Karen Sagot: Thank you. Good morning, everyone, and welcome to FirstEnergy's Q3 2026 earnings review. Our earnings release, presentation, and related financial information are available on our website at firstenergycorp.com/ir. Today's discussion will include the use of non-GAAP financial measures and forward-looking statements, which are subject to risks and uncertainties. Actual results could differ materially from forward-looking statements discussed in our news release, during today's conference call, and in our SEC filings. The appendix of today's presentation includes supplemental information along with the reconciliation of non-GAAP financial measures. Please read our cautionary statement and discussion of non-GAAP financial measures on slides two and three of the presentation. Our Chairman, President, and Chief Executive Officer, Brian Tierney, will lead our call today, and he will be joined by Jon Taylor, our Senior Vice President and Chief Financial Officer. Now it's my pleasure to turn the call over to Brian.

Brian Tierney: Thank you, Karen, and good morning, everyone. We delivered another strong quarter and remain on track to meet our objectives for the year. Our performance reflects strong capital deployment, financial discipline, and an improving customer experience. The team has done a great job executing against our plan to drive continuous improvement while focusing on affordability for our customers. We have also made great progress advancing key regulatory strategies and business opportunities that will fundamentally change the trajectory for FirstEnergy. We continue to see strong interest from data center companies, with contracted and pipelined demand up nearly 60% since year-end, including a 90% increase in contracted demand. West Virginia is a big part of that growth, with pipeline demand up approximately six times to nearly 6 gigawatts. Our proposed Maidsville Energy generating facility will be a key investment to support this demand.

Brian Tierney: We expect an order from the West Virginia Public Service Commission in Q4. Given our confidence level and to protect the schedule, we have reserved the turbines with Siemens for delivery in 2030. All other major contracts are on track to be signed shortly after we receive a commission order. Maidsville is an important project on its own, but we see it as the first of a broader set of opportunities in West Virginia. Last November, I was at our Harrison power station with Governor Morrisey to announce our plans for a new generation. He challenged FirstEnergy to do more. My response to the governor was simple: "Challenge accepted." West Virginia's constructive legislative and regulatory environment are driving economic development, jobs, and businesses that will have a long-term positive impact on the state.

Brian Tierney: We are in active negotiations with large load customers about locations within our West Virginia service territory. Those conversations are open and constructive around delivery schedules, pricing, risk mitigation, and frameworks for benefits to communities and existing customers. To support these large load customers, we have issued a request for proposal for an initial 3 gigawatts of additional combined cycle turbines, and we expect to provide an update in early 2027. We are also exploring innovative bridge power options and temporary behind-the-meter solutions as we build out the grid to support these customers with permanent transmission and generation service. This is a significant opportunity for FirstEnergy. These investments will support the state's goals and create meaningful value for our shareholders. In addition to the opportunities in West Virginia, transmission and distribution remain the foundation of our business and investment strategy.

Brian Tierney: Our transmission system sits at the heart of PJM, a region serving more than 65 million people. Our network connects critical parts of the grid and helps deliver power where it is needed most. The need for transmission investment has never been more important. We need a more flexible and resilient grid to support increasing demand and the economic development taking place in and around our service territory. Across our footprint, we now have 7.9 gigawatts of contracted data center demand. We are in active negotiations with approximately 4 gigawatts of additional load. This demand and the critical infrastructure needed to support a more resilient and reliable regional grid will continue to require increasing transmission investments for the foreseeable future. We expect this to drive at least a 25% increase in our current $19 billion transmission investment plan when we release our updated five-year plan.

Brian Tierney: We are also seeing measurable progress in our distribution business, particularly in Pennsylvania and New Jersey, where we are investing to improve reliability. Since 2024, our reliability has improved by 11% in Pennsylvania and 40% in New Jersey. This is solid proof that our investment plan is working. I am pleased with our progress and believe that our customers, regulators, and policymakers are seeing value from the investments we are making. In the rate cases we have filed, we made the case for investments to meet or exceed our customers' expectations. When we consistently demonstrate the value of our investments for customers, we expect a fair and constructive regulatory outcome. There is more to do, but we are making the right investments, improving performance, and delivering tangible value to our customers.

Brian Tierney: We are reaffirming our 2026 core EPS guidance range of $2.62 to $2.82 per share and expect to be at or slightly above the midpoint. We remain on track to deliver core earnings growth near the top end of our 6% to 8% range through 2030 and have meaningful opportunities to increase earnings growth over time. Our experienced leadership team has the expertise to execute major projects while making the operational improvements our customers expect. We have the people, capability, and commitments to deliver for our customers and shareholders. I will now turn the call over to Jon to cover our financial performance and the progress we have made on key regulatory priorities. Jon?

Jon Taylor: Thank you, Brian, and good morning, everyone. Our financial results are on track for the year, and we have made solid progress on regulatory and strategic priorities. Let me start with our Q3 results. For the quarter, we reported GAAP earnings of $0.96 per share, compared with $0.76 in Q3 2025. Core earnings were $0.98 per share, compared with $0.83 a year ago, largely reflecting growth from our rates and investment programs, increasing customer demand, strong financial discipline, and a slightly lower effective tax rate. Through the first nine months of the year, core earnings increased 9% at $2.20 per share, compared with $2.02 for the same period last year. Through September, we have deployed $4.9 billion of investments to strengthen our electric system, a 23% increase from the same period of 2025.

Jon Taylor: On a trailing 12-month basis, our financial performance resulted in a consolidated 9.5% return on equity in line with our targeted returns. Strong capital deployment continues to drive rate base growth in line with plan of 9.9% at the FirstEnergy level, supported by total transmission rate base growth of 14%, including 21% in our integrated transmission business. We also continue to see encouraging demand trends in our service territory. Total weather-adjusted load increased 1.2% in Q3 and has been positive in each of the last four quarters. This growth is led by the industrial class, which increased 3.3% in Q3 and 2.1% over the last 12 months. We are seeing broad strength in manufacturing activity, including metals, oil and gas, and chemical sectors, along with increasing data center demand.

Jon Taylor: These promising trends give us confidence in the strength and durability of the growth we are seeing across our footprint. As for our financing plan, we have completed our subsidiary debt financings for the year, issuing $2.6 billion at an average coupon of 4.7%. Our expected common equity needs in 2026 remain modest, and we continue to consider equity-like instruments to support our long-term financing plan. Going forward, approximately 50% of our total long-term debt financing needs are supported by formula rate mechanisms that recover interest costs, providing meaningful protection from changes in interest rates. Transitioning to regulatory updates where we continue to make good progress. Earlier this month, we submitted several low voltage transmission solutions through PJM's open window process to address near-term reliability needs. We expect projects to be awarded in Q1 of next year.

Jon Taylor: We have had a solid track record of success in open windows since 2022, with over $5 billion in awarded competitive transmission investments, including joint ventures with other major utilities to develop large, complex projects that cross state boundaries. Our track record positions us well to compete for additional investments as growing electricity demand and new generation drive the need for a stronger regional grid. In New Jersey, we filed our base rate case in August, requesting a rate increase of $253 million, which reflects approximately $1 billion in rate base growth since our last increase was approved in February 2024. Those investments are delivering results for our customers. Reliability improved 16% in 2025, followed by another 22% year-over-year improvement through September of this year.

Jon Taylor: We developed a proposal that delays the impact of any rate increase until 2028 and engaged with the Sherrill administration, the Board of Public Utilities, and Rate Counsel throughout that process. Our proposal balances the investments necessary to improve reliability with affordability for our customers. Even with the proposed increase associated with these important investments, we expect our rates to remain approximately 18% below the state average for investor-owned utilities. In Maryland, we filed our base rate case in September, requesting a revenue increase of $53 million. Since our last rate increase was approved in October 2023, hearings are scheduled for January, and we expect an outcome in April of next year. In West Virginia, we received a regulatory decision on our base rate case, with the commission approving our $76 million Inflation and Investment Adjustment filing as submitted.

Jon Taylor: The first rate increase took effect 1 August, with a second schedule for 1 June 2027. The order also provides for a stay out through April 2028. We expect a regulatory order on the Maidsville CPCN in Q4, and as Brian discussed, that project represents another important opportunity for FirstEnergy, and we will update our 2026 through 2030 financial plan to reflect this investment following an order. As we pursue this opportunity, we remain focused on ensuring that this investment benefits all of our stakeholders. An important part of our approach is to appropriately allocate project and commercial risk to large load off-takers while providing a framework that benefits and protects existing customers. We believe this will create meaningful value for shareholders and will provide the blueprint for future opportunities in West Virginia.

Jon Taylor: Turning to our long-term financial outlook, as we talked about before, our current five-year $36 billion investment plan will be financed with up to $2 billion of equity or equity-like securities through 2030. We will look to fund the additional investments that Brian talked about, including West Virginia generation and transmission, with up to 35% equity or equity-like securities. We are pleased with our results and progress on regulatory matters. Our investment plan provides a solid foundation for continued growth with additional potential beyond it.

Jon Taylor: We will provide a more comprehensive update with our full 2027 through 2031 capital investment and financial outlook on the Q4 earnings call in February, reflecting the incremental transmission investments that Brian highlighted. As we roll forward our plan with incremental investment opportunities, we will continue to maintain the financial discipline and balance sheet strength needed to pursue those investments while delivering value for customers and shareholders. With that, I will turn the call back over to Brian.

Brian Tierney: Thanks, Jon Taylor. Let me close with three points. First, we are executing on our commitments. Our financial performance remains on track, and the investments we are making are producing measurable improvements in reliability and customer service. Second, growing electricity demand is expanding the opportunity across our business. Transmission and distribution remain the foundation of our strategy and an expanding runway for investment needs. In West Virginia, Maidsville and the additional generation opportunities developing behind it offer another meaningful source of long-term growth. Third, we are pursuing growth with discipline. We will invest where we have a constructive regulatory environment, where existing customers benefit and are protected, and where the expected returns create value for shareholders. We have a clear strategy, a compelling opportunity set, and the capabilities to execute. Thank you for your continued interest in FirstEnergy.

Brian Tierney: We look forward to seeing many of you at the EEI conference in a couple of weeks. Now, we will turn the call over for questions.

Operator: Thank you. If you would like to ask a question, please press star one on your telephone keypad. A confirmation tone will indicate your line is in the question queue. You may press star two if you would like to remove your question from the queue, and for participants using speaker equipment, it may be necessary to pick up your headset before pressing the star keys. Our first question is from Nicholas Campanella with Barclays. Please proceed.

Nicholas Campanella: Hey, good morning. Thanks for the time.

Brian Tierney: Good morning, Nick.

Nicholas Campanella: Morning. Thanks for all the updates on West Virginia. My question is, if you were to kind of go beyond Maidsville here with the 3 GW of additional discussions happening right now, any thoughts on continuing to kind of do that in a rate-based solution or doing that through a GenCo structure? How do those kind of returns compare, and would that change the 35% incremental equity need that you laid out at all? Thanks.

Brian Tierney: Yeah. Thanks, Nick. I think the most important thing is for us to get a clean order out of the commission on Maidsville, and that is certainly going to inform how we think about moving forward in West Virginia. The GenCo is absolutely still on the table, and we look at that as an opportunity to protect existing customers, yet still serve the new large load customers. So we are still exploring both opportunities there. If we were to get the additional 3 GW that we are talking about here, that would certainly include additional financing required to finance that.

Jon Taylor: Yeah, Nick, I would say that the discussions that we are having today with off-takers, specifically related to Maidsville, there is an openness to fund some of the investment through a surcharge type of mechanism. We would absolutely expect that to continue with generation investments beyond Maidsville.

Nicholas Campanella: Thanks for that. Then just to follow up on the 3 GW, what type of bridge solutions are you looking for behind-the-meter? Is it like fuel cells or smaller RICE units? If you could talk to that at all. Can you just remind us of the timing of the 3 GW of incremental? Is this kind of layered in to be 2031, 2032, or is it going to be a little bit further beyond that? Thanks.

Brian Tierney: Thanks, Nick. It is going to be beyond that. What we are seeing from customers is if they want a gigawatt type campus, they are looking at seeing if they can start with a building that might be about 100 MW in the near term. So we are looking at solutions from everything from RICE to fuel cells to batteries to anything that can get us quicker to power than a long-term natural gas combined cycle solution. So something that gets the campus up and started and then transitions ultimately to a long-term grid-integrated solution.

Nicholas Campanella: Many thanks.

Brian Tierney: Thanks, Nick.

Operator: Our next question is from Jeremy Tonet with JPMorgan. Please proceed.

Jeremy Tonet: Hi. Good morning.

Brian Tierney: Morning, Jeremy.

Jeremy Tonet: Just want to dive into the large load pipeline as you laid out there, and it seems like the opportunity set in West Virginia moved up a bunch quarter-over-quarter. I was wondering if you could talk about that a bit more. It looks like at the same time, Maryland and New Jersey contracted a little. So just wondering how you see trends developing by state there.

Brian Tierney: Yeah. I think you kind of got it. Maryland, Ohio, Pennsylvania, West Virginia, we are seeing sort of broad interest across the system, and it is real. We are talking to these customers, and people are saying, "Does it end at 2030, 2031?" The answer is it does not. We are seeing it continue beyond that, and the 2030, 2031 is what I would say the first wave. The people who are serious, the large customers that you might think of, the hyperscalers, the legitimate developers, are looking well beyond that, and they are doing so across our service territory. I was out visiting what used to be called Quantum Loophole. I think they now call it the Catellus site outside of Frederick, Maryland. We had our board strategy meeting in Frederick this year. I was out there 3 years ago, and it was dirt.

Brian Tierney: Now there are multiple buildings up and running, and construction continues as they continue to build out that facility. The idea that this stops at 2030, 2031 just is incredible to us, and the people who are serious about this development are talking well beyond that.

Jeremy Tonet: Got it. That is very helpful. Thank you for that. As we think about the transmission additions that could come into the plan here, just could you remind me, I guess, how much of the capital plan gross versus net with partners out there? Just wondering if you could talk a bit more, I guess, on competitive processes out there and what potential upside that could bring.

Jon Taylor: Okay. Jeremy, I will take the first part of that. If you look at our total transmission business, which would include the standalone transmission business plus the transmission in our integrated segment, our external partners' interest in that business is about 30% of that total transmission business, which I would expect to generally stay the same as we roll forward the new plan. The 25% increase that we are talking about would have the exact impact, the same impact, on our owned rate base as we move the plan forward. So, it is a significant driver, and if you actually did the math and rolled the plan forward, you would see a pretty significant increase in our owned rate base in 2031 versus what we have in 2030. So it is a material adjustment for the company.

Brian Tierney: Jeremy, you talk about the competitive processes. Jon mentioned that in the last few years, we have about $5 billion worth of awarded projects through the PJM competitive process. I think this year it might be smaller than what we have seen in the prior years because they were looking for short-term solutions out to 5 years. So I think they are going to be lower voltage, more localized type projects. But that means when they come back out next year for the longer-term solutions, we are going to have big opportunities once again. So I think this thing is just going to continue, and the idea that you have an open window and it goes away is not real. I think these open windows are going to continue for the foreseeable future as we are seeing load growth driven by large load customers across the PJM footprint.

Brian Tierney: I see this as far as I can look out, continuing.

Jeremy Tonet: Got it. That is helpful. I will leave it there. Thank you.

Jon Taylor: Thank you, Jeremy.

Operator: Our next question is from Michael Sullivan with Wolfe Research. Please proceed.

Michael Sullivan: Hey, good morning.

Jon Taylor: Hey, Mike.

Michael Sullivan: Wanted to ask a little more on the. Hey, Brian. Wanted to just ask Jon a little more on the financing plan and maybe how you think about the split between equity and equity-like, and just as you get ready to roll the plan forward and those needs potentially go up, how you are thinking about getting going on equity issuance.

Jon Taylor: Yeah. I think we are open to equity-like instruments. You have seen us execute those types of transactions in the past. But, I think for the time being, we have talked about common equity being 1% of market cap on an annual basis. I think that is kind of where we will be for the foreseeable future. But we will talk more about that as we roll forward the plan in February of next year. But that is generally how we think about it. We would explore those options. We have done that before, so we are used to that. But we will provide those details in February.

Michael Sullivan: Okay, great. Very helpful. In terms of just New Jersey and the broader review going on there, can you just give us some insight into the latest and where and when we see that concluding?

Brian Tierney: Yeah. I think the big thing there is that we are talking about improving affordability without creating additional costs, regulatory lag, or unintended consequences. So there is sort of a menu that is out there right now, and I think as clearer heads prevail, those things will form around things like multi-year rate plans and performance-based rates. So there is a menu out there. A lot of the things on the menu make sense, a lot of them do not. And I think we will end up at the right place. A lot of what Jersey Central Power & Light's comments were incorporated in the New Jersey Utilities Association's remarks, comments back to the plan. But I think we will end up at the right place there. If it looked anything like Ohio, I think it will be reasonable, it will protect customers, and allow utilities to continue to invest to improve reliability.

Michael Sullivan: Okay, great. Any sense of when? That was all for me. Thanks.

Jon Taylor: Well, we filed our comments 29 May and again 25 September. We provided additional comments to the working group. I think later this year or early next year, we will have some resolution to what is selected off the menu.

Michael Sullivan: Great. Thank you.

Jon Taylor: Thank you, Michael.

Operator: As a reminder, just star 1 on your telephone keypad if you would like to ask a question. Our next question is from Carly Davenport with Goldman Sachs. Please proceed.

Carly Davenport: Hey, good morning. Thanks so much for taking the questions.

Jon Taylor: Good morning, Carly.

Carly Davenport: Morning. I just wanted to follow up on Jeremy Tonet's question earlier on transmission. Anything that you can share on how much of that increase would be tied to the large load that is now in your plan versus RTO processes versus kind of regular way maintenance investment? Anything on how we should think about how front end or back end loaded that could be in the new plan?

Jon Taylor: Yeah, Carly. I would say that, if you think about what we've talked about before in terms of every gigawatt of contracted demand being about $250 million of transmission network upgrades, that's kind of how we think about it. So that would be the math that you would put into the plan associated with contracted demand. We don't put any uncontracted demand in our plan, so it has to be fairly solid for us to put something in our plan. Most of the increase you'll see is from the work that we need to do on our existing system to stabilize, provide better reliability, provide better resiliency to the system, just given what we're seeing across our footprint in terms of the need to shore up transmission capacity given the demand across the region that we're seeing. So, I would say very little would be associated with contracted demand.

Jon Taylor: The large piece of it would be just reliability on our existing system, those types of investments.

Carly Davenport: Got it. Okay. That is really helpful. Thank you. Then you highlighted in the slides, negotiations with the data center customer at Maidsville are advancing. Anything that you can provide there on, outside of the CPCN approval, the key gating factors to finalizing that? Is there any sense on if customers you are in negotiations with could be interested in offtake from more than one facility as you think about the go-forward opportunity in West Virginia?

Jon Taylor: Yeah. So Carly, I think the big thing, as you mentioned, is getting the CPCN out of West Virginia. In addition to that, other gating things are finalizing the gas supply and our EPC arrangement, and so that is on the we are buying side. On the we are selling side to customers, there is an enormous amount of interest from a number of, I would say, creditworthy known customers out there, and they are interested in both this first tranche, did I call it, of generation that we are putting together, and people are interested in the remaining 3 gigawatts as well. So, these things just take time. I will say it is kind of refreshing, the negotiations that we are having.

Jon Taylor: People are very candid about what they want, when they want it, what the schedule they can have is, what we are willing to talk about in terms of bridge solutions, protections to our existing customers, even benefits to our existing customers. So they are very candid, but I would say fast-moving discussions. As we get the next gigawatt and the next gigawatt and the next one lined up, we are going to be in active discussions with those customers who are lined up to take that service from us in West Virginia.

Carly Davenport: Great. Thank you so much for the color.

Jon Taylor: Thanks, Carly.

Operator: Our final question is from Andrew Weisel with Scotiabank. Please proceed.

Andrew Weisel: Hey, thanks. Good morning, everyone.

Jon Taylor: Morning, Andrew.

Andrew Weisel: First I wanted to ask. Hi. On the RFP for the 3 gigawatts, what is the targeted in-service date?

Jon Taylor: It will likely be in the 2031, 2032 timeframe, just given where we are in time today and where backlogs are. In between now and then, Andrew, we are going to be pursuing those bridge alternatives that we talk about, whether it is batteries, fuel cells, reciprocating engines, whatever it is. People want some speed to power to get their campuses up and running. But for those longer-term solutions, it will be in the 2031, 2032 and beyond timeframe.

Andrew Weisel: Makes sense. On the bridge stuff, you mentioned things like RICE units and batteries, et cetera. Would the idea be that those assets are actually permanently on-site? I mean, you call that bridge, but what would happen to them physically and economically after the first few years? Would they be permanently there?

Jon Taylor: Yeah, that is a great question. I think as we are thinking about it today, it would be bridge for one solution today, and then as you get the long-term solution in place, that bridge could be used for future developments that are not necessarily on-site. So we do not view those bridge solutions as being disposable. We view them as being reusable for multiple locations as we move forward in time.

Andrew Weisel: And you would own them or the customer, or is that TBD?

Jon Taylor: Any combination of that, and we are in conversations where we would own them, where third parties would own them, where the customer would own them. But we view them as being multiply reusable, whether we move them or not. And I do not think you need to move them.

Andrew Weisel: Interesting. Certainly adds flexibility. Okay, great.

Jon Taylor: Yeah.

Andrew Weisel: And one last one. Jon, forgive me, maybe I misheard you, but did you say up to 35% on the equity? The slides just say 35, but I thought I heard you say up to. Is there potential for that to come down?

Jon Taylor: Yeah, I think on the Maidsville, assuming we get the surcharge, it is about a 35% equity requirement. But if you roll forward the plan, it is up to 35%. So there is some flexibility there, but it is probably going to be in that neighborhood.

Andrew Weisel: Okay. Very good. Thank you so much for clarifying.

Jon Taylor: Thank you, Andrew.

Operator: That will conclude today's conference. You may disconnect your lines at this time, and thank you for your participation.

Browse all earnings call transcripts

Q3 2026 FirstEnergy Corp Earnings Call

Demo

FirstEnergy

Earnings

Q3 2026 FirstEnergy Corp Earnings Call

FE

Wednesday, October 28th, 2026 at 1:00 PM

Transcript

No Transcript Available

No transcript data is available for this event yet. Transcripts typically become available shortly after an earnings call ends.

Want AI-powered analysis? Try AllMind →

Earnings analysis guides

Methods for extracting KPIs and checking source support when reviewing an earnings call.

Browse all earnings calls