100 units

David Brown: What's the dollar volume of 100 units?

Alexander Blanton: What's the dollar volume of 100 units?

Abhinand Rangesh: I don't wanna comment on exact dollar numbers since we don't put pricing out. I would say it's 3x to 4x, you know, at least 3 to 4x of what we've done in our highest year. I'd say, you know, at least $30 to 40 million of product, likely more.

Speaker #2: I don't want to comment on exact dollar numbers since we don't put pricing out , but I would say it's 3X4 , you know , at least 3 to 4 X of what we've done in our highest year .

Abhinand Rangesh: I don't wanna comment on exact dollar numbers since we don't put pricing out. I would say it's 3x to 4x, you know, at least 3 to 4x of what we've done in our highest year. I'd say, you know, at least $30 to 40 million of product, likely more.

Speaker #2: So I'd say , you know , at least 30 to $40 million of product , likely more .

Speaker #5: And that would be just for the data centers.

David Brown: That would be just for the data centers?

Alexander Blanton: That would be just for the data centers?

Speaker #2: Correct .

Abhinand Rangesh: Correct.

Abhinand Rangesh: Correct.

Speaker #5: It doesn't include the cogeneration and other products for other markets . Right .

David Brown: It doesn't include the cogeneration and other products for other markets, right?

Maj Soueidan: It doesn't include the cogeneration and other products for other markets, right?

Speaker #2: That is correct .

Abhinand Rangesh: That is correct.

Abhinand Rangesh: That is correct.

Speaker #6: Okay . Thank you

David Brown: Okay. Thank you.

Alexander Blanton: Okay. Thank you.

Speaker #3: Thank you . Next question . Today is coming from Barry Haimes from Sage Asset Management . Your line is now live .

Operator 3: Thank you. Next question today is coming from Barry Haimes from Sage Asset Management. Your line is now live.

Operator: Thank you. Next question today is coming from Barry Haimes from Sage Asset Management. Your line is now live.

Speaker #7: Hi. Thanks so much for taking my question. My question relates to the master agreement negotiation or renegotiation. You're dealing with Vertiv.

Barry Haimes: Hi, thanks so much for taking my question. My question relates to the master agreement negotiation or renegotiation you're doing with Vertiv. Could you talk a little bit about, you know, what are your goals in doing that and what are their goals, you know, given that you already had an agreement? Thanks so much.

Barry Haimes: Hi, thanks so much for taking my question. My question relates to the master agreement negotiation or renegotiation you're doing with Vertiv. Could you talk a little bit about, you know, what are your goals in doing that and what are their goals, you know, given that you already had an agreement? Thanks so much.

Speaker #7: Could you talk a little bit about , you know , what , what are your goals in in doing that ? And , and what are their goals ?

Speaker #7: You know, given that you already had an agreement? Thanks so much.

Speaker #2: Yeah . So if you look at the marketing agreement we have with Vertiv , right ? The way it's structured , it says that this is kind of the placeholder .

Abhinand Rangesh: Yeah. If you look at the marketing agreement we have with Vertiv, right? The way it's structured, it says that this is kind of the placeholder while we go through the full master agreement. If you look at the marketing agreement, it has various terms that are to do with supply and, you know, delivery, things like that currently are not binding terms within that agreement. All it does is it takes that marketing agreement and expands it so it has all those different portions. It was always designed from day one to go into that broader agreement so that we could actually supply as an approved supplier and have this marketing portion rolled in as part of this broader agreement.

Abhinand Rangesh: Yeah. If you look at the marketing agreement we have with Vertiv, right? The way it's structured, it says that this is kind of the placeholder while we go through the full master agreement. If you look at the marketing agreement, it has various terms that are to do with supply and, you know, delivery, things like that currently are not binding terms within that agreement. All it does is it takes that marketing agreement and expands it so it has all those different portions. It was always designed from day one to go into that broader agreement so that we could actually supply as an approved supplier and have this marketing portion rolled in as part of this broader agreement.

Speaker #2: While we go through the full master agreement . So if you look at the marketing agreement , it has various terms that are to do with supply and , you know , delivery , things like that , that currently are not binding terms within that agreement .

Speaker #2: And all it does is it takes that marketing agreement and expands it . So it has all those different Different portions . It , it , it was always designed from day one to go into that , into that broader agreement so that we could actually supply as an approved supplier and have this marketing portion rolled in as part of this broader agreement .

Speaker #7: Okay , great . And what's the timing on when you expect that to to get finalized and signed

Operator 2: Okay, great. What's the timing on when you expect that to get finalized and signed?

Operator: Okay, great. What's the timing on when you expect that to get finalized and signed?

Speaker #2: At this point, I can't really comment on timing because it's ongoing.

Abhinand Rangesh: At this point, I can't really comment on timing 'cause it's ongoing.

Abhinand Rangesh: At this point, I can't really comment on timing 'cause it's ongoing.

Speaker #7: Okay. Thanks. Appreciate it.

Operator 2: Okay. Thanks. Appreciate it.

Operator: Okay. Thanks. Appreciate it.

Speaker #3: Thank you . As a reminder that star one to be placed into question . Q . Our next question is coming from Chris Tuttle from Blue Caterpillar .

Operator 3: Thank you. As a reminder, that's star one to be placed to the question queue. Our next question is coming from Kris Tuttle from Blue Caterpillar. Your line is now live.

Operator: Thank you. As a reminder, that's star one to be placed to the question queue. Our next question is coming from Kris Tuttle from Blue Caterpillar. Your line is now live.

Speaker #3: Your line is now live

Speaker #8: Great . Thanks for taking the couple questions from me . First of all , I know it's not the sexy part of the business , but I wanted to go back to what you were talking about in terms of some of the investments you've had to make Up on lowering your service costs .

Kris Tuttle: Great. Thanks for taking a couple questions from me. First of all, I know it's not the sexy part of the business, but I wanted to go back to what you were talking about in terms of some of the investments you've had to make on lowering your service cost. I mean, these are mechanical units, which I guess in most cases have a, you know, a nonlinear graph of support and maintenance costs over time. I'm a little. I wanted to understand more about how, you know, you're situated in terms of, you know, if you have older inventory out there, you know, is this how much are you still sort of on the hook for in terms of, you know, what would normally be kind of a customer cost?

Kris Tuttle: Great. Thanks for taking a couple questions from me. First of all, I know it's not the sexy part of the business, but I wanted to go back to what you were talking about in terms of some of the investments you've had to make on lowering your service cost. I mean, these are mechanical units, which I guess in most cases have a, you know, a nonlinear graph of support and maintenance costs over time. I'm a little. I wanted to understand more about how, you know, you're situated in terms of, you know, if you have older inventory out there, you know, is this how much are you still sort of on the hook for in terms of, you know, what would normally be kind of a customer cost?

Speaker #8: I mean , these are mechanical units , which I guess in most cases have a , you know , a non-linear , non-linear graph of support and maintenance costs over time .

Speaker #8: And so I'm a little I wanted to understand more about how , you know , your situated in terms of , you know , if you have older inventory out there , you know , is this how much are you still sort of on the hook for in terms of , you know , what would normally be kind of a customer cost seems like it .

Kris Tuttle: Seems like it, you guys, you know, had to, you know, spend some of your own money on that in Q4.

Kris Tuttle: Seems like it, you guys, you know, had to, you know, spend some of your own money on that in Q4.

Speaker #8: You guys , you know , had to , you know , spend some of your own money on that in , in Q4

Speaker #2: Yeah . So that's a great question . So it is so the way the service contracts work on the cogeneration units , we charge per run our , you know .

Abhinand Rangesh: Yeah. That's a great question. The way the service contracts work, on the cogeneration units, we charge per run hour. You know, for every unit the machine runs, we charge per run hour on those. The service contract includes components, you know, everything inside the cogeneration box. Most contracts are either, you know, 3-year, 5-year, but in many cases, you know, the customers renew it. The reason the contracts were structured that way was so that the customer has some essentially predictable expenses, and it would allow the business to have a recurring stream of cash flow.

Abhinand Rangesh: Yeah. That's a great question. The way the service contracts work, on the cogeneration units, we charge per run hour. You know, for every unit the machine runs, we charge per run hour on those. The service contract includes components, you know, everything inside the cogeneration box. Most contracts are either, you know, 3-year, 5-year, but in many cases, you know, the customers renew it. The reason the contracts were structured that way was so that the customer has some essentially predictable expenses, and it would allow the business to have a recurring stream of cash flow.

Speaker #2: So for every unit , the machine runs , we charge per an hour on those . And the , the service contract includes components .

Speaker #2: You know , everything inside the cogeneration box . So and we most contracts are either , you know , 3 or 5 year .

Speaker #2: But they auto in many cases , you know , customers renew it . The reason the contracts were structured that way was so that the customer has some essentially predictable expenses .

Speaker #2: And it would allow the business to have a recurring stream of cash flow . But as the costs in places like New York have gone up , like the labor costs have gone up substantially , and the time to get from sites has gone up .

Abhinand Rangesh: As the costs in places like New York have gone up, like the labor costs have gone up substantially, and the time to get from sites has gone up, the labor efficiency has gone way down. We've also seen material cost increases, but we're in the other territories, the material cost increases have been absorbed by any increases in service contract rates. We had two choices. We could either turn around and say, "You know what? These service contracts are no longer profitable.

Abhinand Rangesh: As the costs in places like New York have gone up, like the labor costs have gone up substantially, and the time to get from sites has gone up, the labor efficiency has gone way down. We've also seen material cost increases, but we're in the other territories, the material cost increases have been absorbed by any increases in service contract rates. We had two choices. We could either turn around and say, "You know what? These service contracts are no longer profitable.

Speaker #2: The labor efficiency has gone way down . We've also seen material cost increases , but we're in the other territories . The material cost increases have been absorbed by any increases in service contract rates .

Speaker #2: So we had two choices . We could either turn around and say , you know what ? These service contracts are no longer profitable .

Speaker #2: We either get out of that service contract or figure out a way to make those service contracts profitable . The concern we had with essentially walking away from some of these contracts was that over time , like just as you're starting to get your data center side of things ramped up , the risk of a reputational hit , right ?

Abhinand Rangesh: We either get out of that service contract or figure out a way to make those service contracts profitable." The concern we had with essentially walking away from some of these contracts was that over time, like, just as you're starting to get your data center side of things ramped up, the risk of a reputational hit, right, if you walk away from a number of service contracts is high. We felt when we looked at the numbers that with putting in new engines, we could substantially increase the service intervals. I mean, in our test cases, we got almost a 2x increase in service intervals. I commented about, you know, 50% increase on average.

Abhinand Rangesh: We either get out of that service contract or figure out a way to make those service contracts profitable." The concern we had with essentially walking away from some of these contracts was that over time, like, just as you're starting to get your data center side of things ramped up, the risk of a reputational hit, right, if you walk away from a number of service contracts is high. We felt when we looked at the numbers that with putting in new engines, we could substantially increase the service intervals. I mean, in our test cases, we got almost a 2x increase in service intervals. I commented about, you know, 50% increase on average.

Speaker #2: If you walk away from a number of service contracts is high . So we felt when we looked at the numbers that with putting in new engines , we could substantially increase the service intervals .

Speaker #2: I mean , in our test cases , we got almost A2X increase in service intervals . I commented about , you 50% increase on average .

Speaker #2: If you can do that and you don't have to go to the machine as often . The numbers suggested that we should get back up to , you know , our previous margins , which were somewhere around the 50% gross profit margin .

Abhinand Rangesh: If you can do that and you don't have to go to the machine as often, the numbers suggested that we should get back up to, you know, our previous margins, which were somewhere around 50% gross profit margin. That's kind of why, yes, it was very expensive in the short term, right, and it took us. I mean, it pulled our loss down. At some stage, if we can increase that service interval, the numbers should play out. If for some reason that they're not happening, then we'll go back and just raise our prices, or in some cases we will, you know, get rid of service contracts that are not profitable anymore. You know, that's.

Abhinand Rangesh: If you can do that and you don't have to go to the machine as often, the numbers suggested that we should get back up to, you know, our previous margins, which were somewhere around 50% gross profit margin. That's kind of why, yes, it was very expensive in the short term, right, and it took us. I mean, it pulled our loss down. At some stage, if we can increase that service interval, the numbers should play out. If for some reason that they're not happening, then we'll go back and just raise our prices, or in some cases we will, you know, get rid of service contracts that are not profitable anymore. You know, that's.

Speaker #2: That's kind of why , yes , it was very expensive in the short term , right . And it took us I mean , it pulled our loss down .

Speaker #2: But at some stage it if the units , if we can increase that service interval , the number should play out . If for some reason that they're not happening , then we'll go back and just raise our prices or in some cases we will , you know , get rid of service contracts that are not profitable anymore .

Speaker #2: You know , that's but in the short term , we felt that this was a better way to go . Especially because you've got ongoing cash flow that comes from this .

Abhinand Rangesh: In the short term, we felt that this was a better way to go, especially because you've got ongoing cash flow that comes from this. It's much better to figure out a way to make them profitable than walk away from them.

Abhinand Rangesh: In the short term, we felt that this was a better way to go, especially because you've got ongoing cash flow that comes from this. It's much better to figure out a way to make them profitable than walk away from them.

Speaker #2: So it's much better to figure out a way to make them profitable than walk away from them .

Speaker #8: Yeah . That makes a lot more sense now is were those the territories where you feel like you had the problem to address

Kris Tuttle: Yeah, that makes a lot more sense now. Were those the territories where you feel like you had the problem to address?

Kris Tuttle: Yeah, that makes a lot more sense now. Were those the territories where you feel like you had the problem to address?

Speaker #2: Yeah , it's really been the urban environments . Like just actually just predominantly greater New York and to a certain extent up in Toronto , those are the two territories that really pulled it down .

Abhinand Rangesh: Yeah. It's really been the urban environments like just actually just predominantly Greater New York and to a certain extent up in Toronto. Those are the two territories that really pulled it down. The chiller services in those territories continue to make good money. Part of that is just because you know, the chiller product is billed a little differently. It tends to be a flat rate contract, and it also tends to have already very long.

Abhinand Rangesh: Yeah. It's really been the urban environments like just actually just predominantly Greater New York and to a certain extent up in Toronto. Those are the two territories that really pulled it down. The chiller services in those territories continue to make good money. Part of that is just because you know, the chiller product is billed a little differently. It tends to be a flat rate contract, and it also tends to have already very long.

Speaker #2: The chiller services in those territories continue to make good money . And part of that is just because , you know , the the chiller product is built a little differently .

Speaker #2: It tends to be a flat rate contract . And it also tends to have already very long a like one of the reasons actually we did this was because the chiller service intervals are much longer to start with , and that's why we took some of those improvements from the chiller product , applied it to the power generation thing and said , if the chiller can make money , we should be able to make the same things with the same kind of structures and same improvements to the cogeneration and get the code generation units making the same .

Abhinand Rangesh: It like, one of the reasons actually we did this was because the chiller service intervals are much longer to start with, and that's why we took some of those improvements from the chiller product, applied it to the power generation thing and said, "If the chiller can make money, we should be able to make the same things with the same kind of structures and same improvements to the cogeneration and get the cogeneration units making the same margins.

Abhinand Rangesh: It like, one of the reasons actually we did this was because the chiller service intervals are much longer to start with, and that's why we took some of those improvements from the chiller product, applied it to the power generation thing and said, "If the chiller can make money, we should be able to make the same things with the same kind of structures and same improvements to the cogeneration and get the cogeneration units making the same margins.

Speaker #2: Margins .

Speaker #8: Okay , two other quick ones for me . Just one of them . Can you remind us in terms of when you like your pipeline of business with the with the data centers and all that , and we understand they've been delayed , they've been delayed for lots of other companies .

Kris Tuttle: Okay. I have two other quick ones for me. Just one of them, can you remind us in terms of like your pipeline of business with the data centers and all that, and we understand they've been delayed for lots of other companies. It's been very topical. What are the terms in terms of the revenue recognition and payment terms? Are there any upfront payments involved, like deposits? Do you recognize revenue on delivery? Is there a customer acceptance period? And then what are the typical payment terms where you'd be getting that cash?

Kris Tuttle: Okay. I have two other quick ones for me. Just one of them, can you remind us in terms of like your pipeline of business with the data centers and all that, and we understand they've been delayed for lots of other companies. It's been very topical. What are the terms in terms of the revenue recognition and payment terms? Are there any upfront payments involved, like deposits? Do you recognize revenue on delivery? Is there a customer acceptance period? And then what are the typical payment terms where you'd be getting that cash?

Speaker #8: It's been very topical . What are the terms in terms of the revenue recognition and payment terms ? Are there any upfront payments involved like deposits ?

Speaker #8: Do you recognize revenue on deliveries or customer acceptance period ? And then what are the typical payment terms where you would you'd be getting that cash

Speaker #1: This is Roger. Yeah, typically we require a down payment from customers. It can go from 25% to as much as 40%.

Roger Deschenes: This is Roger. Yeah, typically we require a down payment from customers. It can go from 25 to as much as 40%. Then revenue is recognized when title transfers. In most cases, it's ex factory. Sometimes it's destination, but for the most part, we recognize revenue when the product ships. Obviously, you know, there are some holdback on the revenue rec for start-ups and minor things like that. For the most part, when we ship a unit, we will recognize the revenue at that point.

Roger Deschenes: This is Roger. Yeah, typically we require a down payment from customers. It can go from 25 to as much as 40%. Then revenue is recognized when title transfers. In most cases, it's ex factory. Sometimes it's destination, but for the most part, we recognize revenue when the product ships. Obviously, you know, there are some holdback on the revenue rec for start-ups and minor things like that. For the most part, when we ship a unit, we will recognize the revenue at that point.

Speaker #1: And then revenue is recognized when title transfers . In most cases , it's X factory . Sometimes it's it's , you know , destination .

Speaker #1: But for the most part , we recognize revenue when when the product ship ships obviously , you know , there are some hold back on the revenue req for start ups and , you know , minor things like that .

Speaker #1: But for the most part , when we ship a unit , we will recognize the revenue at that point .

Speaker #8: Okay . And payment terms 30 , 60 , 90 on the balance .

Kris Tuttle: Okay. Payment terms, 30, 60, 90 on the balance?

Kris Tuttle: Okay. Payment terms, 30, 60, 90 on the balance?

Speaker #1: Payment terms are generally 30 days upon customer acceptance.

Abhinand Rangesh: Payment terms are generally 30 days upon, you know, customer acceptance.

Abhinand Rangesh: Payment terms are generally 30 days upon, you know, customer acceptance.

Speaker #8: Okay .

Kris Tuttle: Okay.

Kris Tuttle: Okay.

Speaker #1: So usually that could add another 30 days to it . But you know , yeah , generally between 30 and 60 days , I'd say okay .

Abhinand Rangesh: Usually that could add another 30 days to it, but, you know.

Abhinand Rangesh: Usually that could add another 30 days to it, but, you know.

Kris Tuttle: Yeah.

Kris Tuttle: Yeah.

Abhinand Rangesh: Generally between 30 and 60 days, I'd say.

Abhinand Rangesh: Generally between 30 and 60 days, I'd say.

Kris Tuttle: Okay. Last question, you know, really helpful update on the pipeline. It sounds like, you know, things that got delayed from Q4, like, they got delayed, you know, a bit into, you know, like, not just slipping into March in Q1. I mean, it's, we're now almost done, you know, with Q1. It sounds like expectations should be, you know, we're gonna see more deliveries really starting more in Q2. Am I, you know, sort of did I not hear that right? Or, you know, I know it's a little bit awkward in terms of timing, but, you know, it seems like more of these things are gonna be flowing starting in Q2, Q3.

Kris Tuttle: Okay. Last question, you know, really helpful update on the pipeline. It sounds like, you know, things that got delayed from Q4, like, they got delayed, you know, a bit into, you know, like, not just slipping into March in Q1. I mean, it's, we're now almost done, you know, with Q1. It sounds like expectations should be, you know, we're gonna see more deliveries really starting more in Q2. Am I, you know, sort of did I not hear that right? Or, you know, I know it's a little bit awkward in terms of timing, but, you know, it seems like more of these things are gonna be flowing starting in Q2, Q3.

Speaker #8: And then last question , you know , really helpful update on the pipeline . It sounds like , you know , things that got delayed from Q4 , like they got delayed , you know , a bit into , you know , like not just slipping into March in the March quarter .

Speaker #8: I mean , it's , it's , we're now almost done , you know , with the March quarter , it sounds like expectations should be , you know , we're going to see more deliveries really starting more in Q2 .

Speaker #8: AM I , you know , sort of did I not hear that right ? Or , you know , I know it's a little bit awkward in terms of timing , but , you know , it seems like more of these things are going to be flowing starting in two , 2Q223 .

Speaker #9: So the there's two .

Abhinand Rangesh: There's two portions of it. Some of the projects there, that's non-data center related projects, right? Those. There were some cannabis, some non-cannabis, like hospitals and comfort cooling and things. Those are the ones that pushed out a little bit. The data center pipeline, it has been, I think, within the range. Like, your typical sales cycle is longer than what we've seen already on the data center stuff. I would say the two are likely to come together around the same time. With data center projects, it's very much something could suddenly start moving equipment, like close the projects as soon as they get a tenant, or a lot of pieces start to move very quickly after that.

Abhinand Rangesh: There's two portions of it. Some of the projects there, that's non-data center related projects, right? Those. There were some cannabis, some non-cannabis, like hospitals and comfort cooling and things. Those are the ones that pushed out a little bit. The data center pipeline, it has been, I think, within the range. Like, your typical sales cycle is longer than what we've seen already on the data center stuff. I would say the two are likely to come together around the same time. With data center projects, it's very much something could suddenly start moving equipment, like close the projects as soon as they get a tenant, or a lot of pieces start to move very quickly after that.

Speaker #2: Portions of it . So some of the projects they're that's non theta center related projects , right . Those were some cannabis . Some non cannabis like hospitals and comfort cooling and things .

Speaker #2: Those are the ones that pushed out a little bit . The data center pipeline , it has been , I think within the range like your typical sales cycle is longer than what we've seen already on the , on the data center stuff .

Speaker #2: So I would say the two are likely to come together around the same time with data center projects. It's very much something where you could suddenly start moving equipment, like close the projects as soon as they get a tenant, or a lot of pieces start to move very quickly after.

Speaker #2: After that , with the Non-data center projects , usually the timing is contingent on if they're doing , let's say , air conditioning load , then they would usually do that on season .

Abhinand Rangesh: With the non-data center projects, usually the timing is contingent on if they're doing, let's say, air conditioning load. Then they would usually do that off season. They would plan to take equipment deliveries in the fall and winter so that they could do the construction of the chiller plant in the off season. That typically moves that timing. With cannabis, a lot of it is just tied to their financing timing. You know, if they can get financing, the project moves.

Abhinand Rangesh: With the non-data center projects, usually the timing is contingent on if they're doing, let's say, air conditioning load. Then they would usually do that off season. They would plan to take equipment deliveries in the fall and winter so that they could do the construction of the chiller plant in the off season. That typically moves that timing. With cannabis, a lot of it is just tied to their financing timing. You know, if they can get financing, the project moves.

Speaker #2: So they would plan to take equipment deliveries in the fall and winter so that they could do the construction of the chiller plant in the off season so that typically moves that timing .

Speaker #2: And then with cannabis , a lot of it is just tied to their financing , timing . You know , if they can get financing the project moves

Speaker #8: Okay . So therefore , you know , you can have some reasonable volume in Q1

Kris Tuttle: Okay. Therefore, you know, you can have some reasonable volume in Q1.

Kris Tuttle: Okay. Therefore, you know, you can have some reasonable volume in Q1.

Speaker #2: Reasonable. But I think a lot of this right now, right? I think some of the bigger—

Abhinand Rangesh: Reasonable, but I think a lot of this right now, right? I think some of the bigger projects will close. I think we've got enough over there that timing is very hard to predict.

Abhinand Rangesh: Reasonable, but I think a lot of this right now, right? I think some of the bigger projects will close. I think we've got enough over there that timing is very hard to predict.

Speaker #9: Projects

Speaker #2: Will close . I think we've got enough over there that timing is very hard to predict .

Speaker #8: Yeah . Understood . Understood . All right . I've got some other technical questions , but those are best left for another time .

Kris Tuttle: Yeah. Understood. All right. I've got some other technical questions, but those are best left for another time. Thanks a lot, fellas, for the answers.

Kris Tuttle: Yeah. Understood. All right. I've got some other technical questions, but those are best left for another time. Thanks a lot, fellas, for the answers.

Speaker #8: Thanks a lot for the answers .

Speaker #2: Thanks , Chris .

Abhinand Rangesh: Thanks, Kris.

Abhinand Rangesh: Thanks, Kris.

Speaker #3: Thank you . My next question today is coming from Sweden , from Geo dot com . Your line is now live

Operator 3: Thank you. Our next question today is coming from Maj Soueidan from GeoInvesting.com. Your line is now live.

Operator: Thank you. Our next question today is coming from Maj Soueidan from GeoInvesting.com. Your line is now live.

Speaker #10: Hi . Good morning . Quick question . I just I just recall , I think from previous conversations with you at least maybe during earnings calls that you didn't really see hyperscale hyperscalers as an opportunity .

Maj Soueidan: Hi. Good morning, Abhinand Rangesh. Quick question. I just recall, I think from previous conversations with you, at least maybe during earnings calls, that you didn't really see hyperscalers as an opportunity. In the last two calls, you've kind of mentioned them, so I'm trying to understand what's changed there. Is that from the cooling side or power side or. Maybe you could maybe touch on that a little bit for a few seconds.

Maj Soueidan: Hi. Good morning, Abhinand Rangesh. Quick question. I just recall, I think from previous conversations with you, at least maybe during earnings calls, that you didn't really see hyperscalers as an opportunity. In the last two calls, you've kind of mentioned them, so I'm trying to understand what's changed there. Is that from the cooling side or power side or. Maybe you could maybe touch on that a little bit for a few seconds.

Speaker #10: But in the last few calls , you've kind of mentioned them . So I'm trying to understand what's changed there . Is that from the cooling side or power side or and maybe you could maybe touch on that a little bit for a few seconds .

Speaker #2: Yeah . So that's a great question . So originally , we felt that the hyperscalers , the validation process and a lot of this thing might just be out of what we would be able to do .

Abhinand Rangesh: Yeah. That's a great question, Maj. Originally, we felt that the hyperscalers, the validation process, and a lot of this thing might just be out of what we would be able to do. As we've started to go after many of these projects, on the colocation side of things, we found that we've gotten, you know, we've either met hyperscalers at trade shows or direct outreach to hyperscalers has resulted in actually very positive engagement. I think with a lot of this, I can't really comment on specifics on any of them, but it does seem like there is significant interest from the hyperscalers side of things. We're kind of letting the hyperscaler conversations continue, and we'll see whether that leads into into projects or pilot projects or what that leads to. We don't yet know.

Abhinand Rangesh: Yeah. That's a great question, Maj. Originally, we felt that the hyperscalers, the validation process, and a lot of this thing might just be out of what we would be able to do. As we've started to go after many of these projects, on the colocation side of things, we found that we've gotten, you know, we've either met hyperscalers at trade shows or direct outreach to hyperscalers has resulted in actually very positive engagement. I think with a lot of this, I can't really comment on specifics on any of them, but it does seem like there is significant interest from the hyperscalers side of things. We're kind of letting the hyperscaler conversations continue, and we'll see whether that leads into into projects or pilot projects or what that leads to. We don't yet know.

Speaker #2: But as we've started to go after many of these projects on the co-location side of things , we found that we've gotten , you know , we've either met hyperscalers at trade shows or direct outreach to hyperscalers as resulted in actually very positive engagement .

Speaker #2: And the I think with a lot of this , I can't really comment on specifics on any of them , but it does seem like there is significant interest on from the hyperscale side of things .

Speaker #2: So it we're kind of letting the hyperscale conversations continue and we'll see whether that leads into exact , into , into projects or pilot projects or what that leads to .

Speaker #2: We don't yet know . It's just they appear to be happening concurrently . So we're , we're just , you know , we're going to pursue it .

Abhinand Rangesh: It's just they appear to be happening concurrently. We're just, you know, we're gonna pursue it. We have presented to a number of them, and there has been, you know, clear interest on the technology for, you know, for the chiller side. I think the power side at this point, we're not leading with it, but there may be interest on some of the ancillary loads. That is something that, you know, the chiller seems to have significant interest.

Abhinand Rangesh: It's just they appear to be happening concurrently. We're just, you know, we're gonna pursue it. We have presented to a number of them, and there has been, you know, clear interest on the technology for, you know, for the chiller side. I think the power side at this point, we're not leading with it, but there may be interest on some of the ancillary loads. That is something that, you know, the chiller seems to have significant interest.

Speaker #2: We have presented to a number of them and they have been , you know , clear interest on on the technology for for the chiller side .

Speaker #2: So, and I think the power side, at this point, we're not leading with it, but there may be interest on some of the ancillary loads.

Speaker #2: But that is something that you know , the chiller seems to have significant interest .

Operator 1: Sure. Great. I have two more additional questions, real short. I'll start with the service contracts, you know, that business, and the things you've done to decrease, you know, maintenance needs, you know, on-site, or increase service intervals. Does it make sense to do that in other jurisdictions other than where you're at now to increase margins there too?

Operator: Sure. Great. I have two more additional questions, real short. I'll start with the service contracts, you know, that business, and the things you've done to decrease, you know, maintenance needs, you know, on-site, or increase service intervals. Does it make sense to do that in other jurisdictions other than where you're at now to increase margins there too?

Speaker #10: Great . I have two more additional questions . Real short . I'll start with the service contracts . You know that business and the things you've done to decrease , you know , maintenance , maintenance needs on site or service increases , service intervals .

Speaker #10: Does it make sense to do that in other jurisdictions other than where you're at now to increase margins there too

Speaker #9: Yes .

Abhinand Rangesh: Yes. We are in other jurisdictions. We're doing those, because one of the biggest costs on the service side of things is your oil change intervals and your, you know, engine component intervals. It's better to do that when you're replacing the whole engine rather than do it on an engine with higher time. We typically, in other service territories, we're doing those changes, but we're doing them as we get, rather than do it, you know, proactively on units. 'Cause at some point, right, there is an expense associated with it, so it's better to do it where you're gonna have the biggest return on that expense. In other territories, we are doing it, but on a much more gradual basis.

Abhinand Rangesh: Yes. We are in other jurisdictions. We're doing those, because one of the biggest costs on the service side of things is your oil change intervals and your, you know, engine component intervals. It's better to do that when you're replacing the whole engine rather than do it on an engine with higher time. We typically, in other service territories, we're doing those changes, but we're doing them as we get, rather than do it, you know, proactively on units. 'Cause at some point, right, there is an expense associated with it, so it's better to do it where you're gonna have the biggest return on that expense. In other territories, we are doing it, but on a much more gradual basis.

Speaker #2: But we are in other jurisdictions where we're doing those because one of the biggest costs on the service side of things is your oil change intervals and your , you know , engine component intervals .

Speaker #2: It's better to do that when you're replacing the whole engine rather than do it on a engine with higher , higher time . So we typically in other service territories , we're , we're doing those changes , but we're doing them as we , as we get , rather than do it , you know , proactively on units because at some point , right , there is an expense associated with it .

Speaker #2: So it's better to do it where you're going to have the biggest return on that, on that expense. So in other territories, we are doing it.

Speaker #2: But on a much more gradual basis.

Speaker #10: So at some point you could see the overall gross margin on that business go up as places like New York catch up to being where they used to be in other areas , maybe even getting an improving gross margin profile is , am I understanding that correctly ?

Operator 1: At some point you could see the overall gross margin on that business go up as places like New York catch up to being where they used to be in other areas, maybe even getting an improvement, gross margin profile. Am I understanding that correctly?

Operator: At some point you could see the overall gross margin on that business go up as places like New York catch up to being where they used to be in other areas, maybe even getting an improvement, gross margin profile. Am I understanding that correctly?

Speaker #2: Correct . I mean , the target is across the whole service territory . We would like to have at least a 50% gross profit margin .

Abhinand Rangesh: Correct. I mean, the target is across the whole service territory. We would like to have at least a 50% gross profit margin.

Abhinand Rangesh: Correct. I mean, the target is across the whole service territory. We would like to have at least a 50% gross profit margin.

Speaker #10: Okay . And finally , I just have a question on the modular data center space . I don't know if you kind of mentioned it in the , in the past , like a fleeting comments about being that market kind of heating up a little bit .

Operator 1: Okay. Finally, I just have a question on the modular data center space. I don't know, you've kind of mentioned it in the past, like in fleeting comments about seeing that market kind of heating up a little bit. I was wondering if you could give us a little bit of color on what you're seeing there and if you can. Do you see opportunity for Tecogen to play in that growth potential there?

Operator: Okay. Finally, I just have a question on the modular data center space. I don't know, you've kind of mentioned it in the past, like in fleeting comments about seeing that market kind of heating up a little bit. I was wondering if you could give us a little bit of color on what you're seeing there and if you can. Do you see opportunity for Tecogen to play in that growth potential there?

Speaker #10: I was wondering if you could give us a little bit of color on what you're seeing there . And if you are , if you can .

Speaker #10: And do you see opportunity for Jin to play in that, that growth potential there?

Speaker #2: Yeah . So we have seen quite a few leads in that space as yet . Nothing has got far enough that they made it into that opportunity list that I presented .

Abhinand Rangesh: Yeah. We have seen quite a few leads in that space. As yet, nothing has got far enough that they made it into that opportunity list that I presented. We believe, just looking at the broader picture, that there's going to be a lot more modular data centers being built, but also there's gonna be a lot more smaller scale data centers being built. Because we're seeing some of the really large data center campuses run into other hurdles such as, you know, local opposition from, you know, people that live in the area or permit problems on the really large data centers. I think there's going to be a push for these modular as well as the smaller scale data centers being built in urban environments. In that sense, our product is like a perfect fit for that, for that market.

Abhinand Rangesh: Yeah. We have seen quite a few leads in that space. As yet, nothing has got far enough that they made it into that opportunity list that I presented. We believe, just looking at the broader picture, that there's going to be a lot more modular data centers being built, but also there's gonna be a lot more smaller scale data centers being built. Because we're seeing some of the really large data center campuses run into other hurdles such as, you know, local opposition from, you know, people that live in the area or permit problems on the really large data centers. I think there's going to be a push for these modular as well as the smaller scale data centers being built in urban environments. In that sense, our product is like a perfect fit for that, for that market.

Speaker #2: We believe just looking at the broader picture that there's going to be a lot more modular data centers being built , but also there's going to be a lot more smaller scale data centers being built because we're seeing some of the really large data center campuses run into other hurdles , such as , you know , local opposition from , you know , people that live in the area or permit problems on the really large data centers .

Speaker #2: So I think there's going to be a push for modular, as well as the smaller-scale data centers being built in urban environments.

Speaker #2: And in that sense , our product is like a perfect fit for that , for that market . You know , at this point , we're .

Abhinand Rangesh: You know, at this point we're not.

Abhinand Rangesh: You know, at this point we're not.

Speaker #10: Not seeing the and the cooling side right . Sorry .

Operator 1: That would be both power and the cooling side, right? Sorry.

Operator: That would be both power and the cooling side, right? Sorry.

Speaker #2: Correct .

Abhinand Rangesh: Correct.

Abhinand Rangesh: Correct.

Speaker #10: Okay That's all the questions I have . Thanks .

Operator 1: Okay. That's all the questions I have. Thanks.

Operator: Okay. That's all the questions I have. Thanks.

Speaker #2: Thanks , much .

Abhinand Rangesh: Thanks, Maj.

Abhinand Rangesh: Thanks, Maj.

Speaker #3: Thank you . We reached out our question and answer session . I'd like to turn the floor back over for any further closing comments

Operator 3: Thank you. We've reached the end of our question and answer session. I'd like to turn the floor back over for any further closing comments.

Operator: Thank you. We've reached the end of our question and answer session. I'd like to turn the floor back over for any further closing comments.

Speaker #2: Thank you very much for listening . And if anybody wants a further conversation on any of the , you know , management is available to have more in-depth discussions .

Abhinand Rangesh: Thank you very much for listening, and if anybody wants a further conversation on any of this, you know, management is available to have more in-depth discussions. Thank you.

Abhinand Rangesh: Thank you very much for listening, and if anybody wants a further conversation on any of this, you know, management is available to have more in-depth discussions. Thank you.

Speaker #2: Thank you

Operator 3: Thank you. That does conclude today's teleconference and webcast. You may disconnect your line at this time and have a wonderful day. We thank you for your participation today.

Operator: Thank you. That does conclude today's teleconference and webcast. You may disconnect your line at this time and have a wonderful day. We thank you for your participation today.

Speaker #3: Thank you . That does conclude today's teleconference and webcast . You may disconnect your line at this time and have a wonderful day .

Q4 2025 Tecogen Inc Earnings Call

Demo

Tecogen

Earnings

Q4 2025 Tecogen Inc Earnings Call

TGEN

Wednesday, March 18th, 2026 at 1:30 PM

Transcript

No Transcript Available

No transcript data is available for this event yet. Transcripts typically become available shortly after an earnings call ends.

Want AI-powered analysis? Try AllMind AI →