Q1 2026 Aya Gold & Silver Inc Earnings Call

Operator: Communications. Please go ahead.

Operator: Communications. Please go ahead.

Speaker #1: Communications. Please go ahead.

Speaker #2: Thank you, Operator, and welcome to everyone who has joined Aya's first quarter 2026 earnings conference call. Here with me today, I have Benoit Lassalle, President and CEO, Ugo Landry Tolstoch, Chief Financial Officer, Elias Elias, Chief Legal and Sustainability Officer, Raphael Beaudoin, Vice President of Operations, and David Lalonde, Vice President of Exploration.

[Company Representative] (Aya Gold & Silver): Thank you, operator, and welcome to everyone who has joined Aya's first quarter 2026 earnings conference call. Here with me today, I have Benoit La Salle, President and CEO; Ugo Landry-Tolszczuk, Chief Financial Officer; Elias Elias, Chief Legal and Sustainability Officer; Raphaël Beaudoin, Vice President of Operations; and David Lalonde, Vice President of Exploration. We will be referring to a presentation on this conference call, which is available via the webcast and is also posted on our website. As we will be making forward-looking statements during the call, please refer to the cautionary notes included in the presentation, news release, and MD&A, as well as the risk factors included in our annual information form.

Elizabeth Hamaue: Thank you, operator, and welcome to everyone who has joined Aya's first quarter 2026 earnings conference call. Here with me today, I have Benoit La Salle, President and CEO, Ugo Landry-Tolszczuk, Chief Financial Officer, Elias Elias, Chief Legal and Sustainability Officer, Raphaël Beaudoin, Vice President of Operations, and David Lalonde, Vice President of Exploration. We will be referring to a presentation on this conference call, which is available via the webcast and is also posted on our website. As we will be making forward-looking statements during the call, please refer to the cautionary notes included in the presentation, news release, and MD&A, as well as the risk factors included in our annual information form.

Speaker #2: We will be referring to a presentation on this conference call, which is available via the webcast and is also posted on our website. As we will be making forward-looking statements during the call, please refer to the cautionary notes included in the presentation, news release, and MD&A, as well as the risk factors included in our annual information form.

Speaker #2: Technical information in this presentation has been reviewed and approved by Raphael Beaudoin, Aya's Vice President of Operations, and David Lalande, Aya's Vice President of Exploration, both of whom are Aya's qualified persons as the finance international instruments 43101 standards of disclosure for I would also like to remind everyone that our presentation will be followed by a Q&A session.

[Company Representative] (Aya Gold & Silver): Technical information in this presentation has been reviewed and approved by Raphaël Beaudoin, Aya's Vice President of Operations, and David Lalonde, Aya's Vice President of Exploration, both of whom are Aya's qualified persons as defined under National Instrument 43-101, Standards of Disclosure for Mineral Projects. I would also like to remind everyone that our presentation will be followed by a Q&A session. With that, I would now like to turn the call over to Benoit La Salle.

Elizabeth Hamaue: Technical information in this presentation has been reviewed and approved by Raphaël Beaudoin, Aya's Vice President of Operations, and David Lalonde, Aya's Vice President of Exploration, both of whom are Aya's qualified persons as defined under National Instrument 43-101, Standards of Disclosure for Mineral Projects. I would also like to remind everyone that our presentation will be followed by a Q&A session. With that, I would now like to turn the call over to Benoit La Salle.

Speaker #2: With that, I would now like to turn the call over to Benoit Lassalle.

Speaker #3: Thank you, Elizabeth. Good morning, everyone. Thank you for assisting this Q1 2026 conference call. Let me summarize the quarter before we get through the presentation.

Benoit La Salle: Thank you, Isabelle. Good morning, everyone. Thank you for assisting this Q1 2026 conference call. Let me summarize the quarter before we get through the presentation. I think it's, we need to summarize this as Q1 is an exceptional quarter for Aya. It's an exceptional quarter knowing that Q1 is always the most difficult quarter for the company as we are at 2,200 meters above sea level in the mountains with lots of snow, rain, and wind. This year, due to the fact that we lost 5 days of operation due to weather-related situation, we still delivered an outstanding quarter. Aya delivered record revenue, record cash flow, expanding margin, rising silver price, and lower cash costs. We had a very strong Q1.

Benoit La Salle: Thank you, Isabelle. Good morning, everyone. Thank you for assisting this Q1 2026 conference call. Let me summarize the quarter before we get through the presentation. I think it's, we need to summarize this as Q1 is an exceptional quarter for Aya. It's an exceptional quarter knowing that Q1 is always the most difficult quarter for the company as we are at 2,200 meters above sea level in the mountains with lots of snow, rain, and wind. This year, due to the fact that we lost 5 days of operation due to weather-related situation, we still delivered an outstanding quarter. Aya delivered record revenue, record cash flow, expanding margin, rising silver price, and lower cash costs. We had a very strong Q1.

Speaker #3: I think it's we need to summarize this as Q1 is an exceptional quarter for Aya. It's an exceptional quarter knowing that Q1 is always the most difficult quarter for the company as we are at 2,200 meter above sea level in the mountains, with lots of snow and rain and wind.

Speaker #3: So this year, due to the fact that we lost five days of operation due to weather-related situation, we still delivered an outstanding quarter. Aya delivered record revenue, record cash flow, expanding margin, rising silver price, and lower cash costs.

Speaker #3: So we have a very strong Q1. And when you compare it to Q4 of last year, with Q1 of this year, on a per-day basis, the production per day is very similar, approaching 15,000 ounces.

Benoit La Salle: When you compare it to Q4 of last year with Q1 of this year, on a per day basis, the production per day is very similar, approaching 15,000 ounces. The reason the production is a little bit lower in Q1 is due to the fact that we lost an equivalent of about 5 days of production. When you look at the highlights, it's record revenue of CAD 117 million. It's record cash flow of CAD 70 million. It's a record net income after tax of CAD 49 million. It's a cash balance at the end of the quarter of unrestricted cash of CAD 172 million. It's a production of almost 1.5 million ounces for the quarter with record mining rates, you know, really strong quarter.

Benoit La Salle: When you compare it to Q4 of last year with Q1 of this year, on a per day basis, the production per day is very similar, approaching 15,000 ounces. The reason the production is a little bit lower in Q1 is due to the fact that we lost an equivalent of about 5 days of production. When you look at the highlights, it's record revenue of CAD 117 million. It's record cash flow of CAD 70 million. It's a record net income after tax of CAD 49 million. It's a cash balance at the end of the quarter of unrestricted cash of CAD 172 million. It's a production of almost 1.5 million ounces for the quarter with record mining rates, you know, really strong quarter.

Speaker #3: The reason the production is a little bit lower in Q1 is due to the fact that we lost an equivalent of about five days of production.

Speaker #3: But when you look at the highlights, it's record revenue of 117 million dollars. It's record cash flow of 70 million dollars. It's a record net income after tax of 49 million dollars.

Speaker #3: It's a cash balance at the end of the quarter of unrestricted cash of 172 million dollars. It's a production of almost 1.5 million ounces for the quarter.

Speaker #3: With record mining rates, really strong quarter, and as we have a record mining rates, we've also increased our stockpiles. So taking you to our presentation that we use, showing you some graphics, if we go to page four after the forward-looking statement, you see exactly what I've just said.

Benoit La Salle: As we have a record mining rates, we've also increased our stockpiles. Taking you to our presentation that we use, showing you some, you know, graphics, if we go to page 4 after the forward-looking statement, you see exactly what I just said. The record revenue in Q1 2026 at CAD 117 million. Compare that to last year at CAD 34 million. The net income of CAD 49 million compared to last year of CAD 7 million, with an EPS of CAD 0.33 fully diluted, CAD 0.34, CAD 0.33, or CAD 0.33 fully diluted and CAD 0.34 on a undiluted basis. When you look at Q1 of operating cash flow this year at CAD 70 million compared to last year, CAD 8 million. Very strong quarter. You see it on the right-hand side.

Benoit La Salle: As we have a record mining rates, we've also increased our stockpiles. Taking you to our presentation that we use, showing you some, you know, graphics, if we go to page 4 after the forward-looking statement, you see exactly what I just said. The record revenue in Q1 2026 at CAD 117 million. Compare that to last year at CAD 34 million. The net income of CAD 49 million compared to last year of CAD 7 million, with an EPS of CAD 0.33 fully diluted, CAD 0.34, CAD 0.33, or CAD 0.33 fully diluted and CAD 0.34 on a undiluted basis. When you look at Q1 of operating cash flow this year at CAD 70 million compared to last year, CAD 8 million. Very strong quarter. You see it on the right-hand side.

Speaker #3: The record revenue in Q1 2026 at 117 million compared that to last year at 34 million. The net income of 49 million compared to last year of 7 million, with an EPS of 33 dollars fully diluted, 34 at 33 dollars 33 cents, sorry, fully diluted, and 34 on a non-diluted basis.

Speaker #3: And when you look at Q1 of operating cash flow this year at 70 million, compared to last year, 8 million. So very strong quarter.

Speaker #3: You see it on the right-hand side. We'll show you the production profile as increased from Q1 2025, where we produced a million ounces of silver, to Q1 of 2026, where we're at a million 490,000 ounces.

Benoit La Salle: We're showing you the production profile has increased from Q1 2025, where we produced 1 million ounces of silver, to Q1 2026, where we're at 1,490,000 ounces. Of course, a little bit lower than Q4 of last year, because Q4 of last year had no weather-related event, whereas Q1 of this year had approximately 5 days of weather-related events. Moving on to the page, to page 5 of the, of the presentation, very interesting on the left-hand side, the quarterly mining tonnage. You know, we've always been saying that the mining has to follow the plant. The plant's production profile has been, you know, 30% to 40% above nameplate capacity, but the mine also, you know, needs to follow the plant.

Benoit La Salle: We're showing you the production profile has increased from Q1 2025, where we produced 1 million ounces of silver, to Q1 2026, where we're at 1,490,000 ounces. Of course, a little bit lower than Q4 of last year, because Q4 of last year had no weather-related event, whereas Q1 of this year had approximately 5 days of weather-related events. Moving on to the page, to page 5 of the, of the presentation, very interesting on the left-hand side, the quarterly mining tonnage. You know, we've always been saying that the mining has to follow the plant. The plant's production profile has been, you know, 30% to 40% above nameplate capacity, but the mine also, you know, needs to follow the plant.

Speaker #3: Of course, a little bit lower than Q4 of last year, because Q4 of last year had no weather-related event, whereas Q1 of this year had approximately five days of weather-related events.

Speaker #3: Moving on to the page to page five of the presentation, very interesting on the left-hand side, the quarterly mining tonnage. We've always been saying that the mining has to follow the plant.

Speaker #3: The plant's is the plant's production profile has been 30 to 40 percent above name plate capacity. But the mine also needs to follow the plant.

Speaker #3: And the mine is actually now exceeding the plant. So you see on the left-hand side, last year, we were running at 2,200 ton a day in Q4.

Benoit La Salle: The mine is actually now exceeding the plant. You see on the left-hand side, last year, we were running at 2,200 tons a day. In Q4, we were at 4,200 tons a day. Now by Q1 this quarter, we were running at 4,600 tons a day. Absolutely stellar performance from the mine, from the open pit, and from the underground mine. The grade is also steady and improving. We're pleased with the outcome of the mining and the grade and the throughput. On the right-hand side, you look at the plant. Well, in Q4, the plant was running at 3,800 tons a day. In Q1, the plant's running as well, and if not sometimes higher, but as indicated, because of the lost days.

Benoit La Salle: The mine is actually now exceeding the plant. You see on the left-hand side, last year, we were running at 2,200 tons a day. In Q4, we were at 4,200 tons a day. Now by Q1 this quarter, we were running at 4,600 tons a day. Absolutely stellar performance from the mine, from the open pit, and from the underground mine. The grade is also steady and improving. We're pleased with the outcome of the mining and the grade and the throughput. On the right-hand side, you look at the plant. Well, in Q4, the plant was running at 3,800 tons a day. In Q1, the plant's running as well, and if not sometimes higher, but as indicated, because of the lost days.

Speaker #3: We were at 4,200 ton a day. And now by Q1, this quarter, we were running at 4,600 ton a day. So absolutely stellar performance from the mine, from the open pit and from the underground mine.

Speaker #3: The grade is also steady and improving. So we're pleased with the outcome of the mining and the grade and the throughput. And then on the right-hand side, you look at the plant.

Speaker #3: Well, in Q4, the plant was running at 3,800 ton a day. In Q1, the plant's running as well. And if not sometimes higher, but as indicated, because of the lost days and if some of you have followed the weather in Morocco, it was extremely rare like they had two times the historical average rainfall and snowfall in all of Morocco.

Benoit La Salle: If some of you have followed the weather in Morocco, it was extremely rare. They had two times the historical average rainfall and snowfall in all of Morocco. I was there 2 weeks ago, the week before that, there was snow in Marrakech, which is absolutely, you know, rare. This is In one way, it was a little bit difficult on the actual production, but we now have more than 15 months of inventory of water at site, the rivers are still running. You know, being a little difficult on the production was a great situation for water management and for us and for all the country. All the water reservoirs have been filled.

Benoit La Salle: If some of you have followed the weather in Morocco, it was extremely rare. They had two times the historical average rainfall and snowfall in all of Morocco. I was there 2 weeks ago, the week before that, there was snow in Marrakech, which is absolutely, you know, rare. This is In one way, it was a little bit difficult on the actual production, but we now have more than 15 months of inventory of water at site, the rivers are still running. You know, being a little difficult on the production was a great situation for water management and for us and for all the country. All the water reservoirs have been filled.

Speaker #3: I was there two weeks ago, and the week before that, there was snow in Marrakech. Which is absolutely rare. So this is in one way it was a little bit difficult on the actual production, but we now have more than 15 months of inventory of water at site and the rivers are still running.

Speaker #3: So being a little difficult on the production, was a great situation for water management and for us and for all the country. Now, all the water reservoirs have been filled.

Speaker #3: Some of the reservoirs that had not seen water in many, many, many years are now full. So the water situation globally for the country was extremely good.

Benoit La Salle: Some of the reservoirs that had not seen water in many years are now full. The water situation globally for the country was extremely good. Moving on to slide number 6, a quick word on Boumadine. You know, at Boumadine, we are reclaiming the pyrite. The operation is going extremely well. We produced 127,000 ounces of silver and 1,757 ounces of gold. A little bit lower than what we wanted it to be. Again, weather related, because of course, the bad weather of Zgounder was also, you know, weather related at Boumadine.

Benoit La Salle: Some of the reservoirs that had not seen water in many years are now full. The water situation globally for the country was extremely good. Moving on to slide number 6, a quick word on Boumadine. You know, at Boumadine, we are reclaiming the pyrite. The operation is going extremely well. We produced 127,000 ounces of silver and 1,757 ounces of gold. A little bit lower than what we wanted it to be. Again, weather related, because of course, the bad weather of Zgounder was also, you know, weather related at Boumadine.

Speaker #3: Moving on to slide number six, a quick word on Boumadzin. At Boumadzin, we are reclaiming the pyrite. The operation is going extremely well. We produce 127,000 ounces of silver and 1,757 ounces of gold.

Speaker #3: A little bit lower than what we wanted it to be. Again, weather-related because, of course, the bad weather of Goundah was also weather-related in Boumadzin.

Speaker #3: And the other situation with Boumadzin is because we are exporting the pyrite tonnage the port in Morocco were shut down for one month because of weather, because of floods.

Benoit La Salle: The other situation with Bou Azouz is because we are exporting the pyrite tonnage, the port in Morocco was shut down for one month because of weather, because of floods. Of course, that's why, you know, the silver equivalent sold, if when you look at page 6, you see the silver equivalent produced of 227,000 ounces and only 50,000 ounces sold. One reason, exporting. If, you know, we produce it, we ship it to port, and then it stayed there because we could not ship it just because of very, very difficult weather. All of that is behind us. It's probably now going to rain next time in November or December. It's all behind us.

Benoit La Salle: The other situation with Bou Azouz is because we are exporting the pyrite tonnage, the port in Morocco was shut down for one month because of weather, because of floods. Of course, that's why, you know, the silver equivalent sold, if when you look at page 6, you see the silver equivalent produced of 227,000 ounces and only 50,000 ounces sold. One reason, exporting. If, you know, we produce it, we ship it to port, and then it stayed there because we could not ship it just because of very, very difficult weather. All of that is behind us. It's probably now going to rain next time in November or December. It's all behind us.

Speaker #3: So of course, that's why the silver equivalent sold when you look at page six, you see the silver equivalent produced of 227,000 ounces. And only 50,000 ounces sold.

Speaker #3: One reason exporting is we produce it, we ship it to port, and then it stayed there because we could not ship it just because of very, very difficult weather.

Speaker #3: All of that is behind us. It's probably now going to rain next time in November or December. It's all behind us. But the reality was that even at Boumadzin, we were a little bit affected, especially on the shipment of the concentrate to Asia.

Benoit La Salle: The reality was that even at Bou Azouz, we were a little bit affected, especially on the shipment of the concentrate to Asia. The Bou Azouz project is really an add-on to Zgounder. It's minimal CapEx. You know, very low cash cost. It's positive cash flow. The grade reconciliation is actually better. We have the gold grade is a little bit better. The silver grade is better than what we had in our model. Globally, it's a very profitable project and which is at the same time an ESG project 'cause we're cleaning all of the historical waste that was left there for many, many years. It's still going on, and it's accelerating now in Q2, Q3, and Q4.

Benoit La Salle: The reality was that even at Bou Azouz, we were a little bit affected, especially on the shipment of the concentrate to Asia. The Bou Azouz project is really an add-on to Zgounder. It's minimal CapEx. You know, very low cash cost. It's positive cash flow. The grade reconciliation is actually better. We have the gold grade is a little bit better. The silver grade is better than what we had in our model. Globally, it's a very profitable project and which is at the same time an ESG project 'cause we're cleaning all of the historical waste that was left there for many, many years. It's still going on, and it's accelerating now in Q2, Q3, and Q4.

Speaker #3: But the Boumadzin project is really an add-on to Goundah. It's minimal CapEx. Very, very low cash cost. It's positive cash flow. The grade reconciliation is actually better.

Speaker #3: We have the gold grade is a little bit better. The silver grade is better. Than what we had in our model. So globally, it's very profitable project.

Speaker #3: And which is at the same time an ESG project because we're cleaning all of the historical waste that was left there for many, many years.

Speaker #3: So it's still going on. And it's accelerating now in Q2, Q3, and Q4. We are accelerating the reclamation of the Boumadzin pyrite. Going to page seven of the presentation, this again coming back to last quarter, this is the most important slide, the one on the left, is the margin.

Benoit La Salle: We are accelerating the reclamation of the Boumadine. Going to page 7 of the presentation. This, again, coming back to last quarter, this is the most important slide. The one on the left is the margin. Look at the margins from Q1 2025 to Q1 2026. You know, we were working with a CAD 12 margin in Q1 2025 and staying at CAD 12 in Q2 2025, margins started going up to CAD 20 in Q3 2025, you saw to about CAD 40 in Q4 2025, margins right now are like CAD 63 in Q1 2026. Obviously, you are following the silver price, we're seeing that this is, you know, a very strong silver price at the moment, our costs are stable.

Benoit La Salle: We are accelerating the reclamation of the Boumadine. Going to page 7 of the presentation. This, again, coming back to last quarter, this is the most important slide. The one on the left is the margin. Look at the margins from Q1 2025 to Q1 2026. You know, we were working with a CAD 12 margin in Q1 2025 and staying at CAD 12 in Q2 2025, margins started going up to CAD 20 in Q3 2025, you saw to about CAD 40 in Q4 2025, margins right now are like CAD 63 in Q1 2026. Obviously, you are following the silver price, we're seeing that this is, you know, a very strong silver price at the moment, our costs are stable.

Speaker #3: Look at the margin from Q1 2025 to Q1 2026. We were working with a $12 margin. In Q1 last year, and staying at $12 in Q2 of last year.

Speaker #3: And then margins started going up to $20 in Q3. And then you saw to about $40 in Q4. And now margins right now are like 63 in Q1 of 2026.

Speaker #3: And obviously, you are following the silver price. And we're seeing that this is very, very it's a very strong silver price at the moment.

Speaker #3: And our costs are stable. We are not affected greatly by the war and the increase in fuel price. We are. Sinai went up a little bit.

Benoit La Salle: We are not affected greatly by the war and the increase in fuel price. Cyanide went up a little bit. We're gonna see that in Q2, but it's marginal. The main reason is our electricity is from the grid, and it's solar and wind. Like most companies are affected because they need to generate their own power at Zgounder, and it will be the same at Bou Azouz. The power is solar and wind. We do not expect costs to increase more than, you know, maybe CAD 1 an ounce if they do, if they increase by that much. The reason is really because of the source of energy.

Benoit La Salle: We are not affected greatly by the war and the increase in fuel price. Cyanide went up a little bit. We're gonna see that in Q2, but it's marginal. The main reason is our electricity is from the grid, and it's solar and wind. Like most companies are affected because they need to generate their own power at Zgounder, and it will be the same at Bou Azouz. The power is solar and wind. We do not expect costs to increase more than, you know, maybe CAD 1 an ounce if they do, if they increase by that much. The reason is really because of the source of energy.

Speaker #3: We're going to see that in Q2. But its marginal. The main reason is our electricity is from the grid. And it's solar and wind.

Speaker #3: So like most companies are affected because they need to generate their own power. At Goundah, and it will be the same at Boumadzin, the power is solar and wind.

Speaker #3: So we do not expect costs to increase more than maybe $1 an ounce if they increase by that much. And the reason is really because of the source of energy.

Speaker #3: On the right-hand side, you see the growth of revenue. And obviously, as I said, Q1 at 117 million US dollar of revenue, with a net income after tax of 49 million.

Benoit La Salle: On the right-hand side, you see the growth of revenue, obviously, as I said, Q1 at $117 million US dollar of revenue with a net income after tax of CAD 49 million. This is a very strong performance of revenue increasing. Of course, it's due to the silver price, as, you know, we understand what the production profile is, but that the silver price was extremely good in Q1. Our highest selling unit or selling price in Q1, at one point, we were able to sell, close to CAD 120 an ounce.

Benoit La Salle: On the right-hand side, you see the growth of revenue, obviously, as I said, Q1 at $117 million US dollar of revenue with a net income after tax of CAD 49 million. This is a very strong performance of revenue increasing. Of course, it's due to the silver price, as, you know, we understand what the production profile is, but that the silver price was extremely good in Q1. Our highest selling unit or selling price in Q1, at one point, we were able to sell, close to CAD 120 an ounce.

Speaker #3: This is a very strong performance. Of revenue increasing of course, it's due to the silver price. As we understand what the production profile is.

Speaker #3: But the silver price is extremely good in Q1. Our highest selling unit or selling price in Q1 at one point, we were able to sell close to 120 an ounce.

Speaker #3: So it's showing. And now the average of 82, as we speak right now, the silver price is higher than the average of Q1 2026.

Benoit La Salle: It's showing and now the average of 82 as we speak right now, the silver price is higher than the average of Q1 2026. Well, net income after tax of $49 million with an EPS of $0.33. Taking us to page 8, a very strong balance sheet. We finished the quarter with $172 million dollar US in the bank. On top of that, we have the restricted cash that we have for the EBRD loan of $16 million US.

Benoit La Salle: It's showing and now the average of 82 as we speak right now, the silver price is higher than the average of Q1 2026. Well, net income after tax of $49 million with an EPS of $0.33. Taking us to page 8, a very strong balance sheet. We finished the quarter with $172 million dollar US in the bank. On top of that, we have the restricted cash that we have for the EBRD loan of $16 million US.

Speaker #3: And the net income, well, net income after tax of 49 million, with an EPS of 33. Very taking us to page eight, a very strong balance sheet.

Speaker #3: We finished the quarter with 172 million US. In the bank. And on top of that, we have the restricted cash that we have for the EBRD loan of 16 million US.

Speaker #3: So when you look at this, it's a very, very strong cash position, a strong balance sheet. Only one debt with EBRD, which is now below 100 million dollars, and which we could pay, but it's a very, good and not so expensive loan.

Benoit La Salle: When you look at this, it's a very, very strong cash position, a strong balance sheet, only one debt with EBRD, which is now below CAD 100 million and which, you know, we could pay, but it's a very good and not so expensive loan with EBRD. There's no point in pushing the repayment of that debt. When you look at cash from operation at CAD 70 million, our capital expenditure program is CAD 4 million. The exploration and evaluation, exploration mainly is CAD 14 million. We had a very good quarter on exploration, and I'll talk about the drilling.

Benoit La Salle: When you look at this, it's a very, very strong cash position, a strong balance sheet, only one debt with EBRD, which is now below CAD 100 million and which, you know, we could pay, but it's a very good and not so expensive loan with EBRD. There's no point in pushing the repayment of that debt. When you look at cash from operation at CAD 70 million, our capital expenditure program is CAD 4 million. The exploration and evaluation, exploration mainly is CAD 14 million. We had a very good quarter on exploration, and I'll talk about the drilling.

Speaker #3: With EBRD. So there's no point in pushing the repayment of that debt. When you look at cash from operation at 70 million, our capital expenditure program is 4 million.

Speaker #3: The expiration and evaluation expiration mainly is 14 million. We had a very good quarter on expiration. And I'll talk about the drilling. But so all in all, when you look at this with an $18 cash cost and the all the capital expenditure behind us, it's a very, very profitable quarter.

Benoit La Salle: All in all, when you look at this with a CAD 18 cash cost and, you know, all the capital expenditure behind us, it's a very, very profitable quarter. Moving to page 9, which is our guidance. Our guidance is presented to you at the beginning of 2026. We are maintaining our guidance. We, though we are a little bit below where we wanted to be. In our production guidance, we knew that Q1 is always a little bit weaker than the rest of the year because of seasonality. We knew that, so that was part of our planning, and we're very comfortable with our guidance of 6.2 to 6.8 million ounces. The Zgounder production between 5.2 and 5.8.

Benoit La Salle: All in all, when you look at this with a CAD 18 cash cost and, you know, all the capital expenditure behind us, it's a very, very profitable quarter. Moving to page 9, which is our guidance. Our guidance is presented to you at the beginning of 2026. We are maintaining our guidance. We, though we are a little bit below where we wanted to be. In our production guidance, we knew that Q1 is always a little bit weaker than the rest of the year because of seasonality. We knew that, so that was part of our planning, and we're very comfortable with our guidance of 6.2 to 6.8 million ounces. The Zgounder production between 5.2 and 5.8.

Speaker #3: Moving to page nine, which is our guidance. So our guidance is was presented to you at the beginning of 2026. We are maintaining our guidance.

Speaker #3: We though we are a little bit below where we wanted to be. In our production guidance, we knew that Q1 is always a little bit weaker than the rest of the year because of seasonality.

Speaker #3: And we knew that. So that was part of our planning. And we're very comfortable with our guidance of 6.2 to 6.8 million ounces. The 5.8.

Speaker #3: The Boumadzin at 1 million ounces of silver equivalent. We're very comfortable with that. Now, when you look at the Goundah cash cost at 2150, I understand that we were at 18 this quarter.

Benoit La Salle: The Boumadine at 1 million ounces of silver equivalent. We're very comfortable with that. When you look at the Zgounder cash cost at CAD 21.50, I understand that we were at CAD 18 this quarter, but, you know, it's a question of the strip ratio, and we know that, you know, over time, we're gonna be a little bit higher than this. We're comfortable to say that the, on the guidance at CAD 21.50 is where it should be. The Boumadine cash cost at CAD 10.10. In Q4, it was CAD 6. In Q1 of this year, it's more like CAD 11. We're very close. We are also going to ramp up on quantity, and in ramping up on quantity, obviously, the cash cost per ounce will come down a little bit.

Benoit La Salle: The Boumadine at 1 million ounces of silver equivalent. We're very comfortable with that. When you look at the Zgounder cash cost at CAD 21.50, I understand that we were at CAD 18 this quarter, but, you know, it's a question of the strip ratio, and we know that, you know, over time, we're gonna be a little bit higher than this. We're comfortable to say that the, on the guidance at CAD 21.50 is where it should be. The Boumadine cash cost at CAD 10.10. In Q4, it was CAD 6. In Q1 of this year, it's more like CAD 11. We're very close. We are also going to ramp up on quantity, and in ramping up on quantity, obviously, the cash cost per ounce will come down a little bit.

Speaker #3: But it's a question of the strip ratio and we know that over time, we're going to be a little bit higher than this. So we're comfortable to say that on the guidance at 2150 is where it should be.

Speaker #3: The Boumadzin cash cost at 1010 in Q4, it was 6. In Q1 of this year, it's more like 11. We're very close. We are also going to ramp up on quantity.

Speaker #3: And in ramping up on quantity, obviously, the cash cost per ounce will come down a little bit. On the sustaining and growth capital, sustaining is about half.

Benoit La Salle: On the sustaining and growth capital, sustaining is about half, CAD 18 million, and growth capital is CAD 18 million for a total of CAD 36 million. The main growth capital is really we're pushing the ramp down, all the way down to the granite, so that we can go and reach those lower levels where we see high-grade silver. On the exploration expenditure, well, the budget is CAD 60 million. As you know, as a company, we plan to drill close to 240,000 meters this year. This is ongoing. We have always between 14 and 18 drills turning. David has a team of almost 400 people in exploration, including all the drillers.

Benoit La Salle: On the sustaining and growth capital, sustaining is about half, CAD 18 million, and growth capital is CAD 18 million for a total of CAD 36 million. The main growth capital is really we're pushing the ramp down, all the way down to the granite, so that we can go and reach those lower levels where we see high-grade silver. On the exploration expenditure, well, the budget is CAD 60 million. As you know, as a company, we plan to drill close to 240,000 meters this year. This is ongoing. We have always between 14 and 18 drills turning. David has a team of almost 400 people in exploration, including all the drillers.

Speaker #3: 18. And growth capital is 18 for a total of 36. The main growth capital is really we're pushing the ramp down all the way down to the granite.

Speaker #3: So that we can go and reach those lower levels where we see high-grade silver. And on the expiration expenditure, well, the budget is 60 million.

Speaker #3: As you know, as a company, we plan to drill close to 240,000 meters this year. This is ongoing. We have always between 14 and 18 drills starting.

Speaker #3: David has a team of almost 400 people in exploration, including all the drillers. So it's a large program, but we need that program to convert the resource at Boumadzin from inferred to measured and indicated for the feasibility study of next year.

Benoit La Salle: It's a large program, but we need that program to convert the resource at Boumadine from inferred to measured and indicated for the feasibility study of next year. Taking you to slide number 10. Where are we going this year? What are the priorities? Well, look, Boumadine is a top priority. We're very happy and very, you know, in an extremely good position that we can do Boumadine with no outside debt, no equity financing. We have the money available to push on Boumadine. We are pushing on the feasibility study, which we want to be ready for next year, 2027, and also the updated PEA, which will be ready by the end of June, beginning of July. We have, you know, we are stepping up on every aspect.

Benoit La Salle: It's a large program, but we need that program to convert the resource at Boumadine from inferred to measured and indicated for the feasibility study of next year. Taking you to slide number 10. Where are we going this year? What are the priorities? Well, look, Boumadine is a top priority. We're very happy and very, you know, in an extremely good position that we can do Boumadine with no outside debt, no equity financing. We have the money available to push on Boumadine. We are pushing on the feasibility study, which we want to be ready for next year, 2027, and also the updated PEA, which will be ready by the end of June, beginning of July. We have, you know, we are stepping up on every aspect.

Speaker #3: Taking you to slide number 10. Where are we going this year? What are the priorities? Well, look, Boumadzin, it's a top priority. We're very happy and very in an extremely good position that we can do Boumadzin with no outside debt, no equity financing.

Speaker #3: We have the money, available to push on Boumadzin. So we are pushing on the feasibility study. Which we want to be ready for next year, 2027.

Speaker #3: And also the updated PEA, which will be ready by the end of June, beginning of July. And so we have we are stepping up on every aspect.

Speaker #3: I always say every chapter of the study, make it water, TSF, energy, flow sheet, logistics, every chapter is being worked on. And as soon as it's ready, it's being executed.

Benoit La Salle: I always say every chapter of the study, make it water, DSS, energy, flow sheet, logistics. Every chapter is being worked on, and as soon as it's ready, it's being executed. The feasibility study is ongoing. We are, we have identified the contractors for the open pit. We have identified the contractors for the flow sheet. We will be going into detail engineering shortly. I mean, we, we are working with the, with our partners on logistics. All of that is moving towards completion of the feasibility next year and beginning of construction. On the drilling front at Boumadine, we drilled in Q1, obviously, 42,000 meters.

Benoit La Salle: I always say every chapter of the study, make it water, DSS, energy, flow sheet, logistics. Every chapter is being worked on, and as soon as it's ready, it's being executed. The feasibility study is ongoing. We are, we have identified the contractors for the open pit. We have identified the contractors for the flow sheet. We will be going into detail engineering shortly. I mean, we, we are working with the, with our partners on logistics. All of that is moving towards completion of the feasibility next year and beginning of construction. On the drilling front at Boumadine, we drilled in Q1, obviously, 42,000 meters.

Speaker #3: So the feasibility study is ongoing. We are we have identified the contractors for the open pit. We have identified the contractors for the flow sheet for we will be going into detail engineering shortly.

Speaker #3: I mean, we are working with our partners on logistics. All of that is moving towards completion of the feasibility next year and beginning of construction.

Speaker #3: On the drilling front at Boumadzin, we drilled in 20 in Q1, obviously, 42,000 meters. And this was the ramp up plus it was the one month of Ramadan, which we for during Ramadan, sometimes we do not drill as much.

Benoit La Salle: You know, this was the ramp up, plus it was the 1 month of Ramadan, which for during that Ramadan, sometimes we do not drill as much, and we do have a week off at the end of Ramadan. For Q1, we've drilled 42,000 meters. We're stepping up there because the objective is 180,000 meters for the main structure and an additional 20,000 meters on the regional play. That is being done, and we will be delivering on that. At Zgounder, the plan is, well, just, you know, be more efficient, control your costs, make sure that, you know, we maximize our revenue, that the mining is very precise, that there's no dilution.

Benoit La Salle: You know, this was the ramp up, plus it was the 1 month of Ramadan, which for during that Ramadan, sometimes we do not drill as much, and we do have a week off at the end of Ramadan. For Q1, we've drilled 42,000 meters. We're stepping up there because the objective is 180,000 meters for the main structure and an additional 20,000 meters on the regional play. That is being done, and we will be delivering on that. At Zgounder, the plan is, well, just, you know, be more efficient, control your costs, make sure that, you know, we maximize our revenue, that the mining is very precise, that there's no dilution.

Speaker #3: And we do have a week off at the end of Ramadan. So for Q1, we've drilled 42,000 meters. We're stepping up there. Because the objective is 180,000 meters for the main structure.

Speaker #3: And an additional 20,000 meters on the regional plate. So that is being done and we will be delivering on that. At Goundah, the plan is, well, just be more efficient.

Speaker #3: Control your costs. Make sure that we maximize our revenue. That the mining is very precise. That there's no dilution. And the key thing at $80 or $90 silver is let's not leave an ounce behind.

Benoit La Salle: The key thing at CAD 80 or CAD 90 silver is let's not leave an ounce behind and sterilize those ounces. We take it out. If it's between 50 and 80 gram per ton, we stockpile it. You know, we expense it. It's in the cash cost, but we stockpile it. If it is between 80 and, you know, the deposit grade, we put it through. We have a stockpile, we put it through the plant. It's extremely important for us to maximize what we're mining, the ounces that we're mining, and that's why we're running way above 4,000 tons per day and controlling costs. We've also been working on the tailings facility because originally the tailing was planned for 2,800 ton a day.

Benoit La Salle: The key thing at CAD 80 or CAD 90 silver is let's not leave an ounce behind and sterilize those ounces. We take it out. If it's between 50 and 80 gram per ton, we stockpile it. You know, we expense it. It's in the cash cost, but we stockpile it. If it is between 80 and, you know, the deposit grade, we put it through. We have a stockpile, we put it through the plant. It's extremely important for us to maximize what we're mining, the ounces that we're mining, and that's why we're running way above 4,000 tons per day and controlling costs. We've also been working on the tailings facility because originally the tailing was planned for 2,800 ton a day.

Speaker #3: And sterilize those ounces. We take it out. If it's between 50 and 80 gram per ton, we stockpile it. We don't we expense it.

Speaker #3: It's in the cash cost, but we stockpile it. And if it is between 80 and the deposit grade, we put it through. We have a stockpile and then we put it through the plant.

Speaker #3: So it's extremely important for us to maximize what we're mining, the ounces that we're mining, and that's why we're running way above 4,000 ton per day.

Speaker #3: And controlling costs. We've also been working on the tailings. Facility because originally the tailing was planned for 2,800 ton a day. We're now running close to 4,000 ton a day.

Benoit La Salle: We're now running close to 4,000 tons a day. We've decided to do the first phase of the tailings construction to increase the tailings capacity, and that will be done this summer. We will be all done over the summer. When you look on page 11 of where we are, we have Zgounder that will be producing life of mine, 6 million ounces a year, life of mine cash cost at CAD 16, AISC around CAD 19, life of mine, extremely profitable, and that is only from one structure. You will see sure in the coming weeks some more exploration results coming out of Zgounder because, of course, at Zgounder we would like to increase the life of mine from 11 years, hopefully, to 15 years and if possible, even increase the throughput.

Benoit La Salle: We're now running close to 4,000 tons a day. We've decided to do the first phase of the tailings construction to increase the tailings capacity, and that will be done this summer. We will be all done over the summer. When you look on page 11 of where we are, we have Zgounder that will be producing life of mine, 6 million ounces a year, life of mine cash cost at CAD 16, AISC around CAD 19, life of mine, extremely profitable, and that is only from one structure. You will see sure in the coming weeks some more exploration results coming out of Zgounder because, of course, at Zgounder we would like to increase the life of mine from 11 years, hopefully, to 15 years and if possible, even increase the throughput.

Speaker #3: So we've decided to do the first phase of the tailings construction to increase the tailings capacity. And that will be done this summer. We will be all done over the summer.

Speaker #3: So when you look on page 11 of where we are, we have Goundah that will be producing life of mine, 6 million ounces a year.

Speaker #3: Life of mine, cash cost at $16. ASIC around $19. Life of mine, extremely profitable. And that is only from one structure. You will see short in the coming weeks, some more exploration results coming out of Goundah because, of course, at Goundah, we would like to increase the life of mine from 11 years hopefully to 15 years.

Speaker #3: And if possible, even increase the throughput. Our development asset, Boumadzin, well, that is the PEA is being reviewed. The resource update will come with the PEA.

Benoit La Salle: Our development asset, Boumadine, well, that is the PEA is being reviewed. The resource update will come with the PEA. As of the end of 2024, we were looking at 450 million ounces of silver equivalent. That will be updated 'cause we've drilled more than one year the structure. That will be updated, and it will be included in the new PEA. On the right-hand side, to me, that's the most important strategic view of Aya, is we are currently a 6 million ounce producer at CAD 19 all-in life of mine at Zgounder. We will add to that by 2029, 37 million ounces of silver production equivalent at an all-in cost of CAD 14, making us a 43 million ounce producer, of course, silver equivalent.

Benoit La Salle: Our development asset, Boumadine, well, that is the PEA is being reviewed. The resource update will come with the PEA. As of the end of 2024, we were looking at 450 million ounces of silver equivalent. That will be updated 'cause we've drilled more than one year the structure. That will be updated, and it will be included in the new PEA. On the right-hand side, to me, that's the most important strategic view of Aya, is we are currently a 6 million ounce producer at CAD 19 all-in life of mine at Zgounder. We will add to that by 2029, 37 million ounces of silver production equivalent at an all-in cost of CAD 14, making us a 43 million ounce producer, of course, silver equivalent.

Speaker #3: As of the end of 2024, we were looking at 450 million ounces of silver equivalent. That will be updated because we've drilled more than one year the structure.

Speaker #3: So that will be updated and it will be included in the new PEA. But on the right-hand side to me, that's the most important strategic view of Aya is we are currently a 6 million ounce producer.

Speaker #3: At $19 all-in life of mine at Goundah. We will add to that by 2029, 37 million ounces of silver production equivalent. At an all-in cost of $14.

Speaker #3: Making us a 43 million ounce producer of course, silver equivalent. And that will have an average ASIC when you look at 20 or 19 for Goundah and 14 for Boumadzin, you're looking at mid-teens per an ASIC.

Benoit La Salle: That will have an average AISC when you look at 20 or 19 for Zgounder and 14 for Boumadine. You're looking at mid-teen for an AISC. Depending what silver price you want to assume, you can do the math. On top of that, Aya is a major exploration play. We have two districts. We have the Boumadine district, and we have the Zgounder district. Not only do you have two projects, you have two mines. You have the Zgounder mine, and you have the Boumadine in development mine. You have the Boumadine regional play, that is an extremely large play. We have 800 square kilometers. We will be drilling there, 20,000 meters, on the regional play. Of course, the 180 on the main zone that is infilled, though we are finding new zones.

Benoit La Salle: That will have an average AISC when you look at 20 or 19 for Zgounder and 14 for Boumadine. You're looking at mid-teen for an AISC. Depending what silver price you want to assume, you can do the math. On top of that, Aya is a major exploration play. We have two districts. We have the Boumadine district, and we have the Zgounder district. Not only do you have two projects, you have two mines. You have the Zgounder mine, and you have the Boumadine in development mine. You have the Boumadine regional play, that is an extremely large play. We have 800 square kilometers. We will be drilling there, 20,000 meters, on the regional play. Of course, the 180 on the main zone that is infilled, though we are finding new zones.

Speaker #3: Depending what silver price you want to assume, you can do the math. On top of that, Aya is a major exploration plate. We have two districts.

Speaker #3: We have the Boumadzin district. And we have the Goundah district. So not only do you have two projects, you have two mines. You have the Goundah mine and you have the Boumadzin in development mine.

Speaker #3: You have the Boumadzin regional plate. And that is an extremely large plate. We have 800 square kilometers. We will be drilling there 20,000 meters.

Speaker #3: On the regional plate, of course, the 180 on the main zone, that is infilled. Though we are last press release, we had identified a new zone.

Benoit La Salle: You saw in the last press release we had identified new zones. We will be pushing the drilling on the main zone, of course, up to 180,000 m. On the exploration on the regional, as we keep telling the team, you know, as soon as you have another structure where you want to really drill it out, just come back to the committee and to the management committee, and we will give you more budget. Boumadine as an exploration play is very unique. It's got big systems. The main zone is over 5.4 km. You have also SSRM, which is an 8-kilometer-long structure. I mean, we have very strong zone. TZ is a parallel zone, and it's also 5.4 km long. Boumadine is a major regional play.

Benoit La Salle: You saw in the last press release we had identified new zones. We will be pushing the drilling on the main zone, of course, up to 180,000 m. On the exploration on the regional, as we keep telling the team, you know, as soon as you have another structure where you want to really drill it out, just come back to the committee and to the management committee, and we will give you more budget. Boumadine as an exploration play is very unique. It's got big systems. The main zone is over 5.4 km. You have also SSRM, which is an 8-kilometer-long structure. I mean, we have very strong zone. TZ is a parallel zone, and it's also 5.4 km long. Boumadine is a major regional play.

Speaker #3: But we will be pushing the drilling on the main zone, of course. Up to 180,000 meters. And on the exploration on the regional, as we keep telling the team, as soon as you have another structure where you want to really drill it out, just come back to the committee and to the management committee and we will give you more budget.

Speaker #3: So Boumadzin as an exploration play is very unique. It's got big systems. The main zone is over 5.4 kilometer. You have also Assiram, which is an 8-kilometer long structure.

Speaker #3: I mean, we have very, very, very strong zone. TZ is a parallel zone and it's also 5.4-kilometer long. So Boumadzin is a major regional plate.

Speaker #3: And Goundah, well, Goundah is we've done a lot of work. We've done a lot of geological work. We've used AI. We have many targets.

Benoit La Salle: Well, Zgounder is, we've done a lot of work. We've done a lot of geological work. We've used AI. We have many targets. We have new theories and new geological concept behind Zgounder that we're going to be testing this year. It is also a very interesting geological play. In Aya, you have all the geological upside of a major exploration company drilling 230, 240 thousand ounces, 240 thousand meters of exploration drilling coming in 2026. Then you have the production coming from Zgounder, and you have the development at Boumadine. Again, to conclude and to go into the Q&A period, very strong quarter. In our weakest quarter as planned, we are pleased with the production.

Benoit La Salle: Well, Zgounder is, we've done a lot of work. We've done a lot of geological work. We've used AI. We have many targets. We have new theories and new geological concept behind Zgounder that we're going to be testing this year. It is also a very interesting geological play. In Aya, you have all the geological upside of a major exploration company drilling 230, 240 thousand ounces, 240 thousand meters of exploration drilling coming in 2026. Then you have the production coming from Zgounder, and you have the development at Boumadine. Again, to conclude and to go into the Q&A period, very strong quarter. In our weakest quarter as planned, we are pleased with the production.

Speaker #3: We have new theories. And new geological concepts beyond Goundah that we're going to be testing this year. So it is also a very interesting geological play.

Speaker #3: So in Aya, you have all the geological upside of a major, major exploration company drilling 230, 240,000 ounces 240,000 meters of exploration drilling coming in 2026.

Speaker #3: And then you have the production coming from Goundah and you have the development at Boumadzin. So again, to conclude and to go into the Q&A period, very strong quarter.

Speaker #3: In our weakest quarter, as planned, as planned, we are pleased with the production. We are confirming our guidance. And we look forward to a stronger Q2 and much stronger Q4 and Q5 to close the year again and based on the silver price it should be an extremely profitable year.

Benoit La Salle: We are confirming our guidance, and we look forward to a stronger Q2 and much stronger Q4 and Q5 to close the year again. Based on the silver price, it should be an extremely profitable year. Thank you, and I will turn it back to the operator for the Q&A period.

Benoit La Salle: We are confirming our guidance, and we look forward to a stronger Q2 and much stronger Q4 and Q5 to close the year again. Based on the silver price, it should be an extremely profitable year. Thank you, and I will turn it back to the operator for the Q&A period.

Speaker #3: So thank you. And I will turn it back to the operator for the Q&A period.

Speaker #1: Thank you. If you'd like to ask a question, please press star 11. If your question has been answered and you'd like to remove yourself from the queue, please press star 11 again.

Operator: Thank you. If you'd like to ask a question, please press star one one. If your question has been answered and you'd like to remove yourself from the queue, please press star one one again. Our first question comes from the line of Larry Lu with CIBC. Your line is open.

Operator: Thank you. If you'd like to ask a question, please press star one one. If your question has been answered and you'd like to remove yourself from the queue, please press star one one again. Our first question comes from the line of Larry Lu with CIBC. Your line is open.

Speaker #1: Our first question comes from the line of Larry Liu with CIBC. Your line is open.

Speaker #3: Hi, Taiwan team. Thanks for taking my question. I guess I'll start off asking about the severe weather conditions. So Ben, what can you tell us?

Larry Lu: Hi, Valentin. Thanks for taking my question. I guess I'll start off asking about the severe weather conditions. Benoit, can you tell us, you know, what are some of the precautionary measures now that the team have taken? I know you mentioned that this is a very rare event, but are there any precautionary measures you've taken to prevent any further impact to your current operations? I guess second part of that question is your stockpile did increase by 44% or 15-month worth of production. Is there an optimal, you know, kind of size of stockpile you're looking for, or should we start to see it gradually decline as the milling throughput comes back up again?

Larry Liu: Hi, Valentin. Thanks for taking my question. I guess I'll start off asking about the severe weather conditions. Benoit, can you tell us, you know, what are some of the precautionary measures now that the team have taken? I know you mentioned that this is a very rare event, but are there any precautionary measures you've taken to prevent any further impact to your current operations? I guess second part of that question is your stockpile did increase by 44% or 15-month worth of production. Is there an optimal, you know, kind of size of stockpile you're looking for, or should we start to see it gradually decline as the milling throughput comes back up again?

Speaker #3: What are some of the precautionary measures now that a team has taken? I know you mentioned that this is a very rare event, but are there any precautionary measures you've taken to prevent any further impact to your current operations?

Speaker #3: And I guess second part of that question is your stockpile did increase by 44% or 15-month worth of production. Is there an optimal kind of size of stockpile you're looking for or should we start to see it gradually decline as the milling throughput comes back up again?

Speaker #4: Yeah. Thank you for your question. I'll pass it over to Ralph who was at site for all of that period and we'll tell you what we have done to mitigate the risk of weather-related events and what it does to our production profile, which is only in Q1, by the way, because after that, it's sunshine for the rest of the year.

Benoit La Salle: Thank you for your question. I'll pass it over to Ralph, who was at site for all of that period, and will tell you what we have done to mitigate the risk of weather-related events and what it does to our production profile, which is only in Q1, by the way, 'cause after that, it's sunshine for the rest of the year.

Benoit La Salle: Thank you for your question. I'll pass it over to Ralph, who was at site for all of that period, and will tell you what we have done to mitigate the risk of weather-related events and what it does to our production profile, which is only in Q1, by the way, 'cause after that, it's sunshine for the rest of the year.

Speaker #5: So we're in the mountain and as a good mountain climate, when it rained, it pours. So that essentially results into stickiness of the ore and decreases throughput of the crushing circuit.

Raphaël Beaudoin: We're in the mountain and, as a good mountain climate when it rain, it pours. That essentially results into stickiness of the ore and decreases throughput of the crushing circuit. To catch up, and it's something we've been working on for a while to increase the crushing throughput, which is the actual bottleneck in the plant. We did in Q1, 3,633 ton per day on average in Q1, and as soon as sunshine came back in April, we're back on track at 4,000 right there in April. The worst is behind us for the rest of the year, essentially.

Raphaël Beaudoin: We're in the mountain and, as a good mountain climate when it rain, it pours. That essentially results into stickiness of the ore and decreases throughput of the crushing circuit. To catch up, and it's something we've been working on for a while to increase the crushing throughput, which is the actual bottleneck in the plant. We did in Q1, 3,633 ton per day on average in Q1, and as soon as sunshine came back in April, we're back on track at 4,000 right there in April. The worst is behind us for the rest of the year, essentially.

Speaker #5: To catch up, and it's something we've been working on for a while to increase the crushing throughput, which is the actual bottleneck in the plant.

Speaker #5: We did in Q1 3,000, 633-ton per day on average in Q1 and as soon as sunshine came back in April, we're back on track at 4,000 right there in April.

Speaker #5: So the worst is behind us for the rest of the year, essentially. But to answer your question, to mitigate that, we gave a small contract to a contractor, a crushing contractor that is up in an operation now a bit as a contingency for weather and also to help de-bottleneck the plant a bit on the crushing side.

Raphaël Beaudoin: To answer your question, to mitigate that, we gave a small contract to a contractor, a crushing contractor that is up in operation now, a bit as a contingency for weather and also to help debottleneck the plant a bit from the crushing side. This contractor will stay there as long as we need it. We're also contemplating to increase our own crushing capacity within this Zgounder plant. That's something under study that we should be able to make a decision on that soon.

Raphaël Beaudoin: To answer your question, to mitigate that, we gave a small contract to a contractor, a crushing contractor that is up in operation now, a bit as a contingency for weather and also to help debottleneck the plant a bit from the crushing side. This contractor will stay there as long as we need it. We're also contemplating to increase our own crushing capacity within this Zgounder plant. That's something under study that we should be able to make a decision on that soon.

Speaker #5: So this contractor will stay there as long as we need it. And we're also contemplating to increase our own crushing capacity within this Goundah plant.

Speaker #5: And that's something under study. That we should be able to make decision on that soon. But bottom line is we have a contractor that helps us out since maybe a bit less than a month now that can compensate for a bit lower crushing capacity to make sure the plants remain saturated.

Raphaël Beaudoin: Bottom line is we have a contractor that helps us out since maybe a bit less than a month now that can compensate for a bit lower crushing capacity to make sure the plants remain saturated.

Raphaël Beaudoin: Bottom line is we have a contractor that helps us out since maybe a bit less than a month now that can compensate for a bit lower crushing capacity to make sure the plants remain saturated.

Speaker #4: And the stockpile?

Benoit La Salle: The stockpile?

Benoit La Salle: The stockpile?

Speaker #5: Oh, yeah. Sorry. So the stockpile, we set about 300,000-ton right now. It's close to a three-month worth of production. It's a buffer that I'm personally comfortable with.

Raphaël Beaudoin: Oh, yeah, sorry. The stockpile, we sit about 300,000 tons right now. It's close to a 3 months worth of production. It's a buffer that I'm personally comfortable with. We've been really pushing over the last year to bring the open pit to steady state. Now we're producing comfortably over 3,000 tons per day in the open pit, with peaks much above that. It gives us time to do the pushback if we want to later on this year. It gives us time to shut down upper levels in the underground that will be mined in the open pit. It's a flexibility that we always believed in that helped us out in many ways.

Raphaël Beaudoin: Oh, yeah, sorry. The stockpile, we sit about 300,000 tons right now. It's close to a 3 months worth of production. It's a buffer that I'm personally comfortable with. We've been really pushing over the last year to bring the open pit to steady state. Now we're producing comfortably over 3,000 tons per day in the open pit, with peaks much above that. It gives us time to do the pushback if we want to later on this year. It gives us time to shut down upper levels in the underground that will be mined in the open pit. It's a flexibility that we always believed in that helped us out in many ways.

Speaker #5: We've been really pushing over the last year to bring the open pit to steady state. Now we're producing comfortably over 3,000-ton per day in the open pit.

Speaker #5: We peaked much above that. It gives us time to do the pushback if we want to later on this year. It gives us time to shut down upper levels in the underground that will be mine in the open pit.

Speaker #5: So it's a flexibility that we always believe in, that helped us out in many ways. So to answer your question, 300,000-ton is probably where we want to be.

Raphaël Beaudoin: To answer your question, 300,000 tons is probably where we wanna be. It gives us the flexibility we need for future pushback and the flexibility to maximize again, the ore recovery by the open pit. Now that we've reached this capacity and this flexibility, we will look to continue optimizing the underground development, especially on the sub-levels. We can focus now more our efforts into the lower levels and keep the stockpile around 300,000. I wouldn't be surprised we see it go down a bit through the year, which is fine. That's why it's there.

Raphaël Beaudoin: To answer your question, 300,000 tons is probably where we wanna be. It gives us the flexibility we need for future pushback and the flexibility to maximize again, the ore recovery by the open pit. Now that we've reached this capacity and this flexibility, we will look to continue optimizing the underground development, especially on the sub-levels. We can focus now more our efforts into the lower levels and keep the stockpile around 300,000. I wouldn't be surprised we see it go down a bit through the year, which is fine. That's why it's there.

Speaker #5: It gives us the flexibility we need for future pushback and the flexibility to maximize, again, the ore recovery by the open pit. So now that we've reached this capacity and this flexibility, we will look to continue optimizing the underground development, especially on the sublevels.

Speaker #5: So we can focus now more our efforts into the lower levels and keep the stockpile around 300,000. I wouldn't be surprised to see it go down a bit through the year, which is fine.

Speaker #5: That's where it's there.

Speaker #3: Perfect. Sounds good. Thank you very much.

Larry Lu: Perfect. Sounds good. Thanks, Raphaël.

Larry Liu: Perfect. Sounds good. Thanks, Raphaël.

Raphaël Beaudoin: Sort of push back in the open pit towards the end of the year.

Raphaël Beaudoin: Sort of push back in the open pit towards the end of the year.

Speaker #5: Sort of push back in the open pit towards the end of the year.

Speaker #3: Perfect. Sounds good. Thanks, Rafael. I guess kind of shifting gears away from the Goundah now and walking back to Bumedin, this quarter, there was some commercialization of the pyrite concentrate.

Larry Lu: Perfect. Sounds good. Thanks, Raphaël. I guess, kind of shifting gears away from the Zgounder now and walking back to Boumadine. This quarter there was some commercialization of the pyrite concentrate. We see the cost come in at CAD 11.86 per ounce of silver equivalent. How should we look at it? I know it excludes mining, but how does that compare to your PEA, for example, and would this be a good read-through in terms of costs we should see within the feasibility study coming up?

Larry Liu: Perfect. Sounds good. Thanks, Raphaël. I guess, kind of shifting gears away from the Zgounder now and walking back to Boumadine. This quarter there was some commercialization of the pyrite concentrate. We see the cost come in at CAD 11.86 per ounce of silver equivalent. How should we look at it? I know it excludes mining, but how does that compare to your PEA, for example, and would this be a good read-through in terms of costs we should see within the feasibility study coming up?

Speaker #3: We see the cost come in at $11.86 per ounce of silver equivalent. How should we look at it? I know it excludes mining, but how does that compare to your PA, for example, and would this be a good read-through in terms of cost we should see within the feasibility study coming up?

Speaker #4: Well, for the current pyrite reclaim, we essentially dig a pyrite stockpile. We crush it and we send it in trucks. So our costs are really low.

Raphaël Beaudoin: Well, for the current pyrite reclaim, we essentially take a pyrite stockpile, we crush it, and we send it in trucks. Our costs are really low. Our costs will remain for the rest of the operation, it's tough to make a parallel with that with our future Boumadine project. It has nothing to do. This is a small project. It's gonna be reclaimed for the next 2 years. It gives good cash flow. It's a good exercise to start building a small operating team at Boumadine and to have more presence on our Boumadine site, as we go from PEA to feasibility to construction. One is not comparable with another.

Raphaël Beaudoin: Well, for the current pyrite reclaim, we essentially take a pyrite stockpile, we crush it, and we send it in trucks. Our costs are really low. Our costs will remain for the rest of the operation, it's tough to make a parallel with that with our future Boumadine project. It has nothing to do. This is a small project. It's gonna be reclaimed for the next 2 years. It gives good cash flow. It's a good exercise to start building a small operating team at Boumadine and to have more presence on our Boumadine site, as we go from PEA to feasibility to construction. One is not comparable with another.

Speaker #4: Our costs will remain for the rest of the operation but it's tough to make a parallel with that with our future Bumedin project. It has nothing to do this is a small project.

Speaker #4: It's going to be reclaimed for the next two years. It gives good cash flow. It's a good exercise to start building a small operating team at Bumedin and to have more presence on our Bumedin site.

Speaker #4: As we go from PA to feasibility to construction, but one is not comparable with another.

Speaker #3: Gotcha. Sounds good. All right. I think that's all the questions I have today. Thanks, Rafael, and thanks, Ben Wanting, for taking my question. Thank you.

Larry Lu: Gotcha. Sounds good. All right. I think that's all the questions I have today. Thanks, Raphaël Beaudoin, and thanks, Benoit La Salle team for taking my questions. Thank you.

Larry Liu: Gotcha. Sounds good. All right. I think that's all the questions I have today. Thanks, Raphaël Beaudoin, and thanks, Benoit La Salle team for taking my questions. Thank you.

Speaker #4: Thank you.

Raphaël Beaudoin: Thank you.

Raphaël Beaudoin: Thank you.

Speaker #1: Thank you. Our next question comes from Justin Chan. With SCP Resource Finance, your line is open.

Operator: Thank you. Our next question comes from Justin Chan with SCP Resource Finance. Your line is open.

Operator: Thank you. Our next question comes from Justin Chan with SCP Resource Finance. Your line is open.

Speaker #6: Hi, guys. Yeah. Congrats on a good quarter. Thanks for the update. My first one's just on, I guess, on the mine plan for the rest of the year.

Justin Chan: Hi, guys. Yeah, congrats on a good quarter, and thanks for the update. My first one's just on the, I guess, on the mine plan for the rest of the year. I guess, compared to Q1, how should we think about strip for the open pit? I saw the underground really pushed tons quite hard. Do you expect that to continue? I think you were foreshadowing maybe you're shifting more to development and into the lower level. Should we expect tons mined to come down a little bit from that high pace in Q1 from the underground?

Justin Chan: Hi, guys. Yeah, congrats on a good quarter, and thanks for the update. My first one's just on the, I guess, on the mine plan for the rest of the year. I guess, compared to Q1, how should we think about strip for the open pit? I saw the underground really pushed tons quite hard. Do you expect that to continue? I think you were foreshadowing maybe you're shifting more to development and into the lower level. Should we expect tons mined to come down a little bit from that high pace in Q1 from the underground?

Speaker #6: I guess compared to Q1, how should we think about strip for the open pit? And then I saw the underground really push tons quite hard.

Speaker #6: Do you expect that to continue? Or I think you were foreshadowing maybe you're shifting more to development and into the lower levels. So should we expect tons mine to come down a little bit from that high pace in Q1 from the underground?

Speaker #5: Hi, Justin. Yeah. Good question, actually. We've been as you all know, we've been pushing tonnage both in the underground, the open pit. We really wanted to bring back the stockpile we deserve, show everybody we could have a good we could have a good throughput as Goundah both in the open pit, in the underground, in the plant.

Raphaël Beaudoin: Hi, Justin. Yeah, good question, actually. It's, we've been, as you all know, we've been pushing tonnage both in the underground, the open pit. We really wanted to bring back the stockpile we deserve, show everybody we could have a good throughput at Zgounder, both in the open pit, in the underground, in the plant. I think those discussions are behind us now. We have full team on the ground. The open pit has showed it can deliver. Now the open pit is wide open. We have room to work. First for your strip ratio, we expect the long-term strip ratio to be what we published in our latest National Instrument 43-101. This strip ratio of 9, it's temporary.

Raphaël Beaudoin: Hi, Justin. Yeah, good question, actually. It's, we've been, as you all know, we've been pushing tonnage both in the underground, the open pit. We really wanted to bring back the stockpile we deserve, show everybody we could have a good throughput at Zgounder, both in the open pit, in the underground, in the plant. I think those discussions are behind us now. We have full team on the ground. The open pit has showed it can deliver. Now the open pit is wide open. We have room to work. First for your strip ratio, we expect the long-term strip ratio to be what we published in our latest National Instrument 43-101. This strip ratio of 9, it's temporary.

Speaker #5: And I think those discussions are behind us now. So we have a full team on the ground, the open pit has showed it can deliver.

Speaker #5: Now the open pit is wide open. We have room to work. So first, for your strip ratio, we expect the long-term strip ratio to be what we publish in our latest 43101.

Speaker #5: So this strip ratio of mine is temporary. We will have months at 8 or 9 like we have now, and we will have months at 20 like we had in the past.

Raphaël Beaudoin: We will have months at eight or nine like we have now, and we will have months at 20 like we had in the past. Overall, it's between 13 and 16, and this is what we expect, and this is what we expect on the longer term. Can you hear me, Justin?

Raphaël Beaudoin: We will have months at eight or nine like we have now, and we will have months at 20 like we had in the past. Overall, it's between 13 and 16, and this is what we expect, and this is what we expect on the longer term. Can you hear me, Justin?

Speaker #5: Overall, it's between 13 and 16, and this is what we expect and this is what we expect on the longer term. Can you hear me, Justin?

Speaker #6: Yeah. I can hear you well. Thanks, Raf.

Justin Chan: Yeah, I can hear you well. Thanks, Raph.

Justin Chan: Yeah, I can hear you well. Thanks, Raph.

Speaker #5: Oh, okay. And so for the underground, absolutely. We've been we've been at a rate of over 1,500-ton per day underground, and we have some of these levels that we want to shut them down because we want to increase the maximum ore recovery through the open pit.

Raphaël Beaudoin: Okay. For the underground, absolutely. We've been, you know, we've been at a rate of over 1,500 tons per day underground. We have some of these levels that we want to shut them down because we want to increase the maximum ore recovery through the open pit. To answer your question, yes, there will be a shift in focus in Q2 moving on for the rest of the year to accelerate the ramp down and to transfer some of this production power into stope development and sub-level development. We're comfortable at the underground rate, at around 1,000 tons per day is something we're comfortable with because the open pit is well established now. You can expect moving on to have the rate of the underground to slightly decrease.

Raphaël Beaudoin: Okay. For the underground, absolutely. We've been, you know, we've been at a rate of over 1,500 tons per day underground. We have some of these levels that we want to shut them down because we want to increase the maximum ore recovery through the open pit. To answer your question, yes, there will be a shift in focus in Q2 moving on for the rest of the year to accelerate the ramp down and to transfer some of this production power into stope development and sub-level development. We're comfortable at the underground rate, at around 1,000 tons per day is something we're comfortable with because the open pit is well established now. You can expect moving on to have the rate of the underground to slightly decrease.

Speaker #5: So to answer your question, yes, there will be a shift in focus. In Q2 moving on for the rest of the year, to accelerate the ramp down and to transfer some of this production power into stove development and sublevel development.

Speaker #5: We're comfortable that the underground rate at around 1,000-ton per day is something we're comfortable with because the open pit is well-established now. So you can expect you can expect moving on to have the rate of the underground to slightly decrease 1,000 to 12 to 1,300-ton per day is probably the sweet spot we need.

Raphaël Beaudoin: 1,000 to 12 to 1,300 tons per day is probably the sweet spot. We need to really focus on those sub-levels for which we also know we have pretty good grade going down.

Raphaël Beaudoin: 1,000 to 12 to 1,300 tons per day is probably the sweet spot. We need to really focus on those sub-levels for which we also know we have pretty good grade going down.

Speaker #5: To really focus on those sublevels, for which we also know we have pretty good grade going down.

Speaker #6: Okay. Gotcha. Thanks, Raf. That's great color. And on the plant, do you think you'll keep the mobile crushers around even when it gets dry?

Justin Chan: Okay. Gotcha. Thanks, Raph. That's great color. On the plant, do you think you'll keep the mobile crushers around even when it gets dry? What would your throughput potential be if that's the case?

Justin Chan: Okay. Gotcha. Thanks, Raph. That's great color. On the plant, do you think you'll keep the mobile crushers around even when it gets dry? What would your throughput potential be if that's the case?

Speaker #6: And what would your throughput potential be if that's the case?

Speaker #5: So again, what we publish in our feasibility is above 3,600 this year, and 3,850 next year. Internally, we're trying to beat that. We have our best days right now are around 4,300-ton per day.

Raphaël Beaudoin: Again, what we publish in our FS DOP is above 3,600 this year and 3,850 next year. Internally, we're trying to beat that. We have, like, our best days right now are around 4,300 ton per day. Those are punctual, like, best daily performance. Justin, the around 3,800 is probably where we'll be comfortably at in the near future. We're really pushing this plant. As you know, nameplate is 2,700. Now we're near 4,000. It's difficult for me to speculate above that because we need to go bottleneck after bottleneck. I think there's a bit of juice left in the plant, but we need extra crushing capacity for that.

Raphaël Beaudoin: Again, what we publish in our FS DOP is above 3,600 this year and 3,850 next year. Internally, we're trying to beat that. We have, like, our best days right now are around 4,300 ton per day. Those are punctual, like, best daily performance. Justin, the around 3,800 is probably where we'll be comfortably at in the near future. We're really pushing this plant. As you know, nameplate is 2,700. Now we're near 4,000. It's difficult for me to speculate above that because we need to go bottleneck after bottleneck. I think there's a bit of juice left in the plant, but we need extra crushing capacity for that.

Speaker #5: Those are punctual best daily performance. I think, Justin, around 3,800 is probably where we'll be comfortably at in the near future. And that will we're really pushing this plant, as you know, main plate is 2,700.

Speaker #5: Now we're near 4,000. It's difficult for me to speculate above that because we need to go bottleneck after bottleneck. I think there's a bit of juice left in the plant, but we need extra crushing capacity for that.

Speaker #5: So 3,800 is probably where we would be. Some good months above that, some bad months around that. But to answer your question, 3,800, including the mobile crusher that will keep as long as we need.

Raphaël Beaudoin: 3,800 is probably where we would be. Some good months above that, some bad months around that. To answer your question, 3,800, including the mobile crusher that we'll keep as long as we need.

Raphaël Beaudoin: 3,800 is probably where we would be. Some good months above that, some bad months around that. To answer your question, 3,800, including the mobile crusher that we'll keep as long as we need.

Speaker #6: Okay. Perfect. Thanks. And I'm not sure who's the best person to ask this question to, but on Bumedin, the I guess the answers that weren't sold this quarter, do you expect to sell them in Q2 or should that become spread through the rest of the year?

Justin Chan: Okay. Perfect. Thanks. I'm not sure who's the best person to ask this question to, but on Boumadine, the, I guess, the ounces that weren't sold this quarter, do you expect to sell them in Q2, or should that become spread through the rest of the year? Also, just given the world being pretty short of sulfur, will there be any noticeable increase in payability, do you think, for Q2 and Q3, or is it too early to say that?

Justin Chan: Okay. Perfect. Thanks. I'm not sure who's the best person to ask this question to, but on Boumadine, the, I guess, the ounces that weren't sold this quarter, do you expect to sell them in Q2, or should that become spread through the rest of the year? Also, just given the world being pretty short of sulfur, will there be any noticeable increase in payability, do you think, for Q2 and Q3, or is it too early to say that?

Speaker #6: And also, just given the world being pretty short of sulfur, will there be any noticeable increase in payability, do you think, for Q2 and 3, or is it too early to say that?

Speaker #5: Yeah. Hi, Justin. It's Ugo. Yeah. For sales of Bumedin, it's not that the clients don't want it. I think we get called every week, and they said, "Can we get more material?" So especially with what's happening in the sulfur market today.

Ugo Landry-Tolszczuk: Yeah. Hi, Justin, it's Ugo. For sales of Boumadine, it's not that the clients don't want it. I think we get called every week and they say, Can we get more material? Especially with what's happening in the sulfur market today. We are logistics by truck, like, we're learning it, so it's gonna be spread out throughout the year and we're trying to modify things a little bit to send larger shipments. And so that on that, I think it's gonna be put, it's gonna be through the year, but the 1 million ounces of silver equivalent is still what we're on track to do.

Ugo Landry-Tolszczuk: Yeah. Hi, Justin, it's Ugo. For sales of Boumadine, it's not that the clients don't want it. I think we get called every week and they say, Can we get more material? Especially with what's happening in the sulfur market today. We are logistics by truck, like, we're learning it, so it's gonna be spread out throughout the year and we're trying to modify things a little bit to send larger shipments. And so that on that, I think it's gonna be put, it's gonna be through the year, but the 1 million ounces of silver equivalent is still what we're on track to do.

Speaker #5: So we are logistics by truck. We're learning it, so it's going to be spread out throughout the year. And we're trying to modify things a little bit to send larger shipments.

Speaker #5: And so that on that, I think it's going to be it's going to be through the year, but the 1 million ounces of silver equivalent is still what we're on track to do.

Speaker #5: And in terms of payability, it's not going to change because it's old material that's been there for a long time. The sulfur quantity is a lot less than fresh rock from Bumedin.

Ugo Landry-Tolszczuk: In terms of payability, it's not gonna change because it's old material that's been there for a long time, the sulfur quantity is a lot less than fresh rock from Boumadine. The payabilities aren't gonna. The volumes are small on the 2 to 240,000 tons total. We've agreed on a price and on a contract for with our traders, and so that's not gonna change throughout the throughout that stockpile.

Ugo Landry-Tolszczuk: In terms of payability, it's not gonna change because it's old material that's been there for a long time, the sulfur quantity is a lot less than fresh rock from Boumadine. The payabilities aren't gonna. The volumes are small on the 2 to 240,000 tons total. We've agreed on a price and on a contract for with our traders, and so that's not gonna change throughout the throughout that stockpile.

Speaker #5: And so the payabilities aren't going to and the volumes are small on the 2 to 240,000-tons total. And so that we've agreed on a price and on a contract for with our traders.

Speaker #5: And so that's not going to change throughout the stockpile.

Speaker #3: So Justin, if I can add on payability, the payability is changing on the bigger projects.

Raphaël Beaudoin: Justin, if I can add on payability, the payability is changing on the bigger project.

Raphaël Beaudoin: Justin, if I can add on payability, the payability is changing on the bigger project.

Speaker #5: Yeah.

Raphaël Beaudoin: Yeah.

Raphaël Beaudoin: Yeah.

Speaker #3: Yeah. Because that has 45% sulfur. As Ugo said, the tailings is a bit worn down. So it's got very good gold and silver content.

Raphaël Beaudoin: Yeah. Because that has 45% sulfur. As Ugo said, the tailings is a bit worn down, so it's got very good gold and silver content. Pyrite is a bit tired, so it's not changing on the small project, but on the bigger project it is changing in an important way.

Raphaël Beaudoin: Yeah. Because that has 45% sulfur. As Ugo said, the tailings is a bit worn down, so it's got very good gold and silver content. Pyrite is a bit tired, so it's not changing on the small project, but on the bigger project it is changing in an important way.

Speaker #3: Pyrite is a bit tired. So it's not changing on the small project, but on the bigger project, it is changing in an important way.

Speaker #6: Yeah. Absolutely. Okay. Thanks very much. That's really helpful color. Thanks, Ugo, and thanks, Benoit. And thanks, overall. I'll forget the line.

Justin Chan: Yeah, absolutely. Okay, thanks very much. That's really helpful color. Thanks, Ugo, and thanks, Benoit. Thanks overall. I'll stay on the line.

Justin Chan: Yeah, absolutely. Okay, thanks very much. That's really helpful color. Thanks, Ugo, and thanks, Benoit. Thanks overall. I'll stay on the line.

Speaker #3: Thanks, Justin.

Raphaël Beaudoin: Thanks, Justin.

Raphaël Beaudoin: Thanks, Justin.

Speaker #1: Thanks.

Speaker #2: Thank you. Our next question comes from Mike Kozak with Cancer Fitzgerald. Your line is open.

Operator: Thank you. Our next question comes from Mike Kozak with Canaccord Genuity. Your line is open.

Operator: Thank you. Our next question comes from Mike Kozak with Canaccord Genuity. Your line is open.

Speaker #4: Yeah. Good morning, Benoit and team. A few questions for me. First one, Q1, it was the fourth quarter in a row where unit costs at Segunda are on a per-ton basis have trended down.

Mike Kozak: Yeah, good morning. Good morning, Benoit and team. A few questions from me. First one, Q1, it was the Q4 in a row where unit costs at Zgounder on a per ton basis have trended down. I mean, a portion of that is obviously more and more open pit material. I mean, they can settle in around CAD 80 a ton in Q1. You were north of CAD 100 a ton a few quarters ago. Is that CAD 80 a ton a good number going forward? Do you think it's gonna continue trending down, or where do you expect to settle out?

Mike Kozak: Yeah, good morning. Good morning, Benoit and team. A few questions from me. First one, Q1, it was the Q4 in a row where unit costs at Zgounder on a per ton basis have trended down. I mean, a portion of that is obviously more and more open pit material. I mean, they can settle in around CAD 80 a ton in Q1. You were north of CAD 100 a ton a few quarters ago. Is that CAD 80 a ton a good number going forward? Do you think it's gonna continue trending down, or where do you expect to settle out?

Speaker #4: I mean, a portion of that is obviously more and more open pit material. But I mean, they can settle in around $80 a ton in Q1.

Speaker #4: You were north of $100 a ton a few quarters ago. Is that $80 a ton a good number going forward? Do you think it's going to continue trending down, or where do you expect to settle out?

Speaker #5: I can comment a bit on the ounce unit cost. Our costs have been going down, and we're happy about that. Throughput has been going up, and production has been stabilizing in the open pit and the underground.

Raphaël Beaudoin: I can comment a bit on the ounce unit cost. Our costs have been going down, we're happy about that. Throughput has been going up, production has been stabilizing in the open pit and the underground. Now, a lot of that unit cost saving comes from the underground unit cost per ton, as well as the open pit unit cost per ton. We've also had gains in the plant as we process more throughput and stabilize our cyanide consumption. We've been winning on all front, including site services and surface and utilities. As we're towarding being more a mature operation, we're happy to see that.

Raphaël Beaudoin: I can comment a bit on the ounce unit cost. Our costs have been going down, we're happy about that. Throughput has been going up, production has been stabilizing in the open pit and the underground. Now, a lot of that unit cost saving comes from the underground unit cost per ton, as well as the open pit unit cost per ton. We've also had gains in the plant as we process more throughput and stabilize our cyanide consumption. We've been winning on all front, including site services and surface and utilities. As we're towarding being more a mature operation, we're happy to see that.

Speaker #5: Now, a lot of that unit cost saving comes from the underground unit cost per ton, as well as the open pit unit cost per ton, and we've also had gains in the plant, as we process more throughput and stabilize our cyanide consumption.

Speaker #5: So we've been winning on all fronts, including site services and surface and utilities. As we're towarding, being more mature operation, we're happy to see that.

Speaker #5: Now, that being said, there is a lot of cost fluctuation at Segunda based on the open pit strip ratio, as you can imagine. So depending on the sequencing, we have months now, this quarter's strip ratio was around 9, which is quite exceptional.

Raphaël Beaudoin: That being said, there is a lot of cost fluctuation at Zgounder based on the open pit strip ratio, as you can imagine. Depending on the sequencing, we have months. This quarter's strip ratio was around 9, which is quite exceptional. The overall strip ratio of the open pit gets better through the life of mine. Again, we've made that quite clear in our latest 43-101. It will increase slightly this year. Especially towards the end of the year, we'll have a bit higher strip ratio in the open pit, and I expect our strip ratio for the year to sit between 13 and 16.

Raphaël Beaudoin: That being said, there is a lot of cost fluctuation at Zgounder based on the open pit strip ratio, as you can imagine. Depending on the sequencing, we have months. This quarter's strip ratio was around 9, which is quite exceptional. The overall strip ratio of the open pit gets better through the life of mine. Again, we've made that quite clear in our latest 43-101. It will increase slightly this year. Especially towards the end of the year, we'll have a bit higher strip ratio in the open pit, and I expect our strip ratio for the year to sit between 13 and 16.

Speaker #5: The overall strip ratio of the open pit gets better through the life of mine. And again, we've made that quite clear in our latest 43101.

Speaker #5: But it will increase slightly this year. Towards, especially towards the end of the year, we'll have a bit higher strip ratio in the open pit, and I expect our strip ratio for the year to sit between 13 and 16.

Speaker #5: So we'll continue to improve our overall costs, but inherently, the open pit will be more expensive in terms of cost per ton because we'll converge more toward the 13 to 16 strip ratio as opposed to 9.

Raphaël Beaudoin: We'll continue to improve our overall cost, but inherently, the open pit will be more expensive in terms of cost per ton because we'll converge more toward the 13 to 16 strip ratio as opposed to 9. Let's not forget, underground, we need to develop new stopes. Now we have lower levels around 1925 that are operating, that costs are good. On the long term, the underground cost of the Zgounder mine will slowly creep up as we go deeper and deeper, which is also normal and captured in our projections.

Raphaël Beaudoin: We'll continue to improve our overall cost, but inherently, the open pit will be more expensive in terms of cost per ton because we'll converge more toward the 13 to 16 strip ratio as opposed to 9. Let's not forget, underground, we need to develop new stopes. Now we have lower levels around 1925 that are operating, that costs are good. On the long term, the underground cost of the Zgounder mine will slowly creep up as we go deeper and deeper, which is also normal and captured in our projections.

Speaker #5: And let's not forget underground. We need to develop new stoves. Now, we have lower levels, around 1925 that are operating, that costs are good, but on the long term, the underground cost of the Segunda mine will slowly creep up as we go deeper and deeper, which is also normal and captured in our projections.

Speaker #6: Okay. Thank you. That's good color. Second, what do you expect your average, now that you're making so much money, what do you expect your average income tax expense rate to be this year?

Mike Kozak: Okay. Thank you. That's good color. Secondly, what do you expect your average now that the You're making so much money, what do you expect your average income tax expense rate to be this year?

Mike Kozak: Okay. Thank you. That's good color. Secondly, what do you expect your average now that the You're making so much money, what do you expect your average income tax expense rate to be this year?

Raphaël Beaudoin: Hugo?

Raphaël Beaudoin: Hugo?

Speaker #5: Ugo? Yeah. So income tax rate, so I think five years ago, the government in Morocco when we were back at 20%, had put out a new law and said that it was going to increase to 35% being 2026, a 35%.

Raphaël Beaudoin: Yeah,

Raphaël Beaudoin: Yeah,

Ugo Landry-Tolszczuk: Yeah.

Ugo Landry-Tolszczuk: Yeah.

Ugo Landry-Tolszczuk: Income tax rate. I think 5 years ago, the government of Morocco, when we were back at 20%, had put out a new law and said that it was gonna get increased to 35%, being 2026 at 35%. During COVID, they added a 5% COVID tax, which got converted into a 5% Solidarity tax, which is supposed to be temporary. Okay, it's been 3 years now and going on a fourth year of that tax being in existence. We are one of 187 companies in Morocco that pay that tax rate. Everybody else that makes less than 100 million dirhams of profit pays 20%. We know there's the World Cup coming. I think the government, like all governments, needs money.

Ugo Landry-Tolszczuk: Income tax rate. I think 5 years ago, the government of Morocco, when we were back at 20%, had put out a new law and said that it was gonna get increased to 35%, being 2026 at 35%. During COVID, they added a 5% COVID tax, which got converted into a 5% Solidarity tax, which is supposed to be temporary. Okay, it's been 3 years now and going on a fourth year of that tax being in existence. We are one of 187 companies in Morocco that pay that tax rate. Everybody else that makes less than 100 million dirhams of profit pays 20%. We know there's the World Cup coming. I think the government, like all governments, needs money.

Speaker #5: Then during COVID, they added a 5% COVID tax, which got converted into a 5% solidarity tax. Which is supposed to be temporary, okay? It's been three years now and going on a fourth year of that tax being in existence.

Speaker #5: We are one of 187 companies in Morocco that pay that tax rate. Everybody else that makes less than $100 million dirhams of profit pays 20%.

Speaker #5: We know there's the World Cup coming. I think the government, like all governments, needs money. But more and more, we're starting to see companies like ourselves within the 127 that are saying, "Hey, 40% income tax is simply not competitive." And so our I would expect that 27 moving on, at least that 5% falls away, and then we'll see what happens with the additional tax rate.

Ugo Landry-Tolszczuk: More and more, we're starting to see companies like ourselves in, within the 127 that are saying, Hey, 40% income tax is simply not competitive. I would expect that 27 moving on, at least that 5% falls away, and then we'll see what happens with the additional tax rate. Yeah, it's our biggest cost today.

Ugo Landry-Tolszczuk: More and more, we're starting to see companies like ourselves in, within the 127 that are saying, Hey, 40% income tax is simply not competitive. I would expect that 27 moving on, at least that 5% falls away, and then we'll see what happens with the additional tax rate. Yeah, it's our biggest cost today.

Speaker #5: But yeah, it's our biggest cost today.

Speaker #6: Yeah. Got it. And then one more, if you don't mind, cash obviously building at a fast pace. Do you have any options available to you to accelerate repayment of the remaining EBRD debt?

Mike Kozak: Yeah. Got it. One more, if you don't mind. Cash obviously building at a fast pace. Do you have any options available to you to accelerate repayment of the remaining EBRD debt?

Mike Kozak: Yeah. Got it. One more, if you don't mind. Cash obviously building at a fast pace. Do you have any options available to you to accelerate repayment of the remaining EBRD debt?

Speaker #4: Yeah. So if we want to repay, like all debt, we have a there's prepayment penalties. We do have a slight out, is that we can do cash sweeps out of the country back to head office and we have a cash sweep of 30%.

Ugo Landry-Tolszczuk: If we wanna repay, like, all debt, we have a, there's prepayment penalties. We do have a slight out, is that we can do cash sweeps out of the country back to head office and we have a cash sweep of 30%. With that comes no prepayment. We have to do that at specific timings when we pay and when we repay capital in January and July. Assuming things continue like this, I think we're gonna be using that option to cash sweep money out of the country and then force a cash sweep and prepay some of that. That's the expectation. Capital cost cash has to keep going up. Assuming it does, I think that's an option we'll use.

Ugo Landry-Tolszczuk: If we wanna repay, like, all debt, we have a, there's prepayment penalties. We do have a slight out, is that we can do cash sweeps out of the country back to head office and we have a cash sweep of 30%. With that comes no prepayment. We have to do that at specific timings when we pay and when we repay capital in January and July. Assuming things continue like this, I think we're gonna be using that option to cash sweep money out of the country and then force a cash sweep and prepay some of that. That's the expectation. Capital cost cash has to keep going up. Assuming it does, I think that's an option we'll use.

Speaker #4: And with that comes no prepayment. So we have to do that at specific timings when we pay when we repay capital in January and July.

Speaker #4: So assuming things continue like this, I think we're going to be using that option to cash sweep money out of the country and then force a cash sweep and prepay something like that.

Speaker #4: That's the expectation. But cost, cash has to keep going up. But assuming it does I think that's an option we'll use.

Speaker #6: Okay. Very good. That's helpful. That's it for me. I'll jump back into you. Thanks.

Mike Kozak: Okay. Very good. That is helpful tip for me. I will jump back in queue. Thanks.

Mike Kozak: Okay. Very good. That is helpful tip for me. I will jump back in queue. Thanks.

Speaker #2: Thank you. Our next question comes from Eric Windmill with Scotiabank. Your line is open.

Operator: Thank you. Our next question comes from Eric Winmill with Scotiabank. Your line is open.

Operator: Thank you. Our next question comes from Eric Winmill with Scotiabank. Your line is open.

Speaker #5: Oh, hi, everyone. Thanks for taking my question today. Just wanted to ask quickly about the tailings. I know you're increasing capacity there. Can you just remind us how long that's going to get you, how much runway you'll have once that expansion's done?

Eric Winmill: Hi, everyone. Thanks for taking my question today. Just wanted to ask quickly about the tailings. I know you're increasing capacity there. Can you just remind us how long that's gonna get you? How much runway you'll have once that expansion's done?

Eric Winmill: Hi, everyone. Thanks for taking my question today. Just wanted to ask quickly about the tailings. I know you're increasing capacity there. Can you just remind us how long that's gonna get you? How much runway you'll have once that expansion's done?

Speaker #4: Sure. So the first phase was obviously a short one to keep capital costs throughout the initial construction. Phase two is our biggest raise. So we have well, we have about two years and a half of storage in it.

Raphaël Beaudoin: Sure. The first phase was obviously a short one to keep capital costs throughout the initial construction. Phase 2 is our biggest raise. Well, we have about 2 years and a half of storage in it. Obviously, it went down because throughput went up quite a bit. We have over 2 years and a half, after which we have another phase planned.

Raphaël Beaudoin: Sure. The first phase was obviously a short one to keep capital costs throughout the initial construction. Phase 2 is our biggest raise. Well, we have about 2 years and a half of storage in it. Obviously, it went down because throughput went up quite a bit. We have over 2 years and a half, after which we have another phase planned.

Speaker #4: Obviously, it went down because throughput went up quite a bit. So we have over two years and a half after which we have another phase planned.

Speaker #5: Okay. Great. Thank you very much. And maybe just on the Boomer Dean, so you're coming out with a new PEA. You said sort of May, June, or excuse me, June, July timeframe.

Eric Winmill: Okay, great. Thank you very much. Maybe just on the Boumadine, so you're coming out with a new PEA, you said, sort of May, June or excuse me, June, July timeframe. Any views on CapEx there? Should we expect meaningful changes from the last study that you put out?

Eric Winmill: Okay, great. Thank you very much. Maybe just on the Boumadine, so you're coming out with a new PEA, you said, sort of May, June or excuse me, June, July timeframe. Any views on CapEx there? Should we expect meaningful changes from the last study that you put out?

Speaker #5: Any views on CapEx there? Should we expect meaningful changes in the last study that you put out?

Speaker #4: Well, Ralph is with us today, and he's in charge of the team that's overseeing the Boomer Dean study. So I guess it's the right time to ask him.

Benoit La Salle: Well, Ralph is with us today, and he's in charge of the team that's overseeing the Boumadine study, so I guess it's the right time to ask him.

Benoit La Salle: Well, Ralph is with us today, and he's in charge of the team that's overseeing the Boumadine study, so I guess it's the right time to ask him.

Speaker #5: So in the PEA, we had a CapEx with a healthy contingency for that level of the study. And at that point, as we're advancing through this updated PEA and also the feasibility study, we will have some extra costs as we define and detail the project, but we'll also reduce the contingency as the project is well defined.

Raphaël Beaudoin: In the PEA, we had a CapEx with a healthy contingency for that level of the study. At that point, as we're advancing through this updated PEA and also the feasibility study, we will have some extra costs as we define and detail the project, but we'll also reduce the contingency as the project is well-defined. Right now we said that we don't expect capital to go higher than the PEA or sit in the same range.

Raphaël Beaudoin: In the PEA, we had a CapEx with a healthy contingency for that level of the study. At that point, as we're advancing through this updated PEA and also the feasibility study, we will have some extra costs as we define and detail the project, but we'll also reduce the contingency as the project is well-defined. Right now we said that we don't expect capital to go higher than the PEA or sit in the same range.

Speaker #5: So right now, we sit at we don't expect capital to go higher than the PEA or sit in the same range. Okay. Great. That's really helpful.

Eric Winmill: Okay, great. That's really helpful. Appreciate it. Maybe just one more on Zgounder as well. You're looking to increase crushing capacity. There any updates in terms of, you know, ordering of long lead time items or critical path items we should be looking at or maybe updates on the status, please?

Eric Winmill: Okay, great. That's really helpful. Appreciate it. Maybe just one more on Zgounder as well. You're looking to increase crushing capacity. There any updates in terms of, you know, ordering of long lead time items or critical path items we should be looking at or maybe updates on the status, please?

Speaker #5: Appreciate it. Maybe just one more on Segunda as well. So you're looking to increase crushing capacity there. Any updates in terms of ordering of long lead time items or critical path items we should be looking at, or maybe updates on the status, please?

Speaker #4: Well, the good news is we already have the process unit, the concrusher we have it. So that's a relief. And once we decide to go ahead with that expansion, we're probably looking to a nine-month expansion.

Raphaël Beaudoin: Well, the good news is we already have the process unit, the cone crusher, we have it. That's a relief. Once we decide to go ahead with that expansion, we're probably looking to a 9-month expansion. Yeah, it's something that can be done within, probably within 1 year. It's not really important because in the meantime we have the crushing contractor that then bridge that gap.

Raphaël Beaudoin: Well, the good news is we already have the process unit, the cone crusher, we have it. That's a relief. Once we decide to go ahead with that expansion, we're probably looking to a 9-month expansion. Yeah, it's something that can be done within, probably within 1 year. It's not really important because in the meantime we have the crushing contractor that then bridge that gap.

Speaker #4: So yeah, it's something that can be done within probably within a year. And it's not really important because in the meantime, we have the crushing contractor then bridge that gap.

Speaker #5: Okay. Fantastic. That's very helpful. I appreciate the added color. I'll hop back in the queue. Cheers.

Eric Winmill: Okay, fantastic. That's very helpful. I appreciate the added color. I'll hop back in the queue. Cheers.

Eric Winmill: Okay, fantastic. That's very helpful. I appreciate the added color. I'll hop back in the queue. Cheers.

Speaker #2: Ladies and gentlemen, that concludes our Q&A period. I would now like to turn the call back over to Benoit for closing remarks.

Operator: Ladies and gentlemen, that concludes our Q&A period. I would now like to turn the call back over to Benoit for closing remarks.

Operator: Ladies and gentlemen, that concludes our Q&A period. I would now like to turn the call back over to Benoit for closing remarks.

Speaker #5: Thank you, Operator. Thank you for all the questions. Look, what is coming for us now is I mentioned it. We'll have some exploration results coming.

Benoit La Salle: Thank you, operator. Thank you for all the questions. Look, what is coming for us now, as I mentioned it, we'll have some exploration results coming in the next few weeks. We'll have a Boumadine exploration press release in the next week or two. We'll have the same at Zgounder. We also are looking at in-country consolidation of ground because Morocco is very interesting. It's got fantastic geology, and we have a first-mover advantage, and we are taking advantage of this. You can expect some, you know, more news from us. You can, you know, we will be on the road for the coming two months meeting some of our shareholders in United States and in Europe.

Benoit La Salle: Thank you, operator. Thank you for all the questions. Look, what is coming for us now, as I mentioned it, we'll have some exploration results coming in the next few weeks. We'll have a Boumadine exploration press release in the next week or two. We'll have the same at Zgounder. We also are looking at in-country consolidation of ground because Morocco is very interesting. It's got fantastic geology, and we have a first-mover advantage, and we are taking advantage of this. You can expect some, you know, more news from us. You can, you know, we will be on the road for the coming two months meeting some of our shareholders in United States and in Europe.

Speaker #5: In the next few weeks, we'll have a Boomer Dean exploration press release. In the next week or two, we'll have the same at Segunda.

Speaker #5: We also are looking at in-country consolidation of ground because Morocco is very interesting. It's got fantastic geology. And we have a first mover advantage and we will we are taking advantage of this.

Speaker #5: So you can expect some more news from us. You can we will be on the road for the coming two months meeting some of our shareholders in the United States and in Europe.

Speaker #5: As you're fully aware, we started trading a week ago on our 10 days ago on NASDAQ. It's going extremely well. We're getting a lot of positive feedback.

Benoit La Salle: As you are fully aware, we started trading a week ago on or 10 days ago on Nasdaq. It's going extremely well. We're getting a lot of positive feedback, we're really pleased with the Nasdaq listing. Globally, again, I will close on this, you know, you have Aya is a company that is in Morocco, focusing in Morocco, where the geology is exceptional. You can see it on our discovery cost. There were some slides that were put together by a competitor recently on discovery cost, we have the lowest discovery cost in our industry because of the geology. The jurisdiction is probably one of the best in the world with the permitting, with the employees, with the people.

Benoit La Salle: As you are fully aware, we started trading a week ago on or 10 days ago on Nasdaq. It's going extremely well. We're getting a lot of positive feedback, we're really pleased with the Nasdaq listing. Globally, again, I will close on this, you know, you have Aya is a company that is in Morocco, focusing in Morocco, where the geology is exceptional. You can see it on our discovery cost. There were some slides that were put together by a competitor recently on discovery cost, we have the lowest discovery cost in our industry because of the geology. The jurisdiction is probably one of the best in the world with the permitting, with the employees, with the people.

Speaker #5: So we're really pleased with the NASDAQ listing. So globally, and again, I will close on this, you have a Aya is a company that is in Morocco focusing in Morocco.

Speaker #5: We're the geology is exceptional. You can see it on our discovery cost. There were some slides that were put together by a competitor recently on discovery cost.

Speaker #5: And we have the lowest discovery cost in our industry because of the geology. The jurisdiction is probably one of the best in the world with the permitting, with the employees, with the people.

Benoit La Salle: You know, we are in a country that does not just tolerate mining, but in a country where mining is part of their strategic plan, and they want it to be very successful. We have a team at Aya now, which has built many mines and has shown geological expertise. You have a very strong growth profile with Boumadine, you know, being developed and starting to be built in the next few quarters towards a 37 million ounces of annual production of silver equivalent coming at Boumadine, which is just from only one structure. You have beautiful growth profile in the company. You have core assets with two districts, the Boumadine District and the Zgounder District.

Benoit La Salle: You know, we are in a country that does not just tolerate mining, but in a country where mining is part of their strategic plan, and they want it to be very successful. We have a team at Aya now, which has built many mines and has shown geological expertise. You have a very strong growth profile with Boumadine, you know, being developed and starting to be built in the next few quarters towards a 37 million ounces of annual production of silver equivalent coming at Boumadine, which is just from only one structure. You have beautiful growth profile in the company. You have core assets with two districts, the Boumadine District and the Zgounder District.

Speaker #5: We are in a country that does not just tolerate mining, but in a country where mining is part of their strategic plan and they want it to be very successful.

Speaker #5: And you have it we have a team at Aya now which has built many, many mines. And as shown, geological expertise. So you have a very strong growth profile with Boomer Dean being developed and starting to be built.

Speaker #5: In the next few quarters, towards a 37 million ounces of annual production of silver equivalent. Coming at Boomer Dean, which is just from only one structure.

Speaker #5: So you have beautiful growth profile in the company. You have core assets with two districts, the Boomer Dean district and the Segunda district. And you have a company that will spend 60 million US in exploration drilling over 200,000 meters and over 230,000 meters this year.

Benoit La Salle: You have a company that will spend $60 million in exploration, drilling, you know, over 200,000 m and over 230,000 m this year. Major geological upside, strong cash flow, great core assets in one of the best jurisdictions in the world. Look, we will be coming back to follow Morocco in the World Cup of soccer or what they call football, because they have an amazing team, and that will be the topic of all the news flow coming out of Morocco for the next couple of months. Again, thank you so much for participating in this conference call. We look forward to seeing you at the Q2 call.

Benoit La Salle: You have a company that will spend $60 million in exploration, drilling, you know, over 200,000 m and over 230,000 m this year. Major geological upside, strong cash flow, great core assets in one of the best jurisdictions in the world. Look, we will be coming back to follow Morocco in the World Cup of soccer or what they call football, because they have an amazing team, and that will be the topic of all the news flow coming out of Morocco for the next couple of months. Again, thank you so much for participating in this conference call. We look forward to seeing you at the Q2 call.

Speaker #5: So major geological upside, strong cash flow, great core assets. In one of the best jurisdictions in the world. So look, we will be coming back to you.

Speaker #5: Follow Morocco in the World Cup of Soccer or what they call football because they have an amazing team and that will be the topic of all the newsflow coming out of Morocco for the next couple of months.

Speaker #5: So again, thank you so much for participating in this conference call. We look forward to seeing you at the Q2 call. And for many of you, we will be seeing you in all the conferences that are starting next week.

Benoit La Salle: For many of you, we will be seeing you in all the conferences that are starting next week, in Vegas and continuing to London the week after and on and on for the rest till the Rick Rule conference in July in Boca Raton. We should take a few weeks off for the summer. Thank you very much. We will see you in the coming weeks, and otherwise, we will see you at the Q2 conference call in August. Thank you.

Benoit La Salle: For many of you, we will be seeing you in all the conferences that are starting next week, in Vegas and continuing to London the week after and on and on for the rest till the Rick Rule conference in July in Boca Raton. We should take a few weeks off for the summer. Thank you very much. We will see you in the coming weeks, and otherwise, we will see you at the Q2 conference call in August. Thank you.

Speaker #5: In Vegas and continuing to London the week after and on and on for the rest till the Rick Rule Conference in July in Boca Raton.

Speaker #5: And then we should take a few weeks off for the summer. So thank you very much. We'll see you in the coming weeks. And we'll otherwise, we'll see you at the Q2 conference call in August.

Speaker #5: Thank you.

Operator: Thank you for your participation. You may now disconnect. Everyone, have a great day.

Operator: Thank you for your participation. You may now disconnect. Everyone, have a great day.

More AYA earnings call transcripts

Browse all earnings call transcripts

Q1 2026 Aya Gold & Silver Inc Earnings Call

Demo

Aya Gold & Silver

Earnings

Q1 2026 Aya Gold & Silver Inc Earnings Call

AYA.TO

Thursday, May 14th, 2026 at 2:00 PM

Transcript

No Transcript Available

No transcript data is available for this event yet. Transcripts typically become available shortly after an earnings call ends.

Want AI-powered analysis? Try AllMind →