Q2 2026 Firan Technology Group Corp Earnings Call

Speaker #1: Good morning. I would like to welcome everyone to the FDG Q2 2026 Analyst Call. All lines have been placed on mute. There will be a question-and-answer session following the call.

Speaker #1: If you would like to ask a question during this time, simply press * followed by 1 on your telephone keypad. If you would like to withdraw...

Speaker #1: For your question, please press * followed by 2. Please note that this call is being recorded. I would now like to turn the call over to Mr. Brad Bourne, President and Chief Executive Officer of FTG.

Speaker #1: Mr. Born, you may proceed.

Speaker #2: Thank you. Good morning. I'm Brad Born, President and CEO of Firan Technology Group Corporation, or FTG. Also on the call today is Drew Knight, our Chief Financial Officer.

Brad Bourne: Thank you. Good morning. I'm Brad Bourne, President and CEO of Firan Technology Group Corporation, or FTG. Also on the call today is Drew Knight, our Chief Financial Officer. Before we go any further, I must caution you that this call may contain forward-looking statements. Such statements are based on the current expectations of management of the company and inherently involve numerous risks and uncertainties, known and unknown, including economic factors in the company's industry generally. The preceding list is not exhaustive of all possible factors. Such forward-looking statements are not guarantees of future performance, and actual events and results could differ materially from those expressed or implied by forward-looking statements made by the company. The listener is cautioned to consider these and other factors carefully when making decisions with respect to the company and not place undue reliance on forward-looking statements.

Brad Bourne: Thank you. Good morning. I'm Brad Bourne, President and CEO of Firan Technology Group Corporation, or FTG. Also on the call today is Drew Knight, our Chief Financial Officer. Before we go any further, I must caution you that this call may contain forward-looking statements. Such statements are based on the current expectations of management of the company and inherently involve numerous risks and uncertainties, known and unknown, including economic factors in the company's industry generally. The preceding list is not exhaustive of all possible factors. Such forward-looking statements are not guarantees of future performance, and actual events and results could differ materially from those expressed or implied by forward-looking statements made by the company. The listener is cautioned to consider these and other factors carefully when making decisions with respect to the company and not place undue reliance on forward-looking statements.

Speaker #2: Before we go any further, I must caution you that this call may contain forward-looking statements. Such statements are based on the current expectations of management of the company and inherently involve numerous risks and uncertainty.

Speaker #2: Known and unknown factors, including economic factors in the company's industry generally. The preceding list is not exhaustive of all possible factors. Such forward-looking statements are not guarantees of future performance, and actual events and results could differ materially from those expressed or implied by forward-looking statements made by the company.

Speaker #2: The listener is cautioned to consider these and other factors carefully when making decisions with respect to the company, and not to place undue reliance on forward-looking statements.

Speaker #2: The company does not undertake, and has no specific intention to update, any forward-looking statements—written or oral—that may be made from time to time by or on its behalf, whether as a result of new information, future events, or otherwise.

Brad Bourne: The company does not undertake and has no specific intention to update any forward-looking statements, written or oral, that may be made from time to time by or on its behalf, whether as a result of new information, future events, or otherwise. Our Q2 was a record quarter for FTG on virtually every metric. We had record revenues, record earnings, record bookings, and record backlog with continued strong end market demand. More specifically, in our Q2 2026, we achieved the following. Bookings were CAD 86.7 million in the quarter, our best-ever bookings in a single quarter, and an 89% increase over Q2 2025, resulting in a book-to-bill ratio of 1.64 to 1. This included additional bookings on the two classified defense programs we have previously mentioned. To be clear, bookings were strong across our business, not just on these two programs.

Brad Bourne: The company does not undertake and has no specific intention to update any forward-looking statements, written or oral, that may be made from time to time by or on its behalf, whether as a result of new information, future events, or otherwise. Our Q2 was a record quarter for FTG on virtually every metric. We had record revenues, record earnings, record bookings, and record backlog with continued strong end market demand. More specifically, in our Q2 2026, we achieved the following. Bookings were CAD 86.7 million in the quarter, our best-ever bookings in a single quarter, and an 89% increase over Q2 2025, resulting in a book-to-bill ratio of 1.64 to 1. This included additional bookings on the two classified defense programs we have previously mentioned. To be clear, bookings were strong across our business, not just on these two programs.

Speaker #2: Our second quarter was a record quarter for FTG. On virtually every metric, we had record revenues, record earnings, record bookings, and record backlog. We continued to see strong end-market demand.

Speaker #2: More specifically, in our second quarter of 2026, we achieved the following: Bookings were $86.7 million in the quarter—our best-ever bookings in a single quarter—and an 89% increase over Q2 2025, resulting in a book-to-bill ratio of 1.64 to 1.

Speaker #2: This included additional bookings on the two classified defense programs we have previously mentioned, but to be clear, bookings were strong across our business, not just on these two programs.

Speaker #2: The quarter-end backlog stood at $193.5 million, a 30% rise from the previous year-end. Revenue was $52.7 million—again, our best-ever quarter—and an 8.2% increase over Q2 2025.

Brad Bourne: The quarter-end backlog stood at CAD 193.5 million, a 30% rise from the previous year-end. Revenue was CAD 52.7 million, again, our best ever quarter, and an 8.2% increase over Q2 2025. Adjusted EBITDA was CAD 10.5 million in Q2 2026, a record high, up 20% from CAD 8.7 million in Q2 last year. Adjusted net earnings were CAD 5.1 million in Q2 this year, an increase of 44% from Q2 last year and another record for FTG. This once again demonstrates that top-line growth drives profitability at FTG. Free cash flow was CAD +2.7 million in our Q2. We maintained a strong balance sheet with net debt down to CAD 2.9 million or 0.1 times trailing 12-month EBITDA. Most of our debt is government loans.

Brad Bourne: The quarter-end backlog stood at CAD 193.5 million, a 30% rise from the previous year-end. Revenue was CAD 52.7 million, again, our best ever quarter, and an 8.2% increase over Q2 2025. Adjusted EBITDA was CAD 10.5 million in Q2 2026, a record high, up 20% from CAD 8.7 million in Q2 last year. Adjusted net earnings were CAD 5.1 million in Q2 this year, an increase of 44% from Q2 last year and another record for FTG. This once again demonstrates that top-line growth drives profitability at FTG. Free cash flow was CAD +2.7 million in our Q2. We maintained a strong balance sheet with net debt down to CAD 2.9 million or 0.1 times trailing 12-month EBITDA. Most of our debt is government loans.

Speaker #2: Adjusted EBITDA was $10.5 million in Q2 2026, a record high, up 20% from $8.7 million in Q2 last year. Adjusted net earnings were $5.1 million in Q2 this year, an increase of 44% from Q2 last year, and another record for FTG.

Speaker #2: This once again demonstrates that top-line growth drives profitability at FTG. Free cash flow was positive $2.7 million in our second quarter, and we maintained a strong balance sheet with net debt down to $2.9 million, or 0.1 times trailing 12-month EBITDA. Most of our debt is government loans.

Speaker #2: Other accomplishments in our second quarter included: in 2025, our Circuits business qualified for two large-scale classified defense programs, and significant orders have been placed for these two programs during Q2 this year.

Brad Bourne: Other accomplishments in our Q2 included, in 2025, our circuits business qualified for two large-scale classified defense programs, and significant orders had been placed for these two programs during Q2 this year. Only one of these programs had any revenue in our Q2, and it was not significant. FTG Aerospace Calgary continued to benefit from efforts to certify and sell its product portfolio globally and had profitable results again in the quarter. I will talk more on this later. Our efforts to reduce our exposure to US tariff risks continue, and in Q2 2026, our efforts continued to sell outside the US. Deliveries to China's C919 program continue. In addition, deliveries to the new De Havilland Canada 515 aerial firefighting aircraft started to ramp up. More deliveries on both these programs are expected to continue in H2 2026.

Brad Bourne: Other accomplishments in our Q2 included, in 2025, our circuits business qualified for two large-scale classified defense programs, and significant orders had been placed for these two programs during Q2 this year. Only one of these programs had any revenue in our Q2, and it was not significant. FTG Aerospace Calgary continued to benefit from efforts to certify and sell its product portfolio globally and had profitable results again in the quarter. I will talk more on this later. Our efforts to reduce our exposure to US tariff risks continue, and in Q2 2026, our efforts continued to sell outside the US. Deliveries to China's C919 program continue. In addition, deliveries to the new De Havilland Canada 515 aerial firefighting aircraft started to ramp up. More deliveries on both these programs are expected to continue in H2 2026.

Speaker #2: Only one of these programs had any revenue in our second quarter, and it was not significant. FTG Aerospace Calgary continued to benefit from efforts to certify and sell its product portfolio globally, and had profitable results again in the quarter.

Speaker #2: I will talk more on this later. Our efforts to reduce our exposure to U.S. tariff risk continue, and in Q2 2026, our efforts continued to sell outside the U.S.

Speaker #2: Deliveries to the China C919 program continue. In addition, deliveries to the new Dablin Canadair 515 aerial firefighting aircraft have started to ramp up. More deliveries on both these programs are expected to continue in the second half of 2026.

Speaker #2: We also made more progress on moving non-U.S. customer orders to our non-U.S. sites to further reduce our exposure to any tariff risk. And finally, we had some larger orders for circuit boards from a Canadian customer.

Brad Bourne: We also made more progress on moving non-US customer orders to our non-US sites to further reduce our exposure to any tariff risks. Finally, we had some larger orders for circuit boards from a Canadian customer. Offsetting this was continued strong demand coming from the US market. Drew will provide more details on our Q2 results shortly. Let me turn to some external items. Our end market demand remains strong. Airbus is targeting 870 aircraft deliveries this year, up about 10% from last year. More importantly, they're looking to ramp to over 1,000 aircraft annually in the next few years. Airbus has a backlog of over 8,000 orders, which is over a decade worth of production at current production rates. At Boeing, they shipped 600 planes last year, up from 350 in 2024.

Brad Bourne: We also made more progress on moving non-US customer orders to our non-US sites to further reduce our exposure to any tariff risks. Finally, we had some larger orders for circuit boards from a Canadian customer. Offsetting this was continued strong demand coming from the US market. Drew will provide more details on our Q2 results shortly. Let me turn to some external items. Our end market demand remains strong. Airbus is targeting 870 aircraft deliveries this year, up about 10% from last year. More importantly, they're looking to ramp to over 1,000 aircraft annually in the next few years. Airbus has a backlog of over 8,000 orders, which is over a decade worth of production at current production rates. At Boeing, they shipped 600 planes last year, up from 350 in 2024.

Speaker #2: But offsetting this was continued strong demand coming from the U.S. market. Drew will provide more details on our second quarter results shortly. Let me turn to some external items.

Speaker #2: Our end-market demand remains strong. Airbus is targeting 870 aircraft deliveries this year, up about 10% from last year. But more importantly, they are looking to ramp to over 1,000 aircraft annually in the next few years.

Speaker #2: Airbus has a backlog of over 8,000 orders, which is over a decade's worth of production at current production rates. At Boeing, they shipped 600 planes last year, up from 350 in 2024.

Speaker #2: But looking forward, Boeing has plans to ramp their production to over 800 planes annually in the next few years. Boeing's backlog is about 6,000 planes—so also over a decade's worth of orders, at current production rates.

Brad Bourne: Looking forward, Boeing has plans to ramp their production to over 800 planes annually in the next few years. Boeing's backlog is about 6,000 planes, also over a decade's worth of orders at current production rates. In the business jet market, Bombardier reported a high single-digit shipment increase last year. They are also pushing hard to add a defense component to their business, and they have had some success to date in selling their business jets for defense applications, including a NATO award this week for surveillance mission aircraft. In Q1 this year, Bombardier sales were up 5%. In the helicopter market, Bell Helicopter reported a 20% increase in revenues last year, driven by increased defense programs. In their Q1 2026, revenues were up 9%, again, on increased defense activity. All of this bodes well for us as we look to future demand in the coming years.

Brad Bourne: Looking forward, Boeing has plans to ramp their production to over 800 planes annually in the next few years. Boeing's backlog is about 6,000 planes, also over a decade's worth of orders at current production rates. In the business jet market, Bombardier reported a high single-digit shipment increase last year. They are also pushing hard to add a defense component to their business, and they have had some success to date in selling their business jets for defense applications, including a NATO award this week for surveillance mission aircraft. In Q1 this year, Bombardier sales were up 5%. In the helicopter market, Bell Helicopter reported a 20% increase in revenues last year, driven by increased defense programs. In their Q1 2026, revenues were up 9%, again, on increased defense activity. All of this bodes well for us as we look to future demand in the coming years.

Speaker #2: In the business jet market, Bombardier reported a high single-digit shipment increase last year. They are also pushing hard to add a defense component to their business, and they've had some success to date in selling their business jets for defense applications, including a NATO award this week for surveillance mission aircraft.

Speaker #2: In Q1 this year, Bombardier sales were up 5%. In the helicopter market, Dell Helicopter reported a 20% increase in revenues last year, driven by increased defense programs.

Speaker #2: In their first quarter of 2026, revenues were up 9%, again on increased defense activity. All of this bodes well for us as we look to future demand in the coming years.

Speaker #2: Defense spending is expected to increase going forward. The U.S. budget request for next year is for a 50% increase in spending to about $1.5 trillion.

Brad Bourne: Defense spending is expected to increase going forward. The US budget request for next year is for a 50% increase in spending to about CAD 1.5 trillion. There are new commitments from all NATO members, including Canada, to ramp defense spending to 3.5% of GDP, with another 1.5% for defense infrastructure. Canada increased their defense spending in 2025, 2026 to 2% of GDP. All of this indicates significant increases in defense budgets for all European countries and Canada. The recent creation of a defense investment agency in Canada to accelerate and streamline future defense procurement activity is positive for the industry here. Looking at the longer term, Boeing's most recent 20-year forecast for commercial aircraft shows significant long-term industry growth, and they continue to show 20% of all new aircraft deliveries going to China and close to 40% to Asia, as has been the case in all of their recent forecasts.

Brad Bourne: Defense spending is expected to increase going forward. The US budget request for next year is for a 50% increase in spending to about CAD 1.5 trillion. There are new commitments from all NATO members, including Canada, to ramp defense spending to 3.5% of GDP, with another 1.5% for defense infrastructure. Canada increased their defense spending in 2025, 2026 to 2% of GDP. All of this indicates significant increases in defense budgets for all European countries and Canada. The recent creation of a defense investment agency in Canada to accelerate and streamline future defense procurement activity is positive for the industry here. Looking at the longer term, Boeing's most recent 20-year forecast for commercial aircraft shows significant long-term industry growth, and they continue to show 20% of all new aircraft deliveries going to China and close to 40% to Asia, as has been the case in all of their recent forecasts.

Speaker #2: There are new commitments from all NATO members, including Canada, to ramp defense spending to 3.5% of GDP, with another 1.5% for defense infrastructure.

Speaker #2: Canada increased their defense spending in 2025 and 2026 to 2% of GDP. All of this indicates significant increases in defense budgets for all European countries and Canada.

Speaker #2: The recent creation of a defense investment agency in Canada to accelerate and streamline future defense procurement activity is positive for the industry here. Looking at the longer term, Boeing's most recent 20-year forecast for commercial aircraft shows significant long-term industry growth, and it continues to show 20% of all new aircraft deliveries going to China, and close to 40% to Asia, as has been the case in all of their recent forecasts.

Speaker #2: A recent business jet market forecast from Honeywell similarly predicts growth in this market of 5% this year and 3% annually over the next decade.

Brad Bourne: A recent business jet market forecast from Honeywell similarly predicts growth in this market of 5% this year and 3% annually over the next decade. As we have said for many years, FTG's goal is to participate in all segments of the aerospace and defense markets as each move through their independent business cycles. It is not often all segments are growing, as is the case right now. Beyond all this, let me give you a quick update on some key metrics for FTG for our Q2 2026. First, as already noted, the leading indicator of business is our bookings or new orders. Our bookings were almost CAD 87 million in the quarter. This resulted in a backlog of over CAD 193 million at quarter end, even after record shipments in the quarter. Q2 sales were CAD 52.7 million, which is up 8% over Q2 last year.

Brad Bourne: A recent business jet market forecast from Honeywell similarly predicts growth in this market of 5% this year and 3% annually over the next decade. As we have said for many years, FTG's goal is to participate in all segments of the aerospace and defense markets as each move through their independent business cycles. It is not often all segments are growing, as is the case right now. Beyond all this, let me give you a quick update on some key metrics for FTG for our Q2 2026. First, as already noted, the leading indicator of business is our bookings or new orders. Our bookings were almost CAD 87 million in the quarter. This resulted in a backlog of over CAD 193 million at quarter end, even after record shipments in the quarter. Q2 sales were CAD 52.7 million, which is up 8% over Q2 last year.

Speaker #2: So, as we have said for many years, FTG's goal is to participate in all segments of the aerospace and defense markets, as each moves through their independent business cycles.

Speaker #2: It is not often all segments are growing, as is the case right now. Beyond all this, let me give you a quick update on some key metrics for FTG for our second quarter of 2026.

Speaker #2: First, as already noted, the leading indicator of business is our bookings, or new orders. Our bookings were almost $87 million in the quarter. This resulted in a backlog of over $193 million at quarter end, even after record shipments in the quarter.

Speaker #2: Q2 sales were $52.7 million, which is up 8% over Q2 last year. In our aerospace business, sales were up 21% in Q2 to $17.1 million compared to Q2 last year.

Brad Bourne: In our aerospace business, sales were up 21% in Q2 to CAD 17.1 million compared to Q2 last year. Sales in Toronto, Tianjin, and Calgary were up while activity in Chatsworth was down in the year due to timing of some orders. The growth in aerospace was in spite of some challenges on our C919 program in China, where we had to deal with some sizable customer concerns and returns, including some shipments that arrived at the customer with water damage to the shipping containers. In this case, the good news was when we took the product back and inspected and tested them, none of the product itself was damaged. This took a lot of time and energy for our plants in Tianjin and Toronto to support our customer and get the product returned successfully to them, and still, they had a strong quarter.

Brad Bourne: In our aerospace business, sales were up 21% in Q2 to CAD 17.1 million compared to Q2 last year. Sales in Toronto, Tianjin, and Calgary were up while activity in Chatsworth was down in the year due to timing of some orders. The growth in aerospace was in spite of some challenges on our C919 program in China, where we had to deal with some sizable customer concerns and returns, including some shipments that arrived at the customer with water damage to the shipping containers. In this case, the good news was when we took the product back and inspected and tested them, none of the product itself was damaged. This took a lot of time and energy for our plants in Tianjin and Toronto to support our customer and get the product returned successfully to them, and still, they had a strong quarter.

Speaker #2: Sales in Toronto, Tianjin, and Calgary were up, while activity in Chatsworth was down in the year due to the timing of some orders. The growth in aerospace was in spite of some challenges on our C919 program in China, where we had to deal with some sizable customer concerns and returns, including some shipments that arrived at the customer with water damage to the shipping containers.

Speaker #2: In this case, the good news was, when we took the product back and inspected and tested them, none of the product itself was damaged.

Speaker #2: But this took a lot of time and energy for our plants in Tianjin and Toronto to support our customer and get the product returned successfully to them, and still, they had a strong quarter.

Speaker #2: Calgary saw strong revenues from hardware sales, which were mostly SATCOM radios delivered in Canada and the U.S., but also from our second delivery of EdgePlus WQARs in Asia.

Brad Bourne: Calgary saw strong revenues from hardware sales, which were mostly SATCOM radios delivered in Canada and the US, also from our second delivery of Edge+ WQARs in Asia. Data sales were also strong due to SATCOM radio data, also an increase in weather data for NOAA. Licensing revenues were, again, from our SATCOM radio, which were very strong in the quarter. On the FTG Circuits side of our business, sales in the quarter were CAD 34.3 million, up 1.9% over Q2 last year. Our two largest sites were down slightly in the quarter, the other sites more than offset this. FTG Circuits Toronto was down due to an operational disruption mid-quarter, FTG Circuits Minnetonka was down due to a product mix shift towards higher technology product and by labor constraints.

Brad Bourne: Calgary saw strong revenues from hardware sales, which were mostly SATCOM radios delivered in Canada and the US, also from our second delivery of Edge+ WQARs in Asia. Data sales were also strong due to SATCOM radio data, also an increase in weather data for NOAA. Licensing revenues were, again, from our SATCOM radio, which were very strong in the quarter. On the FTG Circuits side of our business, sales in the quarter were CAD 34.3 million, up 1.9% over Q2 last year. Our two largest sites were down slightly in the quarter, the other sites more than offset this. FTG Circuits Toronto was down due to an operational disruption mid-quarter, FTG Circuits Minnetonka was down due to a product mix shift towards higher technology product and by labor constraints.

Speaker #2: Data sales were also strong due to SATCOM radio data, but also an increase in weather data for NOAA. Licensing revenues were again from our SATCOM radio, which were very strong in the quarter.

Speaker #2: On the circuit side of our business, sales in the quarter were $34.3 million, up 1.9% over Q2 last year. Our two largest sites were down slightly in the quarter, but the other sites more than offset this.

Speaker #2: Circuits Toronto was down due to an operational disruption mid-quarter, and Circuits Minnetonka was down due to a product mix shift towards higher-technology products and by labor constraints.

Speaker #2: But by quarter-end, Minnetonka had made strong progress on staffing, which will benefit them in the second half of the year. On the positive side, our Circuits Fredericksburg site almost doubled their revenues in our second quarter, with work transferred from Minnetonka and with no change in their staffing levels.

Brad Bourne: By quarter end, FTG Circuits Minnetonka had made strong progress on staffing, which will benefit them in the H2 of the year. On the positive side, our FTG Circuits Fredericksburg site almost doubled their revenues in our Q2 with work transferred from FTG Circuits Minnetonka and with no change in their staffing levels. They truly had an amazing quarter. While our two largest sites did not grow, FTG Circuits Fredericksburg was up over 90%, FTG Circuits Chatsworth was up 18%, and our Haverhill site was up 15%. Overall at FTG, our top five customers accounted for 51.2% of the total revenue in Q2 2026. This compares to 52.8% last year. Airlines were three of our top customers in the year due to the FLYHT acquisition. Also interesting to note, of the top 10 customers, five are customers shared between FTG Circuits and FTG Aerospace, and two are former FLYHT customers.

Brad Bourne: By quarter end, FTG Circuits Minnetonka had made strong progress on staffing, which will benefit them in the H2 of the year. On the positive side, our FTG Circuits Fredericksburg site almost doubled their revenues in our Q2 with work transferred from FTG Circuits Minnetonka and with no change in their staffing levels. They truly had an amazing quarter. While our two largest sites did not grow, FTG Circuits Fredericksburg was up over 90%, FTG Circuits Chatsworth was up 18%, and our Haverhill site was up 15%. Overall at FTG, our top five customers accounted for 51.2% of the total revenue in Q2 2026. This compares to 52.8% last year. Airlines were three of our top customers in the year due to the FLYHT acquisition. Also interesting to note, of the top 10 customers, five are customers shared between FTG Circuits and FTG Aerospace, and two are former FLYHT customers.

Speaker #2: They truly had an amazing quarter. While our two largest sites did not grow, Fredericksburg was up over 90%, Chatsworth was up 18%, and our Haverhill site was up 15%.

Speaker #2: Overall, at FTG, our top five customers accounted for 51.2% of total revenue in Q2 2026. This compares to 52.8% last year. Airlines were three of our top customers in the year, due to the Flight acquisition.

Speaker #2: It's also interesting to note that the top 10 fiber customers are shared between Circuits and Aerospace, and two or four more are flight customers. Given the actions of the new administration in the U.S....

Brad Bourne: Given the actions of the new administration in the US of implementing tariffs, it's also good to see that two of our top 10 customers are outside the US, with one in Canada and one in China, another six have operations outside the US. On this topic, 70.3% of FTG sales are to US-based customers in 2026. This includes sales by our US sites, as well as sales from sites in Canada or China. This compares to 69.7% last year. Sales grew by 10% in the US, they also grew by 4% in Asia and by 44% in Canada as we benefit from previous efforts to expand globally, including things like our content on C919 aircraft in China and acquiring FLYHT with sales globally. Sales decreased in Europe by 8% in the quarter.

Brad Bourne: Given the actions of the new administration in the US of implementing tariffs, it's also good to see that two of our top 10 customers are outside the US, with one in Canada and one in China, another six have operations outside the US. On this topic, 70.3% of FTG sales are to US-based customers in 2026. This includes sales by our US sites, as well as sales from sites in Canada or China. This compares to 69.7% last year. Sales grew by 10% in the US, they also grew by 4% in Asia and by 44% in Canada as we benefit from previous efforts to expand globally, including things like our content on C919 aircraft in China and acquiring FLYHT with sales globally. Sales decreased in Europe by 8% in the quarter.

Speaker #2: Of implementing tariffs, it's also good to see that two of our top 10 customers are outside the U.S., with one in Canada and one in China.

Speaker #2: And another six have operations outside the U.S. While on this topic, 70.3% of FTG sales are to U.S.-based customers in 2026. This includes sales by our U.S.

Speaker #2: ...sites, as well as sales from sites in Canada or China. This compares to 69.7% last year. While sales grew by 10% in the U.S., they also grew by 4% in Asia. We benefit from previous efforts to expand globally, including things like our content on C919 aircraft in China and acquiring flight with sales globally.

Speaker #2: Sales decreased in Europe by 8% in the quarter. Sales outside the U.S. are helpful in the event of any tariff that the U.S. might impose on our newest non-U.S.-based sites. Our goal is to continue to grow our non-U.S. sales.

Brad Bourne: Sales outside the US are helpful in the event of any tariff that the US might impose on our non-US-based sites. Our goal is to continue to grow our non-US revenue for our non-US sites. In Q2 2026, 35.8% of total revenues came from our FTG Aerospace business, compared to 32% last year. I'd now like to turn the call over to Drew, who will summarize our financial results for our Q2 2026, afterwards I will talk about some key priorities we are working on. Drew?

Brad Bourne: Sales outside the US are helpful in the event of any tariff that the US might impose on our non-US-based sites. Our goal is to continue to grow our non-US revenue for our non-US sites. In Q2 2026, 35.8% of total revenues came from our FTG Aerospace business, compared to 32% last year. I'd now like to turn the call over to Drew, who will summarize our financial results for our Q2 2026, afterwards I will talk about some key priorities we are working on. Drew?

Speaker #2: Revenue for our non-U.S. sites. In Q2 2026, 35.8% of total revenues came from our aerospace business, compared to 32% last year. I'd now like to turn the call over to Drew, who will summarize our financial results for our second quarter of 2026, and afterwards I will talk about some key priorities we are working on.

Speaker #2: Drew.

Speaker #1: Thanks, Brad. Good morning, everyone. I would like to provide some additional detail on our financial performance for Q2, starting with revenue and gross margin.

Drew Knight: Thanks, Brad. Good morning, everyone. I would like to provide some additional detail on our financial performance for Q2, starting with revenue and gross margin. On sales of CAD 52.7 million, FTG achieved a gross margin of CAD 19.2 million, or 36.5% in Q2 2026, compared to CAD 15.9 million, or 32.6% on sales of CAD 48.7 million in Q2 2025. The increase in gross margin dollars is based on top-line growth, while the gross margin rate increased due to operational improvements in multiple facilities, despite unfavorable FX variances. The improved profitability at Aero Calgary and several US sites has a substantial impact on consolidated margin rates. Aero Calgary continues to benefit from its ongoing licensing revenue that resumed in 2026, as well as repeat hardware sales of its AFIRS Edge product. The US sales improved margins via increased throughput with limited added resources. Moving on to SG&A.

Drew Knight: Thanks, Brad. Good morning, everyone. I would like to provide some additional detail on our financial performance for Q2, starting with revenue and gross margin. On sales of CAD 52.7 million, FTG achieved a gross margin of CAD 19.2 million, or 36.5% in Q2 2026, compared to CAD 15.9 million, or 32.6% on sales of CAD 48.7 million in Q2 2025. The increase in gross margin dollars is based on top-line growth, while the gross margin rate increased due to operational improvements in multiple facilities, despite unfavorable FX variances. The improved profitability at Aero Calgary and several US sites has a substantial impact on consolidated margin rates. Aero Calgary continues to benefit from its ongoing licensing revenue that resumed in 2026, as well as repeat hardware sales of its AFIRS Edge product. The US sales improved margins via increased throughput with limited added resources. Moving on to SG&A.

Speaker #1: On sales of $52.7 million, FTG achieved a gross margin of $19.2 million, or 36.5%, in Q2 2026, compared to $15.9 million, or 32.6%, on sales of $48.7 million in Q2 2025.

Speaker #1: The increase in gross margin dollars is based on top-line growth, while the gross margin rate increased due to operational improvements in multiple facilities, despite unfavorable FX variances.

Speaker #1: The improved profitability at Aero Calgary and several U.S. sites has a substantial impact on consolidated margin rates. Aero Calgary continues to benefit from its ongoing licensing revenue that resumed in Q2 2026, as well as repeat hardware sales of its AFRS Edge product.

Speaker #1: U.S. sales improved margins via increased throughput with limited added resources. Moving on to SG&A, SG&A expense was $8.4 million, or 15.9% of sales in Q2 2026, compared to $6.8 million, or 14.1% of sales, in the prior year.

Drew Knight: SG&A expense was CAD 8.4 million, or 15.9% of sales in Q2 2026, as compared to CAD 6.8 million, or 14.1% of sales in the prior year. The increase of CAD 1.55 million during Q2 was primarily due to performance compensation tied to profitability, amortization of deferred financing costs, and some corporate admin costs of the new leadership team. Speaking to R&D. R&D costs for Q2 2026 were CAD 2.8 million, or 5.3% of sales, compared to CAD 2.4 million or 5.0% of revenue in 2025. R&D efforts include product and process improvements at the Circuit segment, as well as Aerospace segment product development and process improvements. Regarding foreign exchange, FTG is exposed to currency risk through transactions, also assets and liabilities recorded in foreign currencies, and finally, from foreign subsidiaries translation of financial statements for consolidation.

Drew Knight: SG&A expense was CAD 8.4 million, or 15.9% of sales in Q2 2026, as compared to CAD 6.8 million, or 14.1% of sales in the prior year. The increase of CAD 1.55 million during Q2 was primarily due to performance compensation tied to profitability, amortization of deferred financing costs, and some corporate admin costs of the new leadership team. Speaking to R&D. R&D costs for Q2 2026 were CAD 2.8 million, or 5.3% of sales, compared to CAD 2.4 million or 5.0% of revenue in 2025. R&D efforts include product and process improvements at the Circuit segment, as well as Aerospace segment product development and process improvements. Regarding foreign exchange, FTG is exposed to currency risk through transactions, also assets and liabilities recorded in foreign currencies, and finally, from foreign subsidiaries translation of financial statements for consolidation.

Speaker #1: The increase of $1.55 million during Q2 was primarily due to performance compensation tied to profitability, amortization of deferred financing costs, and some corporate admin costs of the new leadership team.

Speaker #1: Now, speaking to R&D, R&D costs for Q2 2026 were $2.8 million, or 5.3% of sales, compared to $2.4 million, or 5.0% of revenue, in 2025.

Speaker #1: R&D efforts include product and process improvements at the Circuit segment, as well as Aerospace segment product development and product process improvements. Regarding foreign exchange, FTG is exposed to currency risk through transactions, also assets and liabilities recorded in foreign currencies, and finally, from foreign subsidiaries' translation of financial statements for consolidation.

Speaker #1: The average exchange rate experienced in Q2 2026 was 1.373 on the U.S. dollar, as compared to 1.407 in 2025, which equates to a weakening of the U.S. dollar.

Drew Knight: The average exchange rate experienced in Q2 2026 was 1.373 on the US dollar as compared to 1.407 in 2025, which equates to a weakening of the US dollar by 2.4%. This hurts results for FTG. Moving on to profitability and EBITDA. Adjusted EBITDA, as detailed in the MD&A, was CAD 10.5 million for Q2 2026, or 19.9% of sales, compared to CAD 8.7 million or 17.9% of sales for Q2 2025. As noted with gross margins, the year-over-year comparison of adjusted EBITDA is improved CAD 1.78 million over Q2 2025 as a result of growing the top line organically. Operational improvements in the US plants and Aero Calgary revenue streams added in 2026 for Edge+ and licensing. Regarding earnings, for Q2 2026, FTG recorded net earnings of CAD 5.0 million or CAD 0.20 per diluted share as compared to CAD 3.5 million or CAD 0.14 per diluted share in Q2 2025.

Drew Knight: The average exchange rate experienced in Q2 2026 was 1.373 on the US dollar as compared to 1.407 in 2025, which equates to a weakening of the US dollar by 2.4%. This hurts results for FTG. Moving on to profitability and EBITDA. Adjusted EBITDA, as detailed in the MD&A, was CAD 10.5 million for Q2 2026, or 19.9% of sales, compared to CAD 8.7 million or 17.9% of sales for Q2 2025. As noted with gross margins, the year-over-year comparison of adjusted EBITDA is improved CAD 1.78 million over Q2 2025 as a result of growing the top line organically. Operational improvements in the US plants and Aero Calgary revenue streams added in 2026 for Edge+ and licensing. Regarding earnings, for Q2 2026, FTG recorded net earnings of CAD 5.0 million or CAD 0.20 per diluted share as compared to CAD 3.5 million or CAD 0.14 per diluted share in Q2 2025.

Speaker #1: The dollar decreased by 2.4%, and this hurt results for FTG. Moving on to profitability and EBITDA—adjusted EBITDA, as detailed in the MD&A, was $10.5 million for Q2 2026, or 19.9% of sales, compared to $8.7 million, or 17.9% of sales, for Q2 2025.

Speaker #1: As noted with gross margins, the year-over-year comparison of adjusted EBITDA improved by $1.78 million over Q2 2025 as a result of growing the top line organically and operational improvements in the U.S.

Speaker #1: Plants, and Aero Calgary revenue streams added in 2026 for Edge Plus and licensing. Regarding earnings for Q2 2026, FTG recorded net earnings of $5.0 million, or $0.20 per diluted share, as compared to $3.5 million, or $0.14 per diluted share, in Q2 2025.

Speaker #1: The earnings comparison to the prior year was improved by favorable income taxes, based on the distribution of profits in 2026 being more widespread. Speaking to income taxes, Q2 2025-26—sorry—was tax inefficient, with a few non-deductible losses unable to reduce taxable income in profitable business units.

Drew Knight: The earnings comparison to prior year was improved by favorable income taxes based on the distribution of profits in 2026 being more widespread. Speaking to income taxes, Q2 2026 was tax inefficient, with a few nondeductible losses unable to reduce taxable income in profitable business units. However, this inefficiency improved year-over-year. Also, FTG incurred a CAD 200,000 withholding tax hit on the repatriation of some cash from a foreign subsidiary. I would like to remind everyone that FTG continues to have substantial tax losses available to offset future income, and the accounting benefit of these losses has not been recognized in our financial statements. These tax loss carryforwards are located in both the USA and Canada, with the Canadian losses recently acquired in the acquisition of FLYHT in December 2024.

Drew Knight: The earnings comparison to prior year was improved by favorable income taxes based on the distribution of profits in 2026 being more widespread. Speaking to income taxes, Q2 2026 was tax inefficient, with a few nondeductible losses unable to reduce taxable income in profitable business units. However, this inefficiency improved year-over-year. Also, FTG incurred a CAD 200,000 withholding tax hit on the repatriation of some cash from a foreign subsidiary. I would like to remind everyone that FTG continues to have substantial tax losses available to offset future income, and the accounting benefit of these losses has not been recognized in our financial statements. These tax loss carryforwards are located in both the USA and Canada, with the Canadian losses recently acquired in the acquisition of FLYHT in December 2024.

Speaker #1: However, this inefficiency improved year over year. Also, FTG incurred a $200,000 withholding tax hit on the repatriation of some cash from a foreign subsidiary.

Speaker #1: I would like to remind everyone that FTG continues to have substantial tax losses available to offset future income, and the accounting benefit of these losses has not been recognized in our financial statements.

Speaker #1: These tax loss carry-forwards are located in both the USA and Canada, with the Canadian losses recently acquired in the acquisition of Flight in December 2024.

Speaker #1: Regarding our financial position, FTG maintains a strong balance sheet, with our net debt position as of Q2 2026 at $2.9 million, compared sequentially to net debt of $4 million as of Q1.

Drew Knight: Regarding our financial position, FTG maintains a strong balance sheet with our net debt position as of Q2 2026 at CAD 2.9 million, as compared sequentially to net debt of CAD 4 million as of Q1. This leverage ratio represents 0.09% of trailing 12 months EBITDA. Free cash flow in Q2 2026 was CAD 2.7 million as compared to CAD -5.5 million in Q2 2025. Capital expenditures were CAD 0.9 million as compared to CAD 1.3 million in 2025. Going forward, we expect CapEx to be closer to FTG's long-term target of 3% of revenue, notwithstanding any significant capacity increases. As of the end of Q2 2026, the corporation's primary sources of liquidity totaled CAD 85 million, consisting of working capital of CAD 61.8 million and CAD 23.3 million of unused credit facilities. FTG has plans to improve cash efficiency and minimize stranded cash in various business units.

Drew Knight: Regarding our financial position, FTG maintains a strong balance sheet with our net debt position as of Q2 2026 at CAD 2.9 million, as compared sequentially to net debt of CAD 4 million as of Q1. This leverage ratio represents 0.09% of trailing 12 months EBITDA. Free cash flow in Q2 2026 was CAD 2.7 million as compared to CAD -5.5 million in Q2 2025. Capital expenditures were CAD 0.9 million as compared to CAD 1.3 million in 2025. Going forward, we expect CapEx to be closer to FTG's long-term target of 3% of revenue, notwithstanding any significant capacity increases. As of the end of Q2 2026, the corporation's primary sources of liquidity totaled CAD 85 million, consisting of working capital of CAD 61.8 million and CAD 23.3 million of unused credit facilities. FTG has plans to improve cash efficiency and minimize stranded cash in various business units.

Speaker #1: This leverage ratio represents 0.09% of trailing 12 months EBITDA. Free cash flow in Q2 2026 was $2.7 million, as compared to negative $5.5 million in Q2 2025.

Speaker #1: Capital expenditures were $0.9 million as compared to $1.3 million in 2025. Going forward, we expect capex to be closer to FTG's long-term target of 3% of revenue, notwithstanding any significant capacity increases.

Speaker #1: As of the end of Q2 2026, the corporation's primary sources of liquidity totaled $85 million, consisting of working capital of $61.8 million and $23.3 million of unused credit facilities.

Speaker #1: FTG has plans to improve cash efficiency and minimize stranded cash in various business units. Accounts receivable days were 60 at the end of Q2, up from 55 at the recent year-end, due to the timing of a couple of customer payments and top-line revenue growth.

Drew Knight: Accounts receivable days were 60 at the end of Q2, up from 55 at the recent year-end due to timing of a couple of customer payments and top-line revenue growth. Inventory days were 112 at the end of Q2 2026, up from 105 at 2025 year-end to address order fulfillment in upcoming months. Accounts payable days outstanding were 57 at the end of Q2 2026 as compared to 58 at year-end. Transitioning to our future outlook, FTG's book-to-bill ratio for Q2 2026 was 1.64:1. We enter Q3 2026 with a record backlog of CAD 193.5 million, of which approximately 66% is expected to be converted to revenue in the next 12 months. The new business activities in both the aerospace and defense industries are strong and continue to accelerate. Both the circuits business and aerospace business are increasing throughput and winning their share of customer RFPs.

Drew Knight: Accounts receivable days were 60 at the end of Q2, up from 55 at the recent year-end due to timing of a couple of customer payments and top-line revenue growth. Inventory days were 112 at the end of Q2 2026, up from 105 at 2025 year-end to address order fulfillment in upcoming months. Accounts payable days outstanding were 57 at the end of Q2 2026 as compared to 58 at year-end. Transitioning to our future outlook, FTG's book-to-bill ratio for Q2 2026 was 1.64:1. We enter Q3 2026 with a record backlog of CAD 193.5 million, of which approximately 66% is expected to be converted to revenue in the next 12 months. The new business activities in both the aerospace and defense industries are strong and continue to accelerate. Both the circuits business and aerospace business are increasing throughput and winning their share of customer RFPs.

Speaker #1: Inventory days were 112 at the end of Q2 2026, up from 105 at 2025 year-end, to address order fulfillment in upcoming months. And accounts payable days were outstanding were 57 at the end of Q2 26, as compared to 58 at the end of at year-end.

Speaker #1: Transitioning to our future outlook, FTG's book-to-bill ratio was for Q2 2026 was 1.64 to 1. We enter Q2 26 with a record backlog, or sorry, we enter Q3 2026 with a record backlog of 193.5 million, of which approximately 66% is expected to be converted to revenue in the next 12 months.

Speaker #1: The new business activities in both the aerospace and defense industries are strong and continue to accelerate. Both the circuits business and aerospace business are increasing throughput and winning their share of customer RFPs.

Speaker #1: Last quarter, we noted program awards for two substantial classified defense programs. We have since received the opening POs for delivery in 2026, though these orders are only a fraction of the annualized volumes.

Drew Knight: Last quarter, we noted program awards for two substantial classified defense programs. We have since received the opening POs for delivery in 2026, though these orders are only a fraction of the annualized volumes. I should note that FTG's reported backlog only includes POs received and does not include program awards with estimated volumes. As we approach the midpoint of Q3, we are focused on managing cash flow and improving operational efficiency and continuing with the Aero Calgary revenue plan, which is already bearing fruit. I should note that our complete set of quarterly filings are available on sedarplus.com or on the FTG website. With that, I would like to turn things back over to Brad. Brad?

Drew Knight: Last quarter, we noted program awards for two substantial classified defense programs. We have since received the opening POs for delivery in 2026, though these orders are only a fraction of the annualized volumes. I should note that FTG's reported backlog only includes POs received and does not include program awards with estimated volumes. As we approach the midpoint of Q3, we are focused on managing cash flow and improving operational efficiency and continuing with the Aero Calgary revenue plan, which is already bearing fruit. I should note that our complete set of quarterly filings are available on sedarplus.com or on the FTG website. With that, I would like to turn things back over to Brad. Brad?

Speaker #1: I should note that FTG's reported backlog only includes POs received and does not include program awards with estimated volumes. As we approach the midpoint of Q3, we are focused on managing cash flow, improving operational efficiency, and continuing with the Aero Calgary revenue plan, which is already bearing fruit.

Speaker #1: I should note that our complete set of quarterly filings is available on SEDARPlus.com or on the FTG website. With that, I would like to turn things back over to Brad.

Speaker #1: Brad?

Speaker #2: Thanks, Drew. Let me delve into some important items for the future of FTG that will continue to build on our past accomplishments. We will continue to pursue growth in the defense market.

Brad Bourne: Thanks, Rufe. Let me delve into some important items for the future of FTG that will continue to build on our past accomplishments. We will continue to pursue growth in the defense market. As noted previously, we expect defense spending to continue to grow in Canada, in the US, and in NATO. We have seen some good success on some new classified programs in the US last year, and we're pursuing more new programs in 2026. We are seeing volumes ramp up in many areas, including electronics for various weapon and electronic warfare systems. Beyond this, we will look for opportunities outside the US as well. The NATO budget was about a third of the US budget a decade ago and is two-thirds today, so it's definitely a market of interest to us.

Brad Bourne: Thanks, Rufe. Let me delve into some important items for the future of FTG that will continue to build on our past accomplishments. We will continue to pursue growth in the defense market. As noted previously, we expect defense spending to continue to grow in Canada, in the US, and in NATO. We have seen some good success on some new classified programs in the US last year, and we're pursuing more new programs in 2026. We are seeing volumes ramp up in many areas, including electronics for various weapon and electronic warfare systems. Beyond this, we will look for opportunities outside the US as well. The NATO budget was about a third of the US budget a decade ago and is two-thirds today, so it's definitely a market of interest to us.

Speaker #2: As noted previously, we expect defense spending to continue to grow in Canada, in the U.S., and in NATO. We have seen some good success on some new classified programs in the U.S.

Speaker #2: Last year, and we are pursuing more new programs in 2026. We are seeing volumes ramp up in many areas, including electronics for various weapon and electronic warfare systems.

Speaker #2: Beyond this, we will look for opportunities outside the U.S. as well. The NATO budget was about one-third of the U.S. budget a decade ago, and is two-thirds today, so it is definitely a market of interest to us.

Speaker #2: As Canada ramps up its defense spending and its commitment to NATO, we are hopeful that this will create new opportunities for FTG sites outside the U.S.

Brad Bourne: As Canada ramps its defense spending and its commitment to NATO, we are hopeful that it will create new opportunities for FTG sites outside the US. After the US and NATO, the next biggest defense market is India, and as we get our site established there, we will look to capture some market share in this market too. We will look to capture more work in the commercial aerospace market and grow as volumes ramp up. As part of this, we will look for ways to increase our activity with Airbus as they are the stronger performer right now. To do this, we will leverage our Canadian and China sites. Given the uncertainty regarding tariffs from the US, we will look to continue to diversify revenue streams for our non-US sites.

Brad Bourne: As Canada ramps its defense spending and its commitment to NATO, we are hopeful that it will create new opportunities for FTG sites outside the US. After the US and NATO, the next biggest defense market is India, and as we get our site established there, we will look to capture some market share in this market too. We will look to capture more work in the commercial aerospace market and grow as volumes ramp up. As part of this, we will look for ways to increase our activity with Airbus as they are the stronger performer right now. To do this, we will leverage our Canadian and China sites. Given the uncertainty regarding tariffs from the US, we will look to continue to diversify revenue streams for our non-US sites.

Speaker #2: After the U.S. and NATO, the next biggest defense market is India, and as we get our site established there, we will look to capture some market share in this market too.

Speaker #2: We will look to capture more work in the commercial aerospace market and grow as volumes ramp up. As part of this, we will look for ways to increase our activity with Airbus, as they are the stronger performer right now.

Speaker #2: To do this, we will leverage our Canadian and China sites. Given the uncertainty regarding tariffs from the U.S., we will look to continue to diversify our revenue streams for our non-U.S. business.

Speaker #2: Sites—some of the items I already mentioned will assist in this. But it will remain a priority action for us. We will increase our sales staff outside the U.S.

Brad Bourne: Some of the items I already mentioned will assist in this, but it will remain a priority action for us. We will increase our sales staff outside the US in 2026 to help drive this growth. Tariffs are now impacting input costs in our circuits business. This is because a lot of materials used in our manufacturing processes originate outside of North America. The impact is highest for our US sites, but Toronto's also impacted where materials ship via the US to Canada. We estimate the overall cost impact to be in the CAD millions of dollars in 2026. We have started to work with our customers to pass on these increased costs to them and to the end users. Also for our circuits business, we are seeing significant cost increases on input costs, mostly driven by circuit board demand related to AI data centers.

Brad Bourne: Some of the items I already mentioned will assist in this, but it will remain a priority action for us. We will increase our sales staff outside the US in 2026 to help drive this growth. Tariffs are now impacting input costs in our circuits business. This is because a lot of materials used in our manufacturing processes originate outside of North America. The impact is highest for our US sites, but Toronto's also impacted where materials ship via the US to Canada. We estimate the overall cost impact to be in the CAD millions of dollars in 2026. We have started to work with our customers to pass on these increased costs to them and to the end users. Also for our circuits business, we are seeing significant cost increases on input costs, mostly driven by circuit board demand related to AI data centers.

Speaker #2: In 2026, to help drive this growth, tariffs are now impacting input costs in our circuits business. This is because a lot of materials used in our manufacturing processes originate outside of North America.

Speaker #2: The impact is highest for our U.S. sites, but Toronto is also impacted, where materials are shipped via the U.S. to Canada. We estimate the overall cost impact to be in the millions of dollars in 2026.

Speaker #2: We have started to work with our customers to pass on these increased costs to them and to the end users. Also, for our Circuits business, we are seeing significant cost increases on input costs, mostly driven by circuit board demand related to AI data centers.

Speaker #2: Costs are moving up fast, and again, we are working towards passing these costs on to our customers. But it is tough to keep up with the rate of cost increases we are seeing.

Brad Bourne: Costs are moving up fast, and again, we are working towards passing these costs on to our customers. It is tough to keep up with the rate of cost increases we are seeing. Also, our collective agreement for our unionized staff in our Circuits Toronto facility expires in July. Negotiations are ongoing and we are hopeful of a successful conclusion, but nothing is firm until contract is ratified by the members. We will continue to take steps to create value from our acquisition of FLYHT last year. As of 1 December 2024, we have renamed the business FTG Aerospace Calgary, as we amalgamated it legally into FTG. The amalgamation was done to possibly enable us to use the FLYHT tax losses beyond just our operation in Calgary. But to be clear, we do not have certainty that this will be possible.

Brad Bourne: Costs are moving up fast, and again, we are working towards passing these costs on to our customers. It is tough to keep up with the rate of cost increases we are seeing. Also, our collective agreement for our unionized staff in our Circuits Toronto facility expires in July. Negotiations are ongoing and we are hopeful of a successful conclusion, but nothing is firm until contract is ratified by the members. We will continue to take steps to create value from our acquisition of FLYHT last year. As of 1 December 2024, we have renamed the business FTG Aerospace Calgary, as we amalgamated it legally into FTG. The amalgamation was done to possibly enable us to use the FLYHT tax losses beyond just our operation in Calgary. But to be clear, we do not have certainty that this will be possible.

Speaker #2: Also, our collective agreement for our unionized staff at our Circuits Toronto facility expires in July. Negotiations are ongoing, and we are hopeful of a successful conclusion, but nothing is firm until the contract is ratified by the members.

Speaker #2: And we will continue to take steps to create value from our acquisition of Flight last year. As of December 1 last year, we have renamed the business FTG Aerospace Calgary.

Speaker #2: As we amalgamated it legally into FTG, the amalgamation was done to possibly enable us to use the flight tax losses beyond just our operation in Calgary.

Speaker #2: But to be clear, we do not have certainty that this will be possible. In the Calgary business itself, we believe we are now well positioned to have a strong year as a result of our product certification and STC efforts last year.

Brad Bourne: In the Calgary business itself, we believe we are now well-positioned to have a strong year as a result of our product certification and STC efforts last year. We are seeing strong demand for all three products, and our pipeline looks robust. The licensing revenue on our SATCOM radio product has returned and should be reasonably consistent going forward. The licensed product ends up on Airbus aircraft, so we know the demand is strong. We are working to become the manufacturer of this product for the licensee to capture additional margin from this product. If things proceed as anticipated, this will benefit us in 2027 and beyond. We are looking to manufacture the SATCOM radio product in our Chatsworth, California facility. The production area is set up and parts are on order. This should help get our Chatsworth facility ramped up going forward.

Brad Bourne: In the Calgary business itself, we believe we are now well-positioned to have a strong year as a result of our product certification and STC efforts last year. We are seeing strong demand for all three products, and our pipeline looks robust. The licensing revenue on our SATCOM radio product has returned and should be reasonably consistent going forward. The licensed product ends up on Airbus aircraft, so we know the demand is strong. We are working to become the manufacturer of this product for the licensee to capture additional margin from this product. If things proceed as anticipated, this will benefit us in 2027 and beyond. We are looking to manufacture the SATCOM radio product in our Chatsworth, California facility. The production area is set up and parts are on order. This should help get our Chatsworth facility ramped up going forward.

Speaker #2: We are seeing strong demand for all three products, and our pipeline looks robust. The licensing revenue on our SATCOM radio product has returned and should be reasonably consistent going forward.

Speaker #2: The licensed product ends up on Airbus aircraft, so we know the demand is strong. We are working to become the manufacturer of this product for the licensee to capture additional margin from this product.

Speaker #2: If things proceed as anticipated, this will benefit us in 2027 and beyond. We are looking to manufacture the SATCOM radio product in our Chatsworth, California, facility.

Speaker #2: The production area is set up, and parts are on order. This should help get our Chatsworth facility ramped up going forward. The EdgeFlesh WQAR has the key STCs in place. With our first few orders or few deliveries behind us, we are quoting many new opportunities in a number of geographic jurisdictions.

Brad Bourne: The Edge Flash WQAR has the key STCs in place. With our first few orders or few deliveries behind us, we are quoting many new opportunities in a number of geographic jurisdictions. We are starting to manufacture this product in our Tianjin plant to enable us to capture this margin as well. We expect sales of their weather product to ramp up in H2 2026 as well, with our contract with NOAA in the US. Our contract with UK Met in England was unfortunately canceled in Q2, not for reasons related to the product. While disappointing, we continue to see strong potential for this product elsewhere, including some military applications. In Q2, we installed our first kit for this product on a WestJet aircraft. We expect to have our STC for the 737 MAX in Q3 this year.

Brad Bourne: The Edge Flash WQAR has the key STCs in place. With our first few orders or few deliveries behind us, we are quoting many new opportunities in a number of geographic jurisdictions. We are starting to manufacture this product in our Tianjin plant to enable us to capture this margin as well. We expect sales of their weather product to ramp up in H2 2026 as well, with our contract with NOAA in the US. Our contract with UK Met in England was unfortunately canceled in Q2, not for reasons related to the product. While disappointing, we continue to see strong potential for this product elsewhere, including some military applications. In Q2, we installed our first kit for this product on a WestJet aircraft. We expect to have our STC for the 737 MAX in Q3 this year.

Speaker #2: And we are starting to manufacture this product in our Tianjin plant to enable us to capture this margin as well. We expect sales of their weather product to ramp up in the second half of 2026 as well, with our contract with NOAA in the U.S.

Speaker #2: Our contract with the U.K., met in England, was unfortunately canceled in Q2, but not for reasons related to the product. While disappointing, we continue to see strong potential for this product elsewhere, including some military applications.

Speaker #2: In Q2, we installed our first kit for this product on a WestJet aircraft, and we expect to have our STC for the 737 MAX in Q3 this year.

Speaker #2: Once approved and installed, there will be a recurring revenue stream as we provide real-time weather and water vapor readings to NOAA. We also expect to install further units with WestJet throughout the remainder of this year, each incrementally increasing our recurring data revenue potential.

Brad Bourne: Once approved and installed, there will be a recurring revenue stream as we provide real-time weather and water vapor readings to NOAA. We also expect to install further units with WestJet through the balance of this year, each incrementally increasing our recurring data revenue potential. These actions should enable FTG Aerospace Calgary to be a positive addition to FTG and further mitigate the risks from US tariffs. We opened our aerospace facility in Hyderabad, India, last week. Our decision to expand geographically was partly us looking for an insurance policy against anything negative happening in our China operations. It was also partly to expand into a new region with growth potential.

Brad Bourne: Once approved and installed, there will be a recurring revenue stream as we provide real-time weather and water vapor readings to NOAA. We also expect to install further units with WestJet through the balance of this year, each incrementally increasing our recurring data revenue potential. These actions should enable FTG Aerospace Calgary to be a positive addition to FTG and further mitigate the risks from US tariffs. We opened our aerospace facility in Hyderabad, India, last week. Our decision to expand geographically was partly us looking for an insurance policy against anything negative happening in our China operations. It was also partly to expand into a new region with growth potential.

Speaker #2: These actions should enable FTG Aerospace Calgary to be a positive addition to FTG and further mitigate the risks from U.S. tariffs. We opened our aerospace facility in Hyderabad, India, last week.

Speaker #2: Our decision to expand geographically was partly us looking for an insurance policy against anything negative happening in our China operations, but it was also partly to expand into a new region with growth potential.

Speaker #2: As we analyzed our options, we concluded India was a very cost-effective place for manufacturing. With Prime Minister Modi's "Make in India" policy, coupled with significant defense spending, it would be an ideal place to operate—a place where we can serve our existing Western customers but also penetrate the Indian aerospace and defense market.

Brad Bourne: As we analyzed our options, we concluded India was a very cost-effective place for manufacturing. With Prime Minister Modi's Make in India policy, coupled with significant defense spending, it would be an ideal place to operate, a place where we can serve our existing Western customers, also penetrate the Indian aerospace and defense market. We selected Hyderabad as it has an aerospace hub primarily focused on manufacturing. After our grand opening last week, we attended an aerospace conference in Hyderabad and came away with some exciting new customer opportunities. While we held our grand opening, we are still sourcing some necessary equipment to be ready to go. Our estimated total investment is forecast to be approximately CAD 2 to 3 million. While not the original intent, we believe this initiative could also help mitigate any negative impact from US tariffs.

Brad Bourne: As we analyzed our options, we concluded India was a very cost-effective place for manufacturing. With Prime Minister Modi's Make in India policy, coupled with significant defense spending, it would be an ideal place to operate, a place where we can serve our existing Western customers, also penetrate the Indian aerospace and defense market. We selected Hyderabad as it has an aerospace hub primarily focused on manufacturing. After our grand opening last week, we attended an aerospace conference in Hyderabad and came away with some exciting new customer opportunities. While we held our grand opening, we are still sourcing some necessary equipment to be ready to go. Our estimated total investment is forecast to be approximately CAD 2 to 3 million. While not the original intent, we believe this initiative could also help mitigate any negative impact from US tariffs.

Speaker #2: We selected Hyderabad as it has an aerospace hub, primarily focused on manufacturing. After our grand opening last week, we attended an aerospace conference in Hyderabad and came away with some exciting new customer opportunities.

Speaker #2: While we held our grand opening, we are still sourcing some necessary equipment to be ready to go. Our estimated total investment is forecast to be approximately $2 to $3 million.

Speaker #2: While not the original intent, we believe this initiative could also help mitigate any negative impact from U.S. tariffs. Through the balance of this year, we will be staffing up, training, and building some initial products, but it is expected to be intercompany activity, so no real incremental benefit to FTG before 2027.

Brad Bourne: Through the balance of this year, we will be staffing up and training and building some initial products. It is expected to be intercompany activity, no real incremental benefit to FTG before 2027. We continue to assess possible corporate development opportunities that could fit with either of our businesses. We have a few areas of interest, including establishing a footprint in Europe, growing our presence in India, or expanding our technology in a few areas. In our Q2, three circuit board manufacturing companies were sold in Europe, none of them to us. TTM bought two companies, neither had a strong focus on aerospace and defense. Somacis just bought Group ACB, which is a multi-site business focused on aerospace and defense, their operations are primarily in France, this is not a jurisdiction we are keen on.

Brad Bourne: Through the balance of this year, we will be staffing up and training and building some initial products. It is expected to be intercompany activity, no real incremental benefit to FTG before 2027. We continue to assess possible corporate development opportunities that could fit with either of our businesses. We have a few areas of interest, including establishing a footprint in Europe, growing our presence in India, or expanding our technology in a few areas. In our Q2, three circuit board manufacturing companies were sold in Europe, none of them to us. TTM bought two companies, neither had a strong focus on aerospace and defense. Somacis just bought Group ACB, which is a multi-site business focused on aerospace and defense, their operations are primarily in France, this is not a jurisdiction we are keen on.

Speaker #2: We continue to assess possible corporate development opportunities that could fit with either of our businesses. We have a few areas of interest, including establishing a footprint in Europe and growing our presence in India.

Speaker #2: We're expanding our technology in a few areas. In our second quarter, three circuit board manufacturing companies were sold in Europe, but none of them to us.

Speaker #2: TGM bought two companies, but neither had a strong focus in aerospace and defense. So Matchis bought ACB Circuits, which is a multi-site business focused on aerospace and defense, but their operations are primarily in France, and this is not a jurisdiction we are keen on.

Speaker #2: And finally, as a remember, our third as a reminder, our third quarter is seasonally a bit softer, due to increased vacations and lost production days.

Brad Bourne: Finally, as a reminder, our Q3 is seasonally a bit softer due to increased vacations and lost production days. We estimate about one week or 8% of lost production in the quarter. With a focus on operational excellence in all parts of FTG, our strong financial performance in 2025 and the H1 of 2026, our recent acquisitions, and our key sales wins, we are confident we are on a strong long-term growth trajectory. This concludes our presentation. I thank you for your attention. I would now like to open the phones for any questions. Vincent?

Brad Bourne: Finally, as a reminder, our Q3 is seasonally a bit softer due to increased vacations and lost production days. We estimate about one week or 8% of lost production in the quarter. With a focus on operational excellence in all parts of FTG, our strong financial performance in 2025 and the H1 of 2026, our recent acquisitions, and our key sales wins, we are confident we are on a strong long-term growth trajectory. This concludes our presentation. I thank you for your attention. I would now like to open the phones for any questions. Vincent?

Speaker #2: We estimate about one week, or 8%, of lost production in the quarter. With a focus on operational excellence in all parts of FTG, our strong financial performance in 2025 and the first half of 2026, our recent acquisitions, and our key sales wins, we are confident we are on a strong long-term growth trajectory.

Speaker #2: This concludes our presentation. I thank you for your attention. I would now like to open the phones for any questions. Vincent.

Speaker #1: Ladies and gentlemen, we will now begin the question and answer session. If you would like to ask a question during this time, simply press star, then the number one on your telephone keypad.

Operator: Ladies and gentlemen, we will now begin the question-and-answer session. If you would like to ask a question during this time, simply press star then 1 on your telephone keypad. Again, that will be star, then 1 on your telephone keypad. If you would like to withdraw your question, please press star, then 2. Your first question comes from Nick Voychuck from ATB Cormark Capital Markets. Please go ahead.

Operator: Ladies and gentlemen, we will now begin the question-and-answer session. If you would like to ask a question during this time, simply press star then 1 on your telephone keypad. Again, that will be star, then 1 on your telephone keypad. If you would like to withdraw your question, please press star, then 2. Your first question comes from Nick Voychuck from ATB Cormark Capital Markets. Please go ahead.

Speaker #1: Again, I'll be star, then the number one on your telephone keypad. If you would like to withdraw a question, please press star, then the number two.

Speaker #1: Your first question comes from Nick Boychuk from ADB Cormac Capital Markets. Please go ahead.

Speaker #2: Thanks. Good morning, guys. Brad, you mentioned a lot about the outlook that you have now and this increased booking backlog activity. What's the confidence you have to deliver, given the existing footprint and labor availability?

Nick Voychuck: Thanks. Good morning, guys. Brad, you mentioned a lot about the outlook that you have now and this increased booking backlog activity. What's the confidence you have to deliver given the existing footprint and labor availability? Are there any bottlenecks or things that might prevent that from flowing through over the coming 12 to 24 months?

Nicholas Boychuk: Thanks. Good morning, guys. Brad, you mentioned a lot about the outlook that you have now and this increased booking backlog activity. What's the confidence you have to deliver given the existing footprint and labor availability? Are there any bottlenecks or things that might prevent that from flowing through over the coming 12 to 24 months?

Speaker #2: Are there any bottlenecks or things that might prevent that from flowing through over the coming 12 to 24 months?

Brad Bourne: Yeah, for sure. There's always challenges and bottlenecks and such, and it's different across the sites. I guess all sites but one, it's about staffing and training and getting people operating equipment more hours a day. For every site except FTG Circuits Toronto, it's about that. I tried to allude to it, but the key for us, one of the keys is Minnetonka. We've been struggling to make that happen, but we didn't see the result in Q2, but we saw significant improvement in staffing in Q2, which I believe is going to help us going forward in Q3 and beyond. That was really good to see. The other sites, to their credit, Chatsworth grew 18% with a handful, a couple of staff additions. Fredericksburg grew almost 100% with no staff additions. Haverhill grew 15% with no staff additions.

Brad Bourne: Yeah, for sure. There's always challenges and bottlenecks and such, and it's different across the sites. I guess all sites but one, it's about staffing and training and getting people operating equipment more hours a day. For every site except FTG Circuits Toronto, it's about that. I tried to allude to it, but the key for us, one of the keys is Minnetonka. We've been struggling to make that happen, but we didn't see the result in Q2, but we saw significant improvement in staffing in Q2, which I believe is going to help us going forward in Q3 and beyond. That was really good to see. The other sites, to their credit, Chatsworth grew 18% with a handful, a couple of staff additions. Fredericksburg grew almost 100% with no staff additions. Haverhill grew 15% with no staff additions.

Speaker #3: Yeah, for sure. There are always challenges and, you know, bottlenecks and such. And, you know, it's different across the sites. And I guess at all sites but one, it's about staffing and training and getting people, you know, operating equipment more hours a day.

Speaker #3: And so for every site except Circuits Toronto, it’s about that. And I tried to allude to it, but, you know, the key for us—one of the keys—is Minnetonka. We've been struggling to make that happen, but we didn’t see the result in Q2. However, we saw significant improvement in staffing in Q2, which I believe is going to help us going forward in Q3 and beyond.

Speaker #3: So that was really good to see. You know, the other sites, to their credit—so, you know, Chatsworth grew 18% with a handful, you know, a couple of staff additions.

Speaker #3: Fredericksburg grew almost 100% with no staff additions. Haverhill grew 15% with no staff additions. And so, you know, the sites are really performing well.

Brad Bourne: The sites are really performing well. We will add staff as necessary to support future demand. Finally, the last one on the circuits side. Our FTG Circuits Toronto, for sure, we have some production bottlenecks that are equipment related. We're already running 24/7, so that's not an opportunity to just run it longer. We're working to address the equipment bottlenecks. We have orders in place for some expansion in our plating line. We have orders in place for some drills to expand our capacity there. Our only challenge, which might delay it a little bit, but it's just the lead time on equipment is pushing it out a bit, just given the overall demand in the circuits industry, but everything's on order. We are hoping that we can add CAD 20 million platen capacity by the end of this year.

Brad Bourne: The sites are really performing well. We will add staff as necessary to support future demand. Finally, the last one on the circuits side. Our FTG Circuits Toronto, for sure, we have some production bottlenecks that are equipment related. We're already running 24/7, so that's not an opportunity to just run it longer. We're working to address the equipment bottlenecks. We have orders in place for some expansion in our plating line. We have orders in place for some drills to expand our capacity there. Our only challenge, which might delay it a little bit, but it's just the lead time on equipment is pushing it out a bit, just given the overall demand in the circuits industry, but everything's on order. We are hoping that we can add CAD 20 million platen capacity by the end of this year.

Speaker #3: And we will add staff as necessary to support future demand. You know, and then finally, on the last one on the circuit side—so, our Circuits Toronto—for sure, we have some production bottlenecks that are equipment related.

Speaker #3: So we're already running 24/7, so that's not an opportunity to just run it longer. We're working to, you know, address the equipment bottlenecks. We have orders in place for some expansion in our plating line.

Speaker #3: We have orders in place for some drills to expand our capacity there. Our only challenge—which, you know, might delay it a little bit—is just the lead time on equipment is pushing out a bit, given the overall demand in the circuits industry.

Speaker #3: But everything's on order. We are hoping that, you know, we can add $20 million plus in capacity by the end of this year.

Speaker #3: And then, you know, on the cockpit product side, it's all about staffing. And we're, you know, doing a good job supporting our demand right now.

Brad Bourne: On the cockpit product side, it's all about staffing, and we're doing a good job supporting our demand right now. As I talked about, we just opened our FTG Aerospace Hyderabad facility. That's adding another CAD 20 million of capacity there. I'm giving you the world's longest answer, but at the end of it all, I think we are doing the things to be able to support the demand we see for the coming couple of years.

Brad Bourne: On the cockpit product side, it's all about staffing, and we're doing a good job supporting our demand right now. As I talked about, we just opened our FTG Aerospace Hyderabad facility. That's adding another CAD 20 million of capacity there. I'm giving you the world's longest answer, but at the end of it all, I think we are doing the things to be able to support the demand we see for the coming couple of years.

Speaker #3: As I talked about, we just opened our aerospace Hyderabad facility. That's adding another $20 million of capacity there. So I'm giving you the world's longest answer, but at the end of it all, I think, you know, we are doing the things to be able to support the demand we see for the coming couple of years.

Speaker #2: Okay, perfect. No, that's great color, thank you. And as those start to play through, how are you thinking about margins evolving? I know you're obviously adding this extra equipment to remove some of these bottlenecks.

Nick Voychuck: Okay, perfect. No, that's great color. Thank you. As those start to play through, how are you thinking about margins evolving? I know you're obviously adding this extra equipment to remove some of these bottlenecks. Where could either gross or EBITDA margins, as that operating leverage starts to play through, really go here?

Nicholas Boychuk: Okay, perfect. No, that's great color. Thank you. As those start to play through, how are you thinking about margins evolving? I know you're obviously adding this extra equipment to remove some of these bottlenecks. Where could either gross or EBITDA margins, as that operating leverage starts to play through, really go here?

Speaker #2: Where could other gross or EBITDA margins, as that operating leverage starts to play through, really go here?

Speaker #3: Yeah, I don't know. There's my challenge. I had a long-term target at FTG. These are, I'm going to say, mostly internal targets that, you know, I could get to a 30% margin if I—I've blown way past that.

Brad Bourne: Yeah. I don't know. There's my challenge. I had a long-term target at FTG. I'm going to say these are mostly internal targets that I could get to a 30% margin, but I've blown way past that, and I have a target of getting to a 20% EBITDA, and we're basically there now. I've run out of targets. I've got to come up with some new targets.

Brad Bourne: Yeah. I don't know. There's my challenge. I had a long-term target at FTG. I'm going to say these are mostly internal targets that I could get to a 30% margin, but I've blown way past that, and I have a target of getting to a 20% EBITDA, and we're basically there now. I've run out of targets. I've got to come up with some new targets.

Speaker #3: And I have a target of getting to a 20% EBITDA, and we're basically there now. So I've run out of targets; I've got to come up with some new targets.

Nick Voychuck: Sure.

Nicholas Boychuk: Sure.

Speaker #3: But at the end of it, you know, we are a manufacturer. We've got a bunch of fixed costs. If we grow the top line, margins expand.

Brad Bourne: At the end of it, we are a manufacturer. We've got a bunch of fixed costs. If we grow the top line, margins expand. That I know for sure, and we keep demonstrating that. We can perform efficiently and productively, and obviously, we work on doing that wherever we can. Top line drives bottom line at FTG, so if we can grow the top line, margins will expand. I honestly don't have a target for you today.

Brad Bourne: At the end of it, we are a manufacturer. We've got a bunch of fixed costs. If we grow the top line, margins expand. That I know for sure, and we keep demonstrating that. We can perform efficiently and productively, and obviously, we work on doing that wherever we can. Top line drives bottom line at FTG, so if we can grow the top line, margins will expand. I honestly don't have a target for you today.

Speaker #3: That I know for sure, and we keep demonstrating that. You know, we can perform efficiently and productively, and obviously we work on doing that wherever we can.

Speaker #3: But top line drives bottom line at FTG. So if we can grow the top line, margins will expand. I honestly don't have a target for you today.

Speaker #2: Okay, that's fair. And then, the last one from me: on these classified programs, is there any color you can share? I appreciate that the end application and the use case for some of this hardware may not even be known to you guys, but in terms of either the scale of the contracts, the velocity with which these orders are going to come through, or even the tenure— is there anything that you're aware of that you can share so we can kind of wrap our heads around how impactful these two contracts in particular are?

Nick Voychuck: Okay, that's fair. The last one from me. On these classified programs, is there any color you can share? I appreciate that the end application and the use case of some of this hardware may not be even known to you guys, but in terms of either the scale of the contracts, the velocity with which these orders are going to come through, or even the tenure, is there anything that you're aware of that you can share so we can kind of wrap our heads around how impactful these two contracts in particular are?

Nicholas Boychuk: Okay, that's fair. The last one from me. On these classified programs, is there any color you can share? I appreciate that the end application and the use case of some of this hardware may not be even known to you guys, but in terms of either the scale of the contracts, the velocity with which these orders are going to come through, or even the tenure, is there anything that you're aware of that you can share so we can kind of wrap our heads around how impactful these two contracts in particular are?

Speaker #3: Yeah, yes. You know, I guess on the first part, just to be clear, I truly do not know the end application, so I can't share anything on that—but you didn't ask about that.

Brad Bourne: Yeah. I guess on the first part, just to be clear, I truly do not know the end application, so can't share anything on that. You didn't ask about that. In terms of the financial impact of these, they are both gigantic. Annual circuit board spend is, I don't know, CAD 50 to 100 million. Obviously, I cannot support that full spend, nor would the customer spend it all with one supplier. We're going to get a portion of that, basically whatever we can support. We're early days. One of them, we have orders, we've shipped nothing yet. We're actually still waiting for the customer to finalize designs. We built some prototypes last year, but they're doing back and redesign. We're just waiting. Can't really begin to guess where that one's going to end up.

Brad Bourne: Yeah. I guess on the first part, just to be clear, I truly do not know the end application, so can't share anything on that. You didn't ask about that. In terms of the financial impact of these, they are both gigantic. Annual circuit board spend is, I don't know, CAD 50 to 100 million. Obviously, I cannot support that full spend, nor would the customer spend it all with one supplier. We're going to get a portion of that, basically whatever we can support. We're early days. One of them, we have orders, we've shipped nothing yet. We're actually still waiting for the customer to finalize designs. We built some prototypes last year, but they're doing back and redesign. We're just waiting. Can't really begin to guess where that one's going to end up.

Speaker #3: You know, in terms of the financial impact of these, they are both gigantic. You know, annual circuit board spend is, I don't know, $50 to $100 million.

Speaker #3: Obviously, I cannot support that full spend, nor would the customer spend it all in one place with one supplier. So we're going to get a portion of that—basically whatever we can support.

Speaker #3: But we're in the early days. You know, for one of them, we have orders, but we've shipped nothing yet. We're actually still waiting for the customer to finalize designs.

Speaker #3: We built some prototypes last year, but they're doing back-and-back in redesign. And so we're just waiting. Can't really begin to guess where that one's going to end up.

Speaker #3: The other one, you know, started production, but low numbers—not anything meaningful in Q2. And that one's in our Toronto facility. But I don't know.

Brad Bourne: The other one started production, but low numbers, nothing meaningful in Q2. That one's in our Toronto facility. I don't know. It's going to depend on how fast they ramp, and to be fair, how we perform. We're working to try to make sure we perform well for both of them and get our fair share of the pie. TBD, the exact timing on how this ramps up, and after that, for sure, they're both multi-year programs, five-plus years.

Brad Bourne: The other one started production, but low numbers, nothing meaningful in Q2. That one's in our Toronto facility. I don't know. It's going to depend on how fast they ramp, and to be fair, how we perform. We're working to try to make sure we perform well for both of them and get our fair share of the pie. TBD, the exact timing on how this ramps up, and after that, for sure, they're both multi-year programs, five-plus years.

Speaker #3: It's going to depend on how fast they ramp, and then, to be fair, how we perform. So, you know, we're working to try to make sure we perform well for both of them and get our fair share of the pie.

Speaker #3: But TBD—the exact timing on how this ramps up, and, you know, after that, for sure, they're both multiyear programs... you know, five-plus years.

Speaker #2: Okay, that's really great color, guys. Thanks so much for the time.

Nick Voychuck: Okay. That's really great color, guys. Thanks so much for the time.

Nicholas Boychuk: Okay. That's really great color, guys. Thanks so much for the time.

Speaker #3: Okay, thank you.

Brad Bourne: Okay. Thank you.

Brad Bourne: Okay. Thank you.

Speaker #1: Your next question comes from Steve Hansen from Raymond James. Please go ahead.

Operator: Your next question comes from Steve Hansen from Raymond James. Please go ahead.

Operator: Your next question comes from Steve Hansen from Raymond James. Please go ahead.

Speaker #2: Yeah, thanks for the time, guys. I just want to follow up on the defense programs, Brad. We've obviously seen a step change in the backlog and the bookings.

Steve Hansen: Yeah, thanks for the time, guys. I just want to follow up on the defense programs, Brad. We obviously saw a step change in the backlog and the bookings. I presume some of that references the new POs coming on from these programs. Is there any sort of color you can give us in terms of how you expect these programs to ramp, or at what pace through the H2 of even just this year? That'd be the first step.

Steve Hansen: Yeah, thanks for the time, guys. I just want to follow up on the defense programs, Brad. We obviously saw a step change in the backlog and the bookings. I presume some of that references the new POs coming on from these programs. Is there any sort of color you can give us in terms of how you expect these programs to ramp, or at what pace through the H2 of even just this year? That'd be the first step.

Speaker #2: I presume some of that references the new POs coming in from these programs. Is there any sort of color you can give us in terms of how you expect these programs to ramp, or what the pace will be through the back half of even just this year?

Speaker #2: That'd be the first step.

Speaker #3: Yeah, as I say, there's a little bit of uncertainty right now. You know, one of them—we're waiting for redesign. You just never know how fast that will happen.

Brad Bourne: Yeah. As I say, there's a little bit of uncertainty right now. One of them, we're waiting for a redesign. You just never know how fast that will happen. Just starting with the backlog, our backlog ramp, I don't know, CAD 40 million. Probably half of that was related to these two programs, approximately. It's significant in terms of the orders. They're indicating this would be due basically through this year into early next year. I'll give you a bit of timing on it, but that timing can move. You have learned this many times, when there's a new program and it's trying to get into production, typically it doesn't move faster than you expect. Typically, you end up with a handful of delays because something goes wrong or something doesn't work quite the way they expected. They're moving aggressively.

Brad Bourne: Yeah. As I say, there's a little bit of uncertainty right now. One of them, we're waiting for a redesign. You just never know how fast that will happen. Just starting with the backlog, our backlog ramp, I don't know, CAD 40 million. Probably half of that was related to these two programs, approximately. It's significant in terms of the orders. They're indicating this would be due basically through this year into early next year. I'll give you a bit of timing on it, but that timing can move. You have learned this many times, when there's a new program and it's trying to get into production, typically it doesn't move faster than you expect. Typically, you end up with a handful of delays because something goes wrong or something doesn't work quite the way they expected. They're moving aggressively.

Speaker #3: But, you know, just starting with the backlog. So, our backlog ramp, I don't know, $40 million—probably half of that was related to these two programs, approximately.

Speaker #3: So it's, you know, significant in terms of the orders. They're indicating this would be due basically through this year into early next year, so I'll give you a bit of timing on it.

Speaker #3: But that timing can move. I have learned this many times—when there's a new program kind of trying to get into production, typically it doesn't move faster than you expect.

Speaker #3: Typically, you end up with a handful of delays because something goes wrong or something doesn't work quite the way they expected. But, you know, they're moving aggressively.

Speaker #3: The customers are moving aggressively on this. Clearly, they're being driven to get it to market as fast as they can. But again, there's just a little bit of uncertainty.

Brad Bourne: The customers are moving aggressively on this. Clearly, they're being driven to get it to market as fast as they can. Again, there's just a little bit of uncertainty.

Brad Bourne: The customers are moving aggressively on this. Clearly, they're being driven to get it to market as fast as they can. Again, there's just a little bit of uncertainty.

Speaker #2: No, that's fair. And then, just switching gears a little bit, I know you talked about the broader corp dev backdrop and some of the transactions that took place in Europe.

Steve Hansen: No, that's all right. Just switching gears a little bit, I know you talked about the broader corp dev backdrop and some of the transactions that took place in Europe. I know you've been on the hunt there. Could you perhaps maybe just describe how your pipeline looks at this point, or maybe even characterize your efforts to search out potential partners thus far?

Steve Hansen: No, that's all right. Just switching gears a little bit, I know you talked about the broader corp dev backdrop and some of the transactions that took place in Europe. I know you've been on the hunt there. Could you perhaps maybe just describe how your pipeline looks at this point, or maybe even characterize your efforts to search out potential partners thus far?

Speaker #2: I know you've been on the hunt there. Could you perhaps maybe just describe how your pipeline looks at this point or maybe even characterize your efforts to search out potential partners thus far?

Speaker #3: Yeah, the sure. And, you know, it depends how you determine a target. There's probably at the end of it all, I'm going to say roughly 10 companies that are of interest to me.

Brad Bourne: Yeah. Sure. It depends how you determine a target. There's probably, at the end of it all, I'm going to say roughly 10 companies that are of interest to me, in that they're in Europe, they're in possibly a reasonable jurisdiction of Europe, they're focused on aerospace and defense. That doesn't mean they're available. That's kind of the targets I've identified. I don't know, it's the never-ending game of acquisitions, right? Either they're willing to talk or they're not. Are they going to run a process or not? We're seeing some of that happen, and I just don't know how it's going to turn out yet. I don't know how valuations are going to be. That's certainly been a topic in the past of will these valuations be reasonable? Don't know for sure. Time will tell.

Brad Bourne: Yeah. Sure. It depends how you determine a target. There's probably, at the end of it all, I'm going to say roughly 10 companies that are of interest to me, in that they're in Europe, they're in possibly a reasonable jurisdiction of Europe, they're focused on aerospace and defense. That doesn't mean they're available. That's kind of the targets I've identified. I don't know, it's the never-ending game of acquisitions, right? Either they're willing to talk or they're not. Are they going to run a process or not? We're seeing some of that happen, and I just don't know how it's going to turn out yet. I don't know how valuations are going to be. That's certainly been a topic in the past of will these valuations be reasonable? Don't know for sure. Time will tell.

Speaker #3: In that, you know, they're in Europe, they're in possibly a reasonable jurisdiction of Europe. They're focused on aerospace and defense. And so but that doesn't mean they're available.

Speaker #3: And so you know, that's kind of the the targets I've identified. And then I don't know, it's it's the never-ending game of acquisitions, right?

Speaker #3: Either they're willing to talk or they're not. And then you know, are they going to run a process or not? So we're we're seeing some of that happen.

Speaker #3: And I just don't know how it's going to turn out yet. So I don't know how valuations are going to be, you know, that's certainly been a topic in the past of, you know, will these valuations be reasonable?

Speaker #3: Don't know for sure. And so time will tell. And I, you know, the three that sold, I have seen nothing on valuations on those.

Brad Bourne: The three that sold, I have seen nothing on valuations on those. They were private deals that the details were not announced, so it's not helping me on valuations either.

Brad Bourne: The three that sold, I have seen nothing on valuations on those. They were private deals that the details were not announced, so it's not helping me on valuations either.

Speaker #3: They were private deals that have not, you know, the details were not announced. So that's not helping me on valuations either.

Speaker #2: No, understood. That's helpful. And then just just lastly, and I'll turn it over, I just wanted to go back to the question on capacity and bottlenecks and labor.

Steve Hansen: No, understood. That's helpful. Just lastly, I'll turn it over. I just wanted to go back to the question on capacity and bottlenecks and labor. Maybe is the first part question, are you done with the shuffling or the shifting of work you described? Fredericksburg nearly doubling production, Chatsworth and Haverhill also taking up production. It sounds like you've been quite successful in shifting and moving work. Is that process largely optimized thus far, or is there more to go? On the second piece is just that you also described you're still searching out some new defense programs over and above those that you're there. Just maybe give us a sense for where you think those can fit into the network as it stands in terms of your current sort of future capacity pipeline. Thanks.

Steve Hansen: No, understood. That's helpful. Just lastly, I'll turn it over. I just wanted to go back to the question on capacity and bottlenecks and labor. Maybe is the first part question, are you done with the shuffling or the shifting of work you described? Fredericksburg nearly doubling production, Chatsworth and Haverhill also taking up production. It sounds like you've been quite successful in shifting and moving work. Is that process largely optimized thus far, or is there more to go? On the second piece is just that you also described you're still searching out some new defense programs over and above those that you're there. Just maybe give us a sense for where you think those can fit into the network as it stands in terms of your current sort of future capacity pipeline. Thanks.

Speaker #2: Are you done maybe is the first part question, are you done with the shuffling or the shifting of work you described? You know, Fredericksburg nearly doubling production.

Speaker #2: Chats have also taking up production with no it sounds like you've been quite successful in shifting and moving work. Is that process largely optimized thus far or is there more to go?

Speaker #2: And then on the second piece is just that you also described you're still searching out some new defense programs over and above those that you're there.

Speaker #2: And so just maybe give us a sense for where you think those can fit. Into the network. As it stands in terms of your current sort of, you know, future capacity pipeline, thanks.

Speaker #3: Yeah, okay. I guess first one, in terms of shifting work, you know, we actually did have some success, which was good. For sure, we're not done.

Brad Bourne: Yeah. Okay. I guess first one, in terms of shifting work, we actually did have some success, which was good. For sure we're not done. It's a never-ending process, I think. We're forever optimizing it. It's remarkably painful working this through with customers. It's the nature of the business that when you're moving aerospace or defense product around, customers are cautious. They want lots of approvals, and they want to check everything and be very cautious in making any moves. It takes longer than we'd like, but nevertheless, we continue to do it. Some of it is to manage capacity, some of it is to manage tariff-related stuff, so trying to move non-US work out of the US or US work in the US, that type of stuff. That's ongoing. We'll continue to work it. Your second question, I don't know.

Brad Bourne: Yeah. Okay. I guess first one, in terms of shifting work, we actually did have some success, which was good. For sure we're not done. It's a never-ending process, I think. We're forever optimizing it. It's remarkably painful working this through with customers. It's the nature of the business that when you're moving aerospace or defense product around, customers are cautious. They want lots of approvals, and they want to check everything and be very cautious in making any moves. It takes longer than we'd like, but nevertheless, we continue to do it. Some of it is to manage capacity, some of it is to manage tariff-related stuff, so trying to move non-US work out of the US or US work in the US, that type of stuff. That's ongoing. We'll continue to work it. Your second question, I don't know.

Speaker #3: It's a never-ending process, I think, you know, for we're forever optimizing it. It's remarkably painful. Working this through with customers, it's just it's the nature of the business that when you're moving aerospace or defense product around, customers are cautious.

Speaker #3: They want lots of approvals and they want to, you know, check everything and be, you know, very cautious in making these moves. So it takes longer than we'd like, but nevertheless, we continue to do it.

Speaker #3: Some of it is to manage capacity. Some of it is to manage peripheralated stuff. So trying to move non-US work out of the US or US work into the US, that type of stuff.

Speaker #3: But that's ongoing. And we'll continue to work it. And then your second question, I don't know. You should ask that second question again.

Brad Bourne: You should ask that second question again.

Brad Bourne: You should ask that second question again.

Speaker #2: Oh, just just in effect, if you're you've got a large backlog and pipeline already today. Steward, but you're also on the search for some new programs.

Steve Hansen: Oh, just in effect, if you've got a large backlog and pipeline already today secured, but you're also on the search for some new programs, would you ultimately have places to stick it or fit it into the network today?

Steve Hansen: Oh, just in effect, if you've got a large backlog and pipeline already today secured, but you're also on the search for some new programs, would you ultimately have places to stick it or fit it into the network today?

Speaker #2: Would you ultimately have places to stick it or fit it into the network today?

Speaker #3: Yeah, you know, I am I am actually Q2. I mean, you know, I talk about lots of interesting things going on, but Q2 was a good quarter for us.

Brad Bourne: Yeah. Actually, Q2, I talk about lots of interesting things going on, but Q2 was a good quarter for us, and the sites really performed. They ramped. I'm really encouraged by that. I believe we have room to continue to ramp. Again, it's just keeping the equipment moving more hours a day. In Chatsworth Circuits, for instance, I was running one and a half, not even, one and a quarter shifts. If I add some people, the equipment runs more. I think I could do a double in Chatsworth. Not overnight, but I could do a double. I think I can do a double in Haverhill, not overnight, but a double. I did a double in Fredericksburg. I think there's a potential to do another double. Again, it's not overnight, but in terms of plant and equipment, I have capacity.

Brad Bourne: Yeah. Actually, Q2, I talk about lots of interesting things going on, but Q2 was a good quarter for us, and the sites really performed. They ramped. I'm really encouraged by that. I believe we have room to continue to ramp. Again, it's just keeping the equipment moving more hours a day. In Chatsworth Circuits, for instance, I was running one and a half, not even, one and a quarter shifts. If I add some people, the equipment runs more. I think I could do a double in Chatsworth. Not overnight, but I could do a double. I think I can do a double in Haverhill, not overnight, but a double. I did a double in Fredericksburg. I think there's a potential to do another double. Again, it's not overnight, but in terms of plant and equipment, I have capacity.

Speaker #3: And the sites really performed. And, you know, they ramped and some of the, you know, I'm really encouraged by that. I believe we have room to continue to ramp.

Speaker #3: And again, it's just keeping the equipment moving more hours a day. You know, in Chatsworth, circuits, for instance, I was running one and a half, not even one and a quarter shifts.

Speaker #3: And so if I add some people, the equipment runs more. You know, I could I think I could do a double in Chatsworth, not overnight, but I could do a double.

Speaker #3: I think I could do a double in Haverhill, not overnight, but a double. I did a double in Fredericksburg. I think there's a potential to do another double again.

Speaker #3: It's not overnight, but, you know, in terms of plant and equipment, I have capacity. It's supporting it and staffing it to keep the equipment running.

Brad Bourne: It's supporting it and staffing it to keep the equipment running. Yeah, I'm happy to chase more work, and put it into those types of sites. Even Minnetonka, they could probably add 30% more capacity with staffing properly. It takes work, takes effort, takes a bit of time, but yeah, I can find places to put new work for sure.

Brad Bourne: It's supporting it and staffing it to keep the equipment running. Yeah, I'm happy to chase more work, and put it into those types of sites. Even Minnetonka, they could probably add 30% more capacity with staffing properly. It takes work, takes effort, takes a bit of time, but yeah, I can find places to put new work for sure.

Speaker #3: But yeah, I'm happy to chase more work. And put it into those types of sites. And even Minnetonka, you know, they they could probably add 30% more capacity with staffing properly.

Speaker #3: So it takes work, takes effort, takes a bit of time, but yeah, I can find places to put new work for sure.

Speaker #2: I appreciate that, Brad. Thanks.

Steve Hansen: I appreciate the color, Brad. Thanks.

Steve Hansen: I appreciate the color, Brad. Thanks.

Speaker #3: Okay, thanks, Steve.

Brad Bourne: Okay. Thanks, Steve.

Brad Bourne: Okay. Thanks, Steve.

Speaker #1: Again, if you would like to ask a question, simply press star, then the number one on your telephone keypad. Your next question comes from Russell Stanley.

Operator: If you would like to ask a question, simply press star then the number one on your telephone keypad. Your next question comes from Russell Stanley from Beacon Securities. Please go ahead.

Operator: If you would like to ask a question, simply press star then the number one on your telephone keypad. Your next question comes from Russell Stanley from Beacon Securities. Please go ahead.

Speaker #1: From Beacon Securities, please go ahead.

Speaker #4: Good morning and congrats on the on the quarter, maybe a follow-up on the last question, understanding staffing. Is and as as traditionally been, the gating factor.

Russell Stanley: Good morning, and congrats on the quarter. Maybe a follow-up on the last question. Understanding staffing is and has traditionally been the gating factor, debottlenecking in Toronto being a priority. Customer qualifications and any sort of regulatory certifications, those are facility-specific. I'm wondering, can you talk to your current setup? Are there any meaningful qualifications or certifications that you're lacking for any facilities that otherwise preclude you from reallocating work to them? Is that an allocating factor, or is it really just the staffing in other facilities and of course, the debottlenecking effort in Toronto?

Russell Stanley: Good morning, and congrats on the quarter. Maybe a follow-up on the last question. Understanding staffing is and has traditionally been the gating factor, debottlenecking in Toronto being a priority. Customer qualifications and any sort of regulatory certifications, those are facility-specific. I'm wondering, can you talk to your current setup? Are there any meaningful qualifications or certifications that you're lacking for any facilities that otherwise preclude you from reallocating work to them? Is that an allocating factor, or is it really just the staffing in other facilities and of course, the debottlenecking effort in Toronto?

Speaker #4: The bottlenecking in Toronto being being a priority, but customer qualifications and and any sort of regulatory certifications, those are facilities specific. I'm wondering, can you can you talk to, you know, your current setup?

Speaker #4: Are there any meaningful qualifications or certifications that you're lacking for any facilities that otherwise preclude you from reallocating work to them? Is that at all a gating factor or is it really just a staffing in other facilities?

Speaker #4: And and of course, the debottlenecking effort in Toronto.

Speaker #3: Right. Yeah, I guess the obvious one for sure. There's a bunch of work we need to do on certifications for our aerospace hydro bed facility.

Brad Bourne: Right. Yeah, I guess the obvious one, for sure, there's a bunch of work we need to do on certifications for our aerospace Hyderabad facility. It has no certifications. That one as well, we're hoping to work on through the balance of this year. It's great we opened it, and we could add some people. We got to get the certifications in place and the customer approvals in place for it to really contribute to our overall capacity. Other than that, not really. Certifications is not an issue. It comes back to staffing and, I don't know, truly, I was really happy in Q2 in Minnetonka. It didn't show in their results, but their staffing activity and their staffing success was dramatically positively changed in the quarter. We were, I think, +20 people by the end of the quarter at that site.

Brad Bourne: Right. Yeah, I guess the obvious one, for sure, there's a bunch of work we need to do on certifications for our aerospace Hyderabad facility. It has no certifications. That one as well, we're hoping to work on through the balance of this year. It's great we opened it, and we could add some people. We got to get the certifications in place and the customer approvals in place for it to really contribute to our overall capacity. Other than that, not really. Certifications is not an issue. It comes back to staffing and, I don't know, truly, I was really happy in Q2 in Minnetonka. It didn't show in their results, but their staffing activity and their staffing success was dramatically positively changed in the quarter. We were, I think, +20 people by the end of the quarter at that site.

Speaker #3: It has no certifications. And so you know, that one is what you know, we're hoping to work on through the balance of this year.

Speaker #3: You know, it's great. We opened it, but we could add some people, but we got to get the certifications in place and the customer approvals in place for it to really contribute to our overall capacity.

Speaker #3: But other than that, not really. You know, certifications is not an issue. So then it comes back to staffing. And and like, I don't know, truly I was really really happy in Q2 in Minnetonka.

Speaker #3: It didn't show in their results, but their staffing activity and their staffing success was dramatically positively changed in the quarter and we were in a plus 20 people by the end of the quarter.

Speaker #3: At that site, and, you know, the target we had for that site this year was plus 28. So to do 20 in the quarter was huge.

Brad Bourne: The target we had for that site this year was +28. To do 20 in the quarter was huge. We got to keep them, we got to train them, so it's not an instant overnight event. Again, they just really hit it out of the park in terms of their success on staffing as compared to what we'd seen in prior quarters.

Brad Bourne: The target we had for that site this year was +28. To do 20 in the quarter was huge. We got to keep them, we got to train them, so it's not an instant overnight event. Again, they just really hit it out of the park in terms of their success on staffing as compared to what we'd seen in prior quarters.

Speaker #3: And so, you know, we’ve got to keep them. We’ve got to train them. So it’s not an instant, overnight event. But again, they just really hit it out of the park in terms of their success on staffing compared to what we’ve seen in prior quarters.

Speaker #4: That's great. And just following up on India and your comments around Q2, I'm not going to say other efforts if you've got to get the facility qualified.

Russell Stanley: That's great. Just following up on India and your comments around H2. Amongst the other efforts, you've got to get the facility qualified. When in 2027 should we envision that facility producing net new orders, so to speak, no longer ramping up with reallocated work from other facilities?

Russell Stanley: That's great. Just following up on India and your comments around H2. Amongst the other efforts, you've got to get the facility qualified. When in 2027 should we envision that facility producing net new orders, so to speak, no longer ramping up with reallocated work from other facilities?

Speaker #4: When in '27 should we envision that facility producing net new orders, so to speak—no longer ramping up with reallocated work from other facilities?

Speaker #3: Yeah, well, I don't know. We'll see. So, you know, we want to do it as soon as we can. I'd love to be, you know, having it positively contribute at the beginning of '27.

Brad Bourne: Yeah. I don't know. We'll see. We want to do it as soon as we can. I'd love to be having it positively contribute at the beginning of 2027. That might be a little aggressive. Again, we've got to staff, train, and get certifications. We're going to get the standard certifications, kind of industry certifications, AS9100, that type of thing. That for sure, our goal is to get that done this year. The wild card is customer approvals. I don't control those. We're going to start working on that, but, I've said this many times on these calls, a customer approval can be done in a few months, or my worst case is, it was 5 years to get a customer approval. We're going to work it, but that timeline is more uncertain than not within my control.

Brad Bourne: Yeah. I don't know. We'll see. We want to do it as soon as we can. I'd love to be having it positively contribute at the beginning of 2027. That might be a little aggressive. Again, we've got to staff, train, and get certifications. We're going to get the standard certifications, kind of industry certifications, AS9100, that type of thing. That for sure, our goal is to get that done this year. The wild card is customer approvals. I don't control those. We're going to start working on that, but, I've said this many times on these calls, a customer approval can be done in a few months, or my worst case is, it was 5 years to get a customer approval. We're going to work it, but that timeline is more uncertain than not within my control.

Speaker #3: That might be a little aggressive. You know, again, we've got to staff, train, and get certifications. The wild card, you know, we're going to get the standard certification, kind of industry certifications—AS9100, that type of thing.

Speaker #3: That, for sure, our goal is to get that done this year. The wildcard is customer approvals. And, you know, I don't control those.

Speaker #3: You know, we're going to start working on that, but—and I've said this many times on these calls—you know, a customer approval can be done in a few months, or, you know, my worst case is it was five years to get a customer approval.

Speaker #3: And so we're going to work at it, but that timeline is more uncertain and not within my control.

Speaker #4: Got it. Maybe one last question from me. You know, we just saw press releases related to expanded production of missiles and munitions in Europe.

Russell Stanley: Got it. Maybe one last question from me. We just saw a sort of press release that's related to expanded production of missiles, munitions in Europe, and the US Pentagon looking for CAD 21 billion in supplemental funds for free munitions. I'm wondering, in circuits, can you talk about what you're seeing with respect to demand, specifically whether you're seeing any sort of replenishment demand come through, given the use of these things in the conflict in Middle East and Ukraine as well? I'm just wondering if you're seeing that additional tailwind start to filter through at this point, as far as your demand picture goes.

Russell Stanley: Got it. Maybe one last question from me. We just saw a sort of press release that's related to expanded production of missiles, munitions in Europe, and the US Pentagon looking for CAD 21 billion in supplemental funds for free munitions. I'm wondering, in circuits, can you talk about what you're seeing with respect to demand, specifically whether you're seeing any sort of replenishment demand come through, given the use of these things in the conflict in Middle East and Ukraine as well? I'm just wondering if you're seeing that additional tailwind start to filter through at this point, as far as your demand picture goes.

Speaker #4: In the US, they're looking for $21 billion in supplemental funds for free munitions. I'm wondering, in circuits, can you talk about what you're seeing with respect to demand specifically? Whether you're seeing any sort of replenishment demand come through, given the use of these things in the conflict in the Middle East and Ukraine as well?

Speaker #4: Just wondering if you're seeing that additional tailwind start to filter through at this point, as far as your demand picture goes.

Speaker #3: Yeah, we're definitely starting to see it. I'm going to say it's a bit of a combination of quoting it, but, you know, multi-year quotes on this type of thing.

Brad Bourne: Yeah. We're definitely starting to see it. I'm going to say it's a bit of a combination of quoting it, multi-year quotes on this type of thing. Some orders, definitely some of our, I don't know, 80, whatever it was, CAD 80-some million of backlog was initial orders on replenishment of electronics for various weapons and warfare systems.

Brad Bourne: Yeah. We're definitely starting to see it. I'm going to say it's a bit of a combination of quoting it, multi-year quotes on this type of thing. Some orders, definitely some of our, I don't know, 80, whatever it was, CAD 80-some million of backlog was initial orders on replenishment of electronics for various weapons and warfare systems.

Speaker #3: And some some orders, you know, definitely some of our I don't know, 80 whatever it was, 80 some million dollars of backlog was initial orders on replenishment of electronics for various weapons and warfare systems.

Speaker #4: Okay, that's all from me. Thanks again. Congrats.

Russell Stanley: Got it. That's all from me. Thanks again. Congrats.

Russell Stanley: Got it. That's all from me. Thanks again. Congrats.

Speaker #3: Okay. Thanks, Russ.

Brad Bourne: Okay, thanks, Russ.

Brad Bourne: Okay, thanks, Russ.

Speaker #1: There are no further questions. Presenters, please continue.

Operator: There are no further questions. Presenters, please continue.

Operator: There are no further questions. Presenters, please continue.

Speaker #3: Okay, thank you all. A replay of the call will be available until Monday, August 17, at the numbers noted on our press release. The replay will also be available on our website in a few days.

Brad Bourne: Okay. Thank you all. A replay of the call will be available until Monday, 17 August, at the numbers noted on our press release. Replay will also be available on our website in a few days. I thank you all for your interest and participation. Thank you.

Brad Bourne: Okay. Thank you all. A replay of the call will be available until Monday, 17 August, at the numbers noted on our press release. Replay will also be available on our website in a few days. I thank you all for your interest and participation. Thank you.

Speaker #3: I thank you all for your interest and participation. Thank you.

Operator: Ladies and gentlemen, this concludes today's conference call. Thank you for

Operator: Ladies and gentlemen, this concludes today's conference call. Thank you for

Q2 2026 Firan Technology Group Corp Earnings Call

Demo
FTG.TO

Firan Technology

Earnings

Q2 2026 Firan Technology Group Corp Earnings Call

FTG.TO

Thursday, July 9th, 2026 at 12:30 PM

Transcript

No Transcript Available

No transcript data is available for this event yet. Transcripts typically become available shortly after an earnings call ends.

Want AI-powered analysis? Try AllMind AI →