Company: Bharat Petroleum
Ticker: BPCL
Operator: Ladies and gentlemen, good day and welcome to Bharat Petroleum Corporation Limited Q2 FY27 earnings conference call hosted by Antique Stock Broking Limited. As a reminder, all participant lines will be in the listen only mode, and there will be an opportunity for you to ask questions after the presentation concludes. Should you need assistance during the conference call, please signal an operator by pressing star then zero on your touchtone phone. Please note this conference is being recorded. I now hand the conference over to Mr. Varadarajan. Thank you and over to you, sir.
Varatharajan Sivasankaran: Thank you, Nazneen. Very good morning, ladies and gentlemen. It is my pleasure to welcome all the participants on the call and the BPCL management to the Q2 FY27 result call of BPCL. We have with us Mr. V.R.K. Gupta, Director Finance; Mr. Pankaj Kumar, ED Corporate Finance; Mr. Ashish Dugel, CGM Corporate Treasury; Ms. Anushiya Vatsal Thakker, DGM Finance; Mr. Bala Girish, Senior Manager Finance, Bharat Petroleum Corporation. I would like to hand over to Mr. Bala Girish for the disclaimer.
Bala Girish: Thank you, Mr. Varadarajan. Good morning, and on behalf of the BPCL team, I welcome you all to this post Q2 results con call. Before we begin, I would like to mention that some of the statements that we would be making during this con call are based on our assessments of the matter, and we believe that these statements are reasonable. However, their nature involves a number of risks and uncertainties that may lead to different results. Since this is a quarterly result review, please restrict your questions to the Q2 results. I now request our Director of Finance, Mr. V.R.K. Gupta, who is leading the BPCL team for this call, to make his opening remarks. Thank you, and over to you, sir.
Gupta Vetsa Ramakrishna: Good morning, everyone, and thank you for joining us today. As you are aware, our Q2 results were announced. Let me begin by putting the quarter in context, particularly how the operating environment evolved since we last spoke. When we met in July, the energy markets were under significant stress due to the escalation of the West Asia crisis, which had a considerable impact on our Q1 performance. As tensions showed some signs of easing at the time, we were hopeful that the operating environment would gradually stabilize. However, Q2 unfolded quite differently. The quarter began on a relatively calm note with Brent crude at around $70 per barrel from mid-July. However, geopolitical tension intensified, pushing crude prices above $90 per barrel by August. The situation escalated further in September following attacks on Saudi export infrastructure and tankers, with Brent averaging around $116 per barrel during this month.
Gupta Vetsa Ramakrishna: Tensions around the Strait of Hormuz and the Red Sea also remained elevated. While we continued to secure supplies without disruption, the escalation kept crude premiums and freight costs at elevated levels. Against this challenging backdrop, strong diesel and ATF cracks supported refining economics, while lower LPG underrecoveries provided some relief to marketing margins during the quarter. At the same time, the rupee remained under pressure, averaging around INR 95.6 against US dollar, adding to the cost of our dollar-denominated imports. Through all this volatility, our priorities remained clear. We stayed focused on our four things: securing supplies, serving our customers without disruption, protecting shareholder value, and maintaining momentum on our growth program. Let me start with sourcing. Our spot crude share remained at around 67% in Q2, while Russian grades accounted for approximately 37% of our total crude procurement, both broadly in line with previous quarter.
Gupta Vetsa Ramakrishna: As flows from Middle East improved, we progressively restored sourcing from the region, while retaining the flexibility and diversification we had built during Q1. I am also pleased to share that our efforts to strengthen our international crude sourcing capabilities have begun to yield results. BPCL became the first in the industry to leverage sourcing opportunities from inside the Strait of Hormuz at a price advantage. This was achieved through our international crude desk in Singapore, which commenced operations in September 2026. This marks an important step in strengthening our global sourcing capabilities and improving our ability to respond quickly to opportunities in an increasingly dynamic crude market. As of 30 September, we held around 22 days of crude inventory, and importantly, our crude sourcing requirements are tied up through December 2026. Moving to LPG, despite disruption to traditional supply routes, we maintained domestic availability through a more diversified import portfolio.
Gupta Vetsa Ramakrishna: Supplies from the Arab Gulf improved during the quarter, while US origin cargoes accounted for around 48% of our total LPG imports in Q2. Currently, we are holding 32 days of LPG inventory, including in transit. On LNG, disruptions to our long-term supply contracts required us to actively diversify our sourcing. We secured alternative spot supplies from the US, Oman, and West Africa, supported by flexible logistics arrangement to bridge supply gaps despite elevated market prices. Coming to refining, our refineries continued to deliver a superlative operational performance during the quarter. We achieved a throughput of 10.4 million metric ton in Q2, with overall capacity utilization at 117%. Our gross refining margin stood at $32.53 per barrel, and after adjusting SAED, the GRM was around $14 per barrel. Distillate yield remained strong at 84.38%.
Gupta Vetsa Ramakrishna: Moving to marketing, our domestic sales volume stood at 13.47 million metric ton in Q2 compared to 13.62 MMT in Q1. We continued to strengthen our retail network, taking the number of outlets to 25,592 compared with 25,485 at the end of Q1. At the same time, we continued to build our premium fuel and non-fuel portfolio. Speed 97 conversion stood at 5.21% during the quarter. Speed 100 is now available at 162 outlets, and our BK FY network has expanded to 234 locations. On LPG, we commissioned our Matia LPG plant in Golaghat, Assam, our first LPG bottling plant in the state, with a capacity of 30 TMT per annum. This is an important step towards strengthening our LPG infrastructure and product availability in that region.
Gupta Vetsa Ramakrishna: We are also pleased to share that our premium composite cylinder, Bharatgas Lite ZIP, is now available across India and can be conveniently booked through the HelloBPCL app. I am proud to share with you that BPCL has recently launched extreme weather-grade diesel, developed entirely in-house to keep military vehicles operating reliably in extreme winters and at high altitudes. The first rake was dispatched from Bina in August. For us, this is more than just a new product. It demonstrates what we can achieve when innovation and technological capabilities come together in support of national priorities. Our gas business maintained strong growth momentum. Bulk gas achieved a record H1 sales performance of 979 TMT, registering 53% year-on-year growth, while CGD sales reached 177 TMT, growing 65% year-on-year.
Gupta Vetsa Ramakrishna: The recently announced GOBARdhan scheme has made CBG projects increasingly attractive, and we are actively pursuing this opportunity through both our own plants and joint ventures. Additionally, our CBG blending reached 6.5% in H1, more than double the mandated target of 3%. Coming to LPG compensation, the softening of Saudi CP prices during Q2 provided some relief on underrecoveries. Average underrecovery declined to around ₹290 per cylinder in Q2 compared to ₹507 per cylinder in Q1. As of 30 September, the cumulative buffer stood at ₹17,334 crore, after adjusting for ₹3,796 crore of compensation received during the first half. For the future, we remain hopeful of the government's continued support to OMC toward domestic LPG compensation. Let me now brief on our growth program. Our CapEx program remains on track, and since we last spoke, our key projects have continued to make steady progress.
Gupta Vetsa Ramakrishna: As of 26 September, our Bina Petrochemicals and Refinery Expansion Project has reached 40.2% progress, while the Polypropylene Project at Kochi has reached 55%. The PRFCC project at Mumbai is also progressing. We have also taken an important step in our sustainable aviation fuel journey. in October, we signed India's first co-processing licensing agreement for our SAF project at Mumbai Refinery. Phase 1 involves revamping the existing kerosene hydrotreater unit and is targeted for commissioning by January 2027. This positions us well for India's SAF blending requirement for international flights, beginning at 1% in 2027 and progressively increasing to 5% by 2030. On the Andhra Pradesh Refinery and Petrochemical Complex, I am pleased to share that on Friday, our board approved the incorporation of a wholly owned subsidiary as a dedicated project company, with an initial authorized share capital of up to INR 4,900 crore, subject to requisite approvals.
Gupta Vetsa Ramakrishna: The dedicated project company will facilitate swift due diligence, lender engagement, and development of the financing and partnership structures. The detailed feasibility reports are in their final stages, following which the financial investment decision will be taken shortly. Moving to our upstream portfolio, the Mozambique project continues to progress steadily, reaching 47% completion as of September 2026, with gas production expected by mid-2028. In Brazil, following the award of the FPSO tender in May 2026, the BM-SEAL-11 project is also progressing in line with planned timelines.
Gupta Vetsa Ramakrishna: Overall, against our FY 2026/2027 CapEx target of INR 25,000 crore, we have incurred INR 13,749 crore during the H1, including INR 9,300 crore in Q2. Now coming to our financial performance, revenue from operations for the quarter stood at INR 1.5 lakh crore, with a standalone profit after tax of INR 4,993 crore. For the H1, standalone profit after tax stood at INR 1,031 crore.
Gupta Vetsa Ramakrishna: On a consolidated basis, profit after tax for Q2 stood at INR 4,863 crore, while profit for the H1 was INR 2,919 crore. Despite the challenging operating environment, our Q2 performance demonstrates the resilience of our integrated business model. The quarter benefited from our agile sourcing strategy, robust refining performance, and a reduction in marketing and LPG underrecoveries. Our balance sheet also remains strong. Standalone gross borrowings reduced to INR 15,246 crore as of 30 September, compared with INR 17,386 crore at the end of June. The standalone debt-to-equity ratio improved to 0.16 from 0.19 in Q1. Our borrowings net of short-term investment stood at INR 7,106 crore as against INR 4,800 crore in Q1. As we enter the H2 of the year, the external environment continues to remain uncertain. However, our performance in Q2 demonstrates our ability to adapt quickly and operate with resilience through periods of significant turbulence.
Gupta Vetsa Ramakrishna: We remain confident in BPCL's ability to navigate near-term volatility while building long-term value. With that, I will conclude my brief on our Q2 performance and will be happy to take your questions. Thank you.
Operator: Thank you very much. We will now begin the question and answer session. Anyone who wishes to ask a question may press star and one on their touchtone telephone. If you wish to remove yourself from the question queue, you may press star and two. Participants are requested to use handsets while asking a question. Ladies and gentlemen, we will wait for a moment while the question queue assembles. The first question is from the line of Probal Sen from ICICI Securities. Please go ahead.
Probal Sen: Thank you for the opportunity, sir, and congratulations on a good set of numbers. A few questions. Firstly, you talked about the crude sourcing mix for Q2, which stood at 67% and Russia at 37%. Just wanted to get a sense.
Probal Sen: Given that Middle East crude prices have improved, as you mentioned, have you seen any material change in that mix in the month of October so far? How are we looking at the mix till December, when you said you already have crude tied up till at least the end of December?
Gupta Vetsa Ramakrishna: Let me give you, in terms of the brief numbers. The Saudi side Persian Gulf, compared to Q1, definitely it has improved in Q2. Even October, November also, we are expecting the similar lines of higher volume from Middle East. Mainly after Yanbu pipeline correction by Saudi, they have started increasing their volumes, and certain cargoes are coming from ADNOC also. Only cargoes from Iraq and Kuwait still not coming in full-fledged, but otherwise, a good amount of volume is coming from Middle Eastern side.
Probal Sen: Right.
Gupta Vetsa Ramakrishna: October, our requirement from Russia has slightly come down. But in the month of November, the cargoes from Russia significantly has reduced due to the commercial viability of Russian cargoes. Mainly the increase in the freight, we are not getting good offer from the Russia. For December cargoes, slightly it has improved. Whatever they were expecting a good amount of premium for Russian cargoes, now the premiums, it's slightly they have reduced. Maybe it is now comparable with other Persian Gulf grades, Russian Urals. Maybe for December, some couple of cargoes we can take to Russian. November will be definitely low in terms of Russian availability. Not availability, Russian cargoes, what we have procured.
Probal Sen: Right, sir. Just a follow-up on that. If I remember correctly, sir, I think you had mentioned at the Q1 briefing that blended crude cost was somewhere around Indian benchmark plus or minus about $12 to $15. Has that number changed in terms of delivered crude price to us, in terms of actual cost of crude?
Gupta Vetsa Ramakrishna: No. Still the freight rates are high. The insurance rates is slightly higher. Still benchmark plus $10 to $12. It depends on which side you are taking the product. For example, if it is from Fujairah, definitely it will be lesser, but if it is from Yanbu, the freight rates will be higher. But from benchmark, we can take on an average, the landing level is $10 to $12.
Probal Sen: Right, sir. The second question was with respect to the LPG. Now, sir, obviously, you mentioned, I think INR 290 odd a cylinder for Q2. Now we have seen Asia LPG prices spike quite a bit in October. If we can get a sense month-wise, what was the per cylinder under recovery in October, and what was it in September? And what are you looking at in November at this point of time?
Gupta Vetsa Ramakrishna: If you see the numbers, July it was INR 490, August INR 179, September INR 199. We are expecting October will be INR 245, it is going up in the month of November. November, expecting INR 328 per cylinder.
Probal Sen: Okay. One last question, sir, if I may. In terms of the marketing margins, is there any discussion at all in terms of relooking at the pricing, given how sharply product spreads and prices have increased? I know you cannot answer in terms of timeline, but just wanted your sense on how you are looking to navigate the higher retail marketing losses, which I am sure you are encountering, at least in October. How are you looking at the situation there?
Gupta Vetsa Ramakrishna: If you see the Q2 numbers, integrated side, there is no big stress on the balance sheet and profitability. We are almost at a normal level of profitability for the quarter, slightly on the lower side, mainly for the higher losses in the marketing underrecoveries.
Probal Sen: Right.
Gupta Vetsa Ramakrishna: We thought crude prices will stabilize, but still the war is continuing. There is no clarity by what time things will improve. One thing we are sure, once this war resolves, crude cannot come in at this price, because the supplies are there, production is there. Only thing is route. Transport route is the disturbing thing. This Red Sea side, volumes are coming, Yanbu side. Even there are certain Houthi attacks on Saudi side, but still a good amount of volumes are coming from the Red Sea. But once SOMO route is resolved, we are hopeful crude can come back to the reasonable level. But some more time, we have to wait and see. We are reviewing every month on month, what is the underrecoveries, how long this will continue.
Gupta Vetsa Ramakrishna: But there is no further discussions on any improvement on the marketing margins at this point of time.
Probal Sen: Understood, sir. Thank you so much for your detailed answers. I will come back in the queue.
Operator: Thank you. Ladies and gentlemen, in order to ensure that the management is able to address questions from all the participants in the conference, please limit your questions to two per participant. Next question is from the line of Vivekanand from Ambit Private Limited. Please go ahead.
Vivekanand Subbaraman: Yeah, hi. Thanks for the opportunity. Just two questions. Number one is on the Mozambique asset. You said that the construction is, I think, 40%, I guess, 47% is what you said. Can you refresh us on the targets that are there in terms of by when should this project come on stream and first gas, and what will be your share of gas in, let us say, FY30 from this asset? That is number one. The second one is in terms of your CapEx outlook. Any change versus the guidance given? I believe it was around INR 25,000 crore in the past. Any change on the annual target for FY27 and FY28, along with maybe a key update on the Bina expansion, if you could talk about that. Thank you.
Gupta Vetsa Ramakrishna: Let me explain on Mozambique first, because the project is progressing very well. 47% project progress is achieved. We are expecting mid of 2028, either June or July, the commissioning date. They have declared 20 June, the first gas we can see. As of date, there is no change in the scheduled dates. Based on the current progress of the project, we are hopeful mid of 2028 we can see the gas. That is one. In terms of the gas flows, size of the gas, the first phase development is for 13 million metric ton of two trains development, out of which BPCL is having a 10% share. That means our sharehold will be around 1.3 million metric ton of gas. This is only for phase one development, and subsequently, based on the reserves, we can develop two more trains.
Gupta Vetsa Ramakrishna: Once this particular project is completed, then other trains, we can plan it. The total size will be around, BPCL share will be, BPCL share will be around roughly 4.2 to 4.5 million metric ton of gas. If all three trains are developed based on the reserves. The second question, in terms of the CapEx program, our financial year FY25, 2026, the target 2026, 2027, the target is INR 25,000 crore. In the six months period, we have already reached around INR 13,000 crore. We are keeping the same target, but in case if any good progress on the project side, slightly it may go up beyond INR 25,000. Depends on the project progress. Even certain activities, if the progress is good, maybe this CapEx program can go up slightly.
Vivekanand Subbaraman: Right, sir. Thanks for the answers. Just one follow-up. Any plans on tying up the Mozambique gas to get to Indian customers, given that now you have visibility of completion of the project by mid of 2028?
Gupta Vetsa Ramakrishna: Mozambique, we have already tied up SPA for 1 million metric ton of gas to bring it to India. Out of 1 million metric ton, already we have started marketing in Q2. Q2 itself, we have started marketing, and certain customers already we have tied up, but small volumes. We have started marketing of the gases.
Vivekanand Subbaraman: Right. By when can we expect this gas for you to get tied up for 1 MMTPA, and do you have plans to bring the entire 1.3?
Gupta Vetsa Ramakrishna: We have started in Q2 on the sales side. On the sales side, we have started marketing of this gas in Q2. Maybe next two, three quarters, we can complete 1 MMT.
Vivekanand Subbaraman: Right. Thank you very much.
Operator: Thank you. Next question is on the line of Sarthak from DSP Asset Managers. Please go ahead.
Sarthak Tita: Hi. Thank you for the opportunity. Sir, just a couple of questions on the Mozambique side as well. If you see the balance sheet on the intangibles under development, can you please split as to how much of the 19,000 odd intangibles as well as under the equity method of 29,000 would be pertaining to Mozambique? And how much have we spent post the force majeure, and what can we expect as incremental spending on the Mozambique side?
Gupta Vetsa Ramakrishna: Yeah. Mozambique as of date, cumulative basis, we have spent around $2.8 billion. It is almost around INR 27,461 crore. And the future CapEx commitments based on the current approved project cost is $1.8 billion in the next coming couple of years we have to spend. The total investment in this Mozambique project will become 2.8 plus 1.8, around $4.5, $4.6 billion of investment, including the exploration activity, everything.
Sarthak Tita: Okay. And this will be up till the gas will be started, so that is till 2028, right?
Gupta Vetsa Ramakrishna: 2028, mid of 2028.
Sarthak Tita: Okay. How much incremental interest cost is there? Has there been any uptick on the interest cost for this project?
Gupta Vetsa Ramakrishna: For this project, this project development is happening under the project cost, project financing. There are consortium of around eight or nine bankers consortium at project level. The interest cost will be varying actually. It starts from 6% to 8.5%, 9% based on the current interest rate. Different lenders at different terms and conditions, this project financing has been concluded.
Sarthak Tita: Fair. This was very clear, sir. Thank you. One last thing, the delta that we see in the balance sheet of intangibles, that is mostly pertaining to Mozambique. Is my understanding correct?
Sarthak Tita: 16,000 crores has increased to 19,700 crores, the intangibles under development. A similar increase has been there on the investment under equity method as well.
Gupta Vetsa Ramakrishna: Yeah. Investment under equity method is mainly due to a particular project, Mozambique project. Earlier it was under PA Holding. PA Holding means whatever CapEx straightaway it used to come under the CapEx program. Subsequently, in the last two quarters, there was a development. All the assets and development has been moved to AssetCo. That means initially of CapEx, you will see in the investment. At project level, all the assets under working progress moved to equity under AssetCo. So that this CapEx program, whatever incurred CapEx program under development, it has moved to equity.
Sarthak Tita: Okay, got it. This was helpful. That's it from my side. Thank you.
Operator: Thank you. Next question is on the line of Yogesh Patil from Dolat Capital. Please go ahead.
Yogesh Patil: Thanks for taking my question, sir, and congrats for the good set of numbers. BPCL GRM has dropped quarter-on-quarter closer to $32 per barrel compared to Q1. What's driving this decline in the BPCL GRM? Because most of the independent refiners actually saw their GRM jump on a sequential basis. Could you walk us through what's behind this quarter-on-quarter dip in our reported GRM, and was there any crude inventory gains during Q2? This is my first.
Gupta Vetsa Ramakrishna: Crude inventory gain, generally we do not calculate because our average inventory is around 22 to 25 days, so there will not be any big impact on the crude inventories. If any inventory gains are there, to the extent of intermediaries, if you are holding a very big amount of intermediaries, then there may be an impact.
Gupta Vetsa Ramakrishna: Otherwise, compared to Q1, the GRM reduction is mainly two regions. One is slightly, the GRMs are more or less GRMs are in the same level as Q1 and Q2. Q1 average gas oil spreads are $55, now it is 56 in Q2. Gas oil is also 24 and 24. There is no big change in the spread. But two important things have happened in the crude procurement. One is the crude freight costs have significantly increased compared to Q1. The Q2 freight costs are very high. Second is, Q1, I think most of the period we used to get Russian crude either at benchmark to discount or around the benchmark. But in Q2, certain cargoes, we do not get any discounts on the Russian crude. We have to buy either at the premium of benchmarks or benchmarks.
Gupta Vetsa Ramakrishna: These two have impacted, mostly on the high sulfur grades, impacted the refining GRMs compared to Q1. Otherwise, if you compare the Singapore benchmark GRM, still our GRMs are much higher.
Yogesh Patil: But sir, the freight cost has gone up for every independent refiner. So why in our case, the crude cost is mattering to the GRM calculation?
Gupta Vetsa Ramakrishna: I do not know other industries, what is the impact of crude inventory gain or intermediary inventory gain. What is the carry forward from Q1 to Q2. We do not have any such information. We generally track what is your performance compared to the trend of the spread, what is the crude procurement compared to the market trends. As long as we are better than the market trends, that we can conclude our refinery performance is better.
Yogesh Patil: So one of the reason is the freight cost that has gone up, and that is impacting on our GRM. That is the correct understanding?
Gupta Vetsa Ramakrishna: Russian side, discounts are not there in Q2. For example, earlier, most of the total procurement, around 37% of Russian procurement. If Russian procurement is not available at discount, particular refineries who are using the high sulfur grades, definitely the margins are, compared to Q1, it is on the lower side.
Yogesh Patil: Okay. My next question, sir, on again, GRM side. The freight cost has already gone up for the crude. So here I am trying to figure out, are those higher freight cost or expenses actually negatively impacting to our GRM? That is one thing. Because are you passing those oil product prices when you set up the RTP? Our understanding on this RTP side is that it is a combination of import plus export parity side, and the imports is making up the bigger chunk out of that RTP. That freight cost is also the part of that. So considering all these equations, the question is very simple, that the freight rates are impacting on a GRM or not?
Gupta Vetsa Ramakrishna: RTP is for the product pricing formula. Product pricing formula, product freight is one component. My procurement of crude freight is another component. If both the freights are in tandem, if it is moving, there won't be any impact. Sometimes if the crude freight component is going up, whereas freight component is not going up, there is a squeezing on the refining margins. Or on other side, for example, product freight costs are going up and crude freight cost is not going up, there is an advantage. So these are the market trends. There is no change in the formula. But this time, whatever the freight cost of crude has gone up, similar extent, the product freight is not gone up.
Yogesh Patil: Okay, sir. Thanks a lot for this clarity.
Operator: Thank you. Next question is from the line of Mayank Maheshwari from Morgan Stanley. Please go ahead.
Mayank Maheshwari: Hi, sir. Just an extension of the previous question around crude sourcing. Can you just give us a bit of an idea about how September quarter crude sourcing was and what you are doing for the current months and the next few months since you're loading, I suppose, for November and December as well? What's going on and how you've seen premium shift. Freight, you've kind of addressed partly. But what's going on in the crude market and what you're seeing on your cost side? Thank you.
Gupta Vetsa Ramakrishna: Let me explain on the Q2 side. In terms of the volume, 37% of volumes come from Russia, and 17% is coming from ADNOC, and 19% coming from Saudi, Q2, and around 6% from Oman and 9% from US. Other countries, it is only 4% to 2%, 1%. Broadly, in Q2, our term contracts for Saudi and ADNOC, majority of the volumes are coming from the term side. These two countries, a little bit gone to the spot. Russian, still we have maintained at 32%. Coming to October and November, in terms of the percentage, more or less same. In terms of the November, Russian volumes have come down compared to PG grades. PG grades actually more commercially viable compared to Russian grades. That is the reason November Russian will be lesser. December completely we have not concluded.
Gupta Vetsa Ramakrishna: Maybe another couple of cargoes still it is pending. Maybe another one week or 10 days, we can conclude on the December side also. Overall, we are getting the full volume, but there are challenges. Certain cargoes, unplanned receipt, for example, cancellation of the cargoes. Immediately you have to replace with some other cargoes. There were challenges, but during the quarter we have come across all the challenges, we have addressed all the challenges. We are getting the full volumes and our throughput is clear. In terms of the market pricing, completely volatile. I can say certain period of time, crude is available at a discount. Certain period of time, crude is available at a premium. For example, certain cargoes, we are the first one. We have taken one cargo for SOMO, crossing the SOH.
Gupta Vetsa Ramakrishna: Earlier, we never tried, but this time we have tried with a good amount of discount, we got the SOMO cargo. The second cargo, again, there are certain issues. So there are some challenges, getting crude is at discount, getting crude is at a premium. So it is a mix. Daily it varies. So there is no clear trend whether crude is on premium side or discount side. But volumes, we are sure volumes we will get.
Mayank Maheshwari: Got it, sir. I think that is pretty helpful. I think the second question was more related to the Andhra Pradesh Refinery and Petrochemical Complex. Can you just give us a sense of the steps now going forward and what will be the timelines around FID, et cetera?
Gupta Vetsa Ramakrishna: Yeah. One is, in the last board meeting, our board has approved for creation of a separate subsidiary company, initially with 100%, and whenever the potential partners are ready to join, subsequently, the dilutions will happen. For that, the first step we have approved for creation of the WOS, and it will go to the DIPAM MOPNG. After MOPNG recommendation, the incorporation of that company will happen. In terms of the DFR, we are almost at final stages. The numbers have been frozen. Just reviews are going on. Maybe another couple of weeks, we will conclude on the number. Broadly, we are looking at a configuration of 10 million metric ton of refinery with a high intensity of petrochemicals, around 32%-33% of petrochemicals. The cost numbers, once we are finalizing and take it to the board, that time we can share full details.
Gupta Vetsa Ramakrishna: In the scheduled timelines, we are expecting maybe in next 2, 3 weeks, we will take it to the board for final investment decisions subject to financial closure and subject to CCEA approvals. Because this investment is happening through subsidiary company, it requires, based on the Maharatna Powers, it has to go to the ministry and CCEA approvals. We are expecting maybe once board is approving, another 2, 3 months, the CCEA approvals will come. But parallel activities, pre-project activities and licenses selection and other things are going on. Parallelly, the selection of licensors and CCEA approvals, the notes will move. Maybe 3, 4 months, we are hopeful the entire approvals will be completed. In terms of environmental clearance, the discussions are completed. The minutes have been recommended by the committee to the EC authorities. We are expecting shortly the EC clearance also.
Gupta Vetsa Ramakrishna: Once it is there, maybe we can start the actual physical work on the site. In terms of the land procurement, around 4,700 acres of land has been registered in the name of Bharat Petroleum. So that is sufficient for initial work for refinery, but another INR 1,400 crore, which is required mainly for green belt and other things, we are expecting by November, the entire 6,000 acres requirement of land will be fulfilled by the AP government. So this is the status here.
Mayank Maheshwari: And sir, is there an equity level you are comfortable with in terms of a minimum that you want to have in this project?
Gupta Vetsa Ramakrishna: We are planning either 70/30 or 65/30 debt equity, and we are keen to dilute at least 30% of equity dilution when the project is in progress, because discussions are still going on. Once the terms are agreed, then the partners will join with us. With this, we are comfortable in terms of the investment. Even earlier also, we have discussed our peak debt equity on standalone basis. Our target debt equity around 1, it should not cross beyond 1 in a significant way at the project peak CapEx. Once the projects are commissioned, again, we will come back to 0.3, 0.4 level of debt equity. That is what we are projecting. When we take any CapEx projects, similar trend we follow. At the peak CapEx, we take a debt equity at 1.1 level of leveraging.
Gupta Vetsa Ramakrishna: Once projects are commissioned, we are hopeful it can come back to 0.4, 0.5 of debt equity. That is where we are comfortable on a standalone basis.
Mayank Maheshwari: Very clear, sir. Thank you.
Operator: Thank you. Next question is from the line of Nitin Tiwari from PhillipCapital India. Please go ahead.
Nitin Tiwari: Hi, sir. Good morning. Thanks for the opportunity. Sir, just for the sake of summarizing, if you can give us a summary of all your ongoing and planned CapEx projects, the large ones, and also a guidance for FY28 and 29 CapEx numbers.
Gupta Vetsa Ramakrishna: Yeah. Major projects, I can say one is Bina Petrochemical Complex. Bina is now scheduled completion is around 40%. The total approved project cost for Bina is INR 43,367 crore. This is excluding taxes, ITC. Cumulative CapEx till date is INR 7,566 already incurred, and progress is 40%. Scheduled commissioning is mid of 2028. We are hopeful Bina project will be completed as per the schedule line. There is no revision at this point of time.
Gupta Vetsa Ramakrishna: The next major project is PP at Kochi Refinery, Polypropylene project at Kochi Refinery. The total approved CapEx is INR 4,850 crore. Till September 2026, we have incurred around INR 1,178 crore, and most of the commitments are done. For example, tendering activity and prices have been frozen. Actual progress, 55.10%, and scheduled completion date is October 2027. This is on polypropylene at Kochi. Third project we have recently approved is PRFCC at Mumbai Refinery.
Gupta Vetsa Ramakrishna: The total project cost is INR 13,626. As of date, the initial activities started. The CapEx till Q2, we have incurred only INR 130 crore, and planned CapEx for this year is around INR 1,500 crore. Actual progress 9.2% completed, and scheduled completion date is September 2029. This is the project. Other major projects are small projects compared to this. All are INR 1,000 crore and INR 1,500 crore projects. All projects are going well, including the IDPL. There is one pipeline project. It is almost delayed by seven, eight years. That also, it has taken a good momentum in Q2. We are expecting the project will be completed by December, January. Otherwise, all projects are in full swing. We are expecting as per the schedules, the projects will be completed.
Nitin Tiwari: Right, sir. And the guidance for FY28 and 29 for the CapEx?
Gupta Vetsa Ramakrishna: 2028, 2029 CapEx, we are expecting INR 40,000 crore plus. It depends on the project progress. It is INR 40,000 crore to INR 45,000 crore. 2026, 2027, INR 25,000 crore is our target. Maybe slightly it will go up because the projects are in full swing. Projects are actually progressing very well. Maybe this INR 25,000 crore, it may go up maybe 5% to 10%.
Nitin Tiwari: Right. So INR 25,000 in 2027, then about INR 30,000 to INR 35,000 is what we can expect in FY28?
Gupta Vetsa Ramakrishna: Yeah. FY27, 2028, INR 40,000 crore you can expect, INR 40,000 crore to INR 45,000 crore. We have to find a major project anyhow, the plan we have. Other than major projects, beginning of the year, generally we review. Other than INR 40,000 crore, as per our cash flow projection, INR 40,000 crore we have taken.
Nitin Tiwari: Sorry. This INR 40,000 includes your CapEx in Andhra as well?
Gupta Vetsa Ramakrishna: Andhra will be addition. Once FID is approved, then Andhra will be an addition. My equity commitments, whatever equity commitments are, Andhra will be an addition.
Nitin Tiwari: Understood, sir. Lastly, sir, just a sort of clarification question again. What is our dependence on basically petrol and diesel when it comes to taking it from other refineries as a percentage of our sales?
Gupta Vetsa Ramakrishna: Our dependence, this year, we are expecting around 6 million metric ton of products we may take by end of this year, because this year the growth is very high. Our own requirement, 89.27%, it is coming from own refineries for MS. And HSD, we are expecting 79.34% comes from our own refineries.
Nitin Tiwari: 6 million ton in total, I mean, both MS and HSD is what you are going to take.
Gupta Vetsa Ramakrishna: Yeah, we are expecting.
Nitin Tiwari: Okay
Gupta Vetsa Ramakrishna: by end of.
Nitin Tiwari: Thanks, Amit. That's very helpful. I'll get back in next week.
Operator: Thank you. Next question is from the line of Bineet Banka from Nomura. Please go ahead.
Bineet Banka: Hi, sir. Thanks for the opportunity. On throughput, I think the number has been very strong over last few quarters. This quarter was 118%, and it has been consistently over 110%. Can we expect similar run rates in future as well? If there is a refinery turnaround over the next few quarters?
Gupta Vetsa Ramakrishna: Yeah, this year there are turnarounds. Mumbai Refinery Q3, we have certain planned shutdowns, around 30 days for Mumbai Refinery. Bina, a small shutdown of 4.5 days. Kochi Refinery will be around 30 days, 30, 40 days, because three units are going for a shutdown. It is a regular maintenance. Maybe slightly Q3, Q4, we may not be at 118%. If you remove the 18% from the shutdown, definitely our refinery throughput will continue similar lines.
Bineet Banka: Okay. On a follow-up question on Andhra Pradesh, can you share the IRR at mid-cycle crack? Not at the current level of crack, maybe around $15, $20 per barrel of diesel, gasoline crack. What will be the IRR from this project?
Gupta Vetsa Ramakrishna: Generally, we take any projections, when we take a large project, we take a 10 years average. We cannot deploy any capital based on the short term trend. We will share the numbers very shortly. Once FID is clear, we can share. Otherwise, when we take the assumptions, any crude assumptions or price assumption, we take a 10 years price trends.
Bineet Banka: Okay, sir. Lastly, one more on the LPG compensation. The buffer has continued to go up, because the under-recovery is higher than what you have been recovering from the government. Are there any discussions going on regarding the same from the government side? How do we do about it?
Gupta Vetsa Ramakrishna: LPG already industry, we have submitted our representation to ministry for support. As a precedent earlier also, whenever LPG under-recovery, ministry is always helpful and they give the support. It is a process. There is a process of getting budgetary support. After that, the announcements will happen. Otherwise, we are in consultation with the ministry for LPG subsidy.
Bineet Banka: Okay, sir. Thank you.
Operator: Thank you. Next question is from the line of Amit Murarka from Axis Capital. Please go ahead.
Amit Murarka: Yeah. Hi. Thanks for the opportunity. I missed if you have already shared the number on the call, but what was the GRM net of SAED in the quarter?
Gupta Vetsa Ramakrishna: $14.
Amit Murarka: $14. Okay. Ballpark inventory gain, if you could give. Last quarter, I remember you had mentioned $3 to $4 as inventory loss. So this quarter ballpark number, if you could share.
Gupta Vetsa Ramakrishna: Very difficult to calculate inventory gain losses, because the crude procurement is so volatile. The freight components are so volatile. Earlier when the prices are stable, maybe one can calculate what is the inventory gain losses. Today, very difficult. How we are doing the valuation, there are different principles. A crude cost itself is one cargo to another cargo, the cost differential is around $20 to $25 due to the freight and other things. We stopped calculating what is the inventory gain losses, because our average inventory is 25 to around 25 days only. If you are bringing any cost efficiency in the crude procurement, that is an efficiency. It is not an inventory gain loss. We do not try to calculate as an inventory gain loss in terms of the crude.
Amit Murarka: Sure. Got it. Just a question on other expenses. It seems to have gone up quite a bit in the quarter. Even if I exclude the FX loss of about INR 400 odd crore, even then it is like INR 9,000 odd crore. Usually, it is a number of close to INR 7,000. Could you highlight what are the specific reasons for this jump?
Gupta Vetsa Ramakrishna: Yeah. There are certain one-time items, there are certain regular items. Mainly the transportation, because of increase of the diesel cost, the transportation cost has gone up slightly on account of volume. That is around INR 150 crore for Q2 increase compared to earlier quarters. Second impact is normal increase of octroi and taxes, around INR 150 crore increase. Forex, anyhow, you said you are aware. The one-time impact is generally as a risk management policy to cover my refining operating expenses. Every year, certain percentage of volumes, we sell the spreads in advance. Those spreads, whatever we have sold in advance for the next 12 months requirement, again, as to my refinery throughput, certain percentage of spreads we sell it. But due to this very high spread, there is a MTM losses, a significant amount of MTM losses during this quarter. These are the major things.
Gupta Vetsa Ramakrishna: Maybe in case if the spreads are normalized in next 6 months, this MTM reversal can happen. That is a one-time hit because this particular period, the spreads are very high.
Amit Murarka: Sure. Could you give that number? What is the MTM loss?
Gupta Vetsa Ramakrishna: MTM will be with TerraSoils other than revised MTM derivatives, around INR 1,200, INR 1,300 crore something, MTM.
Amit Murarka: Got it. So that's the bulk of the movement Q3.
Gupta Vetsa Ramakrishna: Yeah, that is it.
Amit Murarka: Sure. Generally, you mentioned a lot about the crude sourcing already. If I have to just understand the whole and the movement around the various crude and the discount premium, I believe you are getting a meaningful advantage from high Russian crude sourcing, which was coming at a discount and which is gone now. To that extent, is it fair to say that, let's say the premium over Singapore, which was being high, would probably now moderate to more normal levels, let's say, as we have been seeing for other refineries or, let's say, in the prior years for you?
Gupta Vetsa Ramakrishna: Yeah, Russian discount definitely helps a lot in terms of availability of the crude and commercial margins for the refineries. In fact, if you see the trend in the month of October, Russian crude is at a premium of $12 to $13. Now, recent numbers I can say it is only $1 to $2. Maybe in the next month, if the Russian is available at a benchmark or discounts, maybe we are much better than Singapore. If it is at a premium, definitely we may not be at the Singapore level, but as for the refining performance efficiency side, definitely our efficiency is much higher than Singapore side. One is our distillate yield is 83% to 84%. In fact, 84% plus only. In fact, last couple of quarters, we are ensuring 84% plus of distillate yield. Secondly, our swing between gas oil and gasoline.
Gupta Vetsa Ramakrishna: These are the unique advantages for our refineries. Most of the times our GRMs, even there is no Russian discount, our margins will be better than Singapore.
Amit Murarka: Sure. Just a last question on CapEx. You mentioned INR 40,000 crore, INR 45,000 crore for next year. Does this include the planned spends on Mozambique as well?
Gupta Vetsa Ramakrishna: Mozambique project is already factored. Only AP refinery we are not factored in our CapEx program. Maybe once the board is approved for the AP refinery, accordingly we will rework our CapEx program and we can share the revised numbers.
Amit Murarka: Sure. These are all committed CapEx, irrespective of the cash flow situation next year or something?
Gupta Vetsa Ramakrishna: Almost maybe a little bit percentage we do not commit because as and when requirement like for example, maintenance or upgradations. During the year we plan it, there will not be any commitment. I think maybe 15%, 20% non-committed. Every year we have to plan it, and during the year we commit it.
Amit Murarka: Sure. That is all from me. Thank you.
Operator: Thank you. Ladies and gentlemen, in order to ensure that the management is able to address questions from all the participants, please limit your questions to two per participant. Next question is from the line of Sumeet Rohra from Smartsun Capital. Please go ahead.
Sumeet Rohra: Yeah. Hi, sir. Good morning to you. Sir, just two questions only. One is on the LPG. So last year, sir, what was approved for us, I think the monthly payments till November or something of that sort, sir. Can you explain? So if my understanding is correct, that means, sir, for the last tranche, we will get paid in November and then we will not get paid further or what is my understanding? Can you just explain on that, sir?
Gupta Vetsa Ramakrishna: So last
Sumeet Rohra: Secondly, is that you.
Gupta Vetsa Ramakrishna: Yes, please go ahead.
Sumeet Rohra: Yes. My second question is, sir, on the Brent. Today the matter of fact is that, a Dated Brent trades at about 127, 130 and Brent future trades at about 115. Sir, basically what is more relevant for us? The physical oil when you buy, we should look at the 127, 130 level or should we look at the 115 level which is the Brent futures which trades every month? Because sir, if my understanding is correct, we are benchmarked about $90, $95, and beyond that, then our marketing side starts kind of losing money. I just want to understand what is the thought process because the war is absolutely an unknown, right? Nobody knows it. It may finish today, it may finish after 2 years after President Trump leaves. Nobody knows anything. We are dealing with a very big unknown.
Sumeet Rohra: So sir, just wanted your thoughts on how you are looking at the scenario, and what is the timeline of saying that, okay, we will make a decision if prices stay longer for higher periods. I just want to understand your thought process on evaluating the crude on a marketing side of our business, sir. Thank you.
Gupta Vetsa Ramakrishna: Yeah. One is on LPG. Last time whatever subsidy support government has announced, that is for 12 months, that will be ending in the month of October. Around INR 630 to 4 per month for BPCL, it will be ending in the month of October. Any new support, if it comes in this quarter or maybe next quarter, we are not sure what form or what amount the support will come. Then accordingly, that will be an addition. But otherwise, last subsidy mechanism, it will be ending in the month of October. Comes to crude sourcing, yes, I agree there is a big gap created between the ICE Brent and Dated Brent. What we see in the TV channels, it is only ICE Brent. The Dated Brent, yes, presently it is hovering around 125, 127.
Gupta Vetsa Ramakrishna: Most of our contract, I can say significant contracts are linked to Dated Brent, not to ICE Brent. Certain cargoes may be Dubai-based, it happens, but most of the cargoes are on Dated Brent. As long as the Dated Brent is in a higher side, our cost of crude will be definitely on the higher side. Most of the times if you see the trends, recently, I have not seen that much of a gap between the ICE Brent and Dated Brent, but the last two months is due to certain issues of war issues, so the Dated Brent is on a higher side. So the cost of crude procurement will be on Dated Brent. Definitely, our cost of crude will be on that side.
Sumeet Rohra: Sure, sir. Sir, if I just may very quickly ask you one thing, sir. As you mentioned that October, we will see the end of whatever money we were getting on the LPG account. Sir, the matter of fact is that, if I heard correctly, you highlighted that the LPG underrecoveries are going up to 300 plus in November, and October also has been very high. Plus, sir, we are seeing Dated Brent or normal Brent or whatever, being at such high levels. So sir, my question more view is as an investor, so how do we look at it? Because we are losing money on practically every product we sell today. So, it is definitely not a very exciting environment. So, what is the thought process on pricing, et cetera? Can we look at some pricing method changing going ahead?
Gupta Vetsa Ramakrishna: No. Definitely, LPG is a controlled product. We do not have any control over the price declarations of LPG. It is completely under control, and only the underrecovery support mechanism will support some point of time. There are some precedences. It is not the first time. Otherwise, we do not have any control over the LPG pricing, because there are periods, for example, September, the LPG underrecovery was INR 199. Maybe July it was INR 490. November, we are expecting INR 328. How the things will move, what decisions will be taken, maybe ministry will take appropriately on the LPG underrecovery. In terms of MS HSD, one should not see on the short term basis. One has to see, everyone is hoping the war will resolve. In case if it is continuing for a longer period of time, again, we have to review.
Gupta Vetsa Ramakrishna: But at this point of time, we are not hoping this war will continue for a longer period of time. Once the war is resolved, crude is available. It is not that crude is shortage. Only the transit is the issue. Otherwise, crude is available. Sufficiently production is there everywhere. Only refining side, there are production losses because there are production facilities that have been hit. Refining spreads will continue. On the refining side, definitely we are hoping the higher refining cycle will continue. In terms of the crude, we are expecting, at least if war resolves, there will not be any higher level of crude. It will come back to the reasonable levels. That is what we are expecting.
Sumeet Rohra: Sure, sir. Okay, sir. Thank you so much, and wish you all the best and good luck.
Operator: Thank you. Next question is from the line of Aanchal Shah from Axis Capital. Please go ahead.
Anand Shah: Hi, sir. Am I audible?
Gupta Vetsa Ramakrishna: Yeah, we can hear you.
Anand Shah: Sir, just wanted to know, could you quantify the incentives available for the AP refinery project with respect to GST or power concessions? Broadly, what could be the ballpark figure as a percentage of total CapEx or absolute number?
Gupta Vetsa Ramakrishna: No, there are good incentives. Still, we are under discussion. Earlier, government of AP approved based on our earlier estimations of CapEx, roughly in couple of elements, maybe tax refunds or GST and CapEx refund during the work in progress. There are certain incentives, but roughly I can say it is like a percentage of CapEx, what we have invested. For example, if we are investing some INR 50 billion or INR 100 billion, principally, AP government, initially, they have indicated 75% of capital, what we have invested in the asset, they may reimburse over a period of 15 or 18 or 20 years. Okay? But otherwise, the subsidy support will come from the AP government. We are expecting the same principle of 75% of capital subsidies over a period of 15 or 20 years, or in between. Maybe in the discussions, we will finalize with the AP government.
Anand Shah: Got it. Sir, second is a more structural question. Sir, how do you see the medium to long term demand outlook for MS HSD in India? Specifically, where I am coming from is factors such as increasing EV and CNG penetration impacting MS growth, and then changes in transportation and industrial activity affecting HSD demand. Any on that near to medium term and even long term?
Gupta Vetsa Ramakrishna: Yeah. At least we can forecast a little bit medium term, maybe 3 to 5 years, because India is growing at a 7.5% growth level. The exports also slowly, if there is no tariff impact of US and most of the FTAs we are signing with various countries, it will help a lot in terms of the export of manufactured goods. With this background, definitely diesel will grow. Initially, we thought 2% or 2.5% growth diesel. Now based on the current trend, when we see the diesel growth can go up to 3% and up to 4%. MS, even earlier years also, almost 5% to 6% growth we are witnessing. We are expecting the similar level of growth for MS also. Even there is a little bit improvement in the EV penetration. But in terms of the numbers, still the volumes are coming for MS HSD.
Anand Shah: Got it. Sir, any sense of where BPCL could end up with respect to the number of retail outlets from the current level next 5 years, 10 years?
Gupta Vetsa Ramakrishna: In the last advertisement, we have almost advertised 4,000 to 5,000 retail outlets, but every year we are taking 1,000 outlets. Maybe next 3 years, maybe one can add maybe 3,000. It depends on the land availability. Mainly issue of land. Getting land in the proper locations market, that is more important. Otherwise, every year we are planning in the CapEx for 1,000 ROs we are planning for CapEx.
Anand Shah: Understood. Thank you a lot, sir.
Operator: Thank you. Next question is from the line of Saurabh Jain from HSBC. Please go ahead.
Saurabh Jain: Yeah, thank you for the opportunity. Sorry, I am going back to the point that has been discussed a lot in this call. Is it possible to give a sense in terms of your overall procurement of crude? What could be the premium that you would have paid over the benchmark Brent? Some sense of that number can be helpful for us.
Gupta Vetsa Ramakrishna: Very difficult to how much premium, because different terms. Some cargoes have an FOB, some cargoes are DES. Some are, for example, two HTS, means, for example, in the en route, maybe some portion of the distance they will incur, some portion of the distance we will incur. So terms are completely different. So one has to see what is the cost of procurement. One should not see what is the premium or discount. Certain cargoes, for example, Iraqi cargoes, you got a $20 discount, but finally after the freight, if you are adding maybe it is a benchmark of $5, $6 benefit. So various components are involved. So very difficult to say how much premium from the benchmark. Even someone is calculating it is not a representative figure of market trends.
Gupta Vetsa Ramakrishna: One has to see what is the landing cost of the crude, and what is the value the crude is giving. The differential is the GRM only this particular period of time when both are volatile. The spreads are also volatile, the crude is volatile, the freight is volatile. It won't give any representation if I say even it is available at a benchmark, it is available at a discount or premium.
Saurabh Jain: Okay, no worries. You also made a comment that the Russian crude is now available at only a premium of $1 to $2. You also mentioned some time back that you are still preferring the Middle East crude. Does it imply the Middle East crudes is actually available at a discount to the benchmark?
Gupta Vetsa Ramakrishna: No. I am talking November. November, the trend is Russian is available at $10 to $12. Okay? Compared to $10 to $12 benchmark, then PG side is commercially viable. For December month, there are certain offers of Russia, $1 to $2 premium over benchmark, that is a delivered product, and freight rates are very high. Maybe today, if anyone is offering Russian cargo, Russian cargo is preferable than Middle Eastern cargo for December month, because November month already we have concluded.
Saurabh Jain: Okay. What is your sourcing for Middle East? Is it on a delivered basis or how is the arrangement?
Gupta Vetsa Ramakrishna: Term contracts are on FOB mainly, but spot basis may cargo to cargo it vary. Some traders, if the cargo is available, if the cargo is on the float, then they may offer at a delivered basis. Otherwise, if the cargo is available at the tanks, the supplier point, they offer at FOB. If the vessel ideal from their side, they may offer DES, mean delivered. So different combinations. There is no standard combination whether delivered or FOB.
Saurabh Jain: Okay. Separately, Aramco some time back had announced that they will not ship cargoes to India. So I am a bit confused, is it into place? Is it into effect or you are easily getting available crude from Aramco?
Gupta Vetsa Ramakrishna: Nothing. There is no such communication. At least we have not received anything from Aramco. I do not know which news article you are referring.
Saurabh Jain: Okay. Maybe some wrong news that we are looking at.
Gupta Vetsa Ramakrishna: Yes.
Saurabh Jain: Lastly, is it possible to also share the refining margins by the refinery?
Gupta Vetsa Ramakrishna: Refining margin we have shared already. Individual refinery you want?
Saurabh Jain: Yeah.
Gupta Vetsa Ramakrishna: Refinery wise crude?
Saurabh Jain: Yes.
Gupta Vetsa Ramakrishna: We will share separately.
Saurabh Jain: Okay. No worries. Thank you so much, and all the best.
Gupta Vetsa Ramakrishna: Thank you.
Operator: Thank you. The last question for today is from the line of Aman Sharma from AS Capital. Please go ahead.
Aman Sharma: Okay. Am I audible?
Gupta Vetsa Ramakrishna: Yeah, we can hear you.
Aman Sharma: Thank you for this opportunity. So basically, as you have mentioned, the after SAED, GRM is $14 per barrel, right?
Gupta Vetsa Ramakrishna: Right.
Aman Sharma: So basically, I want to understand, when you transfer the refined products from your refinery arm to marketing arm, how do you calculate this refinery transfer price? Is it after taking the SAED adjustment?
Gupta Vetsa Ramakrishna: When we purchase product from any of other private refineries, it is after SAED. Similar principles we apply for transfer pricing between our refinery to marketing.
Aman Sharma: But if I am not wrong, the SAED is only on the export volumes, right? Even when you pass on the benefits to the marketing arm.
Gupta Vetsa Ramakrishna: Yes. Even when you purchase from private refineries, we will pay only after SAED.
Aman Sharma: Okay. My second question is again on the inventory gain calculation. I understand you are not calculating the gain loss this time, but could you clarify, how you usually do the inventory gain or loss calculation?
Gupta Vetsa Ramakrishna: Inventory gain losses, we are not calculating last back for crude. For finished goods we calculate, because inventory gain generally, when any refinery is holding a crude of around 20 days, my monthly pricing is for 30 days monthly pricing. It will not give any inventory gain loss. Only, for example, in the processing side, some old batches, if you are not processing, keep it in the inventory tanks, it will have an impact. Otherwise, you have a continuous process. Mostly first in first out, last cargo process over. After that, a new cargo will come and replace it. In that scenario, generally, we do not calculate any inventory gain losses. Whatever refining margin, based on the current market trends, that is the refinery margin.
Aman Sharma: Okay. That is all from my side.
Gupta Vetsa Ramakrishna: Thank you.
Operator: Thank you. As that was the last question for today, I now hand the conference over to Mr. Varadarajan, sir, for closing comments.
Varatharajan Sivasankaran: Thank you, Nazneen. Sir, if you have any closing comments, please go ahead.
Gupta Vetsa Ramakrishna: Yeah. Thank you for your questions and for your engagement on today's call. Above all, we sincerely appreciate the trust and confidence you continue to place in BPCL. It motivates us to keep delivering and creating sustainable long-term value. Should you wish to discuss any aspect of the quarterly results further, our investor relations team will be happy to assist. I look forward to speaking with you again. Thank you once again. Let me take this opportunity to wish you and your families a very happy and prosperous Diwali in advance. Thank you.
Varatharajan Sivasankaran: Thanks, sir. I also thank all the participants and the management for engaging this call and spending time in answering all the questions. I wish you all an advanced Diwali wish. Thank you.
Gupta Vetsa Ramakrishna: Thank you.
Operator: Thank you so much. On behalf of Antique Stock Broking Limited, that concludes this conference. Thank you for joining us. You may now disconnect your lines.