Speaker #3: After the speaker's remarks, there will be a Q&A session. If you'd like to ask a question during this time, simply press star followed by the number 1 on your telephone keypad.
Speaker #3: If you'd like to withdraw your question, press star 1 again. Thank you. I'd now like to turn the call over to Fiona Child, VP Communications and Corporate Development.
Speaker #3: You may begin.
Speaker #2: Thank you, operator. Good morning, everyone, and thank you for joining us to discuss New Found Gold's results for the Q3 of 2026. Our news release, financial statements, and MD&A for the quarter were released yesterday and are available on our website, on Cedar Plus, and on Edgar.
Speaker #2: A replay of this call will also be posted on our website shortly following this call. Before we begin, please note that today's remarks include forward-looking statements, including statements about production, costs, the timing of permitting, and development of Queensway, the Pinecone conversion and expansion, and our future plans and objectives.
Speaker #2: These statements are based on current expectations and are subject to risks and uncertainties that could cause actual results to differ materially. Please refer to the cautionary language in our news release and MD&A and to the risk factors set out in our annual information form, and note that all financial numbers mentioned on this call have been rounded to the nearest million dollars.
Speaker #2: We will also refer to non-IFRS measures, including cash costs, and sustaining costs, average realized gold price, and EBITDA. These measures do not have standardized meanings under IFRS.
Speaker #2: Definitions and reconciliations are in our MD&A. Also, please note the Queensway Gold Project 2026 PEA's preliminary in nature. It includes inferred mineral resources that are considered too speculative geologically to have economic considerations applied to them, that would enable them to be categorized as mineral reserves, and there's no certainty the PEA will be realized.
Speaker #2: Mineral resources are not mineral reserves and do not have demonstrated economic viability. Unless otherwise noted, all dollar figures are in Canadian dollars. On the call with me today are Keith Boyle, our chief executive officer, Hasha Mamed, our chief financial officer, Jared Saunders, our vice president sustainability, and Yelena Fried, general counsel and corporate secretary.
Speaker #2: After our prepared remarks, we will open the line for questions. With that, I'll turn the call over to Keith.
Speaker #3: Thank you, Fiona, and good morning, everyone. Thank you all for joining us. Q3 2026 was a transformational quarter for New Found Gold. In September, we announced commercial production at our 100% owned Hammerdown Gold Mine.
Speaker #3: In central Newfoundland, Canada. With that, New Found Gold is Canada's newest gold producer. Just under a year ago, we acquired the Hammerdown Gold Project and the Pinecone Mill, and in this time, Hammerdown has gone from a development stage asset to a producing mine, feeding the Pinecone Mill.
Speaker #3: We now have a producing asset and, most importantly, permitted mill and tailings facilities at Pinecove to rapidly advance our flagship Queensway Gold Project to production 2 to 3 years faster than building only a standalone mill at Queensway.
Speaker #3: Let me start, as always, with safety. Through September 30, 2026, our Hammerdown and Pinecove teams worked more than 328,000 person-hours this year, with zero lost time incidents.
Speaker #3: I want to thank our employees and contractors for that result. It's the foundation of everything we do. Turning to production, Hammerdown produced 4,863 ounces of gold in the Q3.
Speaker #3: During which we had our first full month of commercial production. We saw an average head grade of 2.77 grams per ton and recovery of 84.2%.
Speaker #3: That brings us to 10,670 ounces year to date at the end of Q3. Consistent with a ramp-up through the year, Q3 alone accounted for 46% of our production, for the first 9 months.
Speaker #3: We sold 6,935 ounces in the quarter at an average realized price of 4,285 US dollars per ounce, generating revenue of 41.6 million. Income from the mine operations was 18.6 million, or 45% of revenue, and EBITDA was positive at 13.1 million.
Speaker #3: Operating costs were higher than anticipated, with cash costs at 2,887 US dollars per ounce and all in sustaining costs at 3,279 US dollars per ounce.
Speaker #3: During the quarter, we advanced overburden stripping and pioneering work in the Rumbullion Pit, moving up the schedule from early 2027 into Q3 so it could be done in a better seasonal conditions.
Speaker #3: Grade infill drilling, fuel surcharges, and water treatment also contributed. I'll walk through the details shortly, along with the steps we are taking to bring costs down.
Speaker #3: To confirm, we expect operating costs to come down in the long run. On the corporate side, we also reached a milestone strengthening our corporate profile through the commencement of trading on the Toronto Stock Exchange main board.
Speaker #3: Post-quarter end, we delivered 2 major milestones at Queensway. In October, we released a revised PEA and updated mineral resource estimate. The PEA shows an after-tax NPV at a 5% discount rate of 1.73 billion dollars and an after-tax internal rate of return of 126%.
Speaker #3: Using a base case gold price of 3,600 dollars US per ounce. At the upside case of 4,100 dollars US per ounce, these numbers rise to 2.225 billion and 164%, respectively.
Speaker #3: In addition, the measured and indicated resources grew by 38%. Last week, we submitted the environmental preview report for Queensway Phase 1, a key step in provincial permitting, and expect a decision from the Minister of Environment, Conservation and Climate Change for the province of Newfoundland, Labrador, in late 2026 or early 2027.
Speaker #3: During the quarter, our balance sheet remained strong and we ended the quarter with 167.1 million dollars in cash and 167.3 million in working capital.
Speaker #3: Queensway Phase 1 is fully funded, and we remain on schedule to deliver first Queensway mineralized material to Pinecove in the fourth quarter of 2027.
Speaker #3: Let me now turn to the operations in more detail. At Hammerdown, Q3 production was driven by higher mining and processing rates. We mined 97,000 tons of mineralized material and about 1.2 million tons of waste for total material movement of 1.3 million tons.
Speaker #3: Pinecove processed 66,000 tons of mineralized material during the quarter, with a head grade of 2.77 grams per ton gold, 31% above our year-to-date average of 2.12, but slightly below mine plan.
Speaker #3: Recovery of 84.2% was in line with the year-to-date average of 83.1%, ounces sold of 6,935 exceeded production as they included about 900 ounces delivered in July against customer prepayments we received in June.
Speaker #3: Third quarter, all in sustaining costs were 904 dollars US per ounce above the 2026 Hammerdown PEA. About 825 US dollars per ounce of that gap is explained by 5 items.
Speaker #3: The largest was the strip ratio, our strip ratio was at 12.4 to 1, about 30% above the PEA's 9.6 to 1 number. That was because we started mining the Rumbullion Pit in Q3.
Speaker #3: This work lifts total material movement from 12,000 to 16,000 tons per day, as planned in the PEA for 2027. We pulled it forward from the first quarter of 2027 so that overburden stripping and pioneering could be done before the winter.
Speaker #3: That is the right call for the mine, but it carries a cost in this quarter. This added approximately 350 dollars or ounce US to the all in sustaining cost for the quarter.
Speaker #3: Next, the head grade was about 11% below the PEA. There was a trench commonly known as a goodbye cut taken out in the 1990s.
Speaker #3: It was unexpectedly larger than what had been recorded and therefore higher grade ounces did not materialize. The grade reconciliation between actual to resource model is excellent at less than 5%.
Speaker #3: So overall, the grade added about 135 US dollars per ounce to the all in sustaining cost for the quarter. Other items impacting operating costs were infill drilling of the inferred blocks in the stage 2 pit at about 180 US dollars per ounce, fuel surcharges on external service contracts of about 85 US dollars per ounce, higher mill labor costs about 45 dollars per ounce, and extra water treatment at the Pinecove, which is about US 30 dollars per ounce.
Speaker #3: So we're now assessing how elevated fuel and water treatment costs affect our ability to reach PEA level metrics and how to close this gap in future quarters.
Speaker #3: We have clear levers to bring costs down. First, the permanent on-site crusher and sorter at Hammerdown. We expect substantial completion this quarter, with commissioning and ramp-up through the first half of 2027.
Speaker #3: Sorting is expected to reduce crushing costs and send higher grade material to the mill, improving both grade and unit costs. Second, the infill and location verification drilling at Hammerdown is complete, with 30,896 meters drilled in 340 holes.
Speaker #3: Those infill costs decreased substantially, and the data will support an updated Hammerdown resource estimate in 2027. Third, the Pinecove circuit conversion. In July, we received the permit amendment to convert the Pinecove from its current flotation leech and marrow crow circuit to a gravity carbon and leech.
Speaker #3: Recent test work suggests that this can lift Hammerdown recoveries from 87% to 92%. The conversion is on schedule for completion in Q4 of 2027.
Speaker #3: We will apply separately for the permit to expand throughput to 1,400 tons per day as part of the Queensway permitting process, subsequent to being released from the environmental process.
Speaker #3: The conversion is an important part of our hub-and-spoke strategy. Pinecove will become one processing hub serving both Hammerdown and Queensway Phase 1. Our focus for Hammerdown and Pinecove through the rest of 2026 and into 2027 is straightforward: steady state production, the crusher-sorter implementation, completion of grade-controlled drilling, and advancement of the off-site mill conversion.
Speaker #3: Turning to Queensway, our flagship project, the revised 2026 PEA and updated mineral resource we released last month, are the result of about 18 months of drilling engineering and technical work.
Speaker #3: At a base case goal price of 3,600 dollars an ounce US, the PEA shows an after-tax net present value at 5% of 1.73 billion, more than double the previous study and an after-tax internal rate of return of 126%.
Speaker #3: At 4,100 dollars per ounce, the NPV rises to 2.2 billion, and the IRR to 164%. After-tax payback is under 1 year. The mine plan assumes a 15-year mine life with a phased open-pit underground operation producing 1.744 million ounces of gold.
Speaker #3: That is an average of about 116,000 ounces a year, peaking at about 190,000 ounces a year in 2032. Life of mine cash costs are estimated at 985 US dollars per ounce, with all in sustaining costs of 1,375 US dollars per ounce.
Speaker #3: Phase 1 starts with very high grades, averaging 13.41 grams per ton, against a life of mine average of 2.09 grams per ton and recovery of 91.5%.
Speaker #3: Capital efficiency is a defining feature. Phase 1 initial capital is about 150 million dollars, in line with the 2025 PEA. Cash flow from Phase 1 is designed to fund Phase 2, and Phase 2 to fund Phase 3.
Speaker #3: Gross capital over the life of mine is 832 million, and sustaining capital is 971 million. The revised mine plan keeps the phased approach of the 2025 PEA, but makes several key changes.
Speaker #3: Phase 1 now uses Pinecove, expanded and converted to a gravity carbon and leech as its mill. Mining starts with contractors in Phase 1 and moves to owner mining later in Phase 2.
Speaker #3: The mine plan adds zones from the AFZ peripheral area, including Dropkick, underground ounces rise 86%, and the underground mining moves up from Phase 3 to Phase 2 starting in 2030.
Speaker #3: The updated resource supports the revised 2026 PEA, measured in indicated resources grew 38% to 1.92 million ounces and in 27.3 million tons grading 2.19 grams per ton.
Speaker #3: Inferred resources total 606,000 ounces in 12.5 million tons at 1.51 grams per ton. The Dropkick zone, about 11 kilometers north of the AFZ core, contributed to that growth in its first inclusion in the mineral resource, and importantly, it speaks to the long strike potential for growth at Queensway beyond the AFZ core area.
Speaker #3: We will be filing the technical report to support the revised PEA and updated MRE by early December, within 45 days of the release. On the permitting front, we submitted the environmental preview report for Queensway Phase 1 on November 3, and it has was subsequently registered by the Ministry of Environment, Conservation and Climate Change for the province of Newfoundland, Labrador.
Speaker #3: The EPR responds to the information requests and feedback from government review, public comment, and our engagement activities, including an open house in the town of Appleton, Central Newfoundland.
Speaker #3: The EPR is now in a 35-day review by the Environmental Assessment Committee, and the public. Under provincial legislation, a decision is due within 45 days of submission, with a possible 14-day extension.
Speaker #3: Based on this timeline, we expect the decision by the end of this year or early in 2027. After release from the Environmental Assessment, we will apply for the provincial and federal permits needed and work with the province on a surface and mining lease through mid-2027, subject to those permits our key milestones are contractor mobilization at Queensway in Q1 of 2027, early works in Q2 2027, including clearing overburden removal, the sound verb, site roads, and water management structures.
Speaker #3: Mining starting in Q3 2027, with the aim of building a stockpile for Phase 1 production. First, Queensway mineralized material to an expanded 1,400-ton a day Pinecove mill in Q4 of 2027.
Speaker #3: Engineering continues under our EPCM contract with WSP Canada, alongside procurement of long-lead items and major contracts. Turning to exploration and de-risking, at the end of Q3, we had 4 rigs active at Queensway and had completed 61,557 meters of diamond drilling in 439 holes.
Speaker #3: Our 2026 Queensway work program has focused on converting inferred to indicated resources in the Phase 2 pits and underground grade-controlled drilling at Keith. Geotechnical drilling for the Phase 2 pits and continued drilling at Dropkick, and regional targets.
Speaker #3: Drilling was slower than planned this quarter due to contractor route maintenance and deep directional drilling challenges in the underground portion of the AFZ core.
Speaker #3: In July, we also reported strong channel and infill results from the Lotto zone in the AFZ core, highlights included. 23.7 grams per ton, over 15.88 meters in channel sampling, and 43.5 grams per ton, over 4.7 meters in infill drilling.
Speaker #3: Those results matched the resource block model well, and support our Phase 2 open pit and underground mine planning. Finally, I would like to say a few words of thanks to our employees, our contractors, and local communities, without which we would not be here today as Canada's newest gold producer.
Speaker #3: Throughout my career, I've worked across Canada and many other countries. This is the best jurisdiction I've worked in. Thanks in large part to the people.
Speaker #3: This company has a solid commitment to hire and source locally whenever possible. Our workforce is over 90% from the province, and over 60% from Central Newfoundland.
Speaker #3: We are bringing responsible development along with economic benefits and new opportunities to the communities in which we operate, including the town of Appleton right next door to Queensway.
Speaker #3: Glenwood, Gander, and the nearby communities. In Springdale and in Kings Point near Hammerdown Gold Mine and in Baybert and Mings Bike near Pinecove. With that, I'll hand over to Hashim Ahmed to walk through the financials.
Speaker #2: Thank you, Keith, and good morning, everyone. Q3 is the first quarter to include a period of commercial production at Hammerdown. It is also the first quarter with depreciation and depletion of the Hammerdown and Pinecove assets, which began on July 1, 2026.
Speaker #2: Therefore, this quarter's results are not directly comparable with the third quarter of 2025, which predates the acquisition of maritime resources or with earlier quarters of 2026.
Speaker #2: Given this, revenue was 42 million, up from 16 million in Q2 2026 and 10 million in Q1 2026. We sold 6,935 ounces at an average realized price of 4,285 US dollars.
Speaker #2: Or 5,996 Canadian dollars per ounce. Year-to-date revenue is 68 million at an average realized price of 4,459 US dollars per ounce. Cost of sale was 23 million, which included 9 million of depreciation and depletion, up from about 0.1 million in Q2, as the company announced commercial production at Hammerdown.
Speaker #2: Cash operating costs were driven mainly by contractor costs of 13 million. Income from mining operations was 19 million, or 45% of revenue. Compared with 2 million in Q2.
Speaker #2: Total cash costs during the quarter were 20 million, and all in sustaining costs were 22 million. Or 4,040 US dollars and 4,00588 Canadian dollars per ounce.
Speaker #2: Exploration and evaluation spending was 15 million, which was flat compared to the second quarter and up 9% year over year. Reflecting the expanded Queensway drilling program.
Speaker #2: Queensway accounted for 92% of that spend. Corporate GNA was 3 million, essentially unchanged from Q3 2025. Share-based compensation was 2 million, a non-cash item.
Speaker #2: With Hammerdown now profitable, we recorded a current and income and mining tax expense of 2 million. The net result was a loss of 7 million, or 2 cents per share, compared with 13 million, or 6 cents per share a year ago.
Speaker #2: And 11 million loss in Q2 2026. Note that before taxes, we recorded income of 2 million this quarter. And I would also like to highlight EBITDA was a positive 13 million, compared with a negative 13 million in Q3 2025.
Speaker #2: Operating cash flow before working capital changes was 11 million. Driven by Hammerdown's mine operating income and partly offset by Queensway's exploration and corporate costs.
Speaker #2: Working capital used 18 million dollars. That reflects lower payables inventory build and delivery of about 900 ounces against repayment received in June. As a result, cash used in operating activities was 7 million dollars.
Speaker #2: We invested 19 million dollars in property, plant, and equipment, mainly at Hammerdown, Pinecove, and Queensway. Financing activities used a net 1 million, mainly interest on the credit facility, partly offset by warrant exercises.
Speaker #2: We ended the quarter with a strong balance sheet and 167 million in cash, down from 194 million at June 30. Mainly due to increased capital spending.
Speaker #2: Working capital was 167 million, and total assets were 706 million. On debt, we have drawn the 70 million first tranche of our 105 million edge point facility.
Speaker #2: At a fixed rate of 8.75%. The 35 million second tranche remains available at our auction until May 15, 2027. Subject to conditions precedent. We are in compliance with all covenants.
Speaker #2: Taken together, our cash, the undrawn tranche, and growing Hammerdown cash flow give us a strong position to fund Queensway phase 1 and our 2026 and 2027 priorities.
Speaker #2: With that, I'll turn the call back to Keith.
Speaker #3: Thank you, Hashim. To sum up, Q3 was the quarter newfound gold became Canada's newest gold producer. Our priorities for the rest of '26 and into 2027 are clear.
Speaker #3: Keep Hammerdown steady state production and commissioning the crusher and sorter to lower costs and lift grade to the mill. Advance Queensway phase 1 through permitting and engineering, targeting first mineralized material to Pinecove in Q4 of 2027.
Speaker #3: File the Queensway technical report and continue the 2026 infill drill program. Complete the Pinecove conversion and begin exploring the Hammerdown gold project land package.
Speaker #3: We have a producing mine, a central mill, a fully funded phase 1 mine plan for Queensway, and a strong balance sheet, all in Newfoundland, Labrador, a top mining jurisdiction.
Speaker #3: That is a solid platform on our path to becoming Canada's next mid-tier gold producer. I want to thank our employees, contractors, communities, shareholders, including our cornerstone shareholder, Eric Sprott, for their continued support.
Speaker #3: With that, operator, we're happy to take questions.
Speaker #1: Thank you. We will now begin the question and answer session. If you would like to ask a question, please press star 1 on your telephone keypad.
Speaker #1: To withdraw your question, simply press star 1 again. If you are listening via the webcast and would like to answer a ques- ask a question, please type your question in the Q&A box on your screen.
Speaker #1: Your first audio question today comes from the line of Mike Nehuzer from Roth Capital Partners. Please go ahead.
Speaker #4: Oh, thanks for taking my call. congratulations on commercial production and, the technical report on, Queensway. could I'm it's a little bit, as you transition, you know, thinking ahead, don't want to be over my skis.
Speaker #4: do you have any guidance on, exploration, drilling at Hammerdown and Queensway? I know you've talked about a percentage, between exploration and infill, but could you provide any thoughts on, the next year?
Speaker #5: Hi, Mike. Thanks for your question. it's well, for those that, on the line there, it's Keith Boyle. we're right in the middle of our budget process, so, you can expect some of that, guidance, in the in the future.
Speaker #5: But, you know, I mean, we're, we're transitioning to a producing, company. And, so, however, we have, some very good targets that we do want to follow up on.
Speaker #4: Do you well, I, I think you've got a lot of targets. with both projects, you mentioned that, in the past, that drop kick was open to expansion.
Speaker #4: do you think that we might see an updated MRE on Queensway, later in 2027?
Speaker #5: the short answer is yes. because what, the work we're doing now, the, drilling and the, infill drilling that we're doing now, with some exploration, is, geared to provide or to move to a, feasibility study next year.
Speaker #4: Okay. And, and on, with regards to, Pinecove and the work at Hammerdown, I, I don't mean to put you on the spot, but I, I know that you're, you're dedicating additional resources and that Hammerdown is, really been uninvested as far as, you know, outside of the main deposit there that you're mining.
Speaker #4: do you think we might be able to see a, an updated, MRE there as well?
Speaker #5: yeah, we'll be, we'll be, providing an updated MRE for, Hammerdown, especially given all the infill drilling that we did do. That infill drilling that was, below stage 1 pit, and, we really did it to ensure that, or re- de-risk, the stage 2 pit, because, it had previously been mined out, underground.
Speaker #5: And so we just wanted to make sure that, what, the resource blocks that were adjacent to those old workings were, in fact, still there.
Speaker #5: And so that was the infill drilling that we did.
Speaker #4: But as far as step-out drilling and some of the other targets to the south or in the periphery, are you, still going to be following up on those in the new year?
Speaker #5: Yeah, that, that'll be that'll be part of the plan for the new year.
Speaker #4: Okay. Well, it's, it's, I think you've built built us invested in a strong foundation for going into the winter and should come out strong next year.
Speaker #4: And best of luck.
Speaker #5: Thanks, Mike.
Speaker #1: Again, if you would like to ask an audio question, please press star 1 on your telephone keypad. We'll pause for just a moment before we move on to our web questions.
Speaker #1: And there are no further phone questions at this time. I will turn the call back over to Fiona for some web questions.
Speaker #2: Yes, thank you very much, operator. So we have a series of questions from Eleanor Medzinski at, SCP Capital. we'll begin with the first question, which was, what was the mine grade for the quarter?
Speaker #2: Keith?
Speaker #5: The mine grade for the quarter? Ooh, I don't have that one at the tip of my fingers. Let me get—we'll search that one down and we'll get back to you.
Speaker #2: Okay. And, the second question was, was any or extracted at Roombillion?
Speaker #5: there was a, a minor part of a ore as, as we did the initial stripping overburden stripping and, and, you know, the first blast, but very little.
Speaker #2: Okay. The next question on Roombillion again. Can you speak to splits on waste tons mined between the two areas?
Speaker #5: sorry, can you ask that question again?
Speaker #2: Yes, she was asking about Roombillion—if we can speak to splits on waste tons mined between the two areas.
Speaker #5: Yeah, I don't, I'll have to get back to you on that one too, Eleanor. I've got just the, the total number.
Speaker #2: Okay, great. Next question from her is if we can speak to the reconciliation to date to the block model, now that the infill program and results have been completed.
Speaker #5: So the, the results of the, infill have not been included in the in the resource model as yet. that still has to be done.
Speaker #5: we're still waiting on, on assays for that. But, I can tell you that, the reconciliation to the, block model, to date, is, 3%, minus 3%.
Speaker #2: All right, and then her last question: she's asking if there are any mine schedule changes with the new infill information that's expected to lift the grade profile ahead of the sorter being commissioned.
Speaker #5: no. No. The mine plan right now is to, continue. We're still too early in the, in the pit, to really have a lot of flexibility to change.
Speaker #5: We did bring forward Roombillion. So we'll be able to then pick the highest grade that we do mine at any one time. but, generally speaking, it's a pretty it's a very small pit.
Speaker #5: So it doesn't, doesn't have a lot of flexibility to change the mine plan that way. going back to the first question, going back to the first question, Eleanor, the mine grade was 2.02.
Speaker #5: So we did stockpile. we did stockpile some, lower-grade material.
Speaker #2: Okay. Great. Thank you. And, that is the end of the questions that we have received. Oh, wait, I'm sorry. Another follow-up has come from Eleanor.
Speaker #2: she's asking for the ASIC, if a 10% increase is safe to assume into next year. The implied lift from removing additional stripping and infilling that is now complete.
Speaker #5: Yeah.
Speaker #2: I think it's early stages to, to, respond on that one, Eleanor, and, we will be re- releasing guidance in due course. All right. And, just checking back, it looks like those are the, all the questions that we've received from today.
Speaker #2: We thank, everyone who has, dialed in for, New Found Gold's, first quarterly earnings call. Thank you very much. Goodbye.