Q2 2026 Aecon Group Inc Earnings Call

Operator: Good day, and thank you for standing by. Welcome to the Q2 2026 Aecon Group Inc. earnings call. At this time, all participants are in a listen-only mode. After the speaker's presentation, there will be a question-and-answer session. To ask a question during the session, you will need to press star one one on your telephone. You will then hear an automated message advising your hand is raised. To withdraw your question, please press star one one again. Please be advised that today's conference is being recorded. I would now like to hand the conference over to your first speaker today, Adam Borgatti, Senior Vice President, Corporate Development and Investor Relations. Please go ahead.

Speaker #1: After the speaker's presentation, there will be a question-and-answer session. To ask a question during the session, you will need to press *11 on your telephone.

Speaker #1: You will then hear an automated message advising that your hand is raised. To withdraw your question, please press *11 again. Please be advised that today's conference is being recorded.

Speaker #1: I would now like to hand the conference over to your first speaker today, Adam Borgatti, Senior Vice President of Corporate Development and Investor Relations. Please go ahead.

Speaker #2: Thank you, Dee Dee. Good morning, everyone, and thanks for participating in our Q2 2026 results conference call. Joining me are Jean-Louis Servranckx, President and CEO; Jerome Julier, Executive Vice President and CFO; and Alistair McCallum, Senior Vice President of Finance.

Adam Borgatti: Thank you, Didi. Good morning, everyone, thanks for participating in our Q2 2026 results conference call. Joining me are Jean-Louis Servranckx, President and CEO, Jerome Julier, Executive Vice President and CFO, and Alistair MacCallum, Senior Vice President of Finance. Our earnings announcement was released yesterday evening, we posted a slide presentation on our website, which we will refer to during the call. Following our comments, we will be happy to take questions from analysts, we ask that you keep to one question and a follow-up if necessary before getting back into the queue. As noted on slide two of the presentation, listeners are reminded that the information we are sharing with you today includes forward-looking statements based on assumptions that are subject to significant risks and uncertainties.

Adam Borgatti: Thank you, Didi. Good morning, everyone, thanks for participating in our Q2 2026 Results Conference Call. Joining me are Jean-Louis Servranckx, President and CEO, Jerome Julier, Executive Vice President and CFO, and Alistair MacCallum, Senior Vice President of Finance. Our earnings announcement was released yesterday evening, we posted a slide presentation on our website, which we will refer to during the call. Following our comments, we will be happy to take questions from analysts, we ask that you keep to one question and a follow-up if necessary before getting back into the queue. As noted on slide two of the presentation, listeners are reminded that the information we are sharing with you today includes forward-looking statements based on assumptions that are subject to significant risks and uncertainties.

Speaker #2: Our earnings announcement was released yesterday evening, and we've posted a slide presentation on our website which we will refer to during the call. Following our comments, we'll be happy to take questions from analysts, and we ask that you keep to one question and a follow-up if necessary, before getting back into the queue.

Speaker #2: As noted on slide 2 of the presentation, listeners are reminded that the information we're sharing with you today includes forward-looking statements based on assumptions that are subject to significant risks and uncertainties.

Speaker #2: While Aecon believes these expectations reflected in these statements are reasonable, we can give no assurance that these expectations will prove to be correct.

Adam Borgatti: Although Aecon believes these expectations reflected in these statements are reasonable, we can give no assurance that these expectations will prove to be correct. Turning to slide three. I am pleased to share key highlights from the quarter. Aecon delivered an all-time record for revenue in any quarter, with second quarter revenue of CAD 1.6 billion, increasing 25% over the same period last year. Adjusted EBITDA improved significantly in the quarter to CAD 82 million compared to CAD 41 million last year, driven by year-over-year margin improvements in the construction segment. Aecon entered into an agreement to purchase the convertible preferred equity investment held by Oaktree Capital Management in Aecon Utilities. The CAD 320 million purchase price implies a CAD 1.2 billion equity value and a CAD 1.5 billion enterprise value for Aecon Utilities.

Adam Borgatti: Although Aecon believes these expectations reflected in these statements are reasonable, we can give no assurance that these expectations will prove to be correct. Turning to slide three. I am pleased to share key highlights from the quarter. Aecon delivered an all-time record for revenue in any quarter, with Q2 revenue of CAD 1.6 billion, increasing 25% over the same period last year. Adjusted EBITDA improved significantly in the quarter to CAD 82 million compared to CAD 41 million last year, driven by year-over-year margin improvements in the construction segment. Aecon entered into an agreement to purchase the convertible preferred equity investment held by Oaktree Capital Management in Aecon Utilities. The CAD 320 million purchase price implies a CAD 1.2 billion equity value and a CAD 1.5 billion enterprise value for Aecon Utilities.

Speaker #2: Turning to slide 3, I'm pleased to share key highlights from the quarter. Aecon delivered an all-time record for revenue in any quarter, with second-quarter revenue of $1.6 billion, increasing 25% over the same period last year.

Speaker #2: Adjusted EBITDA improved significantly in the quarter to $82 million, compared to $41 million last year, driven by year-over-year margin improvements in the construction segment.

Speaker #2: Aecon entered into an agreement to purchase the convertible preferred equity investment held by Oaktree Capital in Aecon Utilities. The $320 million purchase price implies a $1.2 billion equity value and a $1.5 billion enterprise value for Aecon Utilities.

Speaker #2: Backlog at June 30 was $10.5 billion, underpinned by a diversified mix of long-term projects with appropriate risk balance and does not yet include Aecon's share of significant awards, including those under collaborative and progressive models, within or post-quarter, that will be added to future backlog.

Adam Borgatti: Backlog at 30 June was CAD 10.5 billion, underpinned by a diversified mix of long-term projects with appropriate risk balance, does not yet include Aecon's share of significant awards, including those under collaborative and progressive models within or post-quarter, that will be added to future backlog. The Gordie Howe International Bridge reached substantial completion in the second quarter and opened to traffic earlier this week on 27 July. A remarkable achievement by Aecon and its partners. An amicable and mutually agreeable settlement was reached in the second quarter on one of the remaining legacy projects to resolve disputes fully and finally. Aecon reinforces its positive outlook, supported by the expectation for double-digit revenue growth for the full year 2026, based on our strategic positioning in sectors with attractive demand profiles, growing recurring revenue programs, and a healthy pipeline of project opportunities.

Adam Borgatti: Backlog at 30 June was CAD 10.5 billion, underpinned by a diversified mix of long-term projects with appropriate risk balance, does not yet include Aecon's share of significant awards, including those under collaborative and progressive models within or post-quarter, that will be added to future backlog. The Gordie Howe International Bridge reached substantial completion in the Q2 and opened to traffic earlier this week on 27 July. A remarkable achievement by Aecon and its partners. An amicable and mutually agreeable settlement was reached in the Q2 on one of the remaining legacy projects to resolve disputes fully and finally. Aecon reinforces its positive outlook, supported by the expectation for double-digit revenue growth for the full-year 2026, based on our strategic positioning in sectors with attractive demand profiles, growing recurring revenue programs, and a healthy pipeline of project opportunities.

Speaker #2: The Gordie Howe International Bridge reached substantial completion in the second quarter and opened to traffic earlier this week, on July 27—a remarkable achievement by Aecon and its partners.

Speaker #2: And an amicable and mutually agreeable settlement was reached in the second quarter on one of the remaining legacy projects to resolve disputes fully and finally.

Speaker #2: Aecon reinforces its positive outlook, supported by the expectation for double-digit revenue growth for the full year 2026, based on our strategic positioning in sectors with attractive demand profiles, growing recurring revenue programs, and a healthy pipeline of project opportunities.

Speaker #2: And with that, I'll hand the call over to Jerome.

Adam Borgatti: With that, I'll hand the call over to Jerome.

Adam Borgatti: With that, I'll hand the call over to Jerome.

Speaker #3: Thanks, Adam, and good morning, everyone. I'll speak to Aecon's consolidated results, review results by segment, and address Aecon's financial position. Then, close of the summary of the utilities prep share purchase transaction.

Jerome Julier: Thanks, Adam, and good morning, everyone. I'll speak to Aecon's consolidated results, review results by segment, and address Aecon's financial position. Close with a summary of the utilities pref share purchase transaction. Turning to slide four. Revenue for the three months ended 30 June 2026, of CAD 1.6 billion was up CAD 329 million or 25% compared to the same period in 2025. This represents the highest recorded revenue by Aecon in any quarter in its history, approximately 80% of the revenue growth in the quarter was organically generated. Adjusted EBITDA of CAD 82 million doubles compared to CAD 41 million last year, operating profit of CAD 36 million compared to an operating profit of CAD 2 million in the same period last year. The improvement in the period was driven by higher gross profit of CAD 78 million compared to the same period in 2025.

Jerome Julier: Thanks, Adam, and good morning, everyone. I'll speak to Aecon's consolidated results, review results by segment, and address Aecon's financial position. Close with a summary of the utilities pref share purchase transaction. Turning to slide four. Revenue for the three months ended 30 June 2026, of CAD 1.6 billion was up CAD 329 million or 25% compared to the same period in 2025. This represents the highest recorded revenue by Aecon in any quarter in its history, approximately 80% of the revenue growth in the quarter was organically generated. Adjusted EBITDA of CAD 82 million doubles compared to CAD 41 million last year, operating profit of CAD 36 million compared to an operating profit of CAD 2 million in the same period last year. The improvement in the period was driven by higher gross profit of CAD 78 million compared to the same period in 2025.

Speaker #3: Turning to slide 4, revenue for the three months ended June 30, 2026, of $1.6 billion was up $329 million, or 25%, compared to the same period in 2025.

Speaker #3: This represents the highest recorded revenue by Aecon in any quarter in its history, and approximately 80% of the revenue growth in the quarter was organically generated.

Speaker #3: Adjusted EBITDA of $82 million doubled compared to $41 million last year, and operating profit of $36 million compared to an operating profit of $2 million in the same period last year.

Speaker #3: The improvement in the period was driven by higher gross profit of $78 million compared to the same period in 2025. Q2 2026 diluted loss per share of $1.58 is driven by a fair value adjustment on the preferred shares of Aecon Utilities of approximately $128 million, recorded upon reaching the agreement to purchase the shares.

Jerome Julier: Q2 2026 diluted loss per share of CAD 1.58 is driven by a fair value adjustment on the preferred shares of Aecon Utilities of approximately CAD 128 million recorded upon reaching the agreement to purchase the shares. This adjusted the carrying value to the agreed purchase price of CAD 320 million. Adjusted diluted earnings per share in the quarter, excluding this fair value adjustment, was CAD 0.33, an improvement compared to the adjusted diluted loss per share of CAD 0.10 in the Q2 of last year. Financial results in the quarter were impacted by CAD -4.5 million from the legacy projects. On an LTM or trailing 12-month basis, the negative impact from legacy projects was CAD -36 million. Backlog of CAD 10.5 billion at the end of the Q2 compares to backlog of CAD 10.7 billion at the same time last year.

Jerome Julier: Q2 2026 diluted loss per share of CAD 1.58 is driven by a fair value adjustment on the preferred shares of Aecon Utilities of approximately CAD 128 million recorded upon reaching the agreement to purchase the shares. This adjusted the carrying value to the agreed purchase price of CAD 320 million. Adjusted diluted earnings per share in the quarter, excluding this fair value adjustment, was CAD 0.33, an improvement compared to the adjusted diluted loss per share of CAD 0.10 in the Q2 of last year. Financial results in the quarter were impacted by CAD -4.5 million from the legacy projects. On an LTM or trailing 12-month basis, the negative impact from legacy projects was CAD -36 million. Backlog of CAD 10.5 billion at the end of the Q2 compares to backlog of CAD 10.7 billion at the same time last year.

Speaker #3: This adjusted the carrying value to the agreed purchase price of $320 million. Adjusted diluted earnings per share in the quarter excluding this fair value adjustment was 33 cents, an improvement compared to the adjusted diluted loss per share of 10 cents in the second quarter of last year.

Speaker #3: Financial results in the quarter were impacted by negative gross profit of $4.5 million from the legacy projects. On an LTM, or trailing 12-month basis, the negative impact from legacy projects was $36 million.

Speaker #3: Backlog of $10.5 billion at the end of the second quarter compares to backlog of $10.7 billion at the same time last year. New contract awards of $1.3 billion were booked in this quarter, and $2.7 billion were booked year-to-date.

Jerome Julier: New contract awards of CAD 1.3 billion were booked in this quarter. CAD 2.7 billion were booked year to date. Now looking at the results by segment. Turning to slide five. Construction revenue of CAD 1.6 billion in the Q2 was CAD 335 million, or 26% higher than the same period last year. Revenue was higher in all sectors, with the largest increase of CAD 138 million in utility operations, driven by a higher volume of electrical, gas, and telecommunication work in Canada and the US, including contributions from the acquisitions of KPC and Arc American, completed in the Q1 of 2026. Urban transportation solutions increased CAD 93 million, driven by a higher volume of subway and rail system work, as well as closeout activities on Ontario light rail transit projects that achieved substantial completion in 2025 and are now fully operational.

Jerome Julier: New contract awards of CAD 1.3 billion were booked in this quarter. CAD 2.7 billion were booked year to date. Now looking at the results by segment. Turning to slide five. Construction revenue of CAD 1.6 billion in the Q2 was CAD 335 million, or 26% higher than the same period last year. Revenue was higher in all sectors, with the largest increase of CAD 138 million in utility operations, driven by a higher volume of electrical, gas, and telecommunication work in Canada and the US, including contributions from the acquisitions of KPC and Arc American, completed in the Q1 of 2026. Urban transportation solutions increased CAD 93 million, driven by a higher volume of subway and rail system work, as well as closeout activities on Ontario light rail transit projects that achieved substantial completion in 2025 and are now fully operational.

Speaker #3: Now looking at the results by segment, turning to slide 5, construction revenue of $1.6 billion in the second quarter was $335 million, or 26% higher than the same period last year.

Speaker #3: Revenue was higher in all sectors, with the largest increase of $138 million in utility operations driven by a higher volume of electrical, gas, and telecommunication work in Canada and the US, including contributions from the acquisitions of KPC and ARC, completed in the first quarter of 2026.

Speaker #3: Urban transportation solutions increased 93 million, driven by a higher volume of subway and rail system work, as well as closed-out activities on Ontario light rail transit projects that achieved substantial completion in 2025 and are now fully operational.

Speaker #3: Nuclear operations increased $80 million, due to a higher volume of refurbishment, decommissioning, new build, and engineering services work at nuclear-generating stations across North America.

Jerome Julier: Nuclear operations increased CAD 80 million due to a higher volume of refurbishment, decommissioning, new build, and engineering services work at nuclear generating stations across North America. In civil operations, higher revenue of CAD 22 million was mainly from an increase in the civil component of power and rail projects, foundations work, and international major project work. Turning now to slide six. Construction segment adjusted EBITDA of CAD 90 million compared to CAD 40 million last year, with an adjusted EBITDA margin of 5.5% compared to 3.1% in 2025. The increase was primarily driven by an improvement in gross profit margin in urban transportation solutions and civil, and the gross profit impact of higher volumes in utilities. These increases were partially offset by lower gross profit margin in industrial and nuclear operations and higher MG&A to support our ongoing growth in operations. Turning to slide seven.

Jerome Julier: Nuclear operations increased CAD 80 million due to a higher volume of refurbishment, decommissioning, new build, and engineering services work at nuclear generating stations across North America. In civil operations, higher revenue of CAD 22 million was mainly from an increase in the civil component of power and rail projects, foundations work, and international major project work. Turning now to slide six. Construction segment adjusted EBITDA of CAD 90 million compared to CAD 40 million last year, with an adjusted EBITDA margin of 5.5% compared to 3.1% in 2025. The increase was primarily driven by an improvement in gross profit margin in urban transportation solutions and civil, and the gross profit impact of higher volumes in utilities. These increases were partially offset by lower gross profit margin in industrial and nuclear operations and higher MG&A to support our ongoing growth in operations. Turning to slide seven.

Speaker #3: In civil operations, higher revenue of $22 million was mainly from an increase in the civil component of power and rail projects, foundations work, and international major project work.

Speaker #3: Turning now to slide 6, construction segment adjusted EBITDA of $90 million, compared to $40 million last year, with an adjusted EBITDA margin of 5.5%, compared to 3.1% in 2025.

Speaker #3: The increase was primarily driven by an improvement in gross profit margin in urban transportation solutions and civil, and the gross profit impact of higher volumes in utilities.

Speaker #3: These increases were partially offset by lower gross profit margin in industrial and nuclear operations, and higher MG&A to support our ongoing growth in operations.

Speaker #3: Turning to slide 7, concessions adjusted EBITDA for the quarter was $11 million, compared to $60 million in the same period last year. Driven by lower management and development fees on concession projects that achieved substantial completion in 2025, partially offset by improved operating results at Skyport in Bermuda.

Jerome Julier: Concessions adjusted EBITDA for the quarter was CAD 11 million compared to CAD 16 million in the same period last year, driven by lower management and development fees on concession projects that achieved substantial completion in 2025, partially offset by improved operating results at Skyport in Bermuda. The book value of our concessions portfolio at quarter end was over a quarter billion dollars. Turning to slide eight. At June 30, 2026, Aecon held core cash and cash equivalents of CAD 129 million, which excludes CAD 500 million of cash representing Aecon's proportionate share of cash held in joint operations. In addition, at June 30, 2026, Aecon had committed revolving credit facilities of CAD 1 billion, of which CAD 302 million was drawn, and CAD 4 million was utilized for letters of credit.

Jerome Julier: Concessions adjusted EBITDA for the quarter was CAD 11 million compared to CAD 16 million in the same period last year, driven by lower management and development fees on concession projects that achieved substantial completion in 2025, partially offset by improved operating results at Skyport in Bermuda. The book value of our concessions portfolio at quarter end was over a quarter billion dollars. Turning to slide eight. At June 30, 2026, Aecon held core cash and cash equivalents of CAD 129 million, which excludes CAD 500 million of cash representing Aecon's proportionate share of cash held in joint operations. In addition, at June 30, 2026, Aecon had committed revolving credit facilities of CAD 1 billion, of which CAD 302 million was drawn, and CAD 4 million was utilized for letters of credit.

Speaker #3: The book value of our concessions portfolio at quarter end was order of over a quarter billion dollars. Turning to slide 8, at June 30, 2026, Aecon held core cash and cash equivalents of $129 million, which excludes $500 million of cash representing Aecon's proportionate share of cash held in joint operations.

Speaker #3: In addition, at June 30, 2026, Aecon had committed revolving credit facilities of $1 billion, of which $302 million was drawn and $4 million was utilized for letters of credit.

Speaker #3: Combined with our $960 million EDC performance security guarantee facilities, our total committed credit facilities for working capital and letters of credit requirement total $2 billion.

Jerome Julier: Combined with our CAD 960 million EDC performance security guarantee facilities, our total committed credit facilities for working capital and letters of credit requirement total CAD 2 billion. Net debt at June 30, 2026 was CAD 672 million. Aecon has proactively opted to include the CAD 320 million repayment agreement for the preferred shares of Aecon Utilities in this figure. Net debt to trailing 12-month adjusted EBITDA was 2.2x or 2x, excluding the negative earnings impact from legacy projects. Aecon has no debt or working capital credit facility maturities until 2029, except equipment loans and leases in the normal course. Aecon generated free cash flow of CAD 301 million in the trailing 12-month period ending June 2026. Compared to CAD -10 million in free cash flow in the same period last year, a significant improvement in cash generation.

Jerome Julier: Combined with our CAD 960 million EDC performance security guarantee facilities, our total committed credit facilities for working capital and letters of credit requirement total CAD 2 billion. Net debt at June 30, 2026 was CAD 672 million. Aecon has proactively opted to include the CAD 320 million repayment agreement for the preferred shares of Aecon Utilities in this figure. Net debt to trailing 12-month adjusted EBITDA was 2.2x or 2x, excluding the negative earnings impact from legacy projects. Aecon has no debt or working capital credit facility maturities until 2029, except equipment loans and leases in the normal course. Aecon generated free cash flow of CAD 301 million in the trailing 12-month period ending June 2026. Compared to CAD -10 million in free cash flow in the same period last year, a significant improvement in cash generation.

Speaker #3: Net debt at June 30, 2026 million. Aecon has proactively opted to include the $320 million repayment agreement for the preferred shares of Aecon Utilities in this figure, net debt to trailing 12-month adjusted EBITDA was $2.2, or 2 times excluding the negative earnings impact, from legacy projects.

Speaker #3: Aecon has no debt or working capital credit facility maturities until 2029, except for equipment loans and leases in the normal course. Aecon generated free cash flow of $301 million in the trailing 12-month period ending June 2026.

Speaker #3: Compared to negative $10 million in free cash flow in the same period last year, a significant improvement in cash generation. In the second quarter, Aecon's board approved a quarterly dividend of $19.25 per share, or an annualized dividend level of 77 cents per share.

Jerome Julier: In Q2, Aecon's board approved a quarterly dividend of CAD 0.1925 per share, or an annualized dividend level of CAD 0.77 per share. The dividend will be paid on October 2, 2026, to shareholders of record on September 22, 2026. Before I turn the call over to Jean-Louis, I'd like to briefly comment on the announced buyout of the pref shares in Aecon Utilities on slide nine. Partnering with Oaktree in the fall of 2023, Aecon Utilities has delivered significant growth through organic expansion and four strategic acquisitions, strengthening our capabilities across electrical transmission and distribution, substations, metering, telecommunications, and utilities infrastructure. During that time, electrical infrastructure has grown from approximately a quarter of the revenue to nearly half today. The business has expanded from almost exclusively operating in our core Canadian market to 25% of the revenues now being generated in the United States.

Jerome Julier: In Q2, Aecon's board approved a quarterly dividend of CAD 0.1925 per share, or an annualized dividend level of CAD 0.77 per share. The dividend will be paid on October 2, 2026, to shareholders of record on September 22, 2026. Before I turn the call over to Jean-Louis, I'd like to briefly comment on the announced buyout of the pref shares in Aecon Utilities on slide nine. Partnering with Oaktree in the fall of 2023, Aecon Utilities has delivered significant growth through organic expansion and four strategic acquisitions, strengthening our capabilities across electrical transmission and distribution, substations, metering, telecommunications, and utilities infrastructure. During that time, electrical infrastructure has grown from approximately a quarter of the revenue to nearly half today. The business has expanded from almost exclusively operating in our core Canadian market to 25% of the revenues now being generated in the United States.

Speaker #3: The dividend will be paid on October 2, 2026, to shareholders of record on September 22, 2026. Now, before I turn the call over to Jean-Louis, I'd like to briefly comment on the announced buyout of the prep shares in Aecon Utilities on slide 9.

Speaker #3: Partnering with Oak Tree in the fall of 2023, Aecon Utilities has delivered significant growth through organic expansion and forced strategic acquisitions strengthening our capabilities across electrical transmission and distribution, substations, metering, telecommunications, and utilities infrastructure.

Speaker #3: During that time, electrical infrastructure has grown from approximately a quarter of the revenue to nearly half today. The business has expanded from almost exclusively operating in our core Canadian market to 25% of the revenues now being generated in the United States.

Jerome Julier: Aecon Utilities now generates over CAD 1.2 billion of pro forma annual revenue, with over 70% derived from recurring long-term master service agreements, and has established a platform position to benefit from long-term investments in grid modernization, electrification, digital infrastructure, and data center work. The transaction allows Aecon to fully participate in the future growth of Aecon Utilities while significantly simplifying our ownership structure, enhancing financial flexibility, and strengthening integration across our business. Upon closing, Aecon will have full economic and strategic control of a large and diverse utility infrastructure platform supporting our comprehensive power and utility services offering across Canada and the United States. Finally, on a personal note, I'd like to thank the Oaktree Capital team for their partnership and support over the last several years. It's been an absolute pleasure working with you, and together we've built a stronger, larger, and more diversified utility services platform.

Jerome Julier: Aecon Utilities now generates over CAD 1.2 billion of pro forma annual revenue, with over 70% derived from recurring long-term master service agreements, and has established a platform position to benefit from long-term investments in grid modernization, electrification, digital infrastructure, and data center work. The transaction allows Aecon to fully participate in the future growth of Aecon Utilities while significantly simplifying our ownership structure, enhancing financial flexibility, and strengthening integration across our business. Upon closing, Aecon will have full economic and strategic control of a large and diverse utility infrastructure platform supporting our comprehensive power and utility services offering across Canada and the United States. Finally, on a personal note, I'd like to thank the Oaktree Capital team for their partnership and support over the last several years. It's been an absolute pleasure working with you, and together we've built a stronger, larger, and more diversified utility services platform.

Speaker #3: Aecon Utility now generates over $1.2 billion of pro forma annual revenue, with over 70% derived from recurring, long-term master service agreements, and has established a platform position to benefit from long-term investments in grid modernization, electrification, digital infrastructure, and data center work.

Speaker #3: The transaction allows Aecon to fully participate in the future growth of Aecon Utilities, while significantly simplifying our ownership structure, enhancing financial flexibility, and strengthening the integration across our business.

Speaker #3: Upon closing, Aecon will have fully economic and strategic control of a large and diverse utility infrastructure platform supporting our comprehensive power and utility services offering across Canada and the United States.

Speaker #3: Finally, on a personal note, I'd like to thank the Oak Tree capital team for their partnership and support over the last several years. It's been an absolute pleasure working with you, and together we've built a stronger, larger, and more diversified utility services platform.

Speaker #3: We're excited to continue that momentum forward. At this point, I'll turn the call over to Jean-Louis to address our business performance and outlook.

Jerome Julier: We're excited to continue that momentum forward. At this point, I'll turn the call over to Jean-Louis to address our business performance and outlook.

Jerome Julier: We're excited to continue that momentum forward. At this point, I'll turn the call over to Jean-Louis to address our business performance and outlook.

Speaker #1: Thank you, Jerome. Turning now to slide 10, Aecon continues to drive growth through a balanced and diversified work portfolio, across the nuclear, civil, utilities, industrial, and urban transportation sectors.

Jean-Louis Servranckx: Thank you, Jerome. Turning now to slide 10. Aecon continues to drive growth through a balanced and diversified work portfolio across the nuclear, civil, utilities, industrial, and urban transportation sectors. In Q2, the construction segment saw a broad-based increase in revenue across all sectors. Power and utility services collectively represent over 55% of Aecon's nearly CAD 6 billion in trailing 12 months construction revenue. Our concessions portfolio also continues to grow and diversify. The Gordie Howe International Bridge now is operational, and Aecon holds a 20% interest in its equity and 30-year operations, maintenance, and rehabilitation activities. Earlier this week, an Aecon partnership announced it has executed an agreement for the 150 MW Simcoe Battery Energy Storage System Project in Ontario, in which Aecon Concessions is an equity partner. Aecon will also serve as the exclusive EPC provider for the balance of plant works.

Jean-Louis Servranckx: Thank you, Jerome. Turning now to slide 10. Aecon continues to drive growth through a balanced and diversified work portfolio across the nuclear, civil, utilities, industrial, and urban transportation sectors. In Q2, the construction segment saw a broad-based increase in revenue across all sectors. Power and utility services collectively represent over 55% of Aecon's nearly CAD 6 billion in trailing 12 months construction revenue. Our concessions portfolio also continues to grow and diversify. The Gordie Howe International Bridge now is operational, and Aecon holds a 20% interest in its equity and 30-year operations, maintenance, and rehabilitation activities. Earlier this week, an Aecon partnership announced it has executed an agreement for the 150 MW Simcoe Battery Energy Storage System Project in Ontario, in which Aecon Concessions is an equity partner. Aecon will also serve as the exclusive EPC provider for the balance of plant works.

Speaker #1: In the second quarter, the construction segment saw a broad-based increase in revenue across all sectors. Power and utility services collectively represent over 55% of Aecon's nearly $6 billion in trailing 12-month construction revenue.

Speaker #1: Our concessions portfolio also continues to grow and diversify. The Goreo International Bridge is now operational, and Aecon holds a 20% interest in its equity and 30-year operations, maintenance, and rehabilitation activities.

Speaker #1: And earlier this week, an Aecon partnership announced it has executed an agreement for the $150 million, 150-megawatt Simcoe battery energy storage system project in Ontario, in which Aecon Concessions is an equity partner.

Speaker #1: Aecon will also serve as the exclusive EPC provider for the balance of plant works. The project complements our ownership position in the Oneida Energy Storage Project and demonstrates Aecon's credentials in grid-scale battery delivery, with completed and ongoing work representing approximately 1 gigawatt of Ontario's delivered or planned battery energy storage capacity.

Jean-Louis Servranckx: The project complements our ownership position in the Oneida Energy Storage Project and demonstrates Aecon's credentials in grid-scale battery delivery, with completed and ongoing work represented approximately 1 GW of Ontario's delivered or planned battery energy storage capacity. Turning to slide 11. Demand for Aecon services remains strong. With a strong secured backlog, growth in recurring revenue programs and utility services, and a healthy bid pipeline, Aecon maintains its focus on improved profitability and margin predictability while continuing to improve the risk profile of our business. Trailing 12 months recurring revenue was over CAD 1 billion at 30 June 2026. With recurring revenue from utility services increasing to CAD 868 million from CAD 668 million last year, an increase of 30%. Turning to slide 12. I would like to take a moment to recognize a truly historic achievement for Aecon.

Jean-Louis Servranckx: The project complements our ownership position in the Oneida Energy Storage Project and demonstrates Aecon's credentials in grid-scale battery delivery, with completed and ongoing work represented approximately 1 GW of Ontario's delivered or planned battery energy storage capacity. Turning to slide 11. Demand for Aecon services remains strong. With a strong secured backlog, growth in recurring revenue programs and utility services, and a healthy bid pipeline, Aecon maintains its focus on improved profitability and margin predictability while continuing to improve the risk profile of our business. Trailing 12 months recurring revenue was over CAD 1 billion at 30 June 2026. With recurring revenue from utility services increasing to CAD 868 million from CAD 668 million last year, an increase of 30%. Turning to slide 12. I would like to take a moment to recognize a truly historic achievement for Aecon.

Speaker #1: Turning to slide 11, demand for Aecon services remains strong. With a strong secret backlog, growth in recurring revenue programs in utility services, and a healthy bid pipeline, Aecon maintains its focus on improved profitability and margin predictability, while continuing to improve the risk profile of our business.

Speaker #1: Trailing 12-month recurring revenue was over $1 billion, at June 30, 2026, with recurring revenue from utility services increasing to $868 million from $668 million last year, an increase of 30%.

Speaker #1: Turning to slide 12, I would like to take a moment to recognize a truly historic achievement for Aecon. The Goreo International Bridge Project achieved substantial completion on June 9, marking the successful delivery of one of the most significant infrastructure projects in North America.

Jean-Louis Servranckx: The Gordie Howe International Bridge project achieved substantial completion on 09 June, marking the successful delivery of one of the most significant infrastructure projects in North America. Just last week, Aecon had the opportunity to participate in the official opening celebrations, culminating with the opening of the bridge to traffic earlier this week. Together, the entire project team successfully navigated complexity and overcame challenges, including a global pandemic, always remaining focused on safety, perseverance, and world-class execution excellence. It is the first new Canada-US border crossing in more than 60 years. Spans 2.5 km, required over 20 million work hours by close to 16,000 workers, and showcases Aecon's ability to deliver complex infrastructure projects. On behalf of our leadership team, I want to thank the thousands of Aecon employees, partners, suppliers, and stakeholders who contributed to making this project a success.

Jean-Louis Servranckx: The Gordie Howe International Bridge project achieved substantial completion on 09 June, marking the successful delivery of one of the most significant infrastructure projects in North America. Just last week, Aecon had the opportunity to participate in the official opening celebrations, culminating with the opening of the bridge to traffic earlier this week. Together, the entire project team successfully navigated complexity and overcame challenges, including a global pandemic, always remaining focused on safety, perseverance, and world-class execution excellence. It is the first new Canada-US border crossing in more than 60 years. Spans 2.5 km, required over 20 million work hours by close to 16,000 workers, and showcases Aecon's ability to deliver complex infrastructure projects. On behalf of our leadership team, I want to thank the thousands of Aecon employees, partners, suppliers, and stakeholders who contributed to making this project a success.

Speaker #1: Just last week, Aecon had the opportunity to participate in the official opening celebrations, culminating with the opening of the bridge to traffic earlier this week.

Speaker #1: Together, the entire project team successfully navigated complexity and overcame challenges, including a global pandemic, always remaining focused on safety, perseverance, and world-class execution excellence.

Speaker #1: It is the first new Canada-US border crossing in more than 60 years. Spans 2.5 kilometers, required over 20 million work hours by close, to 16,000 workers, and showcases Aecon's ability to deliver complex infrastructure projects.

Speaker #1: On behalf of our leadership team, I want to thank the thousands of Aecon employees, partners, suppliers, and stakeholders who contributed to making this project a success.

Jean-Louis Servranckx: It is an incredible accomplishment and a significant milestone in Aecon's history. Turning to slide 13. We've recently announced several significant project awards and strategic developments that strengthen our multi-year growth profile and reinforce Aecon's position in some of North America's most attractive infrastructure markets, spanning nation-building, defense, power generation, transportation, and water infrastructure. These include the 932 MW Greenlight Electricity Center in Alberta, which will support a major data center for Meta. The Roberts Bank Terminal 2 in British Columbia, a priority nation-building project that will increase container capacity at the Port of Vancouver, the Winnipeg Biosolids Facilities project, and the Mactaquac Life Achievement Project in New Brunswick. These projects align directly with our strategy of pursuing complex infrastructure programs with appropriate risk allocation, long-term visibility, and strong partnership structures.

Jean-Louis Servranckx: It is an incredible accomplishment and a significant milestone in Aecon's history. Turning to slide 13. We've recently announced several significant project awards and strategic developments that strengthen our multi-year growth profile and reinforce Aecon's position in some of North America's most attractive infrastructure markets, spanning nation-building, defense, power generation, transportation, and water infrastructure. These include the 932 MW Greenlight Electricity Center in Alberta, which will support a major data center for Meta. The Roberts Bank Terminal 2 in British Columbia, a priority nation-building project that will increase container capacity at the Port of Vancouver, the Winnipeg Biosolids Facilities project, and the Mactaquac Life Achievement Project in New Brunswick. These projects align directly with our strategy of pursuing complex infrastructure programs with appropriate risk allocation, long-term visibility, and strong partnership structures.

Speaker #1: It is an incredible accomplishment and a significant milestone in Aecon's history. Turning to slide 13, we've recently announced several significant project awards and strategic developments that strengthen our multi-year growth profile and reinforce Aecon's position in some of North America's most attractive infrastructure markets spanning nation-building, defense, power generation, transportation, and water infrastructure.

Speaker #1: These include the $932 million Greenlight Electricity Centre in Alberta, which will support a major data center for Meta; the Roberts Bank Terminal 2 in British Columbia, a priority nation-building project that will increase container capacity at the Port of Vancouver; the Winnipeg Biosolids Facilities Project; and the Mactaquac Life Achievement Project in New Brunswick.

Speaker #1: These projects align directly with our strategy of pursuing complex infrastructure programs with appropriate risk allocation, long-term visibility, and strong partnership structures. We continue to advance a broad portfolio of major projects, including the Arctic Over-the-Horizon Radar Program, the Pickering Nuclear Refurbishment, the Darlington New Nuclear Project, the Cascade Energy Facility in Washington State, the GO Expansion Civil Works Program, the Hamilton LRT and Urban Redevelopment, and the US Virgin Islands Airports.

Jean-Louis Servranckx: We continue to advance a broad portfolio of major projects, including the Arctic Over-the-Horizon Radar Program, the Pickering Nuclear refurbishment, the Darlington new nuclear project, the Cascade Energy facility in Washington State, the GO Expansion Civil Works program, the Hamilton LRT and urban redevelopment, and the U.S. Virgin Islands airports. These are progressing under collaborative and progressive delivery models that support improved risk allocation and execution certainty. This project will present CAD billions of dollars of potential work, and when layered with Aecon's CAD 10.5 billion of backlog and recurring revenue programs, provide long-term growth visibility and match in Aecon's over 150-year history. Turning to slide 14. Aecon expects double-digit revenue growth in 2026. Our expectation for a broad-based revenue increase in 2026 and further revenue growth in 2027 is underpinned by the major projects in development that I just spoke to.

Jean-Louis Servranckx: We continue to advance a broad portfolio of major projects, including the Arctic Over-the-Horizon Radar Program, the Pickering Nuclear refurbishment, the Darlington new nuclear project, the Cascade Energy facility in Washington State, the GO Expansion Civil Works program, the Hamilton LRT and urban redevelopment, and the U.S. Virgin Islands airports. These are progressing under collaborative and progressive delivery models that support improved risk allocation and execution certainty. This project will present CAD billions of dollars of potential work, and when layered with Aecon's CAD 10.5 billion of backlog and recurring revenue programs, provide long-term growth visibility and match in Aecon's over 150-year history. Turning to slide 14. Aecon expects double-digit revenue growth in 2026. Our expectation for a broad-based revenue increase in 2026 and further revenue growth in 2027 is underpinned by the major projects in development that I just spoke to.

Speaker #1: These are progressing under collaborative and progressive delivery models that support improved risk allocation and execution certainty. These projects represent billions of dollars of potential work, and when layered with Aecon's $10.5 billion of backlog and recurring revenue programs, provide long-term growth visibility, unmatched in Aecon's over 150-year history.

Speaker #1: Turning to slide 14, Aecon expects double-digit revenue growth in 2026. Our expectation for a broad-based revenue increase in 2026 and further revenue growth in 2027 is underpinned by the major projects in development that I've just spoke to.

Speaker #1: Contributions from strategic acquisition in the industrial and utility sectors, ongoing strength from an extensive portfolio of small and mid-sized work programs, and the ramp-up of projects under multi-year lower-risk contract models in new nuclear construction and mass transit and mobility.

Jean-Louis Servranckx: Contributions from strategic acquisition in the industrial and utility sectors, ongoing strengths from an extensive portfolio of small and mid-sized work programs, and the ramp-up of projects under multi-year lower risk contract models in new nuclear construction and mass transit and mobility. In the concession segment, there are several opportunities to add to the existing portfolio of Canadian and international concessions in the next six to 12 months to support trends in aging infrastructure, mobility, connectivity, energy, and population growth. Aecon's deliberate shift toward a greater weighting of improved risk-adjusted work programs, in combination with a strong focus on operational excellence, is anticipated to support a stabilization and gradual improvement of adjusted EBITDA margins in the construction segment in 2026. Our overall outlook for 2026 continue to be very positive.

Jean-Louis Servranckx: Contributions from strategic acquisition in the industrial and utility sectors, ongoing strengths from an extensive portfolio of small and mid-sized work programs, and the ramp-up of projects under multi-year lower risk contract models in new nuclear construction and mass transit and mobility. In the concession segment, there are several opportunities to add to the existing portfolio of Canadian and international concessions in the next six to 12 months to support trends in aging infrastructure, mobility, connectivity, energy, and population growth. Aecon's deliberate shift toward a greater weighting of improved risk-adjusted work programs, in combination with a strong focus on operational excellence, is anticipated to support a stabilization and gradual improvement of adjusted EBITDA margins in the construction segment in 2026. Our overall outlook for 2026 continue to be very positive.

Speaker #1: In the concession segment, there are several opportunities to add to the existing portfolio of Canadian and international concessions in the next 6 to 12 months to support trends in aging infrastructure, mobility, connectivity, energy, and population growth.

Speaker #1: Aecon's deliberate shift toward a greater weighting of improved risk-adjusted work programs in combination with a strong focus on operational excellence is anticipated to support a stabilization and gradual improvement of adjusted EBITDA margins in the construction segment in 2026.

Speaker #1: Our overall outlook for 2026 continues to be very positive. We are excited about the momentum we have built in the first half of the year and remain focused on executing our strategy to drive long-term shareholder value.

Jean-Louis Servranckx: We are excited about the momentum we have built in H1 of the year, remain focused on executing our strategy to drive long-term shareholder value. In closing, I want to thank our teams across all our operating sectors for their unwavering safety always mindset as we deliver critical infrastructure projects across Canada, the United States, and internationally. Thank you. We now turn the call over to analysts for questions.

Jean-Louis Servranckx: We are excited about the momentum we have built in H1 of the year, remain focused on executing our strategy to drive long-term shareholder value. In closing, I want to thank our teams across all our operating sectors for their unwavering safety always mindset as we deliver critical infrastructure projects across Canada, the United States, and internationally. Thank you. We now turn the call over to analysts for questions.

Speaker #1: In closing, I want to thank our teams across all our operating sectors for their unwavering safety always mindset, as we deliver critical infrastructure projects across Canada, the United States, and internationally.

Speaker #1: Thank you. We will now turn the call over to analysts for questions.

Speaker #2: Thank you. As a reminder to ask a question, please press star 11 on your telephone and wait for your name to be announced. To withdraw your question, please press star 11 again.

Operator: Thank you. As a reminder to ask a question, please press star 11 on your telephone and wait for your name to be announced. To withdraw your question, please press star 11 again. Please stand by while we compile the Q&A roster. Our first question comes from Sabahat Khan of RBC Capital Markets. Your line is open.

Operator: Thank you. As a reminder to ask a question, please press star 11 on your telephone and wait for your name to be announced. To withdraw your question, please press star 11 again. Please stand by while we compile the Q&A roster. Our first question comes from Sabahat Khan of RBC Capital Markets. Your line is open.

Speaker #2: Please stand by while we compile the Q&A roster. And our first question comes from Sabahat Khan of RBC Capital Markets. Your line is open.

Sabahat Khan: Great. Thanks, and good morning. Just wanted to get maybe starting with a high-level one. You noted a lot of larger projects. There's been a lot of headlines around the Canada nation-building stuff. Can you just talk about maybe as you're having discussions with these customers, are you able to get a bit of a cadence on timeline, just in terms of how those projects will come along? Will you be able to staff for them, get the right people in the right places? Are you starting to get some level of visibility on how that work might start to flow? Then maybe just talk about how, from a preparation side, getting the right staff in the right regions, et cetera. So maybe just an update on how those bigger projects are building up for Aecon. Thanks.

Sabahat Khan: Great. Thanks, and good morning. Just wanted to get maybe starting with a high-level one. You noted a lot of larger projects. There's been a lot of headlines around the Canada nation-building stuff. Can you just talk about maybe as you're having discussions with these customers, are you able to get a bit of a cadence on timeline, just in terms of how those projects will come along? Will you be able to staff for them, get the right people in the right places? Are you starting to get some level of visibility on how that work might start to flow? Then maybe just talk about how, from a preparation side, getting the right staff in the right regions, et cetera. So maybe just an update on how those bigger projects are building up for Aecon. Thanks.

Speaker #3: Great. Thanks, and good morning. I just wanted to get maybe starting with a high-level one. You noted a lot of larger projects; there have been a lot of headlines around the Canada National Building Nation Building stuff.

Speaker #3: Can you just talk about maybe as you're having discussions with these customers, are you able to get a bit of a cadence on timeline, just in terms of how those projects will come along?

Speaker #3: Will you be able to staff for them, get the right people in the right places? Are you on how that work might start to flow?

Speaker #3: And then maybe just talk about how, from a preparation side, getting the right staff and the right reasons, etc. So maybe just an update on how those bigger projects are building up for Aecon.

Speaker #3: Thanks.

Speaker #4: Yeah, I would take this one. Yes, we can. Most of these projects are progressive design-build collaborative projects. So they just begin with a development phase, that can be I mean, from 12 months to 24 months.

Jean-Louis Servranckx: Yeah. I will take this one. Yes, we can. Most of these projects are progressive design-build, collaborative projects. They just begin with the development phase that can be from 12 months to 24 months. When we advance those development phase, more and more visibility about the real execution of the work, the timeframe, the scope, and the budget. Yes, we are just getting more and more secure with those projects, what we call the sovereignty projects. We are extremely careful and focused on our capacity to deliver those projects. You probably have noticed that we are very careful on not having all those projects on the same geography, on the same sectors, on the same timeframe. It's a balancing tactic, we think we are quite well about being able to execute those projects perfectly.

Jean-Louis Servranckx: Yeah. I will take this one. Yes, we can. Most of these projects are progressive design-build, collaborative projects. They just begin with the development phase that can be from 12 months to 24 months. When we advance those development phase, more and more visibility about the real execution of the work, the timeframe, the scope, and the budget. Yes, we are just getting more and more secure with those projects, what we call the sovereignty projects. We are extremely careful and focused on our capacity to deliver those projects. You probably have noticed that we are very careful on not having all those projects on the same geography, on the same sectors, on the same timeframe. It's a balancing tactic, we think we are quite well about being able to execute those projects perfectly.

Speaker #4: And we have when we advance those development phase, more and more visibility about the real execution of the work, the timeframe, the scope, the budget.

Speaker #4: So yes, we are just getting I mean, more and more secure with those projects, what we call the sovereignty projects. We are extremely careful and focused on our capacity to deliver those projects, you probably have noticed that we are very careful on not having all those projects on the same geography, on the same sectors, on the same timeframe.

Speaker #4: It's a balancing tactic and we think we are quite well about being able to execute those projects perfectly.

Speaker #3: And then just for my follow-up, I guess, maybe as you maybe might be a bit one more for Jerome, but just in terms sort of the margin profile as these larger projects are building up, your outlook commentary shared a bit more specifics this time.

Sabahat Khan: Just for my follow-up, I guess, maybe it might be a bit one more for Jerome, but just in terms of the margin profile as these larger projects are building up. Your outlook commentary shared a bit more specifics this time. Just talk about your confidence and sort of the margin progression through H2, what you're seeing, and then what you guys are seeing in the backlog that you've built around the margin profile. I know it's early, but any sort of directional commentary you can share on that for 2027. I think your commentary notes growth into 2027 on the top line, but curious on the margin side as well. Thanks, and I'll pass the line.

Sabahat Khan: Just for my follow-up, I guess, maybe it might be a bit one more for Jerome, but just in terms of the margin profile as these larger projects are building up. Your outlook commentary shared a bit more specifics this time. Just talk about your confidence and sort of the margin progression through H2, what you're seeing, and then what you guys are seeing in the backlog that you've built around the margin profile. I know it's early, but any sort of directional commentary you can share on that for 2027. I think your commentary notes growth into 2027 on the top line, but curious on the margin side as well. Thanks, and I'll pass the line.

Speaker #3: Can you talk about your confidence in the margin progression through the second half, what you're seeing, and what you and your team are seeing in the backlog you've built around the margin profile?

Speaker #3: And I know it's early, but any sort of directional commentary you can share on that for 2027? I think your commentary notes growth into 2027 on the top line, but curious on the margin side as well.

Speaker #3: Thanks, and I'll pass the line.

Speaker #4: Yeah. Time's to unpack there, Sabah. I'll before I start talking about the margin profile, I think it's always critical to re-ground around the risk associated with the work that's being executed because the two go hand in hand.

Jerome Julier: Yeah. Tons to unpack there, Sabahat. Before I start talking about the margin profile, I think it's always critical to reground around the risk associated with the work that's being executed, because the two go hand-in-hand. Starting on that point, we are working on much better quality programs from a risk perspective than we've ever had. If you look at the LTM period, the amount of work that we've done, roughly 70% of the work was on non-fixed price. The fixed price work that we're executing is increasingly under more collaborative models, such that the overall risk in the enterprise is dropping. What we committed to with regards to margin in our outlook, which started in Q4 2025, was a stabilization.

Jerome Julier: Yeah. Tons to unpack there, Sabahat. Before I start talking about the margin profile, I think it's always critical to reground around the risk associated with the work that's being executed, because the two go hand-in-hand. Starting on that point, we are working on much better quality programs from a risk perspective than we've ever had. If you look at the LTM period, the amount of work that we've done, roughly 70% of the work was on non-fixed price. The fixed price work that we're executing is increasingly under more collaborative models, such that the overall risk in the enterprise is dropping. What we committed to with regards to margin in our outlook, which started in Q4 2025, was a stabilization.

Speaker #4: So, starting on that point, we are working on much better quality programs from a risk perspective than we've ever had. So, if you look at the LTM period, the amount of work that we've done—roughly 7% of the work—was on non-fixed price.

Speaker #4: And then the fixed price work that we're executing is increasingly under more collaborative models. So I'd say the overall risk in the enterprise is dropping.

Speaker #4: And what we committed to with regards to margin in our outlook, which started in Q4 of 2025, was a stabilization. And we had to as an adjusted construction margin, excluding the legacy projects, was roughly 6% at the end of Q4, 6% on trailing 12-month basis in Q1.

Jerome Julier: An adjusted construction margin, excluding the legacy projects, was roughly 6% at the end of Q4, 6% on a trailing 12-month basis in Q1, again 6% on a trailing 12-month basis in Q2. All while significantly growing revenue, all while shedding risk against the programs that we're working on. That is just a clear net positive with regard to risk-adjusted returns for Aecon. As far as the guidance on gradual improvement, we really mean that trying to improve things in a very slow and measured way, given the bulk of work that we have in front of us and where we stand on the programs that we're executing. We're very early on in programs in nuclear and urban transportation solutions, the traditional construction S-curve

Jerome Julier: An adjusted construction margin, excluding the legacy projects, was roughly 6% at the end of Q4, 6% on a trailing 12-month basis in Q1, again 6% on a trailing 12-month basis in Q2. All while significantly growing revenue, all while shedding risk against the programs that we're working on. That is just a clear net positive with regard to risk-adjusted returns for Aecon. As far as the guidance on gradual improvement, we really mean that trying to improve things in a very slow and measured way, given the bulk of work that we have in front of us and where we stand on the programs that we're executing. We're very early on in programs in nuclear and urban transportation solutions, the traditional construction S-curve

Speaker #4: And then again, 6% on a trailing 12-month basis in Q2. All while significantly growing revenue, and all while shedding risk against the programs that we're working on.

Speaker #4: So that is just a clear net positive with regard to risk-adjusted returns for Aecon. As far as the guidance on gradual improvement, we really mean that—trying to improve things in a very slow and measured way, given the bulk of work that we have in front of us.

Speaker #4: And where we stand on the programs that we're executing, we're very early on in programs in nuclear and urban transportation solutions. And the traditional construction S-curve means that you will generally see the benefits accrue later on in program life.

Jerome Julier: Means that you will generally see the benefits accrue later on in program life. I'd also note that growth margins and backlog margins are improving. One of the areas that's an offset today is MG&A, which we're doing as far as investments to improve our delivery capacity, which Jean-Louis mentioned. I'll just say margins have been stabilized. We've done a great job with that. Revenue growth is improving, the risk is improving, it's just a net positive. With regards to 2027, we're not providing an outlook on that one. We're not going to front-run it. I think the general direction of travel is probably consistent with what we've seen in 2026's outlook, which is stabilization followed by improvement. Just given the bulk and the size of work, we're really focused on maintaining the appropriate risk cadence across the entire portfolio.

Jerome Julier: Means that you will generally see the benefits accrue later on in program life. I'd also note that growth margins and backlog margins are improving. One of the areas that's an offset today is MG&A, which we're doing as far as investments to improve our delivery capacity, which Jean-Louis mentioned. I'll just say margins have been stabilized. We've done a great job with that. Revenue growth is improving, the risk is improving, it's just a net positive. With regards to 2027, we're not providing an outlook on that one. We're not going to front-run it. I think the general direction of travel is probably consistent with what we've seen in 2026's outlook, which is stabilization followed by improvement. Just given the bulk and the size of work, we're really focused on maintaining the appropriate risk cadence across the entire portfolio.

Speaker #4: I'd also note that growth margins and backlog margins are improving. And one of the areas that's an offset today is MG&A, which we're doing as far as investments to improve our delivery capacity, which is only mentioned.

Speaker #4: So I'll just say margins have been stabilized. We've done a great job with that. Revenue growth is improving. The risk is improving. So it's just a net positive.

Speaker #4: With regards to 2027, we're not providing an outlook on that one. So we're not going to front-run it. I think the general direction of travel is probably consistent with what we've seen in 2026's outlook, which is stabilization followed by improvement.

Speaker #4: Given the bulk and size of the work, we're really focused on maintaining the appropriate risk cadence across the entire portfolio. So, not a perfectly direct answer to the last part of the question, but hopefully that gives a bit of color on where we're thinking things could go.

Jean-Louis Servranckx: Not a perfectly direct answer on the last part of the question, but hopefully a little bit of color on where we're thinking things could go.

Jerome Julier: Not a perfectly direct answer on the last part of the question, but hopefully a little bit of color on where we're thinking things could go.

Speaker #3: Thanks very much.

Sabahat Khan: Thanks very much.

Sabahat Khan: Thanks very much.

Speaker #2: Thank you. And our next question comes from Frederick Bastien of Raymond James through line is open.

Operator: Thank you. Our next question comes from Frederic Bastien of Raymond James. Your line is open.

Operator: Thank you. Our next question comes from Frederic Bastien of Raymond James. Your line is open.

Speaker #5: Hi, good morning, everybody.

Frederic Bastien: Hi. Good morning, everybody.

Frederic Bastien: Hi. Good morning, everybody.

Jean-Louis Servranckx: Morning.

Jean-Louis Servranckx: Morning.

Speaker #6: Morning.

Speaker #5: I have a couple of questions. First one, regarding the Evergreen project that you secured, it's a fairly sizable project. Congratulations on winning it. But I was wondering if you could discuss the risk profile associated with that project.

Frederic Bastien: I have a couple questions. First one, regarding the Greenlight project that you secured. It's a fairly sizable project. Congratulations on winning it. Was wondering if you could discuss the risk profile associated with that project. I did notice that it was an EPC project, so a fixed price project, and would love to get some comments on your comfort level around that particular project. Thank you.

Frederic Bastien: I have a couple questions. First one, regarding the Greenlight project that you secured. It's a fairly sizable project. Congratulations on winning it. Was wondering if you could discuss the risk profile associated with that project. I did notice that it was an EPC project, so a fixed price project, and would love to get some comments on your comfort level around that particular project. Thank you.

Speaker #5: I did notice that it was an EPC project, so fixed-price projects. I would love to get some comments on your comfort level around that particular project.

Speaker #5: Thank you.

Speaker #4: Okay. Frederick, I'm going to take this one. I imagine you are speaking about the green light project with Pembina. I mean, the combined cycle gas turbine.

Jean-Louis Servranckx: Okay. Frederic, I'm going to take this one. I imagine you are speaking about the Greenlight project with Pembina, I mean, the combined cycle gas turbine.

Jean-Louis Servranckx: Okay. Frederic, I'm going to take this one. I imagine you are speaking about the Greenlight project with Pembina, I mean, the combined cycle gas turbine.

Frederic Bastien: Yes, my apologies.

Frederic Bastien: Yes, my apologies.

Speaker #5: Yes, my apologies.

Speaker #4: Yeah, yeah. No problem. Power is a strategic focus at Aecon. You have noticed, I mean, we are now a little more than 55% of our revenue.

Jean-Louis Servranckx: Yeah. No problem. Power is a strategic focus at Aecon. You have noticed, we are now a little more than 55% of our revenue. It's about distribution, it's about transmission, it's about substation, it's about battery storage. You have noticed the Simcoe 150 MW that we have just disclosed a few days ago. Power generation now. The power generation market, on one side, you have the nuclear. We are extremely present and strong in nuclear. I may come back to this after. On the other side, you have the renewable projects, where we have attacked this through battery storage and some transmission. We are not in solar panels, and we are not in wind machine. We think that this has been commoditized, and it was not the right time to enter it. In between nuclear and renewable, you have a spot, which is gas turbine generation.

Jean-Louis Servranckx: Yeah. No problem. Power is a strategic focus at Aecon. You have noticed, we are now a little more than 55% of our revenue. It's about distribution, it's about transmission, it's about substation, it's about battery storage. You have noticed the Simcoe 150 MW that we have just disclosed a few days ago. Power generation now. The power generation market, on one side, you have the nuclear. We are extremely present and strong in nuclear. I may come back to this after. On the other side, you have the renewable projects, where we have attacked this through battery storage and some transmission. We are not in solar panels, and we are not in wind machine. We think that this has been commoditized, and it was not the right time to enter it. In between nuclear and renewable, you have a spot, which is gas turbine generation.

Speaker #4: It's about distribution. It's about transmission. It's about substation. It's about battery storage. You have noticed the Simco 150 megawatts that we have just disclosed a few days ago.

Speaker #4: Power generation now. So the power generation market, on one side, you have the nuclear. We are extremely present and strong in nuclear. I may come back to this after.

Speaker #4: On the other side, you have the renewable projects. Where we have attacked this through battery storage and some transmission, we are not. In solar panels, and we are not in wind machine.

Speaker #4: We think that this has been commoditized and it was not the right time to enter it. In between nuclear and renewable, you have a spot, which is gas turbine generation.

Jean-Louis Servranckx: This is going to be the strong spot during the 10 years to come, Aecon had to be within this spot. On another hand, we are not speaking about first of a kind when we speak about gas turbine. There is something like 500 gas turbine projects under construction every year. The contract model is EPC. What we decided to do a few years ago when we realized that we needed to be there, was to strengthen our capacity to be able to catch this kind of project. Different way of doing it. We have acquired United in United States, specialist in power generation and in EPC delivery. If you go to their track record, it's impressive. We have secured partnership with one of the best engineering company with combined cycle, which is Técnicas Reunidas. They have built more than 60 of those kind of projects.

Jean-Louis Servranckx: This is going to be the strong spot during the 10 years to come, Aecon had to be within this spot. On another hand, we are not speaking about first of a kind when we speak about gas turbine. There is something like 500 gas turbine projects under construction every year. The contract model is EPC. What we decided to do a few years ago when we realized that we needed to be there, was to strengthen our capacity to be able to catch this kind of project. Different way of doing it. We have acquired United in United States, specialist in power generation and in EPC delivery. If you go to their track record, it's impressive. We have secured partnership with one of the best engineering company with combined cycle, which is Técnicas Reunidas. They have built more than 60 of those kind of projects.

Speaker #4: This is going to be the strong spot during the 10 years to come, and Aecon had to be within this spot. On the other hand, we are not speaking about first of a kind when we speak about gas turbine.

Speaker #4: I mean, there is something like 500 gas turbine projects under construction every year. So the contract model is EPC. So what we decided to do a few years ago when we realized that we needed to be there, was to strengthen our capacity to be able to catch this kind of project.

Speaker #4: Different way of doing it. We have acquired United in United States, specialist in power generation and in EPC delivery. If you go to their track record, it's impressive.

Speaker #4: We have secured a partnership with one of the best engineering companies in combined cycle, which is Tecnicas Reunidas. They have built more than 60 of those kinds of projects.

Speaker #4: In addition, this project is in Edmonton, quite close from our industrial base. The client, Pembina, is quite well known from us. I mean, we have been working with them.

Jean-Louis Servranckx: In addition, this project is in Edmonton, quite close from our industrial base. The client, Pembina, is quite well-known from us. We have been working with them. We know them perfectly. The output of this power plant is secured by a power purchase agreement with Meta. Last point, long development phase. We have been working in perfect collaboration with our clients and our engineering partner during more than 12 months. Before we close this job, we had a very good knowledge of the scope, the price, and the risk. In addition, most of the long-lead equipment have been ordered and are going to be supplied with the corresponding warranty and liability by the owner. This was the target and the project to catch.

Jean-Louis Servranckx: In addition, this project is in Edmonton, quite close from our industrial base. The client, Pembina, is quite well-known from us. We have been working with them. We know them perfectly. The output of this power plant is secured by a power purchase agreement with Meta. Last point, long development phase. We have been working in perfect collaboration with our clients and our engineering partner during more than 12 months. Before we close this job, we had a very good knowledge of the scope, the price, and the risk. In addition, most of the long-lead equipment have been ordered and are going to be supplied with the corresponding warranty and liability by the owner. This was the target and the project to catch.

Speaker #4: We know them perfectly. And the output of this power plant is secured by a power purchase agreement with Meta. Last point: long development phase.

Speaker #4: We have been working in perfect collaboration with our clients and our engineering partner during more than 12 months. So we before we closed this job, we had a very, very good knowledge of the scope, the price, and the risk.

Speaker #4: In addition, most of the long lead equipment have been ordered and are going to be supplied with the corresponding warranty and liability by the owner.

Speaker #4: So this was the target and the project to catch. We have been patiently building capacity and core competency to be able to execute it securely, and we just consider that it's a very good catch for Aecon.

Jean-Louis Servranckx: We have been patiently building capacity and core competency to be able to execute it securely, we just consider that it's a very good catch for Aecon. Have I answered your question?

Jean-Louis Servranckx: We have been patiently building capacity and core competency to be able to execute it securely, we just consider that it's a very good catch for Aecon. Have I answered your question?

Speaker #4: Have I answered your question?

Speaker #5: Right. Yes. Thanks for the very detailed answers, Jean-Louis. I appreciate it. Next question's on labor availability. Obviously, you were quite successful winning several contracts in recent months that provide good visibility into future growth.

Frederic Bastien: Yes. Thanks for the very detailed answer, Jean-Louis. I appreciate it. Next question is on labor availability. Obviously, you were quite successful winning several contracts in recent months that provide good visibility into future growth. How are you thinking about scaling your workforce to meet this expected demand, what risk do you see around labor availability going forward?

Frederic Bastien: Yes. Thanks for the very detailed answer, Jean-Louis. I appreciate it. Next question is on labor availability. Obviously, you were quite successful winning several contracts in recent months that provide good visibility into future growth. How are you thinking about scaling your workforce to meet this expected demand, what risk do you see around labor availability going forward?

Speaker #5: How are you thinking about scaling your workforce to meet this expected demand? And what risk do you see around labor availability going forward?

Speaker #4: I would say that two different issues. I mean, the staff and the management teams. And the trades. So far, we have not seen shortages of trades.

Jean-Louis Servranckx: I would say there are two different issues. The staff and the management teams and the trades. So far, we have not seen shortages of trades. We have a mid- and long-term agreement with major trade unions when we are open shop. We also have a very strong geographical presence. We do not see, at this stage, issues so far. As I've said a few minutes ago, we are always extremely focused on the balance of our activity geographically, sector, time for execution, so that we don't unduly overload one aspect. Regarding staff and management, it's a constant fight. You probably remember, we have created Aecon University a few years ago. We have a project management academy. We are training, we are recruiting, we are trying to reward as good as we can all our management.

Jean-Louis Servranckx: I would say there are two different issues. The staff and the management teams and the trades. So far, we have not seen shortages of trades. We have a mid- and long-term agreement with major trade unions when we are open shop. We also have a very strong geographical presence. We do not see, at this stage, issues so far. As I've said a few minutes ago, we are always extremely focused on the balance of our activity geographically, sector, time for execution, so that we don't unduly overload one aspect. Regarding staff and management, it's a constant fight. You probably remember, we have created Aecon University a few years ago. We have a project management academy. We are training, we are recruiting, we are trying to reward as good as we can all our management.

Speaker #4: We have mid- and long-term agreements with major trade unions. When we are open shop—I mean, we also have a very strong geographical presence.

Speaker #4: So, we do not see, at this stage, issues so far. As I've said a few minutes ago, we are always extremely focused on the balance of our activity—geographically, by sector, and in terms of time for execution.

Speaker #4: So that we don't unduly overload I mean, one aspect. Regarding staff and management, I mean, it's a constant fight. You probably remember we have created Aecon University a few years ago.

Speaker #4: We have a project management academy. We are training. We are recruiting we are trying to reward as good as we can all our management.

Jean-Louis Servranckx: It's a constant fight. It's one of my most important file on my desk to ensure that we always have the capacity to execute this backlog that is growing.

Jean-Louis Servranckx: It's a constant fight. It's one of my most important file on my desk to ensure that we always have the capacity to execute this backlog that is growing.

Speaker #4: It's a constant fight, but it's one of my most important—I mean, on my desk—to ensure that we always have the capacity to execute this backlog that is growing.

Speaker #5: Thank you. Thanks, Jean-Louis. That's all I have. I'll pass it over.

Frederic Bastien: Thank you. Thanks, Jean-Louis. That's all I have. I'll pass it over.

Frederic Bastien: Thank you. Thanks, Jean-Louis. That's all I have. I'll pass it over.

Speaker #2: Our next question comes from Benoit Poirier of Desjardins. Your line is open.

Operator: Our next question comes from Benoit Poirier of Desjardins. Your line is open.

Operator: Our next question comes from Benoit Poirier of Desjardins. Your line is open.

Speaker #6: Good morning, everyone. Just on the concession side, obviously you've been successful in securing the agreement with Simco, so you're currently in pre-development. But I was just curious to know maybe a little bit more about the pipeline of opportunities for concessions these days.

Benoit Poirier: Good morning, everyone. Just on the concession side, obviously, you have been successful to secure the agreement with Simcoe, currently in pre-development. I was just curious to know maybe a little bit more about the pipeline of opportunities for concession these days. Obviously, you have been quite successful to grow construction, I am just curious what are the opportunities you see on the concession side to grow this segment? Thank you.

Benoit Poirier: Good morning, everyone. Just on the concession side, obviously, you have been successful to secure the agreement with Simcoe, currently in pre-development. I was just curious to know maybe a little bit more about the pipeline of opportunities for concession these days. Obviously, you have been quite successful to grow construction, I am just curious what are the opportunities you see on the concession side to grow this segment? Thank you.

Speaker #6: So obviously, you've been quite successful to grow construction, but I'm just curious whether what are the kind of the opportunities you see on the concession side to grow this segment?

Speaker #6: Thank you.

Speaker #7: Morning, Benoit. Jerome here. We really the concession business continues to perform really quite well. So as noted, Simco was successfully secured. That builds on our expertise with regards to battery ownership, but also execution of battery projects.

Jerome Julier: Morning, Benoit. Jerome here. The concession business continues to perform really quite well. As noted, Simcoe was successfully secured. That builds on our expertise with regards to battery ownership, but also execution of battery projects. As Jean-Louis mentioned in his prepared notes, under delivery or delivered, Aecon has had roughly a whole gigawatt of battery storage systems in Ontario, which I think is probably something akin to a market-leading position. We have a lot of confidence in that aspect of the execution. The team is continuing to work on the airports in the U.S. Virgin Islands with regards to progressive development. That is going according to expectations. Additionally, you would have seen in the notes, Aecon Concessions is developing a network asset for a third-party client. On that front, the construction side of the house will be building the asset for concessions ownership.

Jerome Julier: Morning, Benoit. Jerome here. The concession business continues to perform really quite well. As noted, Simcoe was successfully secured. That builds on our expertise with regards to battery ownership, but also execution of battery projects. As Jean-Louis mentioned in his prepared notes, under delivery or delivered, Aecon has had roughly a whole gigawatt of battery storage systems in Ontario, which I think is probably something akin to a market-leading position. We have a lot of confidence in that aspect of the execution. The team is continuing to work on the airports in the U.S. Virgin Islands with regards to progressive development. That is going according to expectations. Additionally, you would have seen in the notes, Aecon Concessions is developing a network asset for a third-party client. On that front, the construction side of the house will be building the asset for concessions ownership.

Speaker #7: Jean-Louis mentioned and is prepared notes. Under delivery or delivered, Aecon's had roughly a full gigawatt of battery storage systems in Ontario, which I think is probably something akin to a market-leading position.

Speaker #7: So we have a lot of confidence in that aspect of the execution. The team's continuing to work. The airports in the U.S. Virgin Islands, with regards to progressive development.

Speaker #7: So that's going according to expectations. Additionally, as you would have seen in the notes, Aecon Concessions is developing a network asset for a third-party client, and on that front, the construction side of the house will be building the asset for Concessions ownership.

Speaker #7: There'll be an intra-company elimination. So there'll be a negative drag on concessions EBITDA. But then concessions will be able to then onward use that asset to generate long-term income against a strong credit counterparty.

Jerome Julier: There will be an intracompany elimination, there will be a negative drag on concessions EBITDA. Concessions will be able to then onward use that asset to generate long-term income against a strong credit counterparty. From our perspective, we are really pleased with the work that Concessions is doing. Very much aligned with the long-term vision of that platform, which is to grow, diversify, generate long-term cash-generating assets, be able to get development-style returns, all while generating also construction revenue and profitability from Aecon, and provide an additional source of capital unlock for our clients. I think overall, the quarter billion dollars of book value of equity, it is obviously worth more than that. We will continue to look to invest in this platform because it generates a normal and unique returns for Aecon and shareholders.

Jerome Julier: There will be an intracompany elimination, there will be a negative drag on concessions EBITDA. Concessions will be able to then onward use that asset to generate long-term income against a strong credit counterparty. From our perspective, we are really pleased with the work that Concessions is doing. Very much aligned with the long-term vision of that platform, which is to grow, diversify, generate long-term cash-generating assets, be able to get development-style returns, all while generating also construction revenue and profitability from Aecon, and provide an additional source of capital unlock for our clients. I think overall, the quarter billion dollars of book value of equity, it is obviously worth more than that. We will continue to look to invest in this platform because it generates a normal and unique returns for Aecon and shareholders.

Speaker #7: So, from our perspective, we're really pleased with the work that Concessions is doing. Very much aligned with the long-term vision of that platform, which is to grow, diversify, generate long-term cash-generating assets, and be able to get development-style returns, all while also generating construction revenue and profitability for Aecon.

Speaker #7: And provide an additional source of capital unlock for our clients. So, I think overall, the quarter billion dollars of book value of equity is obviously worth more than that.

Speaker #7: But we'll continue to look to invest in this platform because it generates normal and unique returns for Aecon and shareholders.

Benoit Poirier: That is great color, Jerome. Maybe on the CapEx side, you mentioned that we should see a slight uptick in terms of CapEx as you grow revenue. What about the kind of CapEx we might see going forward as you further grow the construction revenue?

Benoit Poirier: That is great color, Jerome. Maybe on the CapEx side, you mentioned that we should see a slight uptick in terms of CapEx as you grow revenue. What about the kind of CapEx we might see going forward as you further grow the construction revenue?

Speaker #6: Yeah, that's great color, Jerome. And maybe on the CapEx side, you mentioned that we should see a slight uptick in terms of CapEx as you grow revenue.

Speaker #6: What about the kind of CapEx we might see going forward as you further grow the construction revenue?

Speaker #7: Yeah. So the we're very focused with regards to capital deployment. So there's two ways to think about it. One is the raw dollar CapEx.

Jerome Julier: Yeah. We're very focused with regards to capital deployment. There's two ways to think about it. One is the raw CAD CapEx, and then the other one's the finance leases, right? Those are both different forms of capital. Our longer-term objective is to try to maintain good capital intensity and operating leverage with regards to the capital equipment deployed. We're very selective when we deploy CapEx and whether it's equipment, machinery, properties, fabrication facilities, that it needs to generate certain minimum return thresholds for shareholders. Yes, capital is going up, but when you're growing the business at north of 20% rate, that shouldn't be unexpected. We're also really careful about not falling into the trap of just buying equipment to try to generate higher EBITDA because that equipment needs to be maintained and needs to be depreciated.

Jerome Julier: Yeah. We're very focused with regards to capital deployment. There's two ways to think about it. One is the raw CAD CapEx, and then the other one's the finance leases, right? Those are both different forms of capital. Our longer-term objective is to try to maintain good capital intensity and operating leverage with regards to the capital equipment deployed. We're very selective when we deploy CapEx and whether it's equipment, machinery, properties, fabrication facilities, that it needs to generate certain minimum return thresholds for shareholders. Yes, capital is going up, but when you're growing the business at north of 20% rate, that shouldn't be unexpected. We're also really careful about not falling into the trap of just buying equipment to try to generate higher EBITDA because that equipment needs to be maintained and needs to be depreciated.

Speaker #7: And then the other one's the finance leases, right? So those are both different forms of capital. Our longer-term objective is to try to maintain good capital intensity and operating leverage with regards to the capital equipment deployed.

Speaker #7: We're very selective when we deploy CapEx, whether it's equipment, machinery, property, or fabrication facilities. It needs to generate certain minimum return thresholds for shareholders.

Speaker #7: And so yes, capital is going up, but when you're growing the business at a rate north of 20%, that shouldn't be unexpected. But we're also really careful about not kind of falling into the trap of just buying equipment to try to generate higher EBITDA, because that equipment needs to be maintained and needs to be depreciated.

Speaker #7: And so we do think about things from a return standpoint. So capital is going up in line with revenue; it's actually a little bit less than revenue.

Jerome Julier: We do think about things from a return standpoint. Capital is going up in line with revenue. It's actually a little bit less than revenue. From that standpoint, I think it's just good operational discipline from our teams.

Jerome Julier: We do think about things from a return standpoint. Capital is going up in line with revenue. It's actually a little bit less than revenue. From that standpoint, I think it's just good operational discipline from our teams.

Speaker #7: And from that standpoint, I think it shows good operational discipline from our teams.

Speaker #6: Okay. Maybe just a quick follow-up. You call out in the DMDNA tariff and fuel also in terms of potential risk. I was curious to see if it's material these days or I suspect not, but any color on the tariff and fuel maybe whether it's an impact or not.

Benoit Poirier: Okay. Maybe just a quick follow-up. You call out in the MD&A tariff and fuel also in terms of potential risk. I was curious to see if it's material these days or I suspect not, but any color on the tariff and fuel maybe, whether it's an impact or not.

Benoit Poirier: Okay. Maybe just a quick follow-up. You call out in the MD&A tariff and fuel also in terms of potential risk. I was curious to see if it's material these days or I suspect not, but any color on the tariff and fuel maybe, whether it's an impact or not.

Speaker #7: I mean, it certainly creates operating volatility. Generally speaking, we work pretty closely with our clients to understand where pricing risks exist on commodities like diesel.

Jerome Julier: It certainly creates operating volatility. Generally speaking, we work pretty closely with our clients to understand where pricing risk exists on commodities like diesel, unleaded fuels, various input costs. We try to manage those risks contractually through purchasing approach or through potentially hedging programs or pricing. This type of volatility, I think, is the new normal in our world. It's increasingly been in existence since the COVID pandemic. It's just something that needs to be thought of carefully and managed. We call it out because there's these kind of special risks associated with momentary spikes, and then the pricing mechanisms may not catch up immediately. Right now, the one thing we'll note is a significant portion of our business is tied to construction in place. It's a very local business.

Jerome Julier: It certainly creates operating volatility. Generally speaking, we work pretty closely with our clients to understand where pricing risk exists on commodities like diesel, unleaded fuels, various input costs. We try to manage those risks contractually through purchasing approach or through potentially hedging programs or pricing. This type of volatility, I think, is the new normal in our world. It's increasingly been in existence since the COVID pandemic. It's just something that needs to be thought of carefully and managed. We call it out because there's these kind of special risks associated with momentary spikes, and then the pricing mechanisms may not catch up immediately. Right now, the one thing we'll note is a significant portion of our business is tied to construction in place. It's a very local business.

Speaker #7: Unleaded fuels, various input costs. We try to manage those risks contractually through purchasing approach or through potentially hedging programs. So or pricing. And so this type of volatility, I think, is the new normal in our world.

Speaker #7: It's increasingly been in existence since the COVID pandemic. And it's just something that needs to be thought of carefully and managed. We call it out because there's these kind of special risks associated with momentary spikes and then the pricing mechanisms may not catch up immediately.

Speaker #7: But right now, the one thing we'll note is a significant portion of our business is tied to construction in place, to very local business. And so, when we're operating in our Canadian markets, it is very much focused on Canadian supply chain, Canadian labor—utilizing Canadian equipment.

Jerome Julier: When we're operating in our Canadian markets, it is very much focused on Canadian supply chain, Canadian labor, right? Utilizing Canadian equipment and resources. In our US, it's the same approach. Our international operations probably have a little bit more exposure to that because things need to move around in order to access the slightly more remote locations in Caribbean areas, but that's all kind of contemplated in the bid structure. It's a lot to think about. Candidly, the local nature of what we do makes it a little bit easier for us than some of the other companies out there, so we're grateful for that piece, but doesn't mean we can take our eye off the ball.

Jerome Julier: When we're operating in our Canadian markets, it is very much focused on Canadian supply chain, Canadian labor, right? Utilizing Canadian equipment and resources. In our US, it's the same approach. Our international operations probably have a little bit more exposure to that because things need to move around in order to access the slightly more remote locations in Caribbean areas, but that's all kind of contemplated in the bid structure. It's a lot to think about. Candidly, the local nature of what we do makes it a little bit easier for us than some of the other companies out there, so we're grateful for that piece, but doesn't mean we can take our eye off the ball.

Speaker #7: And resources in our US, it's the same approach. Our international operations probably have a little bit more exposure to that because things need to move around in order to access the slightly more remote locations and Caribbean areas.

Speaker #7: But that's all kind of contemplated in the bid structure, so it's a lot to think about. Candidly, the local nature of what we do makes it a little bit easier for us than some of the other companies out there.

Speaker #7: So, we're grateful for that piece, but it doesn't mean we can take our eye off the ball.

Benoit Poirier: Okay. Thank you very much for the time.

Benoit Poirier: Okay. Thank you very much for the time.

Speaker #6: Okay. Thank you very much for the time.

Speaker #1: Thank you. And our next question comes from Michael Tufholm of TD Callan. Your line is open.

Operator: Thank you. Our next question comes from Michael Tupholme of TD Cowen. Your line is open.

Operator: Thank you. Our next question comes from Michael Tupholme of TD Cowen. Your line is open.

Speaker #5: Thank you. Good morning. My question is regarding the nuclear business and opportunity. I’m wondering if you can provide a bit of an update on not only the opportunities that you’ve already highlighted that you’ve become involved with, such as X-energy in the US, but also some of the new opportunities that you’re looking at—and specifically focused here on the new-build side.

Michael Tupholme: Thank you. Good morning.

Michael Tupholme: Thank you. Good morning.

Jerome Julier: Good morning.

Jean-Louis Servranckx: Good morning.

Michael Tupholme: My question is regarding the nuclear business and opportunity. I'm wondering if you can provide a bit of an update on not only the opportunities that you've already highlighted that you've become involved with, such as X-energy in the US, but also some of the new opportunities that you're looking at, and specifically focused here on the new build side. Be that SMRs or large scale reactors.

Michael Tupholme: My question is regarding the nuclear business and opportunity. I'm wondering if you can provide a bit of an update on not only the opportunities that you've already highlighted that you've become involved with, such as X-energy in the US, but also some of the new opportunities that you're looking at, and specifically focused here on the new build side. Be that SMRs or large scale reactors.

Speaker #5: So be that SMRs or large-scale reactors.

Speaker #2: Yeah. I will do it. Our nuclear revenue is around 1.7 billion. Canadian dollar. I mean, between '70 and '75 percent in Canada. And between '25 and '30 percent in United States.

Jerome Julier: Yeah, I will do it. Our nuclear revenue is around CAD 1.7 billion. That's between 70% and 75% in Canada, and between 25% and 30% in US. In Canada, you know where we are strong, and this is all those program of major component replacement. We are now full steam ahead on the third reactor of Bruce after having delivered on time, on budget, the first two ones. Pickering is also ramping up. We are finalizing the development phase and we should come to execution phase quite soon. We are advanced on the small modular reactor globally, something like 16% of progress on this job. This is something that everyone knows on this call. US is a little newer. What are we doing and what are we going to do in the future?

Jean-Louis Servranckx: Yeah, I will do it. Our nuclear revenue is around CAD 1.7 billion. That's between 70% and 75% in Canada, and between 25% and 30% in US. In Canada, you know where we are strong, and this is all those program of major component replacement. We are now full steam ahead on the third reactor of Bruce after having delivered on time, on budget, the first two ones. Pickering is also ramping up. We are finalizing the development phase and we should come to execution phase quite soon. We are advanced on the small modular reactor globally, something like 16% of progress on this job. This is something that everyone knows on this call. US is a little newer. What are we doing and what are we going to do in the future?

Speaker #2: In Canada, you know where we are strong, and this is all those programs of major component replacement. We are now full steam ahead on the third reactor at Bruce after having delivered on time and on budget the first two units.

Speaker #2: Tickering is also ramping up. We are finalizing the development phase. And we should come to execution phase quite soon. We are advanced on the small modular reactor globally, something like 16% of progress on this job.

Speaker #2: So this is something that everyone knows—I mean, on this call. The U.S. is a little newer. What are we doing, and what are we going to do in the future?

Jerome Julier: The real market at the moment where we are focused on, it's not the new build. It's still early. The only new nuclear under construction in North America is Darlington SMR number one. There's not at the moment in US. The market is about life extension and what they call in US, EPU, which is extended power uprate of the 80 to 90 reactors that exist in US. It's about refurbishing a steam generator and major component of all those reactor to uprate the power output. We are getting stronger and stronger in this market. On another end, we are working more with the Department of Energy. This is federal work, and we like it. We have a look at the new build. You know about this Cascade project, which is the first tranche of four X-energy, 100 reactor.

Jean-Louis Servranckx: The real market at the moment where we are focused on, it's not the new build. It's still early. The only new nuclear under construction in North America is Darlington SMR number one. There's not at the moment in US. The market is about life extension and what they call in US, EPU, which is extended power uprate of the 80 to 90 reactors that exist in US. It's about refurbishing a steam generator and major component of all those reactor to uprate the power output. We are getting stronger and stronger in this market. On another end, we are working more with the Department of Energy. This is federal work, and we like it. We have a look at the new build. You know about this Cascade project, which is the first tranche of four X-energy, 100 reactor.

Speaker #2: The real market at the moment where we are focused on, it's not the new build. I mean, it's still early. The only new nuclear and the construction in North America is Darlington SMR number one.

Speaker #2: There's not at the moment. I mean, in the United States, the market is about life extension and what they call in the United States EPU, which is extended power uprate.

Speaker #2: Of the 80 to 90 reactors that exist in the United States, it's about refurbishing steam generators and major components of all those reactors to uprate the power output.

Speaker #2: We are getting stronger and stronger in this market. On the other end, I mean, we are working more with the Department of Energy. I mean, this is federal work and we like it.

Speaker #2: We have a look at the new build. I mean, you know about this Cascade project, which is the first tranche of four X-energy 100 reactor.

Speaker #2: But it's just ramping up very, I would say, very slowly. The last point about the future I would like to highlight is about fabrication.

Jerome Julier: it's just ramping up very slowly. The last point about the future I would like to highlight is about fabrication. We are extremely strong about fabrication in Canada. It may be about those steel composite elements for the new build to come.

Jean-Louis Servranckx: it's just ramping up very slowly. The last point about the future I would like to highlight is about fabrication. We are extremely strong about fabrication in Canada. It may be about those steel composite elements for the new build to come. For example, the SMR number 1. It's also about module assembly. I just remind you that we have been building some modules for Westinghouse a few years ago, we are in discussion to optimize all our processes to modernize our workshops, our tools, our robotics. This is probably one of the point of the future.

Speaker #2: We are extremely strong about fabrication in Canada. It may be about those steel composite elements for the new build to come. I mean, for example, the SMR number one.

Jean-Louis Servranckx: For example, the SMR number 1. It's also about module assembly. I just remind you that we have been building some modules for Westinghouse a few years ago, we are in discussion to optimize all our processes to modernize our workshops, our tools, our robotics. This is probably one of the point of the future.

Speaker #2: It's also about modular assembly. I'll just remind you that we have been building some modules for Westinghouse a few years ago. And we are in discussions to optimize all our processes to modernize our workshops, our tools, our robotics. This is probably one of the points of the future.

Speaker #5: Okay. Perfect. Thank you for that. Second question is regarding the updated Outlook commentary specifically for revenues. So now calling for double-digit revenue growth in 2026 and then additional growth in 2027.

Michael Tupholme: Okay, perfect. Thank you for that. Second question is regarding the updated outlook commentary specifically for revenues. Now calling for double-digit revenue growth in 2026 and then additional growth in 2027. Obviously, very strong top-line growth in the Q2 and acceleration in terms of the rate of growth relative to what you saw in the Q1. How should we think about the revenue growth opportunity in terms of rate of growth in the H2 of the year? In addition to that, as we look a little further out, as we think about 2027, what's the right way to think about that growth opportunity?

Michael Tupholme: Okay, perfect. Thank you for that. Second question is regarding the updated outlook commentary specifically for revenues. Now calling for double-digit revenue growth in 2026 and then additional growth in 2027. Obviously, very strong top-line growth in the Q2 and acceleration in terms of the rate of growth relative to what you saw in the Q1. How should we think about the revenue growth opportunity in terms of rate of growth in the H2 of the year? In addition to that, as we look a little further out, as we think about 2027, what's the right way to think about that growth opportunity?

Speaker #5: Obviously, very strong top-line growth in the second quarter and acceleration in terms of the rate of growth relative to what you saw in the first quarter.

Speaker #5: How should we think about the revenue growth opportunity, in terms of rate of growth, in the second half of the year? And then, in addition to that, as we look a little further out, as we think about '27, what's the right way to think about that growth opportunity?

Speaker #7: So the change in the Outlook which is rightly noted went from we said '26 was going to exceed '25. And '25 was an exceptional performance, by the way.

Jerome Julier: The change in the outlook, which is rightly noted, went from we said 2026 was going to exceed 2025, and 2025 was an exceptional performance, by the way. We thought it prudent to adjust it to note the double-digit level of growth, in particular, just with what we're seeing, the backlog program that we have in place of CAD 10.5 billion, the recurring revenue, what I describe as the book and burn cadence of the business, is all quite positive, in addition to the recent awards that we've seen. With regards to specific guidance, we always shy away from that. We'll note, as it stands today, in the next 12 months, there's roughly CAD 4 billion of what we describe as secured backlog that's executable.

Jerome Julier: The change in the outlook, which is rightly noted, went from we said 2026 was going to exceed 2025, and 2025 was an exceptional performance, by the way. We thought it prudent to adjust it to note the double-digit level of growth, in particular, just with what we're seeing, the backlog program that we have in place of CAD 10.5 billion, the recurring revenue, what I describe as the book and burn cadence of the business, is all quite positive, in addition to the recent awards that we've seen. With regards to specific guidance, we always shy away from that. We'll note, as it stands today, in the next 12 months, there's roughly CAD 4 billion of what we describe as secured backlog that's executable.

Speaker #7: We thought it prudent to adjust it to note the double-digit level of growth. In particular, just with what we're seeing the backlog program that we have in place of 10-point $5 billion to recurring revenue what I describe as the book-and-burn cadence of the business is all quite positive.

Speaker #7: In addition to the recent awards that we've seen, so with regards to specific guidance, we always shy away from that. We'll note, as it stands today, in the next 12 months there's roughly $4 billion of what we describe as secured backlog.

Speaker #7: That's executable. In addition, we know there's been two additional projects that have been that will be added to backlog in Q3 that have been announced, which is the green light electricity center and then the Winnipeg Wastewater phase two biosolids program.

Jerome Julier: In addition, we know there's been two additional projects that will be added to backlog in Q3 that have been announced, which is the Greenlight Electricity Center and the Winnipeg Wastewater Phase 2 biosolids program. Don't want to give a specific number. I think one of the items was we want to note that where we saw street views on revenue was likely a little bit light, we just wanted to encourage people to really get a better understanding of our conservative nature to backlog reporting and the fact that we have been very successful in organic revenue growth, all tied again around being able to secure projects with really appropriate risk-adjusted returns.

Jerome Julier: In addition, we know there's been two additional projects that will be added to backlog in Q3 that have been announced, which is the Greenlight Electricity Center and the Winnipeg Wastewater Phase 2 biosolids program. Don't want to give a specific number. I think one of the items was we want to note that where we saw street views on revenue was likely a little bit light, we just wanted to encourage people to really get a better understanding of our conservative nature to backlog reporting and the fact that we have been very successful in organic revenue growth, all tied again around being able to secure projects with really appropriate risk-adjusted returns.

Speaker #7: So, don't want to give a specific number. I think one of the items was just, we want to note that where we saw street views on revenue was likely a little bit light.

Speaker #7: And so we just wanted to encourage people to really get a better understanding of our conservative nature to backlog reporting and the fact that we have been very successful in organic revenue growth.

Speaker #7: All tied, again, around being able to secure projects with really appropriate risk-adjusted returns. So the one item that's just worth noting is we remain very focused on securing work that has good risk balance to it, work that is executable.

Jerome Julier: The one item that's just worth noting is we remain very focused on securing work that has good risk balance to it, work that is executable, and any given level of margin, we are going to drop risk. At any given level of risk, we're going to take more margin. Overall, we're pretty happy with the work that we've been securing and how that work looks to be burning off over the next, call it 12 to 18 months.

Jerome Julier: The one item that's just worth noting is we remain very focused on securing work that has good risk balance to it, work that is executable, and any given level of margin, we are going to drop risk. At any given level of risk, we're going to take more margin. Overall, we're pretty happy with the work that we've been securing and how that work looks to be burning off over the next, call it 12 to 18 months.

Speaker #7: And any given level of margin, we are going to drop risk. And at any given level of risk, we're going to take more margin.

Speaker #7: But overall, we're pretty happy with the work that we've been securing and how that work looks to be burning off over the next call it 12 to 18 months.

Speaker #5: Thank you for that, Jerome.

Michael Tupholme: Thank you for that, Jerome.

Michael Tupholme: Thank you for that, Jerome.

Speaker #6: Thanks, Mike.

Jerome Julier: Thanks, Ryan.

Jerome Julier: Thanks, Ryan.

Speaker #1: Thank you. And our next question comes from Chris Murray of ATB Cormark. Your line is open.

Operator: Thank you. Our next question comes from Chris Murray of ATB Capital Markets. Your line is open.

Operator: Thank you. Our next question comes from Chris Murray of ATB Capital Markets. Your line is open.

Speaker #6: Yeah. Thanks, folks. So just maybe following on on that revenue question. I guess what I'm trying to understand is just to your point about kind of the risk-adjusted return on some of these projects.

Chris Murray: Yeah, thanks, folks. Just been following on that revenue question. I guess what I'm trying to understand is just to your point about the kind of the risk-adjusted return on some of these projects. I'm just trying to also understand, a lot of these are earlier stage. I'm trying to understand if this is kind of a function as we think about this revenue growth, but also relative to the margin. Is there something going on with, call it larger procurement, or are you just being cautious on early-stage reserves?

Chris Murray: Yeah, thanks, folks. Just been following on that revenue question. I guess what I'm trying to understand is just to your point about the kind of the risk-adjusted return on some of these projects. I'm just trying to also understand, a lot of these are earlier stage. I'm trying to understand if this is kind of a function as we think about this revenue growth, but also relative to the margin. Is there something going on with, call it larger procurement, or are you just being cautious on early-stage reserves? I'm just trying to understand, as these things evolve, if it's just kind of phase of project that plays into what we're seeing with the dynamic or if there's something else to be kind of aware of in terms of what's in the backlog, that quality of revenue, and how it plays out over the next couple of years.

Speaker #6: I'm just trying to also understand a lot of these are earlier stage. So I'm trying to understand if this is kind of a function as we think about this revenue growth, but also relative to the margin.

Speaker #6: Was there something going on with call it larger procurement, or is there are you just being cautious on early-stage reserves? I'm just trying to understand as these things evolve, if it's just kind of phase of project that plays into what we're seeing with the dynamic, or if there's something else to be kind of aware of in terms of the in terms of what's in the backlog, that quality of revenue, and how it plays out over the next couple of years.

Chris Murray: I'm just trying to understand, as these things evolve, if it's just kind of phase of project that plays into what we're seeing with the dynamic or if there's something else to be kind of aware of in terms of what's in the backlog, that quality of revenue, and how it plays out over the next couple of years.

Speaker #2: I would begin and maybe Jerome, if you want to add something. I mean, backlog is about quantity and quality. If we have this backlog today, it's not by chance.

Jean-Louis Servranckx: I will begin and maybe, Jerome, if you want to add something. Backlog is about quality and quality. If we have this backlog today, it's not by chance. We do not wait about Aecon on a Friday morning to say, Hey, we went from 5 billion to 10 billion, and most probably we are going to grow it again. We have a strategy, and we are extremely focused on delivering our strategy. This backlog is highly diversified. Again, it's not by chance. It's because we had targets for new businesses. We had targets for US and international. We had targets about our proportion between fixed price and variable price, which makes it probably the best risk balance backlog that we ever had in the life of Aecon. There is more to come, in 2027.

Jean-Louis Servranckx: I will begin and maybe, Jerome, if you want to add something. Backlog is about quality and quality. If we have this backlog today, it's not by chance. We do not wait about Aecon on a Friday morning to say, Hey, we went from 5 billion to 10 billion, and most probably we are going to grow it again. We have a strategy, and we are extremely focused on delivering our strategy. This backlog is highly diversified. Again, it's not by chance. It's because we had targets for new businesses. We had targets for US and international. We had targets about our proportion between fixed price and variable price, which makes it probably the best risk balance backlog that we ever had in the life of Aecon. There is more to come, in 2027.

Speaker #2: I mean, we do not wait about acorn on a Friday morning to say, "Hey, we went from 5 billion to 10 billion and most probably we are going to grow it again." We have a strategy, and we are extremely focused on delivering our strategy.

Speaker #2: This backlog is highly diversified. Again, it's not by chance. It's because we add targets for new businesses. We add targets for U.S. and international.

Speaker #2: We are targets about our proportion between fixed price and variable price, which makes it probably the best risk-balanced backlog that we ever had in the life of Aecon.

Speaker #2: There is more to come. I mean, in 2027, you have understood that we are under the development phase on a few projects. That will come to execution.

Jean-Louis Servranckx: You have understood that we are in the development phase on a few projects that will come to execution. We can speak about Mactaquac, we can speak about Roberts Bank, we can speak about Arctic Over-the-Horizon Radar Program. All this will, at one moment of time, materialize in revenue. Most of those jobs, as I was explaining a few minutes ago, have a very thorough development phase before we go to execution. We have, in terms of predictability of our future margin, we are in a much better spot

Jean-Louis Servranckx: You have understood that we are in the development phase on a few projects that will come to execution. We can speak about Mactaquac, we can speak about Roberts Bank, we can speak about Arctic Over-the-Horizon Radar Program. All this will, at one moment of time, materialize in revenue. Most of those jobs, as I was explaining a few minutes ago, have a very thorough development phase before we go to execution. We have, in terms of predictability of our future margin, we are in a much better spot

Speaker #2: I mean, we can speak about Macktaquac, we can speak about Roberts Bank, we can speak about Arctic Over the Horizon. All this will, at one moment in time, materialize in revenue.

Speaker #2: Most of those jobs, as I was explaining a few minutes ago, have a very thorough development phase before we go to execution. So, in terms of predictability of our future margin, we are in a much better spot today.

Jean-Louis Servranckx: Today. Maybe, Jerome, you want to add something regarding profitability and margin level?

Jean-Louis Servranckx: Today. Maybe, Jerome, you want to add something regarding profitability and margin level?

Speaker #2: Maybe Jerome, you want to add something regarding profitability and margin levels?

Speaker #7: Yeah. And so, on that front, I think the question behind the question, Chris, is: Given the typical construction S-curve on project delivery and how early we are on several major programs, is that potentially influencing the margin cadence that we're seeing today?

Jerome Julier: Yeah. On that front, I think the question behind the question, Chris, is given the typical construction S-curve on project delivery and how early we are on several major programs, is that potentially influencing the margin cadence that we're seeing today? The answer is yes, but not in a very material way, right? Our general approach is consistent with industry best practices. We are thoughtful about the level of margin recognition that goes through our accounting system, the amount of contingency that we have available on projects with regards to execution uncertainty when it's appropriate. Obviously that vault of contingency is larger at the outset of a project than at the end of the project. In an ideal situation, you're releasing that into profitability. It's a small factor, but I wouldn't say it's one that's super material.

Jerome Julier: Yeah. On that front, I think the question behind the question, Chris, is given the typical construction S-curve on project delivery and how early we are on several major programs, is that potentially influencing the margin cadence that we're seeing today? The answer is yes, but not in a very material way, right? Our general approach is consistent with industry best practices. We are thoughtful about the level of margin recognition that goes through our accounting system, the amount of contingency that we have available on projects with regards to execution uncertainty when it's appropriate. Obviously that vault of contingency is larger at the outset of a project than at the end of the project. In an ideal situation, you're releasing that into profitability. It's a small factor, but I wouldn't say it's one that's super material.

Speaker #7: The answer is yes, but not in a very material way, right? So our general approach is consistent with industry best practices. We are thoughtful about the level of margin recognition that goes through our accounting system.

Speaker #7: The amount of contingency that we have available on projects, with regards to execution uncertainty, depends on when it's appropriate. And obviously, that bulk of contingency is larger at the outset of a project than at the end of the project.

Speaker #7: In an ideal situation, you're really seeing that into profitability. So it's a small factor, but I wouldn't say it's one that's super material.

Speaker #7: And then on the— you asked the question about whether procurement is influencing things or swinging the margin profile. And the answer is not really, right?

Jerome Julier: On the ask question about whether procurement is influencing things or swinging the margin profile, the answer is not really, right? We are a counterparty and delivery partner of choice for very large major capital programs across North America. That's always going to involve procurement of material and subcontract resources. That's always been part of the mix for us, and that's always been part of the approach to our margins. I'd say there's nothing materially shifting on either of those two factors. It really is more around the approach to risk and then the better stability and long-term visibility we have on earnings and cash flow generation at Aecon.

Jerome Julier: On the ask question about whether procurement is influencing things or swinging the margin profile, the answer is not really, right? We are a counterparty and delivery partner of choice for very large major capital programs across North America. That's always going to involve procurement of material and subcontract resources. That's always been part of the mix for us, and that's always been part of the approach to our margins. I'd say there's nothing materially shifting on either of those two factors. It really is more around the approach to risk and then the better stability and long-term visibility we have on earnings and cash flow generation at Aecon.

Speaker #7: We are a counterparty and delivery partner of choice for very large, major capital programs. Across North America, that's always going to involve procurement of material and subcontract resources.

Speaker #7: That's always been part of the mix for us, and that's always been part of the approach to our margin. So, I'd say there's nothing kind of materially shifting on either of those two factors. It really is more around the approach to risk, and then the better stability and long-term visibility we have on earnings and cash flow generation in Aecon.

Speaker #6: Okay, thank you. My next question—just, it was interesting in the notes and then in the adjusted numbers—we saw some costs associated with a new ERP program.

Chris Murray: Okay. Thank you. My next question, it was interesting in the notes and in the adjusted numbers, we saw some costs associated with a new ERP program, which is something I don't think we've seen in a while from you folks. Can you talk a little bit about what that program is all about, what it brings to you, and what you're trying to achieve? Is this some sort of new way to cost, or does it give you a different tool set? Any color would be appreciated.

Chris Murray: Okay. Thank you. My next question, it was interesting in the notes and in the adjusted numbers, we saw some costs associated with a new ERP program, which is something I don't think we've seen in a while from you folks. Can you talk a little bit about what that program is all about, what it brings to you, and what you're trying to achieve? Is this some sort of new way to cost, or does it give you a different tool set? Any color would be appreciated.

Speaker #6: Which is something I don't think we've seen in a while from you folks. Can you talk a little bit about what that program is all about?

Speaker #6: What does it bring to you and what are you trying to achieve? And is this some sort of new way to cost, or does it give you a different tool set?

Speaker #6: So, any color would be appreciated.

Speaker #5: Yeah. I was wondering if it was going to come up. So maybe I'll launch off with saying that general perspective is the systems, technology, infrastructure that we have at Acorn is top tier.

Jerome Julier: Yeah. I was wondering if it was going to come up. Maybe I'll launch off with saying that general perspective is that the systems, technology infrastructure that we have at Aecon is top tier. It enables us to deliver the vast multitude of projects that we have on the books. It allows us to work in the secure environments required for defense and nuclear. This additional call-out is really around the deployment of additional best-in-suite systems within an Aecon ecosystem to allow us to continue to not only maintain that leading position, but effectively try to be actually at the top of systems with regards to project management, integration, data governance, AI, and all the various items that we view as candidly, it's going to be largely table stakes probably at some point.

Jerome Julier: Yeah. I was wondering if it was going to come up. Maybe I'll launch off with saying that general perspective is that the systems, technology infrastructure that we have at Aecon is top tier. It enables us to deliver the vast multitude of projects that we have on the books. It allows us to work in the secure environments required for defense and nuclear. This additional call-out is really around the deployment of additional best-in-suite systems within an Aecon ecosystem to allow us to continue to not only maintain that leading position, but effectively try to be actually at the top of systems with regards to project management, integration, data governance, AI, and all the various items that we view as candidly, it's going to be largely table stakes probably at some point.

Speaker #5: It enables us to deliver the vast multitude of projects that we have on the books. It allows us to work in the secure environments required for defense and nuclear.

Speaker #5: This additional callout is really around the deployment of additional best-in-suite systems within an acorn ecosystem. To allow us to continue to not only kind of maintain that leading position, but effectively try to be actually at the top of systems with regards to project management integration, data governance, AI, and all the various items that we view as candidly.

Speaker #5: It's going to be largely table stakes probably at some point, but it's definitely one where you have to be part of it when you think about digital twins, integrated design delivery, scheduling, the engineering work that we're doing with regards to United, and how that all ties into eventual project delivery on the programs that we're on.

Jerome Julier: It's definitely one where you have to be part of it when you think about digital twins, integrated design delivery, scheduling, the engineering work that we're doing with regards to United and how that all ties into eventual project delivery on the programs that we're on and the programs that are coming, right? I think one of the things that we're very mindful at Aecon is this is a unique time in the construction market with regards to really strong demands. We understand resourcing is going to be constrained. We want to make sure that we are in front of that. One of the ways to make sure that you get best efficiency and productivity out of your teams is to have the best tools available for them. That's what this is tied to.

Jerome Julier: It's definitely one where you have to be part of it when you think about digital twins, integrated design delivery, scheduling, the engineering work that we're doing with regards to United and how that all ties into eventual project delivery on the programs that we're on and the programs that are coming, right? I think one of the things that we're very mindful at Aecon is this is a unique time in the construction market with regards to really strong demands. We understand resourcing is going to be constrained. We want to make sure that we are in front of that. One of the ways to make sure that you get best efficiency and productivity out of your teams is to have the best tools available for them. That's what this is tied to.

Speaker #5: And the programs that are coming, right? So I think one of the things that we're very mindful at Acorn is this is a unique time in the construction market with regards to really strong demands.

Speaker #5: We understand resourcing is going to be constrained. We want to make sure that we're in front of that. One of the ways to make sure that you get best efficiency and productivity out of your teams is to have the best tools available for them.

Speaker #5: That's what this is tied to. I think I'd also note that this was something that we started last year as far as the assessment and early implementation.

Jerome Julier: I think I'd also note that this was something that we started last year, as far as the assessment and early implementation. Now, the specific reason why it's being called out as an adjustment factor in our financials is we try to improve comparability with our results and our peers, which are largely US traded. In the United States, GAAP accounting effectively allows all of these costs to be capitalized. Here, if we were taking that approach, this would have all folded into the CapEx program, and no one would have seen it. However, I think number one, it's important to give people good line of sight into where this money is being spent because it hits the MGNA line.

Jerome Julier: I think I'd also note that this was something that we started last year, as far as the assessment and early implementation. Now, the specific reason why it's being called out as an adjustment factor in our financials is we try to improve comparability with our results and our peers, which are largely US traded. In the United States, GAAP accounting effectively allows all of these costs to be capitalized. Here, if we were taking that approach, this would have all folded into the CapEx program, and no one would have seen it. However, I think number one, it's important to give people good line of sight into where this money is being spent because it hits the MGNA line.

Speaker #5: Now, the specific reason why it's being called out as an adjustment factor in our financials is, we try to improve comparability with our results and our peers, which are largely US-traded.

Speaker #5: And in the United States, gap accounting effectively allows all of these costs to be capitalized. And so here, if we were taking that approach, this would have all folded into the CapEx program and no one would have seen it.

Speaker #5: However, I think a number one, it's important to give people the line of sight into where this money is being spent because it hits the MG&A line.

Speaker #5: And then, number two, it probably also helps to give confidence to our investors and our teams that we are investing in the future to ensure long-term stability and execution capacity, so that we can deliver on what is a very meaningful amount of work that's ahead of us, over and above the secured backlog.

Jerome Julier: Number two, probably also helps to give confidence to our investors and our teams that we are investing in the future to ensure long-term stability, execution capacity so that we can deliver on what is a very meaningful amount of work that's ahead of us over and above the secure backlog.

Jerome Julier: Number two, probably also helps to give confidence to our investors and our teams that we are investing in the future to ensure long-term stability, execution capacity so that we can deliver on what is a very meaningful amount of work that's ahead of us over and above the secure backlog.

Speaker #6: Okay. Great. And then just maybe just for modeling purposes then, so I guess Q2 was about just a hair over 4.2 million. So should we just be expecting that's kind of the normalized run rate?

Chris Murray: Okay, great. Just maybe just for modeling purposes. I guess Q2 was about just a hair over CAD 4.2 million. Should we just be expecting that's a normalized run rate? What's the duration that we should be expecting these costs? I assume that just will be over and above on your MG&A spend.

Chris Murray: Okay, great. Just maybe just for modeling purposes. I guess Q2 was about just a hair over CAD 4.2 million. Should we just be expecting that's a normalized run rate? What's the duration that we should be expecting these costs? I assume that just will be over and above on your MG&A spend.

Speaker #6: What is the duration we should be expecting for these costs? And I assume that will be over and above your MG&A spend.

Speaker #5: I mean, it's the numbers included in the MG&A number, and that's why I dotted back to get to the adjusted EBITDA figure, right? So, from my standpoint, we're not going to provide guidance on the total program size.

Jerome Julier: I mean, the number's included in the MG&A number, and that's why it's added back to get to the adjusted EBITDA figure, right? From my standpoint, we're not going to provide guidance on the total program size. It's very reasonable, right? We're builders and we're constructors, and we're always mindful from a cost standpoint. We're not looking to make a meal of this whole thing. We're not going to provide guidance on timing or quantum. That being said, the amount that we've spent in the quarter is not capital M material to Aecon, and I'd say it'd probably stay in that area code.

Jerome Julier: I mean, the number's included in the MG&A number, and that's why it's added back to get to the adjusted EBITDA figure, right? From my standpoint, we're not going to provide guidance on the total program size. It's very reasonable, right? We're builders and we're constructors, and we're always mindful from a cost standpoint. We're not looking to make a meal of this whole thing. We're not going to provide guidance on timing or quantum. That being said, the amount that we've spent in the quarter is not capital M material to Aecon, and I'd say it'd probably stay in that area code.

Speaker #5: It's very reasonable, right? We're builders and we're constructors, and we're always mindful from a cost standpoint. So we're not looking to make a meal of this whole thing.

Speaker #5: So we're not going to provide guidance on timing or quantum. That being said, the amount that we've spent in the quarter is not, kind of, capital and material to Aecon.

Speaker #5: And I'd say it will probably stay in that area code.

Speaker #6: Okay, I'll leave it there. Thanks, folks.

Chris Murray: Okay. I'll leave it there. Thanks, folks.

Chris Murray: Okay. I'll leave it there. Thanks, folks.

Speaker #1: Thank you. I'm showing no further questions at this time. I'd like to turn it back to Adam Borgatti for closing remarks.

Operator: Thank you. I'm showing no further questions at this time. I'd like to turn it back to Adam Borgatti for closing remarks.

Operator: Thank you. I'm showing no further questions at this time. I'd like to turn it back to Adam Borgatti for closing remarks.

Speaker #4: Thanks, DeeDee. And thanks, everyone, for joining us today. As always, we welcome any follow-up questions or comments. Feel free to reach out to the IR team.

Adam Borgatti: Thanks, Dede, and thanks everyone for joining us today. As always, welcome any follow-up questions or comments, feel free to reach out to the IR team, and have a wonderful rest of your summer.

Adam Borgatti: Thanks, Dede, and thanks everyone for joining us today. As always, welcome any follow-up questions or comments, feel free to reach out to the IR team, and have a wonderful rest of your summer.

Speaker #4: And have a wonderful rest of your summer.

Operator: This concludes today's conference call. Thank you for participating, and you may now disconnect.

Operator: This concludes today's conference call. Thank you for participating, and you may now disconnect.

Q2 2026 Aecon Group Inc Earnings Call

Demo
ARE.TO

Aecon

Earnings

Q2 2026 Aecon Group Inc Earnings Call

ARE.TO

Friday, July 31st, 2026 at 1:00 PM

Transcript

No Transcript Available

No transcript data is available for this event yet. Transcripts typically become available shortly after an earnings call ends.

Want AI-powered analysis? Try AllMind AI →