Company: Engie Chile
Ticker: ECL
Marcela Muñoz: Good afternoon, everyone, and welcome to Engie Energía Chile Q3 2026 Result Conference Call. If you need a copy of the press release issued on 28 October, it is available on the company website at www.engie.cl. Before we begin, I would like to remind you that this call is being recorded and that information discussed today may include forward-looking statements regarding the company's financial and operating performance. Please refer to the detailed note in the company's press release regarding forward-looking statements or contact Investor Relations Officer Marcela Muñoz. We would like to advise participants that this call is dedicated to investors and market analysts, not for the press. We ask all journalists to contact Engie Energía Chile PR department for details. If you have any questions, please post them in the Zoom chat and we will address them during the Q&A session.
Marcela Muñoz: I will now turn the call over to Mr. Vincent Sorel. Please go ahead.
Vincent Sorel: Hello, everyone. Today I am here with Juan Villavicencio, Chief Executive Officer, Alison Saffery, Head of Corporate Finance, and Marcela Muñoz, Investor Relations Officer. We are pleased to present Engie Chile 2026 Q3 results, and I will leave you with Juan, who will describe our performance during the first nine months of 2026.
Juan Villavicencio: Good afternoon, everybody. On page two, we show we have organized this presentation into two sections. In the first part, I will briefly go through our first nine months of 2026 performance. In the second part, Vincent will go through all excellent financial result and upgraded EBITDA guidance. We can start on page three. Here, we share the main highlight of September 2026. First, I want to highlight that we continue to show a very strong cash generation, which helped us finance both our investment and dividend payment, as well as allowing us to deleverage. Some of the driver of this excellent result were a continued high demand under our regulated contract, which supply was supported by the high availability of our thermal fleet, as well as the addition of new BESS capacity, which continue to give stability to our generation portfolio, especially in non-solar hours.
Juan Villavicencio: This continued to reduce our exposure to the spot market. As we have mentioned, all the portfolio of new renewable and BESS project that were under construction are 100% energized, and already five of the eight projects have reached COD to date. This strong operating performance has allowed us to upgrade our EBITDA guidance for 2026 while maintaining our CapEx guidance. On page four, we show you a summary of the progression of our project and activities related to our thermal asset in Tocopilla and Mejillones. In Tocopilla, we continue working on our coal-based former Unit 15, which was closed in 2022 and is being converted into a synchronous condenser, which will provide ancillary services to the system.
Juan Villavicencio: We have also improved, extended the life, and increased the capacity of our gas-fired combined cycle plant, Unit 16, thus becoming the most efficient in the north and ensuring the flexibility of our generation portfolio. This unit has been providing inertia services to the system during solar hours when required. In Mejillones, the conversion of our IEM coal-fired plant to natural gas was completed. IEM, as a natural gas plant, reached COD on 29 September 2026, and even during its testing period, it has been dispatched, providing ancillary services as well as functioning as a peak plant.
Juan Villavicencio: Also, as we have already mentioned during prior calls, our coal plants, CTM1 and CTM2, were decommissioned on 31 December 2025, while CTA and CTH have continued operating as required by the authorities and will continue to operate with coal until May of 2027 in order to secure supply and services to the system until such date. CTM1 and 2 will be kept under preservation maintenance while the company decide if and how this asset could be used in the future. In the case of CTA and CTH, we have recently received the approval from the environmental authorities for their conversion to natural gas. As mentioned, a key driver of our success is the high availability and the operational excellence of our fleet, providing the generation to secure the 24/7 supply for our PPA contract and at the same time reducing our exposure to the spot market.
Juan Villavicencio: This continued to be true during Q3 2026, especially now that IEM has reached its COD. If we go to page five, we show a graph of the complete generation portfolio transformation Engie has embarked on since 2019, when coal generation represented 61% of our generation capacity, while renewable represented only 3% of our total generation capacity of 2.2 GW. In December 2025, we showed that our generation capacity had reached 2.9 GW, of which coal represented only 25% after the disconnection of CTM1 and CTM2. Natural gas represented another 25%, and renewable plus batteries represented 50%, a significant increase during this period. Today, as of September 2026, our generation capacity increased to 3.4 GW, which now includes the 0.6 GW extra capacity of BESS Tocopilla, BESS Arica, BESS Los Loros, PV and BESS Libélula, and BESS Lile.
Juan Villavicencio: With this, plus the mentioned completion of the conversion of IEM, we have reached, as of September 2026, a composition of approximately 58% renewable and BESS, 32% natural gas, and only 10% coal. Our expectation for 2027, considering the renewable and BESS project which haven't yet reached COD, as well as the retirement of the remaining coal plants, is to reach a total installed capacity of approximately 3.6GW, of which 71% will be renewable and batteries, and the remaining 29% will be natural gas. On page six, as anticipated last quarter, we show how now more than half of our renewable and BESS projects that started construction between the end of 2024 and the beginning of 2025 have now reached COD as of September 2026. During this Q3, BESS Los Loros, BESS Lile Antiví, and BESS Libélula reached COD.
Juan Villavicencio: These projects came to complement the CODs of BESS Tocopilla and BESS Arica from H1 of the year. Now, only three remaining projects are in the final construction phase, namely the testing phase. These three projects are already 100% energized and contributed their energy to our portfolio. Of these three projects, we expect the BESS Kallpa to reach COD during this last quarter of 2026, and the two remaining wind projects, on the other hand, continue to be on schedule and are expected to reach COD in H1 2027. Next, on slide seven, we show how our renewable and BESS portfolio has grown.
Juan Villavicencio: As we had projected, by September, we already had 2.1GW of renewable installed capacity, including the recent addition of BESS Los Loros, a battery project co-located in our Los Loros PV project, BESS Lile, our third standalone battery project built in our site in Mejillones, and our recently added PV and BESS Libélula, our first project in the metropolitan region, which includes 140MW of photovoltaic capacity and 206MW of BESS. All these projects have been developed on time and on budget, and some even slightly below budget. As such, during the first nine months of 2026, we generated 1,912GWh with our renewable assets, which represent an increase of more than 700MWh over the generation of the first six months of the year. On slide eight, we provide an overview of our transmission project portfolio.
Juan Villavicencio: The strength and reliability of our transmission assets are enablers for the accelerated growth of our renewable generation portfolio. As shown, we have projects in different regions of the country. Currently, we have six expansion works in the north and south of Chile and another six projects in different stages of development and construction, mostly in the center-south. Of these six projects, two already reached COD during this year. One of our Totihue substation, which reached COD in May of 2026, and more recently, our La Brava substation reached COD on 29 September. We are also developing transmission solutions to customers, such as the Lica project, showing our project execution capacity and our ability to provide integrated energy services to our customers.
Juan Villavicencio: On slide nine, we want to share with you the good news we got some days ago regarding the recent transmission tender process, where Engie participated for five different projects and were awarded three of them. These projects include two new substations, one called La Palca in the Arica region and one called La Brava in the O'Higgins region in the center-south. The third project considers two substations, Guangualí and Río Viejo, plus a 6km double circuit line for the Ñuble region. Now, I will leave you with Vincent, who will present the detailed evolution of Engie Chile's financial for the first nine months of the year, as well as the updated guidance for 2026.
Vincent Sorel: Thank you, Juan. Hello, everyone. I am now pleased to present the financial performance for the first nine months of 2026. On slide 11, we present our key financial highlights for the first nine months. EBITDA reached $578 million, up 11% year-on-year, reflecting strong operating performance, higher electricity margin, explained by a more efficient generation mix and higher sales to regulated clients. Despite lower thermal generation, with the addition of renewable and BESS generation, we were able to reduce our exposure from the spot market. Net income amounted to $278 million, representing a 34% increase versus the same period last year, and this improvement was mainly supported by a stronger operational result. Finally, net financial debt stood at $2.2 billion, while the net debt to 12-month EBITDA ratio improved to 3.2 times as of September 2026.
Vincent Sorel: This reflects both strong EBITDA generation, but also disciplined financial management, even as we continue executing our investment plan. On slide 12, let me provide more detail on the drivers behind our EBITDA performance in the first nine months. Our EBITDA increased by $57 million, from $521 million in 2025 to $578 million in the same period of nine months 2026. The main driver was a $73 million increase in electricity margin, supported by a more balanced generation position that helped reduce exposure to spot market and fuel price. Higher sales to regulated clients and lower spot purchase explain most of this improvement. In addition, EBITDA benefited from positive contribution from transmission, as well as higher cost savings reflecting in performance, which also contributed $12 million to our EBITDA year-on-year increase.
Vincent Sorel: These gains were partially offset by negative effect of one-off, considering that last year we had reflected the result of the arbitration with our main natural gas supplier. Overall, this page notably shows that a stronger and more balanced operating profile was the key factor behind our EBITDA growth in the first nine months of 2026, confirming the benefits of our portfolio transformation and reduced exposure to market volatility. On slide 13, you can see how the improvement in operating performance translated into growth in net result. Net income increased by $70 million, from $208 million in the first nine months of 2025 to $278 million in the same period this year, the strongest net result shown in the last 10 years.
Vincent Sorel: The improvement was primarily driven by stronger operating performance, reflected in a $57 million increase in EBITDA, together with a decrease of interest expense and a favorable tax impact of $30 million. The net interest expense decrease was achieved despite a $4 million PEC-related interest income reported in 2025. The main reason were $23 million increase in capitalized interest and lower average coupon rate of all debt. The favorable tax impact was explained by the one-time increase in deferred tax in Q3 2025, attributed to the merger of Central Termoeléctrica Andina into ECL that generated a tax badwill and consequently the recognition of deferred tax of approximately $37 million. These positive effects were partially offset by higher depreciation and amortization and foreign exchange difference, mainly explained by foreign exchange gains reported last year.
Vincent Sorel: All in all, net result is not significantly impacted by one-off, as one-off in EBITDA and below EBITDA broadly offset each other. On slide 14, we show our investment program continue to be funded through internal cash generation. This cash generation, driven by our significant EBITDA increase, allowed us not only to fund our CapEx, but also our dividend payment. Despite a high level of capital expenditure during these nine months, net debt decreased by $104 million. This reflects the strong cash flow from operation, which more than covered all of the CapEx deployed during this period, and we have a balanced cash equation. In addition, the company received $18 million in dividend from TEN during Q1 and paid $66 million in dividend to investors.
Vincent Sorel: This reflects the strong cash flow from operation, which more than covered all of the CapEx deployed during this period, and we have a balanced cash equation. In addition, the company received $18 million in dividend from TEN during Q1 and paid $66 million in dividend to investors. Slide 15 highlights the strength of our financial structure. Engie Chile continues to maintain investment-grade rating at both international and local scale, reflecting a solid credit profile and disciplined financial management. Notably, confirming this solid credit and risk profile, Feller Rate upgraded Engie's rating in national scale from AA- to AA stable during Q2 and confirmed the continuous improvement in our risk profile. Fitch Ratings upgraded the outlook of our international rating from BBB stable to BBB positive.
Vincent Sorel: As of September 2026, net debt stood at approximately $2.2 billion, while the net debt to 12-month EBITDA ratio improved to 3.2x, excluding IFRS 16 lease. At the same time, the company increased its cash position and continued reducing its average interest paid, which stood at around 5%. The debt maturity schedule also remains well spread over time, with no material short-term refinancing pressure. Overall, this slide confirms that Engie Chile is preserving a strong and flexible balance sheet while continuing to execute its growth plan. All these initiatives contribute to further improve our debt profile and lower the average coupon of our debt going forward in a context where markets remain volatile. Finally, on slide 16, on the back of our strong year-to-date performance, we have upgraded our EBITDA guidance for 2026.
Vincent Sorel: After a strong first nine months, the company has shown that our EBITDA for the year shows sufficient strength to increase the EBITDA range from the $690 million to $760 million range presented originally to $720 million to $790 million range. We have maintained our CapEx guidance, which is expected to range between $640 million and $710 million, excluding capitalized interest. At the same time, we expect net debt to EBITDA to remain below 3.5x, excluding IFRS 16 lease. The first nine-month result, EBITDA of $578 million, net income of $278 million, CapEx of $529 million, and net debt to EBITDA of 3.2x, strongly support our confidence in meeting this new target. Thank you for your attention, and we are now open to any question you may have.
Alison Saffery: Hello, everyone. Alison Saffery here from the company. We are open to questions. Please put them in the chat. I will read the questions for you, and then either Vincent or Juan will answer them. The first question is from Fernando Gonzalez, and the question is, What is required to make the final investment decision to reconvert CTH and CTA into gas? Would this be a completely new combined cycle plant? What would be the expected CapEx, including dismantling costs, if there are any? Finally, why 60? It says megawatts, and I can imagine the question is $60 million. What is the reason for that size?
Juan Villavicencio: Yeah. Okay. Thank you for the question. First of all, the final investment decision depends on many topics. One of them is the exact date where we will have the disconnection of the power plant to secure that we will be able to close our CapEx. The most relevant is we have the permit approved for the environment decision from the authorities. However, we have not progressed yet to close any CapEx estimation because we are in the process of final engineering to secure a proper technical plan to transform the asset. This means that this is ongoing, and the only way to secure and schedule depends on when we will disconnect and when we are finding the proper economics in the negotiation with the contractors, because our decision will be, like always, following the financial discipline of the company to secure proper profitability.
Juan Villavicencio: Regarding the scale of cost, I think that the figures shown in the permit is a general figure. It's not close, but it's similar to the order of $60 to $70 million, like it was in the case of other plants similar converted. Okay? About the total capacity, this is a mistake. I do not know where is the figure of the 60 MW because each plant is 170. This means that if we are going to convert both CTA and CTH, we are speaking about 340, probably less the impact of the efficiency with the new gas burns. That could be quite less, but it's in the order of 300. Okay?
Alison Saffery: Next question comes from. Let me see. From Juan Carlos Castro, and it says, "Looking ahead, how does Engie Energía Chile view inorganic growth as part of its broader strategy? Are there particular segments or asset types where you see opportunities for acquisition, strategic partnerships, or potential portfolio rotation?
Juan Villavicencio: Okay. Like we shared with you in the strategy of the company in March 2026, our plan is to grow with a base of organic growth. However, this does not mean that we are not seeing in an opportunistic approach how to grow in transmission and generation. But this depends on the portfolio match with our view of our current portfolio and thinking in the future portfolio of PPAs that we are seeing in the market for the future. It's not possible to say precisely where is best, is the best, but it's part of our view. We want to follow both, but the organic growth will be the backbone of the company strategy.
Alison Saffery: Okay. Thank you, Juan. Next question is from Juan Felipe Becerra, and it says, "Thank you for the presentation. Two questions from my side. One, could you provide more color on the expected CapEx levels and revenue growth for the transmission business over the next few years?" The second question is, "Could you comment on the expected impact of the Ley de Reconstrucción Nacional, the Reconstruction Law, on the Q4 2026 results?" Juan?
Juan Villavicencio: Oh, we are in the process to create the budget for transmission. You know that the level of CapEx that we have today awarded is more or less USD 250 million, USD 300 million, but depending how is evolving the permitting is how this will be matched in the future CapEx plan. This is in the final step to adjust the timing. Today, we cannot give you perfect figures. The same with the revenues, because at the end of the day, we have a schedule with the new project that are ahead. However, we are moving the timing depending how is evolving the permit. Okay?
Vincent Sorel: Regarding the second question, the impact on deferred tax position as expressed by the impact on the deferred tax position will be impacted by the change of law with about USD 30 million. Not included in the September financial statement, but will be included in the full year financial statement.
Alison Saffery: Next question comes from Juan Carlos Petersen. "Hi, Juan and Vincent. Thank you for your presentation. I have four questions. I would appreciate your views on 2026 net income forecast. What is your latest forecast for full year 2026 net income, considering Q4 performance to date and the positive impact of the deferred tax adjustment resulted from the recent reduction in the corporate income tax rate?" I will ask that.
Vincent Sorel: Well, on that one, as you know, we do not give guidance on net income. So, I would suggest that you build from the EBITDA upgraded guidance that we just submitted, and I guess, presentation will show a good bridge from EBITDA to net recurring income. I suspect this tendency will continue and to be very strong, and so I am very optimistic on the level of net income for 2026. Regarding 2027, which I guess is a subsequent question, please note that we will issue the guidance for 2027 in Q1, hopefully around February, and at this stage, we cannot comment any further.
Alison Saffery: The third question says, "May 2027 dividend. What dividend per share do you expect to distribute in May 2027 based on 2026 earnings? Also, do you think it would be feasible to revisit the dividend distribution policy discussed at previous annual shareholders meetings, where a potential payout of 50% of annual operating earnings was mentioned?
Vincent Sorel: I think the dividend policy is a prerogative of the shareholder assembly and of the board. From a CFO perspective, we have significant ambition for 2030. We have a good pipeline, and of course, under the strict condition that the new megawatt we would build are profitable and meet our investment criteria. We need, I would say, to protect the balance sheet. As you know, at the same time, we are very committed to an investment-grade rating. A deleveraging of the company is, in this context, very important, and maintaining the balance sheet under control is also a key matter for us. I would say that from this stage on, the past dividend policy is the best indicator for the future.
Alison Saffery: There is a last question about TEN valuation. "Regarding TEN, how do the EV/EBITDA multiples observed in comparable transactions over recent years compare with the valuation currently reflected in Engie's books? Do you see any potential for valuation uplift that is not currently reflected in the carrying value?
Vincent Sorel: I think we are in a new world, where interest rates have been significantly increased. From what we see, and that not only applies to transmission, but also to all the sector, including generation, past transaction multiples are not very reflective of what today price could be. That is the one thing. Second, TEN, when we did TEN, you might remember that we structured a partnership with Redeia, and accounting-wise, it has been revalued using our remaining stake, I would say, has been revalued using the transaction value. From your question, you could derive that the valuation of TEN in our book is indeed reflecting, by construction, is reflecting past transaction multiple. Considering any upside that we might have, I think TEN has been delivering $18 million of dividend for us.
Vincent Sorel: You know that, of course, the contribution, the P&L contribution is quite low because of the equity method, et cetera, but still delivering $18 million of dividend for us this year. The returns are there, and I think they are building up, and they are compounding. I think the upside is not reflected in carrying value. There is upside, but we need to give it time to materialize.
Alison Saffery: From Jay Samani, we have a question that is the following: "Without providing formal guidance, can management identify the main positive and negative EBITDA drivers for 2027?
Vincent Sorel: Looking ahead to 2027, we see a very attractive outlook for the company. On the one hand, indeed, we have the expiration of the regulated contract in northern Chile. That could, I mean, you remember, we are short, so I think this will further rebalance the position and also will leave us open to explore any commercial opportunity in a context where there is a lot of tenders that are being launched or that will be launched in the next months. The strategy hasn't changed. It's capture new PPA, reduce cost, and position ourselves to deliver 2 gigawatts between 2027 and 2030. I would say these are the drivers that we expressed six months, seven months ago. We are very positive on this. We see good progress inside the company and how we are organized to deliver this.
Vincent Sorel: By the way, you saw that 26 September result already showed tangible proof of the strategy being executed, with transmission delivering, with the effect of a more balanced portfolio in the EBITDA, and last but not least, the cost performance that we achieve. We will continue to put the focus of the whole company on this topic. 2027 also, don't forget, 2027 is the coal exit. It's a full coal exit, and for me and for my leadership team here, it is one of the main priority, and I would say even one of the most important priorities. 2027 will be a year of creating new optionalities for commercial, completion of the coal phase-out, and as such, the beginning of a new chapter for Engie Chile.
Alison Saffery: There are no more questions in the chat, so thank you all for attending. I will give the microphone to Vincent for closing remarks.
Vincent Sorel: Well, thank you all. Thank you for attending this call. Thank you to all the employees of Engie Energía Chile who are obviously key in making this result happen. Thank you to the leadership team. Thank you to Juan. I think these first nine months are paving the way for what will be another record year for Engie Energía Chile, and I very much look forward discussing with you in Q1 the full-year result and the 2027 forecast. Have a good day, all.