Operator: Ladies and gentlemen, thank you for holding, and Welcome to the SBM Offshore Q3 2026 Trading Update Conference Call. At this moment, all participants are in listen-only mode. After the presentation, there will be opportunity to ask questions. I would now like to hand over the conference to Mr. Charles Alby-Défossé in Investor Relations. Please go ahead.

Charles Alby-Défossé: Thank you, Nadia, and thank you all for joining us today. This call is being recorded and will be available for replay on the company's website. Today's prepared remarks will be delivered by our CEO, Øivind Tangen, followed by a Q&A session. Before we begin, I would like to point out the disclaimer at the bottom of our press release and remind participants that some of our comments today may include forward-looking statements reflecting SBM Offshore's view of future events. These matters involve risks and uncertainties that could cause our results to materially differ from our forward-looking statements. The principal risks are described in SBM Offshore's 2025 annual report, which can be found on the company's website. Once again, we will welcome your questions after the conclusion of the prepared remarks. I will now turn the call over to Øivind.

Øivind Tangen: Thank you, Charles. Good morning, everyone, and welcome to SBM Offshore's Q3 2026 Trading Update Call. I am Øivind Tangen, CEO of SBM Offshore, and joining me on the call, as always, is our CFO, Douglas Wood. Thank you for joining us today and for your continued interest in SBM Offshore. Our teams have delivered another strong quarter, reflecting robust client demand, disciplined project execution, and high availability across our fleet. We continue to progress the design of the Longtail projects under the FEED contract. Together with SEAP I and II, this demonstrates the continued confidence our clients place in us. Our strong performance, combined with the contribution from the Longtail projects integrating the FEED phase until year-end, allows us to increase our 2026 directional revenue guidance by $300 million to around $7.9 billion. We are also increasing our directional EBITDA guidance to above $1.95 billion.

Øivind Tangen: This based on the year-to-date performance, noting that the new awards are not expected to reach the 25% completion threshold for margin recognition before year-end. Turning to execution, we now have five projects at different stages of progress. On FPSO Jaguar for ExxonMobil Guyana, the topside lifting campaigns have been completed. Integration and commissioning activities continue to progress in line with plan. First oil is expected in 2027. For Woodside, construction of FSO Chalchi is progressing well. The turret has been successfully lifted into the FSO hull at the yard in China. On FPSO GranMorgu for TotalEnergies, the dry dock has been completed and the topside fabrication is progressing well. First oil is expected in 2028. Finally, the engineering and procurement activities on both SEAP II and I for Petrobras are advancing well. The construction of the Fast4Ward hull for SEAP II has started.

Øivind Tangen: Contractual handover is expected in 2030 for SEAP II and 2031 for SEAP I. Our growing portfolio demonstrates our ability to execute increasingly large and complex projects reliably. Fast4Ward is central to this. More than a standardized hull, it is an industrial way of working. Standardized designs, bulk procurement, a strong ecosystem of yards and suppliers, and rigorous quality control, because scale only creates value when paired with discipline. That is where standardization and replication matter. We are now at our 13th Fast4Ward hull, and we apply the experience gained from each project to the next, improving predictability, protecting schedule and quality, and strengthening cost competitiveness. This also provides a pathway to scaling execution capacity without a corresponding increase in overhead cost. Turning to operations. Our fleet continues to deliver.

Øivind Tangen: The assets we operate are producing more than 2 million barrels of oil per day, with uptime of 99% year-to-date, underpinned by safe and reliable operations. Operating at this scale provides valuable data, experience, and lessons learned that we continuously apply to the design, construction, and operation of future assets, reinforcing performance across the whole life cycle. Market fundamentals also remain strong, with sustained demand for FPSOs. Over the next three years, 41 FPSO projects are expected to be sanctioned, with 16 in our sweet spot. Deepwater is expected to be the fastest-growing source of new oil supply in the coming years, supported by attractive economics, reliable energy supply, and comparatively low emission intensity. We see a healthy pipeline across the Atlantic Basin, especially in Brazil, Guyana, Suriname, and West Africa.

Øivind Tangen: With two unallocated hulls under construction and additional capacity secured through partner yards, we are positioned to build on this momentum. At the same time, we will remain disciplined and selective, focusing on projects with the right risk-return balance. Now on to the financials. For the first nine months of the year, directional revenue increased by 77% to $6.3 billion compared with the same period last year. This was driven by directional Turnkey revenue, which more than doubled to $4.6 billion, reflecting the sale of FPSO ONE GUYANA in February, the awards of SEAP II and SEAP I, the initial contribution from the Longtail FEED contract, and the 45% divestment of ownership interest in FSO Chalchi. Directional Lease and Operate revenue increased by 10% to $1.8 billion compared with the prior year period.

Øivind Tangen: This mainly reflects the full period contribution from FPSO Almirante Tamandaré and FPSO Alexandre de Gusmão. FPSO ONE GUYANA contributed until its sale to the client in February 2026. These increases were partly offset by the divestments of FPSO Aseng and Thunder Hawk in Q4 2025. Directional Net Debt stood at $3.6 billion at the end of September, broadly in line with the position at H1. This reflects, among other factors, limited financing requirements under the Sale and Operate model, with most new projects not expected to require project debt. Finally, on capital allocation. Our approach to growth is to create value and attractive returns for shareholders. We remain on track to return at least $2.1 billion to shareholders through 2031. Following our recent project wins, we will reassess the potential for additional shareholder returns as part of our full-year 2026 capital allocation review.

Øivind Tangen: To conclude, our priorities remain clear. Be selective, win the right projects, deliver them with discipline, and translate our performance into sustainable long-term value. Our results demonstrate the resilience of our business model, notably increased directional revenue and EBITDA guidance for 2026, reflecting strong year-to-date performance and commercial success. Continued execution of our capital allocation framework, including the commitment to return at least $2.1 billion to shareholders through 2031, with future shareholder returns to be reassessed as part of our full year 2026 capital allocation review. Consistent delivery across our growing Turnkey portfolio, with all five projects progressing per plan. A robust pipeline of large and complex FPSO opportunities, positioning us well to capture our share while remaining selective. As always, with an uncompromising focus on safety and operational excellence by all our teams. This concludes the messages for today's call.

Øivind Tangen: Thank you for listening and your interest in SBM Offshore. Operator, we can now open the line for questions.

Operator: Thank you so much. Dear participants, as a reminder, if you wish to ask a question, please press star, 1 on your telephone keypad and wait for your name to be announced. To withdraw a question, please press star, 1, and 1 again. Please stand by while we compile the queue and the roster. This will take a few moments. Now we are going to take our first question. The question comes line of Guilherme Levy from Morgan Stanley. Your line is open. Please ask your question.

Guilherme Levy: Hi. Good morning. Thank you for taking my questions. The first one on new orders. Could you perhaps say a few words about the next developments in Guyana? You have been, of course, involved in the Longtail FEED, which has a lot of gas, as we know. How do you see the opportunity to leverage this experience in Longtail to get new projects in Guyana, such as Haimara, going forward? Do you believe that could allow you to break the dynamics of awarding that we have seen previous years of one FPSO to you and the next one to your competitor? Then the second, on Brazil, I understand there has been some back and forth between Petrobras and the ANP regarding the gas pipelines to the SEAP FPSOs. How concerned are you about these developments?

Guilherme Levy: Given the gas content of these projects, can the FPSOs start operating if the pipelines are not there by the time that they arrive? Do you see any sort of risk to your contract in case Petrobras is not able to solve this batch in time? Thank you.

Øivind Tangen: All right. Thank you, Guilherme. Good morning. New orders, Longtail. I think we are very happy with the progress of our FEED for the Longtail project. As to future sanctioning based on the experience gained through that prospect, I think that is for Exxon to communicate on and consider. I mean, we always try to do our best, and hopefully that will give us the best positioning for what comes next, and their selection of us or any competitor will be entirely up to Exxon. There should be statements from Exxon as to how far they have come in that contemplation, I think, in publicly available information. That is all we have to say on that particular prospect. But we are proud of our journey in Guyana to date, and we hope to continue to build on that going forward.

Øivind Tangen: For the gas pipeline, this is from a project, FPSO project perspective, not any concern as such. It is an FPSO delivered with the same design. As and when the pipeline will be ready, we will connect it, and we can export the gas. In the interim, the field could be run on gas injection.

Guilherme Levy: Thank you.

Øivind Tangen: Thank you.

Operator: Thank you. Now we are going to take our next question. The question comes from the line of Victoria McCulloch from RBC. Your line is open. Please ask your question.

Victoria McCulloch: Good morning. Thanks very much for your time. The first one, can you give us some guidance when you expect the SEAP contracts to reach the 25% completion threshold and contribute to EBITDA? I know you said it is not before year-end. Just wondering if you could give us any help as to how they may look for next year. Secondly, maybe following on from your previous answer, there certainly appears an emerging design once, build twice trend somewhat in the sector. This is not new, and it certainly lends itself to the commentary you have made, certainly in regards to this Fast4Ward hull and the standardization you have seen across the sector. Can you just talk to us about, in practice, how that shapes your organization? Does that impact the way you tender, the margins you think that you can generate on opportunities? Thanks very much.

Øivind Tangen: All right. Let me talk to the last one. I will let Douglas talk to SEAP POC. Design one, build as many as you would like. That is always a great prospect for maximizing learning and optimizing, let us call it, the project organization and supply chain that surrounds a series of projects. We have seen this on several previous projects, that the higher the, let us call it, the copy-paste effect, the better we are able to generate value on subsequent projects. As I said earlier, we have built on the standardization proposition over more than a decade, and this plays into how we set up our supply chain, the yards, our own engineering teams. What this does is that it optimizes our cost base, and it sets us up for doing better the next time. If you do an identical design, that just reinforces that.

Øivind Tangen: How it plays on margins, et cetera, that is improved performance is always positive in terms of generating value. I think we have seen from the past, playing our organization is set up for learning. That is how we have designed the organization around the FPSO standardization principles and the culture we built, and maximizing that learning will be to do a copy as and when that is suitable for the field development. If that is a journey on oncoming projects, whether it is in Guyana or others, that is something we would always be. We have references that we have leveraged before and we can continue to leverage in the future. Now, let Douglas talk to the sale.

Douglas Wood: Yeah, morning, Victoria. SEAP II, which is the first one, that should pass the 25% mark probably around the end, towards the end of next year. SEAP I is going to be probably in the second half of 2028. That is when we see it passing the gate prop there.

Victoria McCulloch: Thanks very much. Appreciate the time.

Øivind Tangen: Thank you.

Operator: Thank you. Now we are going to take our next question. The question comes to line of Philip Ngotho from Kepler Cheuvreux. Your line is open. Please ask your question.

Philip Ngotho: Hi, good morning. Thank you for taking the questions. A few, if I may. First of all, I mean, I appreciate the comments that you will be looking at potentially the shareholder returns with the full-year results. I am just wondering if you could maybe help us understand a little on also the Sale and Operate schedules. How should we think about in terms of working capital needs during the construction of the project? Is that over the coming years, should we see also an uplift in the cash generation in the early years when you execute on SEAP I and II? That is my first question. Also, related to that, can you give any guidance on how you see net debt developing towards year-end?

Philip Ngotho: My second question would maybe be more on what you are seeing in terms of if you are seeing any more increased pricing pressure, given that you are seeing more competition from Asian shipyards. It is not particularly new, but still, can you talk about anything that you are seeing there in terms of discussions with clients, given that there are potentially also more suppliers of large-scale FPSOs? Those are my questions.

Øivind Tangen: All right, thank you, Philip. So, let me talk to the last one. I think there is a competitive landscape, as we have mentioned as well before, with the Sale and Operate introduces maybe a slightly different competition than the classic, let us call it, SBM and other Lease and Operate FPSO contractors. When we talk about the effects of repetition, continuity in supply chain, yard relationships, and maintaining a cost base that has a higher capacity throughput, that is to, of course, solidify our competitive positioning in this increasingly competitive landscape.

Øivind Tangen: Beyond that, when we also talk about lifecycle value creation, keep in mind, it is only when you start to operate that you generate revenue for the end client, and transitioning a unit out of a yard and into operation, and also debottlenecking that unit to make it perform at its absolute maximum capability or design potential, that is the art of what we are doing, and that is the lifecycle value proposition and managing the cost base of the OPEX through that journey. We like to think that we have a strongly differentiated value proposition, but it is a market that, of course, is competitive and maybe more competitive today than it used to be, but also with assets of a different scale that performing or not performing changes the equation for the client base significantly.

Øivind Tangen: To be able to give a reliable, likely outcome of the performance of an asset, that should be also something that plays to the competitive positioning, not just a CapEx consideration on the project itself. From a holistic economics for the field development, we like to think that we have a leading value proposition and that it is improving at the pace that the others cannot. That is how I see that, and then maybe, Douglas, you talk to shareholder returns, net debt, and those parts.

Douglas Wood: Yeah. First question, hi, Philip, on working capital. I mean, every project has a different profile, but what we always aim to do is to manage the agreed profile to be neutral to positive. That means that we do, we would say that operate, we can get some swings as we have signaled. But we have a very good liquidity management process, so we are very confident that we are able to manage working capital peaks and with the tools that we have, such that it will not compromise our ability to keep going with the shareholder returns.

Douglas Wood: So, they are kind of decoupled. We manage the working capital, and then the underlying cash flow and growth in the underlying cash flow is going to drive the returns. Then on the debt, yeah, what I would say, it is going to be kind of roughly around the same level we anticipate.

Douglas Wood: I mean, we have signaled, though, that there can again be some variations. Sometimes, as you know, clients like us to do some construction financing, but I think the direction of travel with Sale and Operate long term is to see a steady decline over the medium to long term.

Philip Ngotho: Okay. Thank you, Richard.

Operator: Thank you. Now we are going to take our next question. The question comes from the line of Jeremy Kincaid from Van Lanschot Kempen. Your line is open. Please ask your question.

Jeremy Kincaid: Hey. Good morning. Good morning, gentlemen. Two questions from me. The first on the guidance. At the beginning of the year, your revenue guidance was $6.5 billion. It is now $7.9 billion. Obviously, you have had some new projects which have come into the mix there, the SEAP projects, and obviously the Longtail projects. But you also talked to good execution within the portfolio as well. I was just hoping if you could break out how much of that uplift is due to good execution. Related, the EBITDA guidance went from $1.8 billion to $1.95 billion. Since all of those other projects I just mentioned were at the before 25% completion stage and do not contribute to EBITDA, does that suggest to us that the difference between the $1.8 billion and the $1.95 billion for the EBITDA guidance relates purely to good project execution?

Jeremy Kincaid: And then my final question is just on Venus. In August, I think there were press releases from TotalEnergies saying it had received bids and everything was technically ready or something to that effect. But we are now in November. I was just hoping if you can provide an update on the timeline for that project or when we can expect to see an announcement.

Øivind Tangen: All right. Morning, Jeremy. So I will let Douglas Wood talk to the guidance and the EBITDA. What I would say, though, is that we are really happy with the operational performance, both on our projects and our fleet, and very safely so. So it has been an excellent quarter and an excellent year to date on that side. For the Venus, we do not run any of that process. Any announcement and the timing of such announcement is purely a function of Total's decision-making. So we are not today active on discussion on that prospect. So we do not know any more than what you can read from the press. Then I will let Douglas Wood talk to guidance and EBITDA.

Douglas Wood: Yeah. So, I mean, we started the beginning of the year with no prospects. Obviously, we added a couple in terms of the SEAPs. We have had the extension of the Longtail FEED. And yes, there is performance in there, but yeah, we do not break out all of the individual components, I am afraid. On EBITDA, you are right. I mean, as Øivind Tangen just mentioned, we are very happy with the underlying performance. We start the year with a balanced view in terms of all of the risks and opportunities, and I think we are very happy this year with how we have been able to, yeah, manage the risks and capture the opportunities.

Jeremy Kincaid: Okay. Thank you.

Operator: Thank you. Now we are going to take our next question. The question comes from the line of Thijs Berkelder from ABN AMRO - ODDO BHF. Your line is open. Please ask your question.

Thijs Berkelder (ABN AMRO: Yeah. Good morning, all. A great performance again. A couple of questions from my side. The first one coming back on, let's say, previous questions. Reading the Petrobras Q3 reports, they mentioned bonus payments for two of your FPSOs in Brazil because of strong operational performance. Is that then a main driver for Q3 and/or for Q3 only, or should we potentially see a similar bonus payment in Q4 and/or next year? My second question, your press release, maybe I missed it in your presentation, but the press release says two hulls have been ordered to support active tendering with clients. Those two hulls, does that include the hull which was rumored to be already reserved for Haimara and/or maybe a hull of Venus? Or are these simply part of the two you are mentioning here? My third question is on your 6 million shares canceled.

Thijs Berkelder (ABN AMRO: Can you confirm maybe that HAL Trust now is above the 25% hurdle rate in terms of ownership? Then I would like to have maybe a comment on potential implications for SBM Offshore that MISC and Yinson are about to potentially merge.

Øivind Tangen: All right. Thanks. Good morning, and thank you for acknowledging the performance. We like the continuity of excellence in our performance, but we never take it for granted, and it always comes with a lot of hard work and dedication from our teams. So, they make it look easy, but it is not. Let's put it that way. Thank you for that. When it comes to Petrobras bonus payments, and I have not maybe read the exact press release or the published release that you are referring to, but there is upside on the back of excellent performance, and maybe in particular, the debottlenecking performance on our assets. You may have seen, I have seen releases where Petrobras has referred to record production levels. So, those things could be linked, and this is not a Q3 kind of specificity.

Øivind Tangen: It's something that is continuous as long as the assets would perform on similar levels. That is what I can say about that. When it comes to two unallocated hulls, we have two in the market. You will remember from the last time we said one hull had been allocated to the Longtail. Beyond that, we have two that have not been allocated. There is two currently for SEAP II and I, and there is one reserved for Longtail, and then two that are free to the market, being whatever prospects we consider to be the most suitable and promising, and then when we materialize the prospect to a real project. It's in line with our risk appetite and the same strategy that we've been pursuing over the last years.

Øivind Tangen: When it comes to MISC and Yinson, I think they're both very respected competitors of us that we know well, and the benefits from them going together, it's really hard for us to comment on it. They're not really of any scale in our sweet spot market, or we don't see them that frequently, and whatever gains they can get from joining forces, that will be up to them to tell the market how that's going to create value and change their competitive positioning. We will be reading that with interest as well. Then I'll let Douglas talk to the shares cancellations.

Douglas Wood: I can confirm the cancellation, and that's in line with the policy that we have of canceling all shares that are part of the cash return. You ask about how I mean, we're not tracking our share register on a day-to-day basis. We get periodic updates, of course. As far as I know, likely they're less than 25%, but you'd need to ask them.

Thijs Berkelder (ABN AMRO: Okay. Thank you.

Operator: Thank you. Now we will go and take our next question. The question comes line of Guillaume Delaby from Bernstein. Your line is open. Please ask the question.

Guillaume Delaby: Yes, good morning. Two questions, if I may. First, I am sorry, Øivind, but I did not really get your answer regarding the number of unallocated hulls. I understand that there are two hulls for the two SEAP Brazilian project, one unallocated, which is in fact allocated for Longtail, and two other which are unallocated. So, it would mean five in total, of which two for the Brazilian, one for Longtail, and two unallocated. Is it that?

Øivind Tangen: Hey, good morning, Guillaume. So, yeah, okay. So, there are five hulls currently under construction. Two of them are designated to SEAP II and SEAP I. One has been allocated. It goes under the name MPF 6. It is allocated to the Longtail project. Then we have MPF 8 in CMHI and MPF7 in SWS that are unallocated, available to the market to support our prospect pursuits.

Guillaume Delaby: That is crystal clear. Thank you, Øivind.

Øivind Tangen: Thank you.

Guillaume Delaby: So, maybe a broader question. You mentioned that the competitive landscape is emerging a little bit, and with the new model, the new Sale and Operate model, there are some new competitors which are essentially shipyards which are coming. Could you maybe, in just one or two sentences, describe how this competitive landscape has changed, I would say, over the past three years, and how SBM competitive advantage has remained or even strengthened over the past three years? Sorry for this very, very not open, very direct question, but I think it is important.

Øivind Tangen: Yeah. No, no. This is at the heart of when we work on our own value proposition and how we differentiate, how we create incremental value for our clients. This landscape is somehow the backbone analytics of that. You refer to them as shipyards. I think they wouldn't be categorized as shipyards as much as offshore yards or construction yards with capacity for building highly complex projects. That is beyond the shipyard capability normally. The Sale and Operate allows then for them to bring in an offering that is typically a sale of an asset at the time of the asset leaving the yard or at the startup. If you think about what we are selling is an FPSO product that is over.

Øivind Tangen: We are hull number. The two allocated hulls are hull number 12 and 13, since 2017 when we started the MPF hull build. Six units in operation, we just spoke about the performance of the assets in Brazil and how that is generating record production levels for Petrobras. I think you all seen the performance level in Guyana over a number of years of these assets. When you consider that now six in operation, five more in progress, or four more in progress, and to start in the next few years, the experience base in our project team, the experience base in our supply chain, the scale of that and the continuity and your ability to leverage that scale.

Øivind Tangen: When I talk about disciplined project execution and leverage the scale, is that you need to be able to repeat business in order to do it better the next time. If you do it one-off and then you do another one 5 years later, basically you cannot benefit from anything you have experienced in that, apart from having capacity in your yard. For us, it is about working with the yards and pairing up with yards to allow them to perform at their best in their facilities and giving them line of sight through continuity of work. That generates a differentiated value proposition, for your build, for your design, and for the probability that the asset, once it leaves the yard, because a yard does not run assets over years.

Øivind Tangen: They do not have operational management systems where they bring their learning and proceduralize their learning, and they do not have an asset knowledge in terms of system performance in order to run the asset at an optimized operational cost. It is all of those elements coming together in a sort of managed through one organization with this repeat every time getting better, that is a differentiating value proposition that for some clients in the market, they look at that favorably. Every client has their own strategy in how they go about their CapEx and their OpEx space and how they look at these different phases of a project. We like to think that our value proposition differs in each work phase, and we should be able to generate incremental value versus whether it is a yard or a yard plus an operator in all of the work phases.

Øivind Tangen: That is what we work hard with every day to have a documented value proposition that tells that story in terms of numbers and output. We can tell the story from here in the boardroom, but it is really through what you see, the client's experience and the numbers we produce consistently quarter by quarter that we then tell here and say, "Once again, we have had a strong quarter," right? With excellence. That is the value proposition that differentiates from a yard and the competitive landscape, shift in the competitive landscape.

Guillaume Delaby: Okay. Thank you very much, Øivind. I turn it over. Thank you.

Øivind Tangen: Thank you.

Operator: Thank you. Now we are going to take our next question. The question comes from the line of Mick Pickup from Barclays. Your line is open. Please ask your question.

Mick Pickup: Good afternoon. Sorry, good morning, everybody. Long day. Couple of questions, if I may. I know you said you have not seen the Petrobras presentation, but you should have a look at the two slides that look like an SBM marketing pack. What they are saying is they have debottlenecked 11 FPSOs, and the biggest increases on productions are on your three. So what is it about your FPSOs that has enabled you to find so much capability in those units? Secondly, for Douglas Wood, if I just do the math, clearly you have got a dilutive impact in Turnkey margins in H2. I think you are saying SEAP will not be a get back onto contribution until back end of next year. So is there anything else when I am looking into next year that can make that margin go up in Turnkey before those SEAPs kick in?

Øivind Tangen: All right. So, thank you, Mick. So yeah, I will have to look at those slides. I did see some pictures of our FPSOs though on certain publications, so we always like to see that, of course. But what is special with our assets? So again, right, so just what I was just saying previously, it is not just the asset, it is the knowledge of how the assets operate and how each system should be tuned to be performing at its best.

Øivind Tangen: So that is the combination of the assets, the inherent design that builds in that knowledge, and the teams that operate it day by day, and the engineers that back that up to find out when the real reservoir fluids and the real pressures from the reservoir and the wells get open, how can we then use the asset in that real-term condition to get the most out of it and do that at pace and do it with stability? Because it is not just to debottleneck and achieve an output, it is to hold that output consistently every hour of the day, every day of the week, and so forth. So it is a mix of a design that is continuously improving.

Øivind Tangen: It is a mix of then system understanding and having excellence in our teams to harvest that value creation and let our clients enjoy that value creation, and then publish nice reports on it. So it is a combination of assets, continuous learning, and the people that fit into the same. The continuous learning is not just on the hardware and design. It comes with the system understanding and how to run the assets. So that is the combination, that is the, let us call it, the value proposition that is exemplified in its most beautiful example than in this case. Well, that is the best I can say about that. Douglas, the numbers?

Douglas Wood: Yeah, I mean, so you are right. I mean, this year in Turnkey, there is probably disproportionate amount of revenue that is not generating any margin yet. So yeah, we would expect to see a change next year. So I mean, contributors are going to be B58, still some Jaguar, as I mentioned earlier, SEAP II, and then, if we do get Longtail award and depending on the timing of that, et cetera, could make a contribution. But actually, I think the bigger point is more when you are looking at our margins or our especially Turnkey results, you really need to look at it on a kind of a rolling maybe four-year basis.

Douglas Wood: That is a better way to look at it, to smooth out some of these swings that increasingly, as we have been flagging for the past 18 months to two years, we are going to see as a result of Sale and Operate. So, I think that is really a good marker to track, is the rolling four-year EBITDA and margins.

Øivind Tangen: I mean, rolling it on the project schedule type of

Douglas Wood: Yeah, yeah.

Øivind Tangen: info, right?

Douglas Wood: The same

Øivind Tangen: Yeah, four years. That is four years.

Douglas Wood: It is a cycle, a four-year cycle of the project.

Øivind Tangen: Yeah.

Mick Pickup: Okay. Thank you.

Douglas Wood: Yep. Thanks.

Operator: Thank you. Now we are going to take our next question. The question comes line of Quirijn Mulder from ING. Your line is open. Please ask your question.

Quirijn Mulder: Yeah. Good morning, everyone. My question is on two things. Can you maybe elaborate on Bonga Southwest? Is there any progression, or is that returning to a back burner again? A little bit cynical, I know. The second question is about, of this 16 FPSOs in the coming three years, what do you see as your fair share? Is that five or something like that? How do you look at it? Let me say, given the increased competition from Korean yards, et cetera.

Øivind Tangen: That was it? Okay.

Quirijn Mulder: Yeah, that was my question. Sorry.

Øivind Tangen: Yeah. Very good. So, Bonga Southwest, I mean, we are very hopeful that this project will fly, and we understand that Shell are being very enthusiastic about it as well, and there seems to be a dynamic of progress seen through the summer published agreements between Nigerian government and Shell. So, I think it has a new dynamic. I think we have spoken about it on a few occasions, how West African countries have been somehow repositioning some of the previous positions on licenses to give a more favorable economy to stimulate further investment. So, I think you are going to see increased exploration volume as well in West African countries in the years ahead. So, that is very exciting. Bonga Southwest looks like a great prospect in the right license design. So, hopefully it will be on the front burner and not on the back burner.

Øivind Tangen: But let us follow Shell and see how they are able to move that forward. On market share, on 16, it will really be. There is always a bit of how will this time out and how will it fit in terms of the workload that we want. We remain ambitious, and any prospect that sits in our sweet spot with therefore the right fundamentals, we want them to stay on above 50% market share. That would be a minimum, as we have been saying. Douglas?

Douglas Wood: Yeah. I just wanted to add one thing, Quirijn. I think this is your last day at ING. Very impressed, but typically with your typical dedication to the last. Yeah, I think actually you have more history with SBM than many of us. And I wanted to say that we really appreciate your support, but also your challenges over the past probably several decades. So, thank you very much, and everybody here at SBM would like to wish you all the best for the future.

Øivind Tangen: Mm. Absolutely. Thank you so much. And I am hoping you will be following SBM, though, through the quarter results in the years to come as well with some interest.

Quirijn Mulder: Yeah, yeah, I certainly will. Thank you for your nice words.

Øivind Tangen: Thank you.

Operator: Thank you. Dear participant, as a reminder, if you wish to ask a question, please press star, 1 on your telephone keypad and wait for your name to be announced. Now we are going to take our next question. The question comes line of Thijs Berkelder from ABN AMRO - ODDO BHF. Your line is open. Please ask your question.

Thijs Berkelder (ABN AMRO: Okay. Thank you. Two additional questions from my side. In lifting your revenue guidance for the year, is there also a component of better than or quicker than expected construction on your projects under construction? Meaning that you are ahead of your original timeline or your budgeted timeline? The second question is coming back again on the Petrobras bonus payments that is accounted for in Lease and Operate, yes?

Douglas Wood: Yes. Let me take that. The driver of the revenue increase is really the integration of an extension in the Longtail FEED. That is the main component. Not really anything from the other projects in the increase. And indeed, the bonus payments from Petrobras are reflected in Lease and Operate.

Thijs Berkelder (ABN AMRO: Okay. Thank you.

Operator: Thank you. Dear participants, as a reminder, if you would like to ask a question, please press star 11. Now we are going to take our final question for today, and it comes to line of Peter Testa from One Investment. Your line is open. Please ask your question.

Peter Testa: Hi. Thank you for taking my question at the end. It is more of a market environment question for you and how things are shifting. We have seen, obviously, oil prices up and security supply is a big topic. We also see finance costs up as well. I was wondering if you could give a sense of how all this is combining now into the dynamics of commercial conversations, both in terms of pipeline pace moving through to FID, but also new projects arriving into pipeline. Thank you.

Øivind Tangen: Yeah. Thank you, Peter. I think, keeping in mind that by the time a prospect comes our way, there has already been a few years of work and exploration and well tests, and there is a journey, right? There is no sort of immediate correlation in the production facility and dynamics. It is more about how do we see this strengthening or weakening our value proposition, and thinking about our value proposition being one of the deep water market Atlantic Basin. I think the combination of all of this is that we, versus, let us say, previous periods, we would see our, the expected. You combine this maybe with power needs emerging from data centers and some of these macro drivers.

Øivind Tangen: Energy, reliable sources of energy, increasing energy demand, and the need to bring then oil into the mix for longer, most likely than before, from this additional demand, apart from the world wants to become a developing world and then develop at pace and then add data center and all that to the equation, combined with the energy reliability and the sort of differentiating source of energy from a geopolitical perspective drives the Atlantic Basin. We see that overall, it is a strengthening of our medium to long-term outlook, and the longevity of the long-term outlook is also extending to the right. We see oil in the mix for a very long time, sort of at perpetuity, I would say, in a corporate context at least. Overall, yeah, we consider that favorably.

Peter Testa: Okay. No, thank you very much.

Øivind Tangen: Thank you.

Operator: Thank you, Peter. Dear speakers, there are no further questions for today. I would now like to hand the conference over to speaker Øivind Tangen for any closing remarks.

Øivind Tangen: All right. Thank you, operator. Only then closing remark. Again, Kieran, thank you so much for having followed and challenged SBM over the whole period. Thanks to all of you. Thank you for your interest and continued interest in SBM. Any further questions, you know how to get hold of us and bring those questions to our teams, which we will be happy to reply. Have a great day, all of you. Thank you.

Operator: This concludes today's conference call. Thank you for participating, and now all disconnect. Have a nice day.

Browse all earnings call transcripts

Q3 2026 SBM Offshore NV Earnings Call

Demo

SBM Offshore

Earnings

Q3 2026 SBM Offshore NV Earnings Call

SBMO

Thursday, November 12th, 2026 at 9:00 AM

Transcript

No Transcript Available

No transcript data is available for this event yet. Transcripts typically become available shortly after an earnings call ends.