Speaker #1: Good day, ladies and gentlemen, and welcome to the TUTOR PERINI CORP FIRST QUARTER 2026 EARNINGS CONFERENCE CALL. My name is Rob, and I will be your coordinator for today.
Operator: Good day, ladies and gentlemen. Welcome to the Tutor Perini Corporation Q1 2026 earnings conference call. My name is Rob. I will be your coordinator for today. All participants are currently in a listen-only mode. Following management's prepared remarks, we'll be opening the call for a question and answer session. As a reminder, this conference call is being recorded for replay purposes. If anyone should require operator assistance during the conference, please press star zero on your telephone keypad. I will now turn the call over to your host for today, Mr. Jorge Casado, Senior Vice President of Investor Relations. Please proceed.
Operator: Good day, ladies and gentlemen. Welcome to the Tutor Perini Corporation Q1 2026 Earnings Conference Call. My name is Rob. I will be your coordinator for today. All participants are currently in a listen-only mode. Following management's prepared remarks, we'll be opening the call for a question-and answer session. As a reminder, this conference call is being recorded for replay purposes. If anyone should require operator assistance during the conference, please press star zero on your telephone keypad. I will now turn the call over to your host for today, Mr. Jorge Casado, Senior Vice President of Investor Relations. Please proceed.
Speaker #1: All participants are currently in a listen-only mode following management's prepared remarks. We will open we'll be opening the call for a question-and-answer session. As a reminder, this conference call is being recorded for replay purposes.
Speaker #1: If anyone should require operator assistance during the conference, please press *0 on your telephone keypad. I'll now turn the call over to your host for today, Mr. Jorge Casado, Senior Vice President of Investor Relations.
Speaker #1: Please proceed.
Speaker #2: Hello, everyone, and thank you for joining us. With us today are Gary Smalley, CEO and President, and Ryan Soroka, Executive Vice President and CFO.
Jorge Casado: Hello, everyone, and thank you for joining us. With us today are Gary Smalley, CEO and President, and Ryan Soroka, Executive Vice President and CFO. Before we discuss our results, I will remind everyone that during today's call, we will be making forward-looking statements which are based on management's current assessment of existing trends and information. There is an inherent risk that our actual results could differ materially. You can find disclosures about risk factors that could contribute to such differences in our Form 10-Q, which we are filing today, and in our Form 10-K, which was filed on 26 February 2026. The company assumes no obligation to update forward-looking statements, whether due to new information, future events, or otherwise, other than as required by law. In addition, during today's call, management will be referring to certain non-GAAP financial measures.
Jorge Casado: Hello, everyone, and thank you for joining us. With us today are Gary Smalley, CEO and President, and Ryan Soroka, Executive Vice President and CFO. Before we discuss our results, I will remind everyone that during today's call, we will be making forward-looking statements which are based on management's current assessment of existing trends and information. There is an inherent risk that our actual results could differ materially. You can find disclosures about risk factors that could contribute to such differences in our Form 10-Q, which we are filing today, and in our Form 10-K, which was filed on 26 February 2026. The company assumes no obligation to update forward-looking statements, whether due to new information, future events, or otherwise, other than as required by law. In addition, during today's call, management will be referring to certain non-GAAP financial measures.
Speaker #2: Before we discuss our results, I will remind everyone that during today's call, we will be making forward-looking statements which are based on management's current assessment of existing trends and information.
Speaker #2: There is an inherent risk that our actual results could differ materially. You can find disclosures about risk factors that could contribute to such differences in our Form 10-Q, which we are filing today, and in our Form 10-K, which was filed on February 26, 2026.
Speaker #2: The company assumes no obligation to update forward-looking statements, whether due to new information, future events, or otherwise, other than as required by law. In addition, during today's call, management will be referring to certain non-GAAP financial measures.
Speaker #2: You can find information and a reconciliation of these non-GAAP financial measures in the earnings release that we issued today and in the Form 10-Q being filed today.
Jorge Casado: You can find information and a reconciliation of these non-GAAP financial measures in the earnings release that we issued today and in the Form 10-Q being filed today, both of which can be found in the Investors section of our website. Thank you. With that, I will turn the call over to Gary Smalley.
Jorge Casado: You can find information and a reconciliation of these non-GAAP financial measures in the earnings release that we issued today and in the Form 10-Q being filed today, both of which can be found in the Investors section of our website. Thank you. With that, I will turn the call over to Gary Smalley.
Speaker #2: Both of which can be found in the investor's section of our website. Thank you, and with that, I will turn the call over to Gary Smalley.
Speaker #3: Thanks, Jorge. Hello, everyone, and thank you for joining us. Before we discuss our first-quarter results, we wanted to share with you tragic news regarding a recent incident that affected the TUTOR PERINI family.
Gary Smalley: Thanks, Jorge. Hello, everyone, and thank you for joining us. Before we discuss our Q1 results, we wanted to share with you tragic news regarding a recent incident that affected the Tutor Perini family. A few weeks ago, during Super Typhoon Sinlaku, our offshore cargo vessel, the Mariana, capsized at sea with a six-member crew that included two of our employees near the island of Saipan in the northwestern Pacific Ocean. It's an unimaginable loss for all of us at Tutor Perini, and we extend our deepest thoughts, prayers, and heartfelt condolences to the crew's families, loved ones, and the entire affected community. We have been in close contact with the families to provide them with updates and to offer our support.
Gary Smalley: Thanks, Jorge. Hello, everyone, and thank you for joining us. Before we discuss our Q1 results, we wanted to share with you tragic news regarding a recent incident that affected the Tutor Perini family. A few weeks ago, during Super Typhoon Sinlaku, our offshore cargo vessel, the Mariana, capsized at sea with a six-member crew that included two of our employees near the island of Saipan in the northwestern Pacific Ocean. It's an unimaginable loss for all of us at Tutor Perini, and we extend our deepest thoughts, prayers, and heartfelt condolences to the crew's families, loved ones, and the entire affected community. We have been in close contact with the families to provide them with updates and to offer our support.
Speaker #3: A few weeks ago, during Super Typhoon Sanaklu, our offshore cargo vessel, the Mariana, capsized at sea with a six-member crew that included two of our employees near the island of Saipan, in the northwestern Pacific Ocean.
Speaker #3: It's an unimaginable loss for all of us at TUTOR PERINI, and we extend our deepest thoughts, prayers, and heartfelt condolences to the crew's families, loved ones, and the entire affected community.
Speaker #3: We have been in close contact with the families to provide them with updates and to offer our support. We remain committed to the families and will continue to work with them to provide whatever support we can.
Gary Smalley: We remain committed to the families and will continue to work with them to provide whatever support we can. I would like to express our sincerest appreciation to the US Coast Guard, the US Air Force, US Navy, as well as search teams from the Japan Coast Guard and the Royal New Zealand Air Force for their professionalism and tireless efforts during an intensive nearly two-week search and rescue mission. One of the bodies of the crew was found, but the other five were not. Before proceeding, I will now pause for a moment of silence to honor and remember the crew members and pray for their families and friends. Thank you. Turning to our usual agenda.
Gary Smalley: We remain committed to the families and will continue to work with them to provide whatever support we can. I would like to express our sincerest appreciation to the US Coast Guard, the US Air Force, US Navy, as well as search teams from the Japan Coast Guard and the Royal New Zealand Air Force for their professionalism and tireless efforts during an intensive nearly two-week search and rescue mission. One of the bodies of the crew was found, but the other five were not. Before proceeding, I will now pause for a moment of silence to honor and remember the crew members and pray for their families and friends. Thank you. Turning to our usual agenda.
Speaker #3: I would like to express our sincerest appreciation to the U.S. Coast Guard, the U.S. Air Force, U.S. Navy, as well as search teams from the Japan Coast Guard and the Royal New Zealand Air Force for their professionalism and tireless efforts during an intensive nearly two-week search and rescue mission.
Speaker #3: One of the bodies of the crew was found, but the other five were not. Before proceeding, I will now pause for a moment of silence to honor and remember the crew members and pray for their families and friends.
Speaker #3: Thank you. Turning to our usual agenda. We delivered strong first-quarter results highlighted by record operating cash flow of $147 million, by far the highest first-quarter result ever.
Gary Smalley: We delivered strong Q1 results, highlighted by record operating cash flow of $147 million, by far the highest Q1 result ever, which was driven by collections on new and ongoing projects. Our revenue grew 11% year over year to $1.4 billion, the highest revenue of any Q1 since 2009, driven by contributions from various larger, higher-margin projects that are in the early stages with significant scope of work remaining. Ryan Soroka will get into more of the details of our financial results shortly. Our backlog remains very strong at $19.8 billion at the end of the Q1, we continue to expect that it will fuel much higher revenue and earnings, increased profitability, and continued strong cash flow this year and beyond.
Gary Smalley: We delivered strong Q1 results, highlighted by record operating cash flow of $147 million, by far the highest Q1 result ever, which was driven by collections on new and ongoing projects. Our revenue grew 11% year over year to $1.4 billion, the highest revenue of any Q1 since 2009, driven by contributions from various larger, higher-margin projects that are in the early stages with significant scope of work remaining. Ryan Soroka will get into more of the details of our financial results shortly. Our backlog remains very strong at $19.8 billion at the end of the Q1, we continue to expect that it will fuel much higher revenue and earnings, increased profitability, and continued strong cash flow this year and beyond.
Speaker #3: Which was driven by collections on new and ongoing projects. Our revenue grew 11% year over year to $1.4 billion, the highest revenue of any first quarter since 2009, driven by contributions from various larger higher-margin projects that are in the early stages with significant scope of work remaining.
Speaker #3: Ryan will get into more of the details of our financial results shortly. Our backlog remains very strong, at $19.8 billion at the end of the first quarter, and we continue to expect that it will feel much higher revenue and earnings increase profitability and continued strong cash flow this year and beyond.
Speaker #3: The civil segment produced its highest-ever first-quarter operating income, which was up 10% year over year and delivered a $12.6% operating margin, solid results for a first quarter which is typically a slower quarter for us due to seasonality.
Gary Smalley: The Civil segment produced its highest ever Q1 operating income, which was up 10% year-over-year and delivered a 12.6% operating margin. Solid results for a Q1, which is typically a slower quarter for us due to seasonality. The Building segment's operating income was up an impressive 56% year-over-year with an operating margin of 3.5%. The Specialty Contractors segment continues to deliver solid execution on its current projects and improved operating results, as evidenced by the fact that they were marginally profitable for the quarter, with further improvement still expected as the year unfolds. In fact, we see higher margins ahead for all three segments as many newer large projects continue to ramp up. In Q1, we booked nearly $700 million of new awards and contract adjustments.
Gary Smalley: The Civil segment produced its highest ever Q1 operating income, which was up 10% year-over-year and delivered a 12.6% operating margin. Solid results for a Q1, which is typically a slower quarter for us due to seasonality. The Building segment's operating income was up an impressive 56% year-over-year with an operating margin of 3.5%. The Specialty Contractors segment continues to deliver solid execution on its current projects and improved operating results, as evidenced by the fact that they were marginally profitable for the quarter, with further improvement still expected as the year unfolds. In fact, we see higher margins ahead for all three segments as many newer large projects continue to ramp up. In Q1, we booked nearly $700 million of new awards and contract adjustments.
Speaker #3: The building segment's operating income was up an impressive 56% year over year, with an operating margin of 3.5%. And the specialty contractor segment continues to deliver solid execution on its current projects, improved operating results, as evidenced by the fact that they were marginally profitable for the quarter with further improvement still expected as the year unfolds.
Speaker #3: In fact, we see higher margins ahead for all three segments, as many newer large projects continue to ramp up. In the first quarter, we booked nearly $700 million of new awards and contract adjustments.
Speaker #3: The largest additions to backlog included the following which are all in California: $186 million of additional funding for the Eagle Mountain Casino Phase II expansion project, $97 million of additional funding for a healthcare project that entered the construction phase, and approximately $66 million for two mass transit projects.
Gary Smalley: The largest additions to backlog included the following, which were all in California. $186 million of additional funding for the Eagle Mountain Casino phase 2 expansion project, $97 million of additional funding for a healthcare project that entered the construction phase, and approximately $66 million for 2 mass transit projects. Our strong backlog, which includes the 9 mega projects we won over the last 1 to 3 years, provides us with excellent visibility for our future revenue and earnings over the next several years. Recently, one of our major projects, the Brooklyn Jail in New York, reached a key milestone. The project held its topping out ceremony, marking the completion of the structure's steel frame with the placement of the final and highest structural beam.
Gary Smalley: The largest additions to backlog included the following, which were all in California. $186 million of additional funding for the Eagle Mountain Casino phase 2 expansion project, $97 million of additional funding for a healthcare project that entered the construction phase, and approximately $66 million for 2 mass transit projects. Our strong backlog, which includes the 9 mega projects we won over the last 1 to 3 years, provides us with excellent visibility for our future revenue and earnings over the next several years. Recently, one of our major projects, the Brooklyn Jail in New York, reached a key milestone. The project held its topping out ceremony, marking the completion of the structure's steel frame with the placement of the final and highest structural beam.
Speaker #3: Our strong backlog, which includes the nine megaprojects we won over the last one to three years, provides us with excellent visibility for our future revenue and earnings over the next several years.
Speaker #3: Recently, one of our major projects, the Brooklyn Jail in New York, reached a key milestone. The project held its topping-out ceremony marking the completion of the structure's steel frame with the placement of the final and highest structural beam.
Speaker #3: Workers and dignitaries watched as the final beam adorned with the traditional evergreen tree and American flag rose 15 stories to its destination atop the building that, when completed, will be a $1,00,000 square foot facility and have 1,040 beds.
Gary Smalley: Workers and dignitaries watched as the final beam, adorned with the traditional evergreen tree and American flag, rose 15 stories to its destination atop the building that, when completed, will be a 1 million square foot facility and have 1,040 beds. This project and all of our other major projects are all running very smoothly with solid business execution and strong financial performance. As I have discussed previously, customer demand remains strong and we continue to have numerous significant project bidding opportunities, particularly in the Northeast, the Midwest, the West Coast, and the Indo-Pacific region. We believe we are all well-positioned to continue winning our share of new projects later this year and over the next several years. We will continue to be very selective when we bid future projects, which will continue to enhance and help maximize shareholder value.
Gary Smalley: Workers and dignitaries watched as the final beam, adorned with the traditional evergreen tree and American flag, rose 15 stories to its destination atop the building that, when completed, will be a 1 million square foot facility and have 1,040 beds. This project and all of our other major projects are all running very smoothly with solid business execution and strong financial performance. As I have discussed previously, customer demand remains strong and we continue to have numerous significant project bidding opportunities, particularly in the Northeast, the Midwest, the West Coast, and the Indo-Pacific region. We believe we are all well-positioned to continue winning our share of new projects later this year and over the next several years. We will continue to be very selective when we bid future projects, which will continue to enhance and help maximize shareholder value.
Speaker #3: This project, and all of our other major projects, are all running very smoothly with solid business execution and strong financial performance. As I have discussed previously, customer demand remains strong, and we continue to have numerous significant project bidding opportunities, particularly in the Northeast, the Midwest, the West Coast, and the Indo-Pacific region.
Speaker #3: We believe we are all well positioned to continue winning our share of new projects later this year and over the next several years. We will continue to be very selective when we bid future projects which will continue to enhance and help maximize shareholder value.
Speaker #3: Our focus remains on bidding projects with favorable contractual terms, limited competition, and higher margins. In addition to vibrant demand across the markets we serve, some of our existing projects are expected to spawn significant incremental work which bolsters our confidence that our backlog will remain elevated.
Gary Smalley: Our focus remains on bidding projects with favorable contractual terms, limited competition, and higher margins. In addition to vibrant demand across the markets we serve, some of our existing projects are expected to spawn significant incremental work, which bolsters our confidence that our backlog will remain elevated. For example, we anticipate adding approximately $1 billion of additional backlog in the H2 of the year for the finished trades scope of work for phase one of our Midtown Bus Terminal Replacement Project in New York. Some of our Building segment projects that are currently in the pre-construction phase are anticipated to advance to the construction phase later this year and the next year. The largest of these is a multi-billion dollar healthcare project in California, expected to begin construction in late 2027, for which we currently only have a nominal amount of backlog.
Gary Smalley: Our focus remains on bidding projects with favorable contractual terms, limited competition, and higher margins. In addition to vibrant demand across the markets we serve, some of our existing projects are expected to spawn significant incremental work, which bolsters our confidence that our backlog will remain elevated. For example, we anticipate adding approximately $1 billion of additional backlog in the H2 of the year for the finished trades scope of work for phase one of our Midtown Bus Terminal Replacement Project in New York. Some of our Building segment projects that are currently in the pre-construction phase are anticipated to advance to the construction phase later this year and the next year. The largest of these is a multi-billion dollar healthcare project in California, expected to begin construction in late 2027, for which we currently only have a nominal amount of backlog.
Speaker #3: For example, we anticipate adding approximately $1 billion of additional backlog in the second half of the year for the finished trades scope of work for Phase I of our Midtown Bus Terminal replacement project in New York.
Speaker #3: Also, some of our building segment projects that are currently in the pre-construction phase are anticipated to advance to the construction phase later this year and the next year.
Speaker #3: The largest of these is a multi-billion dollar healthcare project in California expected to begin construction in late 2027, for which we currently only have a nominal amount of backlog.
Speaker #3: Let's talk about some of the significant bidding opportunities we expect to pursue over the next 12 to 18 months. They include the multi-billion dollar Penn Station transformation project in New York for which the US Department of Transportation has recently announced a substantial amount of committed funding and for which the selected development team is expected to be chosen later this month.
Gary Smalley: Let's talk about some of the significant bidding opportunities we expect to pursue over the next 12 to 18 months. They include the $multi-billion Penn Station transformation project in New York, for which the U.S. Department of Transportation has recently announced a substantial amount of committed funding and for which the selected development team is expected to be chosen later this month. The $1.4 billion I-535 Blatnik Bridge project in Minnesota, for which the selected contractor is expected to be announced next month. A $multi-billion additional segment of the California High-Speed Rail project, bidding later this year. The $1 billion I-69 ORX Section 2 project connecting Indiana and Kentucky also bidding later this year.
Gary Smalley: Let's talk about some of the significant bidding opportunities we expect to pursue over the next 12 to 18 months. They include the $multi-billion Penn Station transformation project in New York, for which the U.S. Department of Transportation has recently announced a substantial amount of committed funding and for which the selected development team is expected to be chosen later this month. The $1.4 billion I-535 Blatnik Bridge project in Minnesota, for which the selected contractor is expected to be announced next month. A $multi-billion additional segment of the California High-Speed Rail project, bidding later this year. The $1 billion I-69 ORX Section 2 project connecting Indiana and Kentucky also bidding later this year.
Speaker #3: The $1.4 billion I-535 Blatnik Bridge project in Minnesota for which the selected contractor is expected to be announced next month. A multi-billion dollar additional segment of the California High-Speed Rail project bidding later this year; the $1 billion I-69 ORX Section II project connecting Indiana and Kentucky also bidding later this year; the Sepulveda Transit Corridor program in Southern California believed to be valued at approximately $12 billion and expected to be awarded under multiple contracts with the initial contract expected to be bid next year.
Gary Smalley: The Sepulveda Transit Corridor Program in Southern California, believed to be valued at approximately $12 billion and expected to be awarded under multiple contracts, with the initial contract expected to be bid next year. The $3.8 billion Southeast Gateway Line, also in Southern California, bidding next year. The $3 billion Newark Liberty International Airport Terminal B project in New Jersey, very similar to the award-winning Terminal A project that we recently completed at the same airport. This enormous number of significant opportunities I just mentioned doesn't even include numerous projects we are pursuing in the Indo-Pacific region, which collectively total more than $4 billion and include military infrastructure improvements at Naval Base Guam, airport and harbor projects on the island of Yap, and wharf and harbor improvement projects in the Republic of Palau.
Gary Smalley: The Sepulveda Transit Corridor Program in Southern California, believed to be valued at approximately $12 billion and expected to be awarded under multiple contracts, with the initial contract expected to be bid next year. The $3.8 billion Southeast Gateway Line, also in Southern California, bidding next year. The $3 billion Newark Liberty International Airport Terminal B project in New Jersey, very similar to the award-winning Terminal A project that we recently completed at the same airport. This enormous number of significant opportunities I just mentioned doesn't even include numerous projects we are pursuing in the Indo-Pacific region, which collectively total more than $4 billion and include military infrastructure improvements at Naval Base Guam, airport and harbor projects on the island of Yap, and wharf and harbor improvement projects in the Republic of Palau.
Speaker #3: The $3.8 billion Southeast Gateway Line also in Southern California and bidding next year; and the $3 billion Newark Liberty International Airport Terminal B project in New Jersey very similar to the award-winning Terminal A project that we recently completed at the same airport.
Speaker #3: This enormous number of significant opportunities I just mentioned doesn't even include numerous projects we are pursuing in the Indo-Pacific region which collectively total more than $4 billion and include military infrastructure improvements at naval-based Guam, airport and harbor projects on the island of Yap, and wharf and harbor improvement projects in the Republic of Palau.
Speaker #3: We also continue to have several large healthcare project opportunities on the West Coast and hospitality and gaming opportunities mostly in the Southwest. As a reminder, the majority of these opportunities start bidding and are expected to be awarded in the middle or second half of 2026 or to continue bidding through next year.
Gary Smalley: We also continue to have several large healthcare project opportunities on the West Coast and hospitality and gaming opportunities mostly in the Southwest. As a reminder, the majority of these opportunities start bidding and are expected to be awarded in the middle or second half of 2026 or to continue bidding through next year. Due to this timing and the significantly higher revenue we expect to recognize this year for work already in backlog, we continue to anticipate a modest sequential backlog reduction in the near term, followed by resumed backlog growth as we capture our share of major new projects. We are confident in our ability to drive continued backlog growth over the medium to longer term, even as we focus on profitability, free cash flow, earnings growth, quality, and safety as our primary performance indicators.
Gary Smalley: We also continue to have several large healthcare project opportunities on the West Coast and hospitality and gaming opportunities mostly in the Southwest. As a reminder, the majority of these opportunities start bidding and are expected to be awarded in the middle or second half of 2026 or to continue bidding through next year. Due to this timing and the significantly higher revenue we expect to recognize this year for work already in backlog, we continue to anticipate a modest sequential backlog reduction in the near term, followed by resumed backlog growth as we capture our share of major new projects. We are confident in our ability to drive continued backlog growth over the medium to longer term, even as we focus on profitability, free cash flow, earnings growth, quality, and safety as our primary performance indicators.
Speaker #3: Due to this timing and the significantly higher revenue we expect to recognize this year for work already in backlog, we continue to anticipate a modest sequential backlog reduction in the near term followed by resumed backlog growth as we capture our share of major new projects.
Speaker #3: We are confident in our ability to drive continued backlog growth over the medium to longer term even as we focus on profitability, free cash flow, earnings growth, quality, and safety as our primary performance indicators.
Speaker #3: As you recall, last November, our board of directors authorized our first-ever quarterly cash dividend of $0.06 per share as well as a share repurchase program totaling $200 million.
Gary Smalley: As you recall, last November, our board of directors authorized our first-ever quarterly cash dividend of $0.06 per share, as well as a share repurchase program totaling $200 million. Today, the board declared another $0.06 quarterly dividend, which will be paid on 4 June. Earlier this year, in Q1, we completed the first repurchase under our share repurchase program, buying back approximately 278,000 shares on the open market for $20 million at an average price of approximately $72 per share. We expect to make additional opportunistic share buybacks moving forward under this authorization to return excess capital to shareholders. Next, let's turn to our outlook and guidance. First, I am pleased with the excellent start to the year as we delivered results in line with our expectations.
Gary Smalley: As you recall, last November, our board of directors authorized our first-ever quarterly cash dividend of $0.06 per share, as well as a share repurchase program totaling $200 million. Today, the board declared another $0.06 quarterly dividend, which will be paid on 4 June. Earlier this year, in Q1, we completed the first repurchase under our share repurchase program, buying back approximately 278,000 shares on the open market for $20 million at an average price of approximately $72 per share. We expect to make additional opportunistic share buybacks moving forward under this authorization to return excess capital to shareholders. Next, let's turn to our outlook and guidance. First, I am pleased with the excellent start to the year as we delivered results in line with our expectations.
Speaker #3: Today, the board declared another $0.06 quarterly dividend which will be paid on June 4th. And earlier this year, in the first quarter, we completed the first repurchase under our share repurchase program buying back approximately $278,000 shares on the open market for $20 million at an average price of approximately $72 per share.
Speaker #3: We expect to make additional opportunistic share buybacks moving forward under this authorization to return excess capital to shareholders. Next, let's turn to our outlook and guidance.
Speaker #3: First, I am pleased with the excellent start to the year as we delivered results in line with our expectations. We continue to benefit from favorable macroeconomic tailwinds that are driving strong sustained market demand across all segments which is a great sign for future awards, growth, and value creation.
Gary Smalley: We continue to benefit from favorable macroeconomic tailwinds that are driving strong, sustained market demand across all segments, which is a great sign for future awards, growth, and value creation. Our business is resilient, and we remain confident in our outlook for consistent revenue and earnings growth over the next several years. Based on our outlook and assessment of the current market, we continue to anticipate double-digit revenue growth and strong earnings in 2026, with even higher earnings expected in 2027, by which time many of the newer large projects in our backlog should be in the construction phase. Accordingly, we are affirming our 2026 adjusted EPS guidance in the range of $4.90 to 5.30 per share.
Gary Smalley: We continue to benefit from favorable macroeconomic tailwinds that are driving strong, sustained market demand across all segments, which is a great sign for future awards, growth, and value creation. Our business is resilient, and we remain confident in our outlook for consistent revenue and earnings growth over the next several years. Based on our outlook and assessment of the current market, we continue to anticipate double-digit revenue growth and strong earnings in 2026, with even higher earnings expected in 2027, by which time many of the newer large projects in our backlog should be in the construction phase. Accordingly, we are affirming our 2026 adjusted EPS guidance in the range of $4.90 to 5.30 per share.
Speaker #3: Our business is resilient, and we remain confident in our outlook for consistent revenue and earnings growth over the next several years. Based on our outlook and assessment of the current market, we continue to anticipate double-digit revenue growth and strong earnings in 2026 with even higher earnings expected in 2027 by which time many of the newer large projects in our backlog should be in the construction phase.
Speaker #3: Accordingly, we are affirming our 2026 adjusted EPS guidance in the range of $4.90 to $5.30 per share. Our guidance continues to factor in a significant amount of contingency for unknown or unexpected outcomes and developments in 2026, including the possibility of a lower than anticipated success rate for future project pursuits, the potential for project delays, slower ramp-ups for our newer projects, and any unexpected settlements and/or adverse legal decisions associated with the resolution of disputes.
Gary Smalley: Our guidance continues to factor in a significant amount of contingency for unknown or unexpected outcomes and developments in 2026, including the possibility of a lower-than-anticipated success rate for future project pursuits, the potential for project delays, slower ramp-ups for our newer projects, and any unexpected settlements and/or adverse legal decisions associated with the resolution of disputes. We also continue to expect strong operating cash generation in 2026 and beyond due to increasing project execution activities on our newer mega projects and the anticipated resolution of remaining legacy disputes. Before I turn the call over to Ryan, I'd like to comment on one of those remaining legacy disputes.
Gary Smalley: Our guidance continues to factor in a significant amount of contingency for unknown or unexpected outcomes and developments in 2026, including the possibility of a lower-than-anticipated success rate for future project pursuits, the potential for project delays, slower ramp-ups for our newer projects, and any unexpected settlements and/or adverse legal decisions associated with the resolution of disputes. We also continue to expect strong operating cash generation in 2026 and beyond due to increasing project execution activities on our newer mega projects and the anticipated resolution of remaining legacy disputes. Before I turn the call over to Ryan, I'd like to comment on one of those remaining legacy disputes.
Speaker #3: We also continue to expect strong operating cash generation in 2026 and beyond due to increasing project execution activities on our newer megaprojects and the anticipated resolution of remaining legacy disputes.
Speaker #3: Before I turn the call over to Ryan, I'd like to comment on one of those remaining legacy disputes. Last month, we received an unfavorable legal ruling and were assessed damages of approximately $175 million related to a dispute with our customer regarding the W Element Hotel in Philadelphia, a building segment project that we completed in 2021 and that opened to the public the same year.
Gary Smalley: Last month, we received an unfavorable legal ruling and were assessed damages of approximately $175 million related to a dispute with our customer regarding the W/Element Hotel in Philadelphia, a Building segment project that we completed in 2021 and that opened to the public the same year. We strongly disagree with the ruling and firmly believe it does not reflect the merits of the case. To be respectful to the legal process and since it is ongoing litigation, we will not comment specifically about what we believe to be significant legal flaws in the court's decision. We do intend to appeal and will continue to vigorously pursue all appropriate legal remedies to defend ourselves against the damages awarded to the customer and to collect amounts contractually due to us.
Gary Smalley: Last month, we received an unfavorable legal ruling and were assessed damages of approximately $175 million related to a dispute with our customer regarding the W/Element Hotel in Philadelphia, a Building segment project that we completed in 2021 and that opened to the public the same year. We strongly disagree with the ruling and firmly believe it does not reflect the merits of the case. To be respectful to the legal process and since it is ongoing litigation, we will not comment specifically about what we believe to be significant legal flaws in the court's decision. We do intend to appeal and will continue to vigorously pursue all appropriate legal remedies to defend ourselves against the damages awarded to the customer and to collect amounts contractually due to us.
Speaker #3: We strongly disagree with the ruling and firmly believe it does not reflect the merits of the case. To respectful to the legal process and since it is ongoing litigation, we will not comment specifically about what we believe to be significant legal flaws in the court's decision.
Speaker #3: We do intend to appeal and will continue to vigorously pursue all appropriate legal remedies to defend ourselves against the damages awarded to the customer and to collect amounts contractually due to us.
Speaker #3: The appeal process is likely to take two years perhaps even longer so this recent development represents another step along the path of an ongoing lengthy legal dispute.
Gary Smalley: The appeal process is likely to take 2 years, perhaps even longer, so this recent development represents another step along the path of an ongoing, lengthy legal dispute. As a result of the ruling and after a close review of our claims against the owner and certain subcontractors, we recognized an immaterial charge to earnings in Q1. Thank you. With that, I will turn the call over to Ryan to discuss the details of our financial results.
Gary Smalley: The appeal process is likely to take 2 years, perhaps even longer, so this recent development represents another step along the path of an ongoing, lengthy legal dispute. As a result of the ruling and after a close review of our claims against the owner and certain subcontractors, we recognized an immaterial charge to earnings in Q1. Thank you. With that, I will turn the call over to Ryan to discuss the details of our financial results.
Speaker #3: As a result of the ruling and after a close review of our claims against the owner and certain subcontractors, we recognize an immaterial charge earnings in the first quarter.
Speaker #3: Thank you, and with that, I will turn the call over to Ryan to discuss the details of our financial results.
Speaker #1: Thanks, Gary. Good day, everyone. I will begin by discussing our results for the first quarter. After which, I'll provide some commentary on our balance sheet and our 2026 guidance assumptions.
Ryan Soroka: Thanks, Gary. Good day, everyone. I will begin by discussing our results for Q1, after which I'll provide some commentary on our balance sheet and our 2026 guidance assumptions. All comparative references will be against Q1 of last year, unless otherwise stated. As Gary mentioned, we generated a record $147 million of operating cash for the quarter, up 542% year-over-year and well ahead of any Q1 cash flow result ever. I'm pleased to see our cash flow momentum from last year's record year continuing this year. Our cash flow this quarter was largely driven by collections from newer and ongoing projects, reflecting a significant increase in project execution and improved working capital management, with only an immaterial amount attributable to the resolution of disputes.
Ryan Soroka: Thanks, Gary. Good day, everyone. I will begin by discussing our results for Q1, after which I'll provide some commentary on our balance sheet and our 2026 guidance assumptions. All comparative references will be against Q1 of last year, unless otherwise stated. As Gary mentioned, we generated a record $147 million of operating cash for the quarter, up 542% year-over-year and well ahead of any Q1 cash flow result ever. I'm pleased to see our cash flow momentum from last year's record year continuing this year. Our cash flow this quarter was largely driven by collections from newer and ongoing projects, reflecting a significant increase in project execution and improved working capital management, with only an immaterial amount attributable to the resolution of disputes.
Speaker #1: I'll comparative references will be against the first quarter of last year, unless otherwise stated. As Gary mentioned, we generated a record $147 million of operating cash for the quarter, up $542% year over year and well ahead of any first quarter cash flow result ever.
Speaker #1: I'm pleased to see our cash flow momentum from last year's record year continuing this year. Our cash flow this quarter was largely driven by collections from newer and ongoing projects, reflecting a significant increase in project execution and improved working capital management.
Speaker #1: With only an immaterial amount attributable to the resolution of disputes. We anticipate that we will continue to generate solid cash flow in 2026 and beyond, with most of our cash to be derived from organic operations, that is, from the new and existing projects, and enhanced from time to time by cash collected following dispute resolutions.
Ryan Soroka: We anticipate that we will continue to generate solid cash flow in 2026 and beyond, with most of our cash to be derived from organic operations, that is, from the new and existing projects, and enhanced from time to time by cash collected following dispute resolutions. Revenue for the Q1 of 2026 was $1.4 billion, up 11%, with the growth primarily due to increased project execution activities on certain large, newer and higher-margin Civil and Building segment projects, especially in the Northeast. This included, among others, the Midtown Bus Terminal Phase 1 project, the Manhattan Tunnel Project, the Manhattan Jail, and the Newark AirTrain replacement. Civil segment revenue was $698 million, up 14% due to increased project execution activities on some of the projects I just mentioned, which have substantial scope of work remaining.
Ryan Soroka: We anticipate that we will continue to generate solid cash flow in 2026 and beyond, with most of our cash to be derived from organic operations, that is, from the new and existing projects, and enhanced from time to time by cash collected following dispute resolutions. Revenue for the Q1 of 2026 was $1.4 billion, up 11%, with the growth primarily due to increased project execution activities on certain large, newer and higher-margin Civil and Building segment projects, especially in the Northeast. This included, among others, the Midtown Bus Terminal Phase 1 project, the Manhattan Tunnel Project, the Manhattan Jail, and the Newark AirTrain replacement. Civil segment revenue was $698 million, up 14% due to increased project execution activities on some of the projects I just mentioned, which have substantial scope of work remaining.
Speaker #1: Revenue for the first quarter of 2026 was $1.4 billion. Up 11%, with the growth primarily due to increased project execution activities on certain large newer and higher-margin civil and building segment projects, especially in the Northeast.
Speaker #1: This included among others the Midtown Bus Terminal Phase One project, the Manhattan Tunnel project, the Manhattan Jail and the Newark Air Train replacement. Civil segment revenue was $698 million.
Speaker #1: Up 14% due to increased project execution activities on some of the projects I just mentioned, which have substantial scope of work remaining. It was a civil segment's highest revenue of any first quarter ever, reflecting the solid, sustained demand that Gary noted.
Ryan Soroka: It was the Civil segment's highest revenue of any Q1 ever, reflecting the solid, sustained demand that Gary noted. Building segment revenue was $473 million, up slightly compared to the Q1 last year, with the segment's revenue growth expected to increase substantially later this year. All our major Building segment projects, including the Brooklyn and Manhattan Jail projects in New York and a large healthcare campus project in California, are running smoothly and also have substantial scope of work remaining. Specialty segment revenue was $219 million, up a solid 24%, with the segment's growth continuing to be primarily driven by increased activities on various electrical and mechanical projects in New York and Texas.
Ryan Soroka: It was the Civil segment's highest revenue of any Q1 ever, reflecting the solid, sustained demand that Gary noted. Building segment revenue was $473 million, up slightly compared to the Q1 last year, with the segment's revenue growth expected to increase substantially later this year. All our major Building segment projects, including the Brooklyn and Manhattan Jail projects in New York and a large healthcare campus project in California, are running smoothly and also have substantial scope of work remaining. Specialty segment revenue was $219 million, up a solid 24%, with the segment's growth continuing to be primarily driven by increased activities on various electrical and mechanical projects in New York and Texas.
Speaker #1: Building segment revenue was $473 million. Up slightly compared to the first quarter last year, with the segment's revenue growth expected to increase substantially later this year.
Speaker #1: All our major building segment projects, including the Brooklyn and Manhattan Jail projects in New York and a large healthcare campus project in California, are running smoothly and also have substantial scope of work remaining.
Speaker #1: Specialty segment revenue was $219 million. Up a solid 24%, with the segment's growth continuing to be primarily driven by increased activities on various electrical and mechanical projects in New York and Texas.
Speaker #1: The specialty segment's strong revenue growth began in the second half of 2025, and we expect the growth to continue this year and next year as those projects and other newer megaprojects advance.
Ryan Soroka: The Specialty segment's strong revenue growth began in H2 2025. We expect the growth to continue this year and next year as those projects and other newer mega projects advance. Our operating income for the quarter was $59 million, down 9% compared to last year. Our operating income was driven by improved contributions from each of our three segments. Those contributions were offset by a $23 million increase in share-based compensation expense in Q1 2026 compared to Q1 2025, primarily due to our stock price being substantially higher in 2026 as compared to the same period last year, which affects the fair value of liability classified awards.
Ryan Soroka: The Specialty segment's strong revenue growth began in H2 2025. We expect the growth to continue this year and next year as those projects and other newer mega projects advance. Our operating income for the quarter was $59 million, down 9% compared to last year. Our operating income was driven by improved contributions from each of our three segments. Those contributions were offset by a $23 million increase in share-based compensation expense in Q1 2026 compared to Q1 2025, primarily due to our stock price being substantially higher in 2026 as compared to the same period last year, which affects the fair value of liability classified awards.
Speaker #1: Our operating income for the quarter was $59 million. Down 9% compared to last year. Our operating income was driven by improved contributions from each of our three segments but those contributions were offset by a $23 million increase in shared-based compensation expense in the first quarter of 2026 compared to the first quarter of 2025.
Speaker #1: Primarily due to our stock price being substantially higher in 2026 as compared to the same period last year, which affects the fair value of liability classified awards.
Speaker #1: As a reminder, our share-based compensation expense is expected to decrease in 2026 and to decline much more significantly next year as some of these liability classified awards vested at the end of last year and most of the remaining awards will vest by the end of 2026.
Ryan Soroka: As a reminder, our share-based compensation expense is expected to decrease in 2026 and decline much more significantly next year as some of these liability classified awards vested at the end of last year, and most of the remaining awards will vest by the end of 2026. We are no longer awarding liability classified awards, which should meaningfully reduce earnings volatility starting next year. Civil segment operating income was $88 million, up 10% and the highest Q1 result ever for the segment, with a corresponding segment operating margin of 12.6%, a very solid result for a Q1 given typical seasonality.
Ryan Soroka: As a reminder, our share-based compensation expense is expected to decrease in 2026 and decline much more significantly next year as some of these liability classified awards vested at the end of last year, and most of the remaining awards will vest by the end of 2026. We are no longer awarding liability classified awards, which should meaningfully reduce earnings volatility starting next year. Civil segment operating income was $88 million, up 10% and the highest Q1 result ever for the segment, with a corresponding segment operating margin of 12.6%, a very solid result for a Q1 given typical seasonality.
Speaker #1: We are no longer awarding liability-classified awards, which should meaningfully reduce earnings volatility starting next year. Civil segment operating income was $88 million, up 10%, and the highest first quarter result ever for the segment, with a corresponding segment operating margin of 12.6%.
Speaker #1: A very solid result for a first quarter given typical seasonality. The increase in operating income was primarily due to contributions associated with the increased project execution activities on various higher-margin projects that are ramping up.
Ryan Soroka: The increase in the operating income was primarily due to contributions associated with the increased project execution activities on various higher-margin projects that are ramping up, partially offset by an unfavorable adjustment of $16 million in Q1 2026 on a mass transit project in California due to changes in estimates resulting from ongoing negotiations of change orders, which we will expect will generate significant cash once they are ultimately approved. We anticipate continued Civil segment margins in the range of 12% to 15%. Building segment operating income was $16 million, up a strong 56%, with the increase driven by contributions from certain newer, higher-margin projects in New York and California, with substantial scope of work remaining.
Ryan Soroka: The increase in the operating income was primarily due to contributions associated with the increased project execution activities on various higher-margin projects that are ramping up, partially offset by an unfavorable adjustment of $16 million in Q1 2026 on a mass transit project in California due to changes in estimates resulting from ongoing negotiations of change orders, which we will expect will generate significant cash once they are ultimately approved. We anticipate continued Civil segment margins in the range of 12% to 15%. Building segment operating income was $16 million, up a strong 56%, with the increase driven by contributions from certain newer, higher-margin projects in New York and California, with substantial scope of work remaining.
Speaker #1: Partially offset by an unfavorable adjustment of $16 million in the first quarter of 2026 on a mass transit project in California due to changes in estimates resulting from ongoing negotiations of change orders, which we will expect will generate significant cash once they are ultimately approved.
Speaker #1: We anticipate continued civil segment margins in the range of 12% to 15%. Building segment operating income was $16 million. Up a strong 56%, with the increase driven by contributions from certain newer higher-margin projects in New York and California, with substantial scope of work remaining.
Speaker #1: The segment's operating margin was $3.5% compared to $2.3% last year, with the improvement primarily driven by contributions related to the increased higher-margin project execution activities I mentioned.
Ryan Soroka: The segment's operating margin was 3.5% compared to 2.3% last year, with the improvement primarily driven by contributions related to the increased higher-margin project execution activities I mentioned. We anticipate Building segment margins in the range of 3% to 6%, fueled by continued contributions from certain higher-margin projects. Specialty Contractor segment operating income was approximately $600,000 for the quarter, compared to a loss from construction operations of $7 million for the Q1 of last year. The improvement compared to last year was primarily due to contributions related to increased project execution activities on the electrical and mechanical projects I mentioned earlier. Many of these projects are in the early stages and are expected to ramp up substantially over the next several years.
Ryan Soroka: The segment's operating margin was 3.5% compared to 2.3% last year, with the improvement primarily driven by contributions related to the increased higher-margin project execution activities I mentioned. We anticipate Building segment margins in the range of 3% to 6%, fueled by continued contributions from certain higher-margin projects. Specialty Contractor segment operating income was approximately $600,000 for the quarter, compared to a loss from construction operations of $7 million for the Q1 of last year. The improvement compared to last year was primarily due to contributions related to increased project execution activities on the electrical and mechanical projects I mentioned earlier. Many of these projects are in the early stages and are expected to ramp up substantially over the next several years.
Speaker #1: We anticipate building segment margins in the range of 3% to 6%, fueled by continued contributions from certain higher-margin projects. Specialty contractor segment operating income was approximately $600,000 for the quarter compared to a loss from construction operations of $7 million for the first quarter of last year.
Speaker #1: The improvement compared to last year was primarily due to contributions related to increased project execution activities on the electrical and mechanical projects I mentioned earlier. Many of these projects are in the early stages and are expected to ramp up substantially over the next several years.
Speaker #1: The specialty segment had a handful of small immaterial unfavorable project adjustments this quarter related to legacy disputes that adversely affected its results for the quarter, though the segment was still profitable and its results reflected a significant improvement year over year.
Ryan Soroka: The Specialty segment had a handful of small, immaterial, unfavorable project adjustments this quarter related to legacy disputes that adversely affected its results for the quarter, though the segment was still profitable and its results reflected a significant improvement year-over-year. Corporate G&A expense for Q1 2026 was $45 million compared to $18 million last year, with increase mostly due to the substantially higher share-based compensation expense that I mentioned. Income tax expense for the quarter was $17 million, with a corresponding effective tax rate of 30.1% for the period, compared to $13 million last year, with a corresponding effective tax rate of 23.2% in that period. The higher effective tax rate this year is attributable to the significant increase in share-based compensation expense, which is almost entirely non-deductible.
Ryan Soroka: The Specialty segment had a handful of small, immaterial, unfavorable project adjustments this quarter related to legacy disputes that adversely affected its results for the quarter, though the segment was still profitable and its results reflected a significant improvement year-over-year. Corporate G&A expense for Q1 2026 was $45 million compared to $18 million last year, with increase mostly due to the substantially higher share-based compensation expense that I mentioned. Income tax expense for the quarter was $17 million, with a corresponding effective tax rate of 30.1% for the period, compared to $13 million last year, with a corresponding effective tax rate of 23.2% in that period. The higher effective tax rate this year is attributable to the significant increase in share-based compensation expense, which is almost entirely non-deductible.
Speaker #1: Corporate G&A expense for the first quarter of 2026 was $45 million. Compared to $18 million last year, with increased mostly due to the substantially higher share-based compensation expense that I mentioned.
Speaker #1: Income tax expense for the quarter was $17 million, with a corresponding effective tax rate of 30.1% for the period compared to $13 million last year with a corresponding effective tax rate of 23.2% in that period.
Speaker #1: The higher effective tax rate this year is attributable to the significant increase in shared-based compensation expense, which is almost entirely non-deductible. Net income attributable to Tudor Perini for the first quarter of 2026 was $26 million.
Ryan Soroka: Net income attributable to Tutor Perini for Q1 2026 was $26 million or $0.48 of GAAP earnings per share, compared to $28 million or $0.53 of GAAP earnings per share in Q1 of last year. Excluding the impact of share-based compensation expense, net of the associated tax benefit, adjusted net income attributable to Tutor Perini for Q1 2026 was $55 million or $1.03 of adjusted earnings per share, compared to $34 million or $0.65 of adjusted earnings per share in the same quarter last year. As you can see, our adjusted EPS was up a strong 58% year over year, reflecting the high margin contribution and outstanding performance we are seeing from our projects and backlog. Now I'll address the balance sheet.
Ryan Soroka: Net income attributable to Tutor Perini for Q1 2026 was $26 million or $0.48 of GAAP earnings per share, compared to $28 million or $0.53 of GAAP earnings per share in Q1 of last year. Excluding the impact of share-based compensation expense, net of the associated tax benefit, adjusted net income attributable to Tutor Perini for Q1 2026 was $55 million or $1.03 of adjusted earnings per share, compared to $34 million or $0.65 of adjusted earnings per share in the same quarter last year. As you can see, our adjusted EPS was up a strong 58% year over year, reflecting the high margin contribution and outstanding performance we are seeing from our projects and backlog. Now I'll address the balance sheet.
Speaker #1: Or $48 of gap earnings per share compared to $28 million or 53 cents of gap earnings per share in the first quarter of last year.
Speaker #1: Excluding the impact of share-based compensation expense, net of the associated tax benefit, adjusted net income attributable to Tudor Perini for the first quarter of 2026 was $55 million.
Speaker #1: Or $1.03 of adjusted earnings per share. Compared to $34 million or 65 cents of adjusted earnings per share in the same quarter last year.
Speaker #1: As you can see, our adjusted EPS was up a strong 58% year over year, reflecting the high margin contribution and outstanding performance we are seeing from our projects and backlog.
Speaker #1: Now I'll address the balance sheet. Our record cash generation enabled us to continue paying down our total debt, which stood at $399 million at the end of the first quarter.
Ryan Soroka: Our record cash generation enabled us to continue paying down our total debt, which stood at $399 million at the end of Q1. We ended the quarter with a cash and cash equivalents exceeding total debt by $404 million, a very strong net cash position, and $533 million better than we were just 1 year ago when we were in a net debt position. Our cash available for general corporate purposes was $321 million at the end of Q1 2026, up 18% compared to $271 million at the end of 2025. Our balance sheet is stronger than it's ever been, and our solid net cash position provides us with excellent capital allocation flexibility.
Ryan Soroka: Our record cash generation enabled us to continue paying down our total debt, which stood at $399 million at the end of Q1. We ended the quarter with a cash and cash equivalents exceeding total debt by $404 million, a very strong net cash position, and $533 million better than we were just 1 year ago when we were in a net debt position. Our cash available for general corporate purposes was $321 million at the end of Q1 2026, up 18% compared to $271 million at the end of 2025. Our balance sheet is stronger than it's ever been, and our solid net cash position provides us with excellent capital allocation flexibility.
Speaker #1: We ended the quarter with a cash and cash equivalents exceeding total debt by $404 million. A very strong net cash position and $533 million better than we were just one year ago when we were in a net debt position.
Speaker #1: Our cash available for general corporate purposes was $321 million, at the end of the first quarter of 2026, up 18% compared to $271 million at the end of 2025.
Speaker #1: Our balance sheet is stronger than it's ever been, and our solid net cash position presides with excellent capital allocation flexibility. We anticipate refinancing our existing senior notes by around mid-year to secure a more favorable interest rate and extend our debt maturities, which should result in substantially reduced interest expense going forward.
Ryan Soroka: We anticipate refinancing our existing senior notes by around mid-year to secure a more favorable interest rate and extend our debt maturities, which should result in substantially reduced interest expense going forward. Lastly, all assumptions I provided last quarter pertaining to our 2026 guidance remain unchanged. Thank you. With that, I will turn the call back over to Gary.
Ryan Soroka: We anticipate refinancing our existing senior notes by around mid-year to secure a more favorable interest rate and extend our debt maturities, which should result in substantially reduced interest expense going forward. Lastly, all assumptions I provided last quarter pertaining to our 2026 guidance remain unchanged. Thank you. With that, I will turn the call back over to Gary.
Speaker #1: Lastly, all assumptions I provided last quarter pertaining to our 2026 guidance remain unchanged. Thank you, and with that, I will turn the call back over to Gary.
Speaker #2: Thank you, Ryan. To recap, we have kicked off 2026 with excellent first quarter results, marked by record operating cash flow of $147 million, solid revenue growth, adjusted EPS of $1.03, which was up 58% year over year and continued strong backlog of approximately $20 billion.
Gary Smalley: Thank you, Ryan. To recap, we have kicked off 2026 with excellent Q1 results marked by record operating cash flow of $147 million, solid revenue growth, adjusted EPS of $1.03, which was up 58% year-over-year, and continued strong backlog of approximately $20 billion. This backlog underpins the confidence we have in our ability to deliver double-digit revenue and earnings growth and continued strong annual cash flow in 2026 and beyond as our newer projects progress through design and into construction. Our business continues to perform well. We expect our solid project execution to continue.
Gary Smalley: Thank you, Ryan. To recap, we have kicked off 2026 with excellent Q1 results marked by record operating cash flow of $147 million, solid revenue growth, adjusted EPS of $1.03, which was up 58% year-over-year, and continued strong backlog of approximately $20 billion. This backlog underpins the confidence we have in our ability to deliver double-digit revenue and earnings growth and continued strong annual cash flow in 2026 and beyond as our newer projects progress through design and into construction. Our business continues to perform well. We expect our solid project execution to continue.
Speaker #2: This backlog underpins the confidence we have in our ability to deliver double-digit revenue and earnings growth and continued strong annual cash flow in 2026 and beyond, as our newer projects progress through design and into construction.
Speaker #2: Our business continues to perform well and we expect our solid project execution to continue. The long-term outlook for Tudor Perini remains very bright, given today's backlog of long duration higher-margin projects with improved contractual terms, operational improvements we have made in our specialty contractor segment, persistent favorable macroeconomic tailwinds, and strong public and private customer funding that is fueling vibrant market demand and numerous major bidding opportunities.
Gary Smalley: The long-term outlook for Tutor Perini remains very bright, given today's backlog of long duration, higher margin projects with improved contractual terms, operational improvements we have made in our Specialty Contractors segment, persistent favorable macroeconomic tailwinds, and strong public and private customer funding that is fueling vibrant market demand and numerous major bidding opportunities. Importantly, we also believe that we are getting closer to the time when all of our segments will be firing on all cylinders, which will allow us to demonstrate more fully our growth and earnings potential. Thank you. With that, I will turn the call over to the operator for your questions.
Gary Smalley: The long-term outlook for Tutor Perini remains very bright, given today's backlog of long duration, higher margin projects with improved contractual terms, operational improvements we have made in our Specialty Contractors segment, persistent favorable macroeconomic tailwinds, and strong public and private customer funding that is fueling vibrant market demand and numerous major bidding opportunities. Importantly, we also believe that we are getting closer to the time when all of our segments will be firing on all cylinders, which will allow us to demonstrate more fully our growth and earnings potential. Thank you. With that, I will turn the call over to the operator for your questions.
Speaker #2: And importantly, we also believe that we are getting closer to the time when all of our segments will be firing on all cylinders which will allow us to demonstrate more fully our growth and earnings potential.
Speaker #2: Thank you, and with that, I will turn the call over to the operator for your questions.
Speaker #3: Thank you. We will now be conducting a question-and-answer session. If you would like to ask a question, please press star one on your telephone keypad.
Operator: Thank you. Our first question is from Michael Dudas with Vertical Research Partners. Please proceed with your question.
Operator: Thank you. Our first question is from Michael Dudas with Vertical Research Partners. Please proceed with your question.
Speaker #3: A confirmation tone will indicate your line is in the question queue. You may press star two if you would like to remove your question from the queue.
Speaker #3: For participants using speaker equipment, it may be necessary to pick up your handset before pressing the star keys. One moment, please, while we pull for questions.
Speaker #3: Our first question is from Michael Dudas with Vertical Research Partners. Please proceed with your question.
Speaker #4: Good afternoon, gentlemen. Hello. And I share my parents with the family at those families as well. First, Gary, sure. First, Gary, on so you talked about several large projects that will be coming up for bid second half this year, 2027, but maybe you could assess that relative to what projects may be rolling off and some of those regions and it seems like there's so much business that can be done in northeast, especially New York area, certainly in California.
Michael Dudas: Good afternoon, gentlemen.
Michael Dudas: Good afternoon, gentlemen.
Gary Smalley: Hi, Mike.
Gary Smalley: Hi, Mike.
Ryan Soroka: Hello.
Ryan Soroka: Hello.
Michael Dudas: I share my prayers with the family, those families as well.
Michael Dudas: I share my prayers with the family, those families as well.
Gary Smalley: Thank you.
Gary Smalley: Thank you.
Michael Dudas: First, Gary, you talked about several large projects that, you know, will be coming up for bid H2 this year, 2027. Maybe you could assess that relative to what projects may be rolling off in some of those regions. You know, it seems like there's so much business that can be done in the Northeast, especially in New York area, certainly in California. I mean, again, all over, you know, how you balance, like, where the opportunities are, your capacity, and maybe even see if you can think a little bit more on the Guam, 'cause you mentioned some pretty large numbers and some opportunities in the Indo-Pacific, which certainly should have a pretty good tail given all the money that's been spent over there.
Michael Dudas: First, Gary, you talked about several large projects that, you know, will be coming up for bid H2 this year, 2027. Maybe you could assess that relative to what projects may be rolling off in some of those regions. You know, it seems like there's so much business that can be done in the Northeast, especially in New York area, certainly in California. I mean, again, all over, you know, how you balance, like, where the opportunities are, your capacity, and maybe even see if you can think a little bit more on the Guam, 'cause you mentioned some pretty large numbers and some opportunities in the Indo-Pacific, which certainly should have a pretty good tail given all the money that's been spent over there.
Speaker #4: I mean, again, all over, but how you're balanced, where the opportunities are, your capacity, and maybe even think a little bit more on the Guam because you mentioned some pretty large numbers and some opportunities in Indo-Pacific, which certainly should have a pretty good tail given all the money that's been spent over there.
Speaker #5: Yeah. Yeah, great, Mike. First of all, some of these opportunities are already in the hopper, so to speak. They've been submitted. We're waiting on the results.
Gary Smalley: Yeah, great, Mike. You know, first of all, some of these opportunities are already in the hopper, so to speak. They've been submitted. We're waiting on the results. You know, we should know something, as we talked about in some cases, later this month, sometime in some cases next month. Capacity, look, you should feel just rest assured we're not going to pursue something we can't handle. We do have some work that's winding down in California, and we'll use some of those resources to staff this other work. All the work we're pursuing, we have people ready and raring to go, and we will execute the work soundly. Yeah, I don't think that should be a concern.
Gary Smalley: Yeah, great, Mike. You know, first of all, some of these opportunities are already in the hopper, so to speak. They've been submitted. We're waiting on the results. You know, we should know something, as we talked about in some cases, later this month, sometime in some cases next month. Capacity, look, you should feel just rest assured we're not going to pursue something we can't handle. We do have some work that's winding down in California, and we'll use some of those resources to staff this other work. All the work we're pursuing, we have people ready and raring to go, and we will execute the work soundly. Yeah, I don't think that should be a concern.
Speaker #5: So we should know something as we talk about in some cases. Later this month, sometime in some cases next month. So capacity look, you should feel just rest assured we're not going to pursue something we can't handle.
Speaker #5: We do have some work that's winding down in California and we'll use some of those resources to staff this other work. But all the work we're pursuing, we have people ready in rare and to go and we will execute the work soundly.
Speaker #5: Yeah, so I don't think that should be a concern. If I would look at what's out there and what we would expect to book provided we get anywhere close to our fair share, I would say that it's going to be by far a net add.
Gary Smalley: If I would look at what's out there and what we would expect to book, provided we get, you know, anywhere close to our fair share, I would say that it's gonna be a, you know, by far a net add. There are just so many opportunities, as you noted. The opportunities that we have as we sit here today and we compare that to the last time we talked, there's more out there. Some of it's moved closer to, you know, fruition. In other cases, there are new opportunities that we're pursuing. You know, the pipeline is rich, and we think we're well positioned for, you know, a fair amount of these opportunities.
Gary Smalley: If I would look at what's out there and what we would expect to book, provided we get, you know, anywhere close to our fair share, I would say that it's gonna be a, you know, by far a net add. There are just so many opportunities, as you noted. The opportunities that we have as we sit here today and we compare that to the last time we talked, there's more out there. Some of it's moved closer to, you know, fruition. In other cases, there are new opportunities that we're pursuing. You know, the pipeline is rich, and we think we're well positioned for, you know, a fair amount of these opportunities.
Speaker #5: There are just so many opportunities, as you noted, the opportunities that we have as we sit here today and we compare that to the last time we talked, there's more out there.
Speaker #5: Some of it's moved closer to fruition and other cases they're new opportunities that we're pursuing. So the pipeline is rich and we think we're well positioned for a fair amount of these opportunities.
Speaker #5: And then if we get to a point and we'd love for this to happen, if we get to a point where we can't handle any more, then we'll sit on the sidelines.
Gary Smalley: Then, you know, if we get to a point, and we'd love for this to happen, as we get to a point where, you know, we can't handle any more, then we'll sit on the sidelines. We're not there yet. We don't think we will be there at this point. We look forward to, you know, when we get together another quarter or two to report on increased backlog as these opportunities come home.
Gary Smalley: Then, you know, if we get to a point, and we'd love for this to happen, as we get to a point where, you know, we can't handle any more, then we'll sit on the sidelines. We're not there yet. We don't think we will be there at this point. We look forward to, you know, when we get together another quarter or two to report on increased backlog as these opportunities come home.
Speaker #5: But we're not there yet. We don't think we will be there at this point. And we look forward to when we get together another quarter or two to report on increased backlog as these opportunities come home.
Speaker #4: I appreciate that. And my follow-up, Gary, would be, as you assess the margin performance, which again, for Q1 seemed quite solid across the board, but the cadence of it as we move through 2026, is it just a function of ramping up the volume and capacity and are there some other opportunity areas where between the low and high end of those ranges where what could help you achieve those versus maybe pushing them out to, say, 2027?
Michael Dudas: I appreciate that. My follow-up, Gary, would be, as you assess the margin performance, which again for Q1 results seemed quite solid across the board, but the cadence of it as we move through 2026, is it just a function of ramping up the volume and capacity? Are there similar other areas where, you know, between the low and high end of those ranges, where what could help you achieve those versus, maybe pushing them out to, say, 2027?
Michael Dudas: I appreciate that. My follow-up, Gary, would be, as you assess the margin performance, which again for Q1 results seemed quite solid across the board, but the cadence of it as we move through 2026, is it just a function of ramping up the volume and capacity? Are there similar other areas where, you know, between the low and high end of those ranges, where what could help you achieve those versus, maybe pushing them out to, say, 2027?
Speaker #5: That's exactly what you said is about volume. The first quarter is always a slower quarter for us. It's difficult to estimate what the first quarter is going to be.
Gary Smalley: It's exactly what you said. It's about volume. You know, Q1 is always a slower quarter for us. It's difficult to, you know, to estimate what Q1's gonna be. It's harder than the others because you don't know the extent of, you know, we didn't know we were gonna have all the rain that we had in Southern California, for example. We didn't know that, you know, New York out your way, Mike, I had a trip that I canceled because of, you know, the weather being so bad and the airport being closed and things of that nature. You just don't know. As we progress, during, you know, through the year, the volume goes up.
Gary Smalley: It's exactly what you said. It's about volume. You know, Q1 is always a slower quarter for us. It's difficult to, you know, to estimate what Q1's gonna be. It's harder than the others because you don't know the extent of, you know, we didn't know we were gonna have all the rain that we had in Southern California, for example. We didn't know that, you know, New York out your way, Mike, I had a trip that I canceled because of, you know, the weather being so bad and the airport being closed and things of that nature. You just don't know. As we progress, during, you know, through the year, the volume goes up.
Speaker #5: It's harder than the others because you don't know the extent of we didn't know we were going to have all the rain that we had in Southern California, for example.
Speaker #5: And we didn't know that New York out your way Mike, I had a trip that I canceled because of the weather being so bad and the airport being closed and things of that nature.
Speaker #5: So you just don't know. But as we progress during through the year, the volume goes up. We also are margins are expected to go up.
Gary Smalley: We also our margins are expected to go up. These larger projects that we've been booking, you know, they're ramping up right now. They're only gonna get stronger as the year progresses. Some of that is the weather. You know, other, you know, other factor is that they're just early in their development, they're going to start blowing and going. Some already have, others will gain more momentum as we continue. I would expect 2026 to gain strength each quarter, 2027 will just be a follow-on to that.
Gary Smalley: We also our margins are expected to go up. These larger projects that we've been booking, you know, they're ramping up right now. They're only gonna get stronger as the year progresses. Some of that is the weather. You know, other, you know, other factor is that they're just early in their development, they're going to start blowing and going. Some already have, others will gain more momentum as we continue. I would expect 2026 to gain strength each quarter, 2027 will just be a follow-on to that.
Speaker #5: These larger projects that we've been booking, they're ramping up right now. They're only going to get stronger as the year progresses and some of that is the weather.
Speaker #5: But other factors that they're just early in their development and so they're going to start blowing and going some already have and others will gain more momentum as we continue.
Speaker #5: So I would expect '26 to gain strength each quarter, and '27 will just be a follow-on to that.
Speaker #4: Excellent. Thank you, Gary.
Michael Dudas: Excellent. Thank you, Gary.
Michael Dudas: Excellent. Thank you, Gary.
Speaker #5: You're welcome. Thanks.
Gary Smalley: You're welcome. Thanks.
Gary Smalley: You're welcome. Thanks.
Speaker #3: Our next question is from Judah Aranovitz with UBS. Please proceed with your question.
Operator: Our next question is from Judah Aronowitz with UBS. Please proceed with your question.
Operator: Our next question is from Judah Aronowitz with UBS. Please proceed with your question.
Speaker #4: Hey, good evening. Thanks for taking my question. On for Steve Fisher. The first question, I noticed that you changed the language around 2027 UPS expectations to significantly higher than the upper end of the 2020s guide from just higher.
Judah Aronowitz: Hey, good evening. Thanks for taking my question. On for Steven Fisher. The first question, I noticed that you changed the language around 2027 EPS expectations to significantly higher on the upper end of the 2026 guide from just higher. Is that right? If so, I guess what makes you more confident now relative to 3 months ago? You know, can you talk about your confidence level in achieving this level of earnings in 2027? Specifically, is the work already in backlog, or is there still more work to book?
Judah Aronowitz: Hey, good evening. Thanks for taking my question. On for Steven Fisher. The first question, I noticed that you changed the language around 2027 EPS expectations to significantly higher on the upper end of the 2026 guide from just higher. Is that right? If so, I guess what makes you more confident now relative to 3 months ago? You know, can you talk about your confidence level in achieving this level of earnings in 2027? Specifically, is the work already in backlog, or is there still more work to book?
Speaker #4: Is that right? And if so, I guess what makes you more confident now relative to three months ago? Can you talk about your confidence level in achieving this level of earnings in '27?
Speaker #4: And specifically, is the work already in backlog or is there still more work to book?
Speaker #5: Yes, if we didn't book any more work '27 is going to be blowout year as is '26. But there is going to be more work to book.
Gary Smalley: Yes. If we didn't book any more work, 2027 is gonna be a blowout year, as is 2026. You know, there is gonna be more work to book, so it'll be even better. What gives us a little bit more optimism or confidence, Judah, is, you know, time has gone by. We see how things have developed. We see how, you know, the new work is progressing. We see how settlement discussions are progressing. All those things together make us as confident as we can be. You know, look, we didn't affirm guidance, we didn't raise guidance, and that's always something, at least as we go forward, that you should expect is maybe a raise or at least consideration for it.
Gary Smalley: Yes. If we didn't book any more work, 2027 is gonna be a blowout year, as is 2026. You know, there is gonna be more work to book, so it'll be even better. What gives us a little bit more optimism or confidence, Judah, is, you know, time has gone by. We see how things have developed. We see how, you know, the new work is progressing. We see how settlement discussions are progressing. All those things together make us as confident as we can be. You know, look, we didn't affirm guidance, we didn't raise guidance, and that's always something, at least as we go forward, that you should expect is maybe a raise or at least consideration for it.
Speaker #5: So, it'll be even better. So what gives us a little bit more optimism or confidence, Judah, is time has gone by. We see how things have developed.
Speaker #5: We see how the new work has progressing. We see how settlement discussions are progressing. So all those things together make us as confident as we can be.
Speaker #5: And look, we didn’t—we affirmed guidance. We didn’t raise guidance. And that’s always something, at least as we go forward, that you should expect—is maybe a raise or at least consideration for it.
Speaker #5: We did consider it this time because we do feel a lot better about how things are shaping up. But we also want to be conservative in our approach.
Gary Smalley: We did consider it this time because we do feel a lot better about how things are shaping up. We also want to be conservative in our approach. Yes, we do feel more confident, and it's just the way all the details are coming together right now. We're very pleased with where we are with respect to the execution of all this new work, and also very optimistic about building on this great backlog we already have.
Gary Smalley: We did consider it this time because we do feel a lot better about how things are shaping up. We also want to be conservative in our approach. Yes, we do feel more confident, and it's just the way all the details are coming together right now. We're very pleased with where we are with respect to the execution of all this new work, and also very optimistic about building on this great backlog we already have.
Speaker #5: So yes, we do feel more confident and it's just the way all the details are coming together right now. We're very pleased with where we are with respect to the execution of all this new work and also very optimistic about building on this great backlog we already have.
Speaker #4: Okay. That makes sense. Good to hear. And then my follow-up relative to inflation, what are you seeing in the business now? And how comfortable are you with your contingencies in areas where you don't have the ability to re-index to inflation?
Judah Aronowitz: Okay. That makes sense. Good to hear. My follow-up, relative to inflation, what are you seeing in the business now? How comfortable are you with your contingencies, you know, in areas where you don't have the ability to reindex to inflation? Thank you.
Judah Aronowitz: Okay. That makes sense. Good to hear. My follow-up, relative to inflation, what are you seeing in the business now? How comfortable are you with your contingencies, you know, in areas where you don't have the ability to reindex to inflation? Thank you.
Speaker #4: Thank you.
Speaker #5: Yeah. Yeah. And good question because you even indicated that in some cases you implied that we do have the ability to re-index with inflation.
Gary Smalley: Yeah. Yeah, good question because you even indicated that in some cases, you know, you implied that we do have the ability to reindex with inflation, and that is the case. In those instances where we're still being impacted by inflation as everyone else is, you know, look, we're covered. We're very conservative in how we address contingency, but also we have this buyout that we've talked about before on calls, where early on we look at firming up commitments with respect to subcontractors and also vendors to make sure that, you know, we pass that risk on to them if there's any change in pricing. We're good with respect to inflation.
Gary Smalley: Yeah. Yeah, good question because you even indicated that in some cases, you know, you implied that we do have the ability to reindex with inflation, and that is the case. In those instances where we're still being impacted by inflation as everyone else is, you know, look, we're covered. We're very conservative in how we address contingency, but also we have this buyout that we've talked about before on calls, where early on we look at firming up commitments with respect to subcontractors and also vendors to make sure that, you know, we pass that risk on to them if there's any change in pricing. We're good with respect to inflation.
Speaker #5: And that is the case. But in those instances where we're still being impacted by inflation as everyone else is, look, we're covered. We're very conservative in how we addressed how we addressed contingency.
Speaker #5: But also we have the this buyout that we've talked about before on calls where early on we look at firming up commitments with respect to subcontractors and also vendors to make sure that we pass that risk on to them if there's any change in pricing.
Speaker #5: So we're good with respect to inflation.
Speaker #4: Great. Got it. Thank you.
Judah Aronowitz: Got it. Thank you.
Judah Aronowitz: Got it. Thank you.
Speaker #5: Okay. Thanks, Judah.
Gary Smalley: Okay. Thanks, Judah.
Gary Smalley: Okay. Thanks, Judah.
Speaker #3: Our next question is from Liam Burke with B Riley Securities. Please proceed with your question.
Operator: Our next question is from Liam Burke with B. Riley Securities. Please proceed with your question.
Operator: Our next question is from Liam Burke with B. Riley Securities. Please proceed with your question.
Speaker #6: Thank you. Good evening, Gary, Ryan, Jorge.
Liam Burke: Thank you. Good evening, Gary, Ryan, Jorge.
Liam Burke: Thank you. Good evening, Gary, Ryan, Jorge.
Speaker #5: Hi, Liam.
Gary Smalley: Hi, Liam.
Gary Smalley: Hi, Liam.
Speaker #6: Hi. Gary, your balance sheet is much stronger. Your cash position is great. Your return on cash to shareholders does your strong liquidity position allow you to undertake the larger projects without having to consider a joint venture partner?
Ryan Soroka: Hi.
Ryan Soroka: Hi.
Liam Burke: Gary, your balance sheet is much stronger. Your cash position is great. You're returning cash to shareholders. Does your strong liquidity position allow you to undertake larger projects without having to consider a joint venture partner?
Liam Burke: Gary, your balance sheet is much stronger. Your cash position is great. You're returning cash to shareholders. Does your strong liquidity position allow you to undertake larger projects without having to consider a joint venture partner?
Speaker #5: You know what? It absolutely does. And that's what our preference is, of course, because we have great joint venture partners and we appreciate what they bring to the table.
Gary Smalley: You know what? It absolutely does. That's what our preference is, of course, because we have great joint venture partners, and we appreciate what they bring to the table. At the same time, if we can do the work on our own and not have to share 20% or 25% or 30% margin and cash with them, that's the ideal position that we'd like to be in. Certainly, when you're a stronger company, as we are now, compared to a year ago and the year before that, then that does offer us opportunities to do more things on our own.
Gary Smalley: You know what? It absolutely does. That's what our preference is, of course, because we have great joint venture partners, and we appreciate what they bring to the table. At the same time, if we can do the work on our own and not have to share 20% or 25% or 30% margin and cash with them, that's the ideal position that we'd like to be in. Certainly, when you're a stronger company, as we are now, compared to a year ago and the year before that, then that does offer us opportunities to do more things on our own.
Speaker #5: But at the same time, if we can do the work on our own and not have to share 20 or 25 or 30 percent margin in cash with them, that's the ideal position that we'd like to be in.
Speaker #5: And certainly when you're a stronger company as we are now compared to a year ago and the year before that, then that does offer us opportunities to do more things on our own.
Speaker #6: Great. And in terms you're talking about bidding activity and potential projects expanding, is that increasing the competitive field or things pretty much the same?
Liam Burke: Great. In terms of talking about bidding activity and potential projects expanding, is that increasing the competitive field or are things pretty much the same? Part of it is that data center activity has pulled some of the competitors off the projects that you're bidding on.
Liam Burke: Great. In terms of talking about bidding activity and potential projects expanding, is that increasing the competitive field or are things pretty much the same? Part of it is that data center activity has pulled some of the competitors off the projects that you're bidding on.
Speaker #6: Part of it is the data center activity has pulled some of the competitors off the projects that you're bidding on.
Speaker #5: Yeah. I would say that if there is a change, it's from last quarter, there's probably not much of a change to be honest with you.
Gary Smalley: Yeah, I would say that, if there is a change, it's, you know, from last quarter, there's probably not much of a change to be honest with you. You know, look, the trend has been to be less competitive in whether it's data centers or just the volume of work, such as what we've talked about. You know, certainly, there's not gonna be more competition, at least in the short term, medium term, or even as far as we can see looking out because of all the just the magnitude of work and so few of us that can do the complex work that we pursue.
Gary Smalley: Yeah, I would say that, if there is a change, it's, you know, from last quarter, there's probably not much of a change to be honest with you. You know, look, the trend has been to be less competitive in whether it's data centers or just the volume of work, such as what we've talked about. You know, certainly, there's not gonna be more competition, at least in the short term, medium term, or even as far as we can see looking out because of all the just the magnitude of work and so few of us that can do the complex work that we pursue.
Speaker #5: But look, the trend has been to be less competitive. And whether it's data centers or just the volume of work, such as what we've talked about.
Speaker #5: So you certainly there's not going to be more competition, at least in the short term, medium term, or even as far as we can see looking out.
Speaker #5: Because of all the just the magnitude of work and so few of us that can do the complex work that we pursue. So I would say that the competition is probably a little less and would likely be continue to be less than what it is currently.
Gary Smalley: I would say that, you know, the competition is probably a little less and would likely be, continue to be less than what it is currently. Certainly, we don't see, new competitors coming into the market right now.
Gary Smalley: I would say that, you know, the competition is probably a little less and would likely be, continue to be less than what it is currently. Certainly, we don't see, new competitors coming into the market right now.
Speaker #5: But certainly we don't see new competitors coming into the market right now.
Speaker #6: Great. Thank you, Gary.
Liam Burke: Great. Thank you, Gary.
Liam Burke: Great. Thank you, Gary.
Speaker #5: Yeah. Thank you.
Gary Smalley: Yeah. Thank you.
Gary Smalley: Yeah. Thank you.
Speaker #3: Our next question is from Min Cho with Texas Capital Securities. Please proceed with your question.
Operator: Our next question is from Min Cho with Texas Capital Securities. Please proceed with your question.
Operator: Our next question is from Min Cho with Texas Capital Securities. Please proceed with your question.
Speaker #7: Great. Thank you. Thanks for taking my questions. My first question has to do with black construction. So I know that's a higher margin business for you.
Min Cho: Great. Thank you. Thanks for taking my questions. My first question has to do with Black Construction. I know that's a higher margin business for you. Can you talk about your annual run rate of revenue there and just kind of what you have in backlog? How big do you feel like that business can get? If you can just talk about any of the bottlenecks to driving more growth from Black Construction. Thank you.
Min Cho: Great. Thank you. Thanks for taking my questions. My first question has to do with Black Construction. I know that's a higher margin business for you. Can you talk about your annual run rate of revenue there and just kind of what you have in backlog? How big do you feel like that business can get? If you can just talk about any of the bottlenecks to driving more growth from Black Construction. Thank you.
Speaker #7: Can you talk about your annual run rate of revenue there and kind of what you have in backlog? And how big do you feel like that business can get?
Speaker #7: And if you can just talk about any of the bottlenecks to driving more growth from black construction. Thank you.
Speaker #5: Yeah. Hi, Min. In the past, what we've really steered away from talking too much about specific business units and what type of what they bring to the overall consolidated two-to-printing.
Gary Smalley: Yeah. Hi, Min. In the past, what we've really steered away from talking too much about specific business units and what type of, you know, what they bring to the overall consolidated Tutor Perini. Just, I guess, to try to address your question in some way, we're looking at Black. I won't talk about revenue, I'll talk about backlog. It exceeds $1 billion. You know, if you look at the run rate, some of their work is, you know, 2 to 3 years in duration. Other projects are, you know, a bit longer, maybe 4 or 5 years. You know, we're looking to build that. We've got the capabilities there. It's a extraordinary business for us. Just very talented workforce.
Gary Smalley: Yeah. Hi, Min. In the past, what we've really steered away from talking too much about specific business units and what type of, you know, what they bring to the overall consolidated Tutor Perini. Just, I guess, to try to address your question in some way, we're looking at Black. I won't talk about revenue, I'll talk about backlog. It exceeds $1 billion. You know, if you look at the run rate, some of their work is, you know, 2 to 3 years in duration. Other projects are, you know, a bit longer, maybe 4 or 5 years. You know, we're looking to build that. We've got the capabilities there. It's a extraordinary business for us. Just very talented workforce.
Speaker #5: Just, I guess, to try to address your question in some way—we're looking at black. I won't talk about revenue, but I'll talk about backlog.
Speaker #5: It exceeds a billion dollars. And if you look at the run rate, some of their work is two, three years in duration. Other projects are a bit longer, maybe four or five years.
Speaker #5: And we're looking to build that. We've got the capabilities there. It's an extraordinary business for us. Just a very talented workforce. So look for that.
Gary Smalley: You know, look for that. It probably won't double, but it could grow significantly from that, you know, beginning point.
Gary Smalley: You know, look for that. It probably won't double, but it could grow significantly from that, you know, beginning point.
Speaker #5: It probably won't double, but it could grow significantly from that beginning point.
Speaker #7: Great. Thank you. And then also your recent Army Corps May Top Award to support the energy resilience and conservation investment program. How much of that 2 billion is within TPC's kind of addressable kind of addressable business?
Min Cho: Great. Thank you. Also your recent Army Corps MATOC award to support the Energy Resilience and Conservation Investment Program. How much of that $2 billion is within TPC's kind of addressable business? If you can just talk a little bit about the types of construction projects that are expected there.
Min Cho: Great. Thank you. Also your recent Army Corps MATOC award to support the Energy Resilience and Conservation Investment Program. How much of that $2 billion is within TPC's kind of addressable business? If you can just talk a little bit about the types of construction projects that are expected there.
Speaker #7: And if you can just talk a little bit about the types of construction projects that are expected there.
Speaker #5: Yeah. All of it is within what we do and what we do well. And the type of work for that that's available under that May Top is it varies.
Gary Smalley: All of it is within what we do and what we do well. The type of work for, you know, that's available under that MATOC, it varies. It can be building work. It can be civil work. It can be specialty work as well, specialty contractors work. Our workforce at Black in Guam and the surrounding areas, again, I mentioned before it was very talented, but we're very diversified. We can do whatever work that's out there. We also have PMSI as one of our business units. Likewise, they are very equipped in whatever part of the world that they operate to do all types of building work or all types of construction work.
Gary Smalley: All of it is within what we do and what we do well. The type of work for, you know, that's available under that MATOC, it varies. It can be building work. It can be civil work. It can be specialty work as well, specialty contractors work. Our workforce at Black in Guam and the surrounding areas, again, I mentioned before it was very talented, but we're very diversified. We can do whatever work that's out there. We also have PMSI as one of our business units. Likewise, they are very equipped in whatever part of the world that they operate to do all types of building work or all types of construction work.
Speaker #5: It can be building work. It can be civil work. It can be specialty work as well, specialty contractors' work. Our workforce in at black in Guam and the surrounding areas again, I mentioned before, it was very talented, but we're very diversified.
Speaker #5: We can do whatever work is that's out there. We also have PMSI as one of our business units and likewise, they are very equipped in whatever part of the world that they operate to do all types of building work or all types of construction work.
Speaker #5: Their emphasis is generally more on the building side, but really between the two of those entities, we can do just about anything.
Gary Smalley: Their emphasis is generally more on the Building side. Really between the two of those entities, we can do just about anything.
Gary Smalley: Their emphasis is generally more on the Building side. Really between the two of those entities, we can do just about anything.
Speaker #7: Excellent. Then if I can just squeeze in one more question, can you just talk a little bit about Tutor's position currently on pursuing some of the mission-critical kind of high-tech projects like the data centers or semiconductor campuses?
Min Cho: Excellent. If I can just squeeze in one more question. Can you just talk a little bit about Tutor's position currently on pursuing some of the mission-critical kind of high-tech projects like the data centers or semiconductor campuses?
Min Cho: Excellent. If I can just squeeze in one more question. Can you just talk a little bit about Tutor's position currently on pursuing some of the mission-critical kind of high-tech projects like the data centers or semiconductor campuses?
Speaker #5: Yes. So this is something that we're looking at very closely. We do we are actually doing some data center work with on the specialty side.
Gary Smalley: Yes. This is, you know, something that we're looking at very closely. We are actually doing some data center work with, on the Specialty Contractors segment side. We're exploring ways to expand that currently. You know, we wanna make sure that we don't give up the core market because we know at one day that, you know, and who knows how long down the road that will be, whether it's 5 years or 10 years down the road, that, you know, the data center work at some point in time probably won't be there, at least not as strong as it is now.
Gary Smalley: Yes. This is, you know, something that we're looking at very closely. We are actually doing some data center work with, on the Specialty Contractors segment side. We're exploring ways to expand that currently. You know, we wanna make sure that we don't give up the core market because we know at one day that, you know, and who knows how long down the road that will be, whether it's 5 years or 10 years down the road, that, you know, the data center work at some point in time probably won't be there, at least not as strong as it is now.
Speaker #5: And we are looking to we're exploring ways to expand that. Currently, so we want to make sure that we don't give up the core market because we know one day that and who knows how long down the road that will be, whether it's five years or 10 years down the road, that the data center work at some point in time probably won't be there, at least not as strong as it is now.
Speaker #5: So we want to make sure that we're still well positioned to do the work that is our standard bread and butter. But at the same time, the data center work is very exciting for us.
Gary Smalley: We wanna make sure that, you know, we're still well-positioned to do the work that is our, you know, standard bread and butter. At the same time, the data center work is very exciting for us. We see it as an opportunity that where we can expand margins and increase revenue as well. We're, you know, looking at it very closely, and I think not too far down the road, certainly before the year is up, you'll hear more from us as far as maybe, you know, new strategy to explore some of that market. Or at least explore it more.
Gary Smalley: We wanna make sure that, you know, we're still well-positioned to do the work that is our, you know, standard bread and butter. At the same time, the data center work is very exciting for us. We see it as an opportunity that where we can expand margins and increase revenue as well. We're, you know, looking at it very closely, and I think not too far down the road, certainly before the year is up, you'll hear more from us as far as maybe, you know, new strategy to explore some of that market. Or at least explore it more.
Speaker #5: We see it as a opportunity that where we can expand margins and increase revenue as well. So we're so we're looking at it very closely.
Speaker #5: And I think not too far down the road, certainly for the years up, you'll hear more from us as far as maybe new strategy to explore some of that market.
Speaker #5: Or at least explore it more—what we're already doing. And we'll talk more publicly about it at some point, too. We're just not quite there, but we're getting closer.
Min Cho: Great. Thank you so much
Min Cho: Great. Thank you so much
Gary Smalley: than what we're already doing. We'll talk more publicly about it at some point too. We just, we're not quite there, but we're getting closer.
Gary Smalley: than what we're already doing. We'll talk more publicly about it at some point too. We just, we're not quite there, but we're getting closer.
Speaker #7: Great. Thanks for the caller.
Ryan Soroka: Great. Thanks for the color.
Min Cho: Great. Thanks for the color.
Speaker #5: Thank you.
Gary Smalley: Thank you.
Gary Smalley: Thank you.
Speaker #3: Our last question is from Adam Talheimer. With Thompson Davis. Please proceed with your question.
Operator: Our last question is from Adam Thalhimer with Thompson Davis. Please proceed with your question.
Operator: Our last question is from Adam Thalhimer with Thompson Davis. Please proceed with your question.
Speaker #8: Hey, good afternoon, guys. Great quarter.
Adam Thalhimer: Hey, good afternoon, guys. Great quarter.
Adam Thalhimer: Hey, good afternoon, guys. Great quarter.
Speaker #5: Yeah, thanks, Adam. We're happy.
Gary Smalley: Yeah, thanks, Adam.
Gary Smalley: Yeah, thanks, Adam.
Ryan Soroka: Thanks.
Ryan Soroka: Thanks.
Gary Smalley: We're happy.
Gary Smalley: We're happy.
Speaker #8: Okay. I liked Min's question. Can I just keep going on that? Are you thinking that you might look at data center work for other segments or just within the specialties?
Adam Thalhimer: Good. I liked Min's question. Can I just keep going on that? What are you thinking that you might look at data center work for other segments or just within the specialties?
Adam Thalhimer: Good. I liked Min's question. Can I just keep going on that? What are you thinking that you might look at data center work for other segments or just within the specialties?
Speaker #5: Yeah. Right now, it's a little too early to get out in front of any more than what I said, Adam. But specialty is probably where we see the most, we'll say, current type opportunities.
Gary Smalley: Yeah. Right now it's a little too early to, you know, get out in front of, you know, any more than what I said, Adam. Specialty is probably where we see, you know, the most, we'll say, current type opportunities. We're looking at other areas as well. It's something that, you know, we're talking about as management. We'll talk more about it with the board as we learn a little bit more. Certainly there's a lot of excitement internally as we look at opportunities that could be out there for Tutor Perini.
Gary Smalley: Yeah. Right now it's a little too early to, you know, get out in front of, you know, any more than what I said, Adam. Specialty is probably where we see, you know, the most, we'll say, current type opportunities. We're looking at other areas as well. It's something that, you know, we're talking about as management. We'll talk more about it with the board as we learn a little bit more. Certainly there's a lot of excitement internally as we look at opportunities that could be out there for Tutor Perini.
Speaker #5: But we're looking at other areas as well, and it's something that we're talking about as management. We'll talk more about it with the Board as we learn a little bit more.
Speaker #5: But certainly, there's a lot of excitement internally as we look at opportunities that could be out there for two-to-printing.
Speaker #8: Okay. Great. The buyback, I was curious. Good to see you do 20 million in Q1. How would you like to pace that from here?
Adam Thalhimer: Okay. Great. The buyback, I was curious. Good to see you do $20 million in Q1. How would you like to pace that from here?
Adam Thalhimer: Okay. Great. The buyback, I was curious. Good to see you do $20 million in Q1. How would you like to pace that from here?
Speaker #5: Well, it's certainly something that what do we buy back at? $72 on average price, right? I think that's right. And so it's.
Gary Smalley: Well, it's certainly something that Would we buy back at $72 on average price, right, Ryan?
Gary Smalley: Well, it's certainly something that Would we buy back at $72 on average price, right, Ryan?
Ryan Soroka: That's right.
Ryan Soroka: That's right.
Ryan Soroka: I think that's right.
Gary Smalley: I think that's right.
Speaker #8: Nicely done.
Adam Thalhimer: Nicely done.
Adam Thalhimer: Nicely done.
Speaker #5: Yes. And there is some. It wasn't without some debate internally because we're a stock that has grown quite well over the last year or so.
Gary Smalley: Yes. We, you know, there are some. You know, it wasn't without some debate internally because, you know, we're a stock that has grown quite well over the last year or so. Some of us, you know, felt a strong conviction to even buy with our own money, such as myself. I've done that a couple times in the last, you know, several months. For me it was pretty easy on the buyback. Now that we're, you know, 90-ish or something like that, you know, it's not as compelling for us. At the same time, we know that, you know, we've got a lot of upward trajectory that's to come.
Gary Smalley: Yes. We, you know, there are some. You know, it wasn't without some debate internally because, you know, we're a stock that has grown quite well over the last year or so. Some of us, you know, felt a strong conviction to even buy with our own money, such as myself. I've done that a couple times in the last, you know, several months. For me it was pretty easy on the buyback. Now that we're, you know, 90-ish or something like that, you know, it's not as compelling for us. At the same time, we know that, you know, we've got a lot of upward trajectory that's to come.
Speaker #5: And some of us felt a strong conviction to even buy with our own money, such as myself. And I've done that a couple of times in the last several months.
Speaker #5: So for me, it was pretty easy. On the buyback, now that we're 90-ish or something like that, it's not as compelling for us. But at the same time, we know that we've got a lot of upward trajectory that's to come.
Speaker #5: And so I think there will be we're going to be opportunistic and I think there will be opportunities in front of us. But we're not really planning it to say, "Okay, we're going to do X million dollars every quarter or six months." We'll just see where the opportunities are, weigh that with the cash needs and how quickly we're building our cash balances and then go from there.
Gary Smalley: I think there will be, you know, We're gonna be opportunistic, and I think there will be opportunities in front of us. We're not really planning it to say, "Okay, we're gonna do $X million every quarter or 6 months." We'll just see where the opportunities are, weigh that with, you know, the cash needs and how quickly we're building our cash balances and then, go from there. I know it's not a specific answer for you, but we're very aware that we've got a lot of room left with the buyback.
Gary Smalley: I think there will be, you know, We're gonna be opportunistic, and I think there will be opportunities in front of us. We're not really planning it to say, "Okay, we're gonna do $X million every quarter or 6 months." We'll just see where the opportunities are, weigh that with, you know, the cash needs and how quickly we're building our cash balances and then, go from there. I know it's not a specific answer for you, but we're very aware that we've got a lot of room left with the buyback.
Speaker #5: So, I know it's not a specific answer for you, but we're very aware that we've got a lot of room left with the buyback.
Speaker #5: We are very bullish on where the what the opportunities are right now with very bullish on what this what the share price could continue to do.
Gary Smalley: We are very bullish on where the what the opportunities are right now with, very bullish on, you know, what this, what the share price could continue to do. You know, either on a personal basis or a company basis, I think there'll be more, you know, coming. Again, we just don't know exactly when.
Gary Smalley: We are very bullish on where the what the opportunities are right now with, very bullish on, you know, what this, what the share price could continue to do. You know, either on a personal basis or a company basis, I think there'll be more, you know, coming. Again, we just don't know exactly when.
Speaker #5: So either on a personal basis or a company basis, I think there will be more coming. But again, we just don't know exactly when.
Speaker #8: Great. Ryan, the refinancing you said is coming in the next few months. Can you give us a sense for the target structure and potential interest rate savings?
Adam Thalhimer: Great. Ryan, the refinancing you said is coming in the next few months. Can you give us a sense for the target structure and potential interest rate savings?
Adam Thalhimer: Great. Ryan, the refinancing you said is coming in the next few months. Can you give us a sense for the target structure and potential interest rate savings?
Speaker #9: Yeah, sure. I think at this point, we're looking to refinance the notes one-to-one—maybe that could change a little. We're looking at an interest saving of somewhere between 400 or 500 basis points as we look at the marketplace.
Ryan Soroka: Yeah, sure. You know, I think at this point we're looking to refinance the notes 1 to 1. You know, maybe that could change a little. We're looking at, you know, an interest savings of somewhere between, you know, 400 or 500 basis points as we look at the marketplace. Again, a little, you know, there's still a little bit of volatility out there related to some of the geopolitical issues going on, so that remains to be seen. I think at the same time, what we also intend to do is take a look at our credit facility, right? Looking to upsize that and extend those maturities.
Ryan Soroka: Yeah, sure. You know, I think at this point we're looking to refinance the notes 1 to 1. You know, maybe that could change a little. We're looking at, you know, an interest savings of somewhere between, you know, 400 or 500 basis points as we look at the marketplace. Again, a little, you know, there's still a little bit of volatility out there related to some of the geopolitical issues going on, so that remains to be seen. I think at the same time, what we also intend to do is take a look at our credit facility, right? Looking to upsize that and extend those maturities.
Speaker #9: Again, a little there's still a little bit of volatility out there related to some of the geopolitical issues going on. So that remains to be seen.
Speaker #9: But I think, at the same time, what we also intend to do is take a look at our credit facility, right? And we're looking to upsize that and extend those maturities.
Speaker #9: So ultimately, the goal is to refinance the notes with significant interest savings and then extend the maturity and have some extend the maturity on the credit facility with significant extension and maturity as well.
Ryan Soroka: Ultimately the goal is to, you know, refinance the notes with significant interest savings and then extend the maturity and have some, extend the maturity on the credit facility with significant extension and maturity as well.
Ryan Soroka: Ultimately the goal is to, you know, refinance the notes with significant interest savings and then extend the maturity and have some, extend the maturity on the credit facility with significant extension and maturity as well.
Speaker #8: Okay. So our goal is to get somewhere with a six-handle compared to the horrible rate that we have right now on the bonds. Yep.
Adam Thalhimer: Okay.
Adam Thalhimer: Okay.
Gary Smalley: Our goal is to get somewhere with the 6 handle compared to, you know, the horrible rate that we have right now on the bonds.
Gary Smalley: Our goal is to get somewhere with the 6 handle compared to, you know, the horrible rate that we have right now on the bonds.
Adam Thalhimer: Yep. That'd be great. Last one for me. You gave the margin outlook for the other segments, Ryan, but I didn't hear it for Specialty. I was curious what the range is there that you're working towards. What % of their work now is for other TPC segments?
Adam Thalhimer: Yep. That'd be great. Last one for me. You gave the margin outlook for the other segments, Ryan, but I didn't hear it for Specialty. I was curious what the range is there that you're working towards. What % of their work now is for other TPC segments?
Speaker #8: That'd be great. And then last one for me, you gave the margin outlook for the other segments, Ryan, but I didn't hear it for specialty.
Speaker #8: I was curious what the range is there that you're working towards, and also, what percent of their work now is for other TPC segments?
Speaker #9: Sure. For 2026, we're probably looking in the we call it 1, 2, to 3 percent range. Ultimately, we expect that especially to get up into the 5 to 8 percent range.
Ryan Soroka: Sure. For 2026, we're probably looking in the, call it, 1% to 3% range. Ultimately, we expect that, you know, specialty to get up into the 5% to 8% range. I mean, look, we still have a little bit of overhang with some legacy disputes. That's why I'm, you know, kind of tempering 2026 in that 1% to 3% range. At this point, specialty's backlog, about two-thirds of it is with, you know, is on, call it other Tutor Perini subsidiary projects.
Ryan Soroka: Sure. For 2026, we're probably looking in the, call it, 1% to 3% range. Ultimately, we expect that, you know, specialty to get up into the 5% to 8% range. I mean, look, we still have a little bit of overhang with some legacy disputes. That's why I'm, you know, kind of tempering 2026 in that 1% to 3% range. At this point, specialty's backlog, about two-thirds of it is with, you know, is on, call it other Tutor Perini subsidiary projects.
Speaker #9: I mean, look, we still have a little bit of overhang with some legacy disputes. That's why I'm kind of tempering 2026 in that 1 to 3 percent range.
Speaker #9: And at this point, specialties backlog about two-thirds of it is with is on call it other two-to-printing subsidiary projects.
Speaker #8: Great. Thank you, guys.
Adam Thalhimer: Great. Thank you, guys.
Adam Thalhimer: Great. Thank you, guys.
Speaker #5: Thank you.
Speaker #9: Thank you.
Gary Smalley: Thank you.
Gary Smalley: Thank you.
Ryan Soroka: Thank you.
Ryan Soroka: Thank you.
Speaker #3: There are no further questions at this time. I would like to turn the floor back over to Gary Smalley for closing comments.
Operator: There are no further questions at this time. I would like to turn the floor back over to Gary Smalley for closing comments.
Operator: There are no further questions at this time. I would like to turn the floor back over to Gary Smalley for closing comments.
Speaker #5: Thank you, everyone, for your participation today. We look forward to continuing to deliver excellent results and to speaking with you again next quarter. Thanks again.
Gary Smalley: Thank you everyone for your participation today. We look forward to continuing to deliver excellent results and to speaking with you again next quarter. Thanks again.
Gary Smalley: Thank you everyone for your participation today. We look forward to continuing to deliver excellent results and to speaking with you again next quarter. Thanks again.
Operator: This concludes today's teleconference. You may disconnect your lines at this time. Thank you for your participation.
Operator: This concludes today's teleconference. You may disconnect your lines at this time. Thank you for your participation.