Operator 2: Hello, ladies and gentlemen, and thank you for standing by for JinkoSolar Holding Co., Ltd. Q2 2026 earnings conference call. At this time, all participants are in listen only mode. After management's prepared remarks, there will be a question and answer session. As a reminder, today's conference call is being recorded. I would now like to turn the meeting over to your host for today's call, Ms. Stella Wang, JinkoSolar's Investor Relations Manager. Please proceed, Stella.

Operator: Hello, ladies and gentlemen, and thank you for standing by for JinkoSolar Holding Co., Ltd. Q2 2026 earnings conference call. At this time, all participants are in listen only mode. After management's prepared remarks, there will be a question and answer session. As a reminder, today's conference call is being recorded. I would now like to turn the meeting over to your host for today's call, Ms. Stella Wang, JinkoSolar's Investor Relations Manager. Please proceed, Stella.

Speaker #1: After management's prepared remarks, there will be a question-and-answer session. As a reminder, today's conference call is being recorded. I would now like to turn the meeting over to your host for today's call, Ms. Stella Wang, JinkoSolar's Investor Relations Manager.

Speaker #1: Please proceed, Stella.

Speaker #2: Thank you, operator. Hello, everyone, and thank you for joining us today for JinkoSolar's second quarter 2026 earnings conference call. The company's results were released earlier today and are available on the company's IR website at ir.jinkosolar.com, as well as on newswire services.

Stella Wang: Thank you, operator. Hello, everyone, and thank you for joining us today for JinkoSolar Q2 2026 earnings conference call. The company's results were released earlier today and available on the company's IR website at ir@jinkosolar.com, as well as on NewsWire Services. We have also provided a supplemental presentation for today's earnings call, which can also be found on the IR website. On the call today from JinkoSolar are Mr. Dimmy Du, CEO of JinkoSolar Holding Company Limited; Mr. Gener Miao, CMO of JinkoSolar Company Limited; Mr. Pan Li, CFO of JinkoSolar Holding Company Limited; and Mr. Haiyun Cao, CEO of JinkoSolar Company Limited. Mr. Du will discuss JinkoSolar's business operations and the company highlights, followed by Mr. Miao, who will provide an update on sales and marketing, and then Mr. Pan Li, who will go through the financials.

Stella Wang: Thank you, operator. Hello, everyone, and thank you for joining us today for JinkoSolar Q2 2026 earnings conference call. The company's results were released earlier today and available on the company's IR website at ir@jinkosolar.com, as well as on NewsWire Services. We have also provided a supplemental presentation for today's earnings call, which can also be found on the IR website. On the call today from JinkoSolar are Mr. Dimmy Du, CEO of JinkoSolar Holding Company Limited; Mr. Gener Miao, CMO of JinkoSolar Company Limited; Mr. Pan Li, CFO of JinkoSolar Holding Company Limited; and Mr. Haiyun Cao, CEO of JinkoSolar Company Limited. Mr. Du will discuss JinkoSolar's business operations and the company highlights, followed by Mr. Miao, who will provide an update on sales and marketing, and then Mr. Pan Li, who will go through the financials.

Speaker #2: We have also provided a supplemental presentation for today's earnings call, which can be found on the IR website. On the call today from JinkoSolar are Mr. Jimmy Zhou, CEO of JinkoSolar Holding Company Limited.

Speaker #2: Mr. Janet Miao, CMO of JinkoSolar Company Limited; Mr. Pan Li, CFO of JinkoSolar Holding Company Limited; and Mr. Charlie Cao, CEO of JinkoSolar Company Limited.

Speaker #2: Mr. Zhou will discuss JinkoSolar's business operations and company highlights, followed by Mr. Miao, who will provide an update on sales and marketing. Then, Mr. Pan Li will go through the financials.

Speaker #2: Management will be available to answer questions during the Q&A session. Please note that today's discussion will contain forward-looking statements made under the Safe Harbor provision of the U.S.

Stella Wang: Management will be available to answer questions during the Q&A session. Please note that today's discussion will contain forward-looking statements made under the safe harbor provisions of the U.S. Private Securities Litigation Reform Act of 1995. Forward-looking statements involve inherent risks and uncertainties. As such, our future results may be materially different from the views expressed today. Further information regarding this and other risks is included in JinkoSolar's public filings with the Securities and Exchange Commission. JinkoSolar does not assume any obligation to update any forward-looking statements except as required under the applicable law. It is now my pleasure to turn the call over to Mr. Dimmy Du, CEO of JinkoSolar. Please go ahead, Dimmy.

Stella Wang: Management will be available to answer questions during the Q&A session. Please note that today's discussion will contain forward-looking statements made under the safe harbor provisions of the U.S. Private Securities Litigation Reform Act of 1995. Forward-looking statements involve inherent risks and uncertainties. As such, our future results may be materially different from the views expressed today. Further information regarding this and other risks is included in JinkoSolar's public filings with the Securities and Exchange Commission. JinkoSolar does not assume any obligation to update any forward-looking statements except as required under the applicable law. It is now my pleasure to turn the call over to Mr. Dimmy Du, CEO of JinkoSolar. Please go ahead, Dimmy.

Speaker #2: The Private Securities Litigation Reform Act of 1995 states that forward-looking statements involve inherent risk and uncertainty. As such, future results may be materially different from the views expressed today.

Speaker #2: Further information regarding this and other risks is included in JinkoSolar's public filings with the Securities and Exchange Commission. JinkoSolar does not assume any obligation to update any forward-looking statements except as required under applicable law.

Speaker #2: Let's now take pleasure in turning the call over to Mr. Jimmy Zhou, CEO of JinkoSolar. Please go ahead, Jimmy.

Speaker #3: Hello, everyone. This is Jimmy Zhou, and thank you for joining JinkoSolar's second quarter 2026 earnings call. It is an honor to take on the role of CEO, and I appreciate the trust the board of directors and management team have placed in me.

Dimmy Du: Hello, everyone. This is Dimmy Du, and thank you for joining JinkoSolar Q2 2026 earnings call. It is an honor to take the role of CEO. I appreciate the trust the board of directors and management team have placed in me. Standing at this milestone of our 20th anniversary, as we embark on the next stage of development, I look forward to working closely together to further enhance our operating performance and strategic execution to drive sustainable, high quality growth. I will begin by reviewing our operational performance in Q2, and then outline our key priorities going forward. In Q2, module shipments increased sequentially to approximately 16 gigawatts. Supply and demand imbalances across the PV industry remain dynamic. These pressures were further compounded by shifts in domestic and overseas policies, with prices across the supply chain and industry profitability remaining under pressure.

Dimmy Du: Hello, everyone. This is Dimmy Du, and thank you for joining JinkoSolar Q2 2026 earnings call. It is an honor to take the role of CEO. I appreciate the trust the board of directors and management team have placed in me. Standing at this milestone of our 20th anniversary, as we embark on the next stage of development, I look forward to working closely together to further enhance our operating performance and strategic execution to drive sustainable, high quality growth. I will begin by reviewing our operational performance in Q2, and then outline our key priorities going forward. In Q2, module shipments increased sequentially to approximately 16 gigawatts. Supply and demand imbalances across the PV industry remain dynamic. These pressures were further compounded by shifts in domestic and overseas policies, with prices across the supply chain and industry profitability remaining under pressure.

Speaker #3: Daniel, as we reach this milestone of our 20th anniversary and embark on the next stage of development, I look forward to working closely together to further enhance our operating performance and strategic execution to drive sustainable, high-quality growth.

Speaker #3: I will begin by reviewing our operational performance in the second quarter, and then outline our key priorities going forward. In the second quarter, module shipments increased sequentially to approximately 16 gigawatts.

Speaker #3: Supply and demand imbalances across the PV industry remain dynamic. These pressures were further compounded by shifts in domestic and overseas policies, with prices across the supply chain and industry profitability remaining under pressure.

Speaker #3: As the cost of ramping up our high-efficiency products remained elevated during the quarter, together with the impact of delivering certain low-value orders, gross margin decreased sequentially during the quarter while our net loss expanded. Facing this operating pressure, we optimized our order book and geographic mix, rationally managed utilization rates, and continued to expand the proportion of high-efficiency products within shipments while introducing technologies that lower costs.

Dimmy Du: At the cost of ramping up, our high efficiency products remained evaluated during the quarter. Together with impact of delivering certain low value orders, gross margin decreased sequentially during the quarter while our net loss expanded. Facing this operating pressure, we optimized our order books and geographic mix to rationally manage utilization rates and continue to expand the proportion of high efficiency products within shipments while introducing technologies that lower costs. These measures are driving a gradual recovery in profitability. The underlying pattern of PV industry competition is gradually shifting from capacity and shipment scale to effective supply, product value and earnings quality. The mandatory new national standard on energy efficiency for modules and inverters released in July will take effect in January 2027. The new standards set level 3 energy efficiency as a minimum threshold for market access.

Dimmy Du: At the cost of ramping up, our high efficiency products remained evaluated during the quarter. Together with impact of delivering certain low value orders, gross margin decreased sequentially during the quarter while our net loss expanded. Facing this operating pressure, we optimized our order books and geographic mix to rationally manage utilization rates and continue to expand the proportion of high efficiency products within shipments while introducing technologies that lower costs. These measures are driving a gradual recovery in profitability. The underlying pattern of PV industry competition is gradually shifting from capacity and shipment scale to effective supply, product value and earnings quality. The mandatory new national standard on energy efficiency for modules and inverters released in July will take effect in January 2027. The new standards set level 3 energy efficiency as a minimum threshold for market access.

Speaker #3: These measures are driving a gradual recovery in profitability. The underlying pattern of PV industry competition is gradually shifting from capacity and shipment scale to effective supply, product value, and earnings quality.

Speaker #3: The mandatory new national standard on energy efficiency for modules and inverters, released in July, will take effect in January 2027. The new standard sets level-three energy efficiency as a minimum threshold for market access.

Speaker #3: Products that fail to meet this minimum threshold will not be permitted for production or sale, placing high-efficiency products in a stronger position for large-scale renewable energy project tenders.

Dimmy Du: Products that fail to meet these minimum thresholds will not be permitted for production or sale, placing high efficiency products in a stronger position for large scale renewable energy project tenders. Meanwhile, the implementation of market-based pricing for renewable power is pushing customers to increasingly focusing on energy yield, reliability, and the lifetime value of modules. These changes are beneficiary to industry leaders with advanced manufacturing capacity, technological expertise, global delivery, and long-term service capabilities, which will accelerate the phase out of inefficient production capacity. By the end of 2026, we expect to have more than 40 gigawatts of TOPCon 3.0 production capacity. Based on the new standard thresholds, these products are expected to meet level 1 energy efficiency requirements and strengthen our annualized production capacity for high efficiency products to lead the industry.

Dimmy Du: Products that fail to meet these minimum thresholds will not be permitted for production or sale, placing high efficiency products in a stronger position for large scale renewable energy project tenders. Meanwhile, the implementation of market-based pricing for renewable power is pushing customers to increasingly focusing on energy yield, reliability, and the lifetime value of modules. These changes are beneficiary to industry leaders with advanced manufacturing capacity, technological expertise, global delivery, and long-term service capabilities, which will accelerate the phase out of inefficient production capacity. By the end of 2026, we expect to have more than 40 gigawatts of TOPCon 3.0 production capacity. Based on the new standard thresholds, these products are expected to meet level 1 energy efficiency requirements and strengthen our annualized production capacity for high efficiency products to lead the industry.

Speaker #3: Meanwhile, the implementation of market-based pricing for renewable power is pushing customers to increasingly focus on energy yield reliability and lifetime value of modules. These changes are beneficial to industry leaders with advanced manufacturing capacity, technological expertise, global delivery, and long-term service capabilities.

Speaker #3: This will accelerate the phase-out of inefficient production capacity. By the end of 2026, we expect to have more than 40 gigawatts of TOPCon 3.0 production capacity.

Speaker #3: Based on the new standard thresholds, these products are expected to meet Level One energy efficiency requirements and strengthen our annualized production capacity for high-efficiency products to lead the industry.

Speaker #3: We continue to advance our product portfolio and build a solid base for next-generation technologies based on our TOPCon technology roadmap. In June, we unveiled our newest, next-generation TOPCon Titan New 5.0 modules.

Dimmy Du: We continue to advance our product portfolio and build a solid base for next generation technologies based on our TOPCon technology roadmap. In June, we unveiled our newest next generation TOPCon Tiger Neo 5.0 modules. By optimizing multiple core technologies, the Tiger Neo 5.0 achieved mass-produced efficiency of 25.91% and a power output of over 700 watts, setting a new benchmark for TOPCon product performance once again. ESS shipments in H1 of the year were 3.1 gigawatt hours, increased significantly year-over-year. Benefiting from our presence in high value market, gross margin improved year-over-year in H1 2026. Due to uncertainties in timing of project delivery and other factors, recognized revenue remains in ramp-up stage. Approximately 1.5 gigawatt hour were recognized as revenue in H1, including more than 1 gigawatt hour in Q2.

Dimmy Du: We continue to advance our product portfolio and build a solid base for next generation technologies based on our TOPCon technology roadmap. In June, we unveiled our newest next generation TOPCon Tiger Neo 5.0 modules. By optimizing multiple core technologies, the Tiger Neo 5.0 achieved mass-produced efficiency of 25.91% and a power output of over 700 watts, setting a new benchmark for TOPCon product performance once again. ESS shipments in H1 of the year were 3.1 gigawatt hours, increased significantly year-over-year. Benefiting from our presence in high value market, gross margin improved year-over-year in H1 2026. Due to uncertainties in timing of project delivery and other factors, recognized revenue remains in ramp-up stage. Approximately 1.5 gigawatt hour were recognized as revenue in H1, including more than 1 gigawatt hour in Q2.

Speaker #3: By optimizing multiple core technologies, the Titan New 5.0 achieved a mass-produced efficiency of 25.91% and power outputs of over 700 watts, setting a new benchmark for TOPCon product performance once again.

Speaker #3: ESS shipments in the first half of the year were 3.1 gigawatt-hours, increasing significantly year over year. Benefiting from our presence in high-value markets, gross margin improved year over year.

Speaker #3: In the first half of 2026, due to uncertainties in the timing of project delivery and other factors, recognized revenue remains in the ramp-up stage. Approximately 1.5 gigawatt-hours were recognized as revenue in the first half, including more than 1 gigawatt-hour in the second quarter.

Speaker #3: As project deliveries increase, alongside ongoing enhancement of our in-house PCS, EMS, and other capabilities, we will continue to boost the efficiency of both revenue recognition and profit realization.

Dimmy Du: As project deliveries increase, alongside ongoing enhancements of our in-house PCS, EMS, and other capabilities, we will continue to boost efficiency of both revenue recognition and profit realization, driving high quality growth for our ESS business. Now, I will move on to our guidance for the Q3 and full year of 2026. We expect our annual integrated production capacity to reach approximately 100 gigawatts by year end 2026, including approximately 14 gigawatts from overseas facilities. Considering demand dynamics in certain markets, we will place greater emphasis on balancing shipment volume, profitability, cash flow, and order quality going forward, and adjusting guidance for full year 2026 module shipments to between 60 gigawatts and 70 gigawatts, and high efficiency products accounting for over 60%. We expect module shipments to between 15 gigawatts and 17 gigawatts in Q3 of 2026.

Dimmy Du: As project deliveries increase, alongside ongoing enhancements of our in-house PCS, EMS, and other capabilities, we will continue to boost efficiency of both revenue recognition and profit realization, driving high quality growth for our ESS business. Now, I will move on to our guidance for the Q3 and full year of 2026. We expect our annual integrated production capacity to reach approximately 100 gigawatts by year end 2026, including approximately 14 gigawatts from overseas facilities. Considering demand dynamics in certain markets, we will place greater emphasis on balancing shipment volume, profitability, cash flow, and order quality going forward, and adjusting guidance for full year 2026 module shipments to between 60 gigawatts and 70 gigawatts, and high efficiency products accounting for over 60%. We expect module shipments to between 15 gigawatts and 17 gigawatts in Q3 of 2026.

Speaker #3: Driving high-quality growth for the ESS business. Now, I will move on to our guidance for the third quarter and the full year of 2026. We expect our annual integrated production capacity to reach approximately 100 gigawatts by year-end 2026, including approximately 14 gigawatts from overseas facilities.

Speaker #3: Considering demand dynamics in certain markets, we will place greater emphasis on balancing shipment volume, profitability, cash flow, and order quality going forward. And we are adjusting guidance for full year 2026 module shipments to between 60 gigawatts and 70 gigawatts.

Speaker #3: And high-efficiency products accounted for over 60%. We expect module shipments to be between 15 gigawatts and 17 gigawatts in the third quarter of 2026. For the full year 2026, we expect our energy storage system shipments to more than double year over year.

Dimmy Du: For full year 2026, we expect our energy storage system shipments to more than double year-over-year. As we continue to strengthen the competitiveness of our core solar and energy storage businesses, we are also building an investment platform through disciplined capital allocation and professional investment management that will act as a complementary driver for long-term value creation. Over the past several years, leveraging our deep industry expertise and long-term perspective on technological trends, we have made disciplined and selective investments directly or through fund platforms focusing on strategic synergies, technological innovation, and long-term value creation. Our early investment primarily focused on the solar and energy storage value chain. In recent years, as AI drives demand for computing power and electricity demand, we have selectively expanded our investment scope to the AI ecosystem and other frontier technologies. To date, we have invested in more than 40 companies in total.

Dimmy Du: For full year 2026, we expect our energy storage system shipments to more than double year-over-year. As we continue to strengthen the competitiveness of our core solar and energy storage businesses, we are also building an investment platform through disciplined capital allocation and professional investment management that will act as a complementary driver for long-term value creation. Over the past several years, leveraging our deep industry expertise and long-term perspective on technological trends, we have made disciplined and selective investments directly or through fund platforms focusing on strategic synergies, technological innovation, and long-term value creation. Our early investment primarily focused on the solar and energy storage value chain. In recent years, as AI drives demand for computing power and electricity demand, we have selectively expanded our investment scope to the AI ecosystem and other frontier technologies. To date, we have invested in more than 40 companies in total.

Speaker #3: As we continue to strengthen the competitiveness of our core solar and energy storage businesses, we are also building an investment platform through disciplined capital allocation and professional investment management that will act as a complementary driver for long-term value creation.

Speaker #3: Over the past several years, leveraging our deep industry expertise and long-term perspective on technological trends, we have made disciplined and selective investments directly or through fund platforms, focusing on strategic synergies, technological innovation, and long-term value creation.

Speaker #3: Our earlier investment primarily focused on the solar and energy storage value chain. In recent years, as AI drives demand for computing power and electricity, we have selectively expanded our investment scope to the AI ecosystem and other frontier technologies.

Speaker #3: To date, we have invested in more than 40 companies in total. As of June 30, 2026, we have invested an aggregate of approximately RMB 1.86 billion in cash.

Dimmy Du: As of 30 June 2026, we have invested an aggregate of approximately RMB 1.86 billion in cash. The original cash cost of the investment remaining our portfolio is approximately RMB 1.5 billion, with a fair value of approximately RMB 1.99 billion as of the same date. Our investment portfolio has generated cumulative value appreciation of approximately RMB 880 million, comprising of approximately RMB 410 million in realized gain from exit, and approximately RMB 470 million in unrealized fair value from remaining investments in the portfolio. During the H1 of 2026, our portfolio generated gains of approximately RMB 490 million, comprising approximately RMB 110 million in realized gains and approximately RMB 380 million in unrealized fair value gains. In the H1 of 2026, we divested a substantial portion of our equity interest in LAPLACE Renewable Energy Technology Co., Ltd., receiving over RMB 300 million in cash proceeds.

Dimmy Du: As of 30 June 2026, we have invested an aggregate of approximately RMB 1.86 billion in cash. The original cash cost of the investment remaining our portfolio is approximately RMB 1.5 billion, with a fair value of approximately RMB 1.99 billion as of the same date. Our investment portfolio has generated cumulative value appreciation of approximately RMB 880 million, comprising of approximately RMB 410 million in realized gain from exit, and approximately RMB 470 million in unrealized fair value from remaining investments in the portfolio. During the H1 of 2026, our portfolio generated gains of approximately RMB 490 million, comprising approximately RMB 110 million in realized gains and approximately RMB 380 million in unrealized fair value gains. In the H1 of 2026, we divested a substantial portion of our equity interest in LAPLACE Renewable Energy Technology Co., Ltd., receiving over RMB 300 million in cash proceeds.

Speaker #3: The original cash cost of the investment remaining in our portfolio is approximately RMB 1.5 billion, with a fair value of approximately RMB 1.99 billion as of the same date.

Speaker #3: Our investment portfolio has generated cumulative value appreciation of approximately RMB 880 million, comprising approximately RMB 410 million in realized gain from exit and approximately RMB 470 million in unrealized fair value from remaining investments in the portfolio.

Speaker #3: During the first half of 2026, our portfolio generated gains of approximately RMB 490 million, comprising approximately RMB 110 million in realized gains and approximately RMB 380 million in unrealized fair value gains.

Speaker #3: In the first half of 2026, we divested a substantial portion of our equity interest in Laplace Renewable Energy Technology Company Limited, receiving over RMB 300 million in cash proceeds.

Speaker #3: Since our initial investment in Laplace, the cumulative realized gain on this disposal exceeded RMB 250 million. This gain was recognized over multiple periods through fair value adjustments following its IPO in late 2024, with over RMB 100 million recorded in changes in fair value of long-term investment upon settlement in the first half of 2026.

Dimmy Du: Since our initial investment in LAPLACE, the cumulative realized gains on this disposal exceeded RMB 250 million. This gain was recognized over multiple periods through fair value adjustments following its IPO in late 2024, with over RMB 100 million recorded in change in fair value of long-term investments upon settlement in the H1 of 2026. In addition, Hangzhou Gold Electronic Equipment Co., Ltd. successfully completed its listing on ChiNext market of Shenzhen Stock Exchange during the Q2, creating an additional pathway for future value realization. Looking ahead, we will continue to maintain a disciplined approach to capital allocation. Supporting the long-term development of our core solar and energy storage business will remain our top priority.

Dimmy Du: Since our initial investment in LAPLACE, the cumulative realized gains on this disposal exceeded RMB 250 million. This gain was recognized over multiple periods through fair value adjustments following its IPO in late 2024, with over RMB 100 million recorded in change in fair value of long-term investments upon settlement in the H1 of 2026. In addition, Hangzhou Gold Electronic Equipment Co., Ltd. successfully completed its listing on ChiNext market of Shenzhen Stock Exchange during the Q2, creating an additional pathway for future value realization. Looking ahead, we will continue to maintain a disciplined approach to capital allocation. Supporting the long-term development of our core solar and energy storage business will remain our top priority.

Speaker #3: In addition, Hangzhou Gold Electronic Equipment Company Limited successfully completed its listing on the Genex Market of the Shenzhen Stock Exchange during the second quarter, creating an additional pathway for future value realization.

Speaker #3: Looking ahead, we will continue to maintain a disciplined approach to capital allocation. Supporting the long-term development of our core solar and energy storage business will remain our top priority.

Speaker #3: At the same time, we will continue to evaluate our existing strategic investments based on operating performance, strategic synergies, and the long-term value creation potential of each portfolio company, while remaining disciplined and selective in pursuing new opportunities.

Dimmy Du: At the same time, we will continue to evaluate our existing strategic investments based on the operating performance, strategic synergies, and the long-term value creation potential of each portfolio company, while remaining disciplined and selective in pursuing new opportunities. Through strengthening our core businesses, realizing portfolio value, and improving capital utilization efficiency, we remain committed to creating sustainable long-term value for our shareholders. This concludes my remarks. I will now turn the call over to Gener.

Dimmy Du: At the same time, we will continue to evaluate our existing strategic investments based on the operating performance, strategic synergies, and the long-term value creation potential of each portfolio company, while remaining disciplined and selective in pursuing new opportunities. Through strengthening our core businesses, realizing portfolio value, and improving capital utilization efficiency, we remain committed to creating sustainable long-term value for our shareholders. This concludes my remarks. I will now turn the call over to Gener.

Speaker #3: Through strengthening our core businesses, realizing portfolio value, and improving capital utilization efficiency, we remain committed to creating sustainable long-term value for our shareholders. This concludes my remarks.

Speaker #3: I will now turn the call over to Jenna.

Gener Miao: Thanks, Dimi. Total shipments were 32.9 gigawatts in H1, with total module shipments accounting for over 90%, leveraging sales network covering nearly 200 countries and regions and 35 service centers globally. We continue to optimize our geographic mix and the customer structure overseas. In H1, shipments to the overseas markets accounted for over 70%, mainly across Asia-Pacific, Europe, and emerging markets. In Q2, the proportion of high-efficiency product shipments improved sequentially. Our Tiger Neo 3.0 series continued to command a premium of approximately $0.01 per watt over conventional products. We also began to ship a small number of scenario-based product in Q2 and gradually plan to increase deliveries in H2. Those products already command a premium of approximately $0.005 to $0.01 per watt over conventional products.

Gener Miao: Thanks, Dimi. Total shipments were 32.9 gigawatts in H1, with total module shipments accounting for over 90%, leveraging sales network covering nearly 200 countries and regions and 35 service centers globally. We continue to optimize our geographic mix and the customer structure overseas. In H1, shipments to the overseas markets accounted for over 70%, mainly across Asia-Pacific, Europe, and emerging markets. In Q2, the proportion of high-efficiency product shipments improved sequentially. Our Tiger Neo 3.0 series continued to command a premium of approximately $0.01 per watt over conventional products. We also began to ship a small number of scenario-based product in Q2 and gradually plan to increase deliveries in H2. Those products already command a premium of approximately $0.005 to $0.01 per watt over conventional products.

Speaker #1: Thanks, Jimmy. Total shipments were 32.9 gigawatts in the first half, with module shipments accounting for over 90%. We leveraged a sales network covering nearly 200 countries and regions, and 35 service centers globally.

Speaker #1: We continue to optimize our geographic mix and customer structure overseas. In the first half, shipments to overseas markets accounted for over 70%, mainly across Asia-Pacific, Europe, and emerging markets.

Speaker #1: In the second quarter, the proportion of high-efficiency product shipments improved sequentially. Our Tiger Neo 3.0 series continued to command a premium of approximately one U.S. cent per watt over conventional products.

Speaker #1: We also began to ship a small number of scenario-based products in the second quarter and gradually plan to increase deliveries in the second half.

Speaker #1: Those products already command a premium of approximately $0.005 to $0.01 per watt over conventional products. Following the launch of AIDC and other scenario-based module products in the first quarter, we recently released the Sunny 365 smart solar storage system.

Gener Miao: Following the launch of AIDC and other scenario-based module products in Q1, we recently released the Sunny 365 Smart Solar Storage System. This comprehensive series of integrated PV storage solutions covers several scenarios such as retail, supermarkets, AIDC, and the manufacturing sector. Especially the AIDC solution is built around our Tiger Neo 3.0 module platform technology and the SunTera energy storage system, capable of meeting the demand from data center for power supply reliability, energy economics, and the sustainable low carbon development through the coordinated control of energy storage system, PCS, EMS, and smart operations and maintenance. We recently received the highest triple A bankability rating in the Q2 2026 bankability rating report for module manufacturers released by PV Tech. Since first participating in the evaluation in 2014, we have maintained A grade rating for 12 consecutive years.

Gener Miao: Following the launch of AIDC and other scenario-based module products in Q1, we recently released the Sunny 365 Smart Solar Storage System. This comprehensive series of integrated PV storage solutions covers several scenarios such as retail, supermarkets, AIDC, and the manufacturing sector. Especially the AIDC solution is built around our Tiger Neo 3.0 module platform technology and the SunTera energy storage system, capable of meeting the demand from data center for power supply reliability, energy economics, and the sustainable low carbon development through the coordinated control of energy storage system, PCS, EMS, and smart operations and maintenance. We recently received the highest triple A bankability rating in the Q2 2026 bankability rating report for module manufacturers released by PV Tech. Since first participating in the evaluation in 2014, we have maintained A grade rating for 12 consecutive years.

Speaker #1: This comprehensive series of integrated PV storage solutions covers retail, supermarkets, AIDC, and the manufacturing sector. Especially, the AIDC solution is built around our Tiger Neo 3.0 module platform technology and the Sunterra energy storage system.

Speaker #1: Capable of meeting the demand from data centers for power supply reliability, energy economics, and sustainable low-carbon development through the coordinated control of energy storage systems.

Speaker #1: PCS, EMS, and smart operations and maintenance. We recently received the highest AAA bankability rating in the Q2 2026 Bankability Rating Report for module manufacturers released by PV Tech.

Speaker #1: Since first participating in the evaluation in 2014, we have maintained a great rating for 12 consecutive years. Also, we were recognized as a Tier 1 energy storage provider by BNEF for the 10th consecutive quarter.

Gener Miao: Also, we were recognized as a tier 1 energy storage provider by BNEF for the 10th consecutive quarter. These ratings reinforce our bankability, project implementation capabilities, and long-term delivery capabilities for the international market. Impacted by the market-based pricing mechanism for renewable energy and the pace of project investment, domestic installation demand has slowed. Yet, we observed the positive signs of shifting structural demand with national-level large-scale renewable energy project led by the central and state-owner enterprises, maintaining a steady pace of progress. The share of tenders for high-efficiency modules has increased significantly in the centralized procurement, and the criteria has shifted from simply pursuing the lowest bidding price to greater emphasize on module efficiency, life cycle power generation performance, reliability, and long-term delivery capability. High-efficiency modules have already commanded a reasonable premium in tenders.

Gener Miao: Also, we were recognized as a tier 1 energy storage provider by BNEF for the 10th consecutive quarter. These ratings reinforce our bankability, project implementation capabilities, and long-term delivery capabilities for the international market. Impacted by the market-based pricing mechanism for renewable energy and the pace of project investment, domestic installation demand has slowed. Yet, we observed the positive signs of shifting structural demand with national-level large-scale renewable energy project led by the central and state-owner enterprises, maintaining a steady pace of progress. The share of tenders for high-efficiency modules has increased significantly in the centralized procurement, and the criteria has shifted from simply pursuing the lowest bidding price to greater emphasize on module efficiency, life cycle power generation performance, reliability, and long-term delivery capability. High-efficiency modules have already commanded a reasonable premium in tenders.

Speaker #1: This rating reinforced our bankability, project implementation capabilities, and long-term delivery capabilities for the international market. Impacted by the market-based pricing mechanism for renewable energy and the pace of project investment, domestic installation demand has slowed.

Speaker #1: Yes, we observed a positive shift in structural demand, with national-level, large-scale renewable energy-based projects led by the central and state-owned enterprises maintaining a steady pace of progress.

Speaker #1: The share of tenders for high-efficiency modules has increased significantly in the centralized procurement, and the criteria have shifted from simply pursuing the lowest bidding price to placing greater emphasis on module efficiency, lifecycle power generation performance, reliability, and long-term delivery capability.

Speaker #1: High-efficiency modules have already commanded a reasonable premium in tenders. At the same time, the distributed generation market is transitioning from scale-driven growth towards a focus on scenarios and operational value.

Gener Miao: At the same time, the distributed generation market is transitioning from scale-driven growth towards a focus on scenarios and operational value. Brand reputation, channel, local services, and scenario adaptabilities are becoming increasingly critical. This trend benefits enterprises with global channel established brands and differentiated products, which enable conversion of technology and product power into more stable price relationship and product value. Looking forward to 2027, as electricity pricing marketization policies are gradually absorbed and the mechanism-based pricing and project ROI models become clearer, several projects that were delayed due to insufficient returns are expected to gradually resume. Large-scale renewable energy-based product, direct green power connection, and distributed scenario-based application will continue to drive domestic demand. The overseas market is expected to maintain some growth resilience, benefiting from energy security, growing power demand, and improved solar-plus-storage economics.

Gener Miao: At the same time, the distributed generation market is transitioning from scale-driven growth towards a focus on scenarios and operational value. Brand reputation, channel, local services, and scenario adaptabilities are becoming increasingly critical. This trend benefits enterprises with global channel established brands and differentiated products, which enable conversion of technology and product power into more stable price relationship and product value. Looking forward to 2027, as electricity pricing marketization policies are gradually absorbed and the mechanism-based pricing and project ROI models become clearer, several projects that were delayed due to insufficient returns are expected to gradually resume. Large-scale renewable energy-based product, direct green power connection, and distributed scenario-based application will continue to drive domestic demand. The overseas market is expected to maintain some growth resilience, benefiting from energy security, growing power demand, and improved solar-plus-storage economics.

Speaker #1: Brand reputation, channel, local services, and scenario adaptabilities are becoming increasingly critical. This trend benefits enterprises with global channels, established brands, and differentiated products, which enable the conversion of technology and product power into a more stable price relationship and product value.

Speaker #1: Looking forward to 2027, as electricity pricing marketization policies are gradually absorbed and mechanism-based pricing and project ROI models become clearer, several projects that were delayed due to insufficient returns are expected to gradually resume.

Speaker #1: Large-scale, renewable energy-based product direct green power connection and distributed scenario-based applications will continue to drive domestic demand. The overseas market is expected to maintain some growth resilience, benefiting from energy security, growing power demand, and improved solar-plus-storage economics.

Speaker #1: Leveraging our global sales network, leading high-efficiency products, and continuously expanding solar-plus-storage solutions, we will capitalize on the opportunities arising from changes in demand structure and expanding application scenarios.

Gener Miao: Leveraging our global sales network, leading high-efficiency products, and continuously expanding solar-plus-storage solutions, we will capitalize on the opportunities arising from changes in demand structure and expanding application scenarios. We will continue to optimize our market and product mix and leverage our technological advantages to strengthen our presence in high-value markets, enhance product value, and improve the quality of our operations. With that, I will turn the call over to Pan.

Gener Miao: Leveraging our global sales network, leading high-efficiency products, and continuously expanding solar-plus-storage solutions, we will capitalize on the opportunities arising from changes in demand structure and expanding application scenarios. We will continue to optimize our market and product mix and leverage our technological advantages to strengthen our presence in high-value markets, enhance product value, and improve the quality of our operations. With that, I will turn the call over to Pan.

Speaker #1: We will continue to optimize our market and product mix, and leverage our technological advantages to strengthen our presence in high-value markets, enhance product value, and improve the quality of our operations.

Speaker #1: With that, I will turn the call over to Pam.

Speaker #2: Thank you, Jino. Leveraging our leading position and high-efficiency products, we optimized our sales mix during the quarter, resulting in gross margin reaching 4.2%, up 1.3 percentage points year over year.

Pan Li: Thank you, Gener. Leveraging our leading position and high-efficiency products, we optimized our sales mix during the quarter, resulting in gross margin reaching 4.2%, up 1.3 percentage points year-over-year. We also continued to optimize our capital structure and cash flow management and generated positive operating cash flow during the period, a significant improvement compared to last quarter. Our asset to liability ratio declined by approximately 1.5 percentage points from the beginning of the year. For the remainder of the year, our focus will be on balancing scale and earnings quality while carefully controlling cash flow. We expect full-year operating cash flow to improve compared to 2025. Looking at our Q2 financials in more detail. Total revenue was RMB 1.82 billion, up 0.9% sequentially and down 31% year-over-year. The sequential and year-over-year changes were mainly due to the fluctuation in the shipment volume of modules.

Pan Li: Thank you, Gener. Leveraging our leading position and high-efficiency products, we optimized our sales mix during the quarter, resulting in gross margin reaching 4.2%, up 1.3 percentage points year-over-year. We also continued to optimize our capital structure and cash flow management and generated positive operating cash flow during the period, a significant improvement compared to last quarter. Our asset to liability ratio declined by approximately 1.5 percentage points from the beginning of the year. For the remainder of the year, our focus will be on balancing scale and earnings quality while carefully controlling cash flow. We expect full-year operating cash flow to improve compared to 2025. Looking at our Q2 financials in more detail. Total revenue was RMB 1.82 billion, up 0.9% sequentially and down 31% year-over-year. The sequential and year-over-year changes were mainly due to the fluctuation in the shipment volume of modules.

Speaker #2: We also continue to optimize our capital structure and cash flow management, and generated positive operating cash flow during the period—a significant improvement compared to last quarter.

Speaker #2: Our asset-to-liability ratio declined by approximately 1.5 percentage points from the beginning of the year. For the remainder of the year, our focus will be on balancing scale and earnings quality, while carefully controlling cash flow.

Speaker #2: We expect full-year operating cash flow to improve compared to '25. Looking at our second quarter financials in more detail, total revenue was $1.82 billion, up 0.9% sequentially and down 31% year over year.

Speaker #2: The sequential and year-over-year changes were mainly due to the fluctuation in the shipment volume of modules. Gross margin was 4.2%, compared with 8.3% in the first quarter.

Pan Li: Gross margin was 4.2%, compared with 8.3% in Q1 and 2.9% in Q2 last year. The sequential decrease was mainly due to lower average selling price of solar modules, while the year-over-year increase were primarily due to the higher ASP. Total operating expenses were RMB 287 million, up 21% sequentially and 2% year-over-year. The sequential and year-over-year increases were mainly due to the higher expected credit losses in Q2 this year. Operating expenses accounted for 15.8% of total revenues, compared to 13.1% in Q1 this year and 10.6% in Q2 last year. Operating loss margin was 11.6%, compared with 4.8% in Q1 this year and 7.7% in Q2 last year. Moving to the balance sheet.

Pan Li: Gross margin was 4.2%, compared with 8.3% in Q1 and 2.9% in Q2 last year. The sequential decrease was mainly due to lower average selling price of solar modules, while the year-over-year increase were primarily due to the higher ASP. Total operating expenses were RMB 287 million, up 21% sequentially and 2% year-over-year. The sequential and year-over-year increases were mainly due to the higher expected credit losses in Q2 this year. Operating expenses accounted for 15.8% of total revenues, compared to 13.1% in Q1 this year and 10.6% in Q2 last year. Operating loss margin was 11.6%, compared with 4.8% in Q1 this year and 7.7% in Q2 last year. Moving to the balance sheet.

Speaker #2: And 2.9% in the second quarter last year. The sequential decrease was mainly due to lower average selling price of solar modules, but the year-over-year increase was primarily due to the higher ASP.

Speaker #2: Total operating expenses were $287 million, up 21% sequentially and 2% year over year. The sequential and year-over-year increases were mainly due to higher expected credit losses in the second quarter this year.

Speaker #2: Operating expenses accounted for 15.8% of total revenues, compared to 13.1% in the first quarter this year and 10.6% in the second quarter last year.

Speaker #2: Operating loss margin was 11.6%, compared with 4.8% in the first quarter this year and 7.7% in the second quarter last year. Moving to the balance sheet, at the end of the second quarter, our cash and cash equivalents were about $2.5 billion, compared with about $3.3 billion at the end of the first quarter.

Pan Li: At end of Q2, our cash and cash equivalents were about RMB 2.5 billion, compared with about RMB 3.3 billion at the end of Q1 this year. AR turnover days was 113 days, compared with 128 days in Q1 2026. Inventory turnover was 125 days compared to 142 days in Q1 this year. At the end of Q2, total debt was about RMB 6.6 billion, compared to about RMB 6.8 billion at the end of Q1 2026. Net debt was RMB 4.1 billion, compared to RMB 3.5 billion at the end of Q1 2026.

Pan Li: At end of Q2, our cash and cash equivalents were about RMB 2.5 billion, compared with about RMB 3.3 billion at the end of Q1 this year. AR turnover days was 113 days, compared with 128 days in Q1 2026. Inventory turnover was 125 days compared to 142 days in Q1 this year. At the end of Q2, total debt was about RMB 6.6 billion, compared to about RMB 6.8 billion at the end of Q1 2026. Net debt was RMB 4.1 billion, compared to RMB 3.5 billion at the end of Q1 2026.

Speaker #2: This year, AR turnover days was 113 days, compared with 128 days in the first quarter of '26. Inventory turnover was 125 days, compared to 142 days in the first quarter.

Speaker #2: This year, at the end of the second quarter, total debt was about $6.6 billion compared to about $6.8 billion at the end of the first quarter of '26.

Speaker #2: Net debt was $4.1 billion compared to $3.5 billion at the end of the first quarter of '26. This concludes our prepared remarks. We are now happy to take your questions.

Gener Miao: This concludes our prepared remarks. We are now happy to take your questions. Operator, please proceed.

Gener Miao: This concludes our prepared remarks. We are now happy to take your questions. Operator, please proceed.

Speaker #2: Operator, please proceed.

Speaker #3: Thank you. If you wish to ask a question, please press star on your telephone and wait for your name to be announced. If you wish to cancel your request, please press star, then 2.

Operator 2: Thank you. If you wish to ask a question, please press star on your telephone and wait for your name to be announced. If you wish to cancel your request, please press star, then two. If you are on a speakerphone, please pick up your handset to ask your question. Your first question comes from Brian Lee with Goldman Sachs & Co. Please go ahead.

Operator: Thank you. If you wish to ask a question, please press star on your telephone and wait for your name to be announced. If you wish to cancel your request, please press star, then two. If you are on a speakerphone, please pick up your handset to ask your question. Your first question comes from Brian Lee with Goldman Sachs & Co. Please go ahead.

Speaker #3: If you are on a speakerphone, please pick up your handset to ask your question. Your first question comes from Brian Lee with Goldman Sachs & Company.

Speaker #3: Please go ahead.

Speaker #4: Hey guys, this is Tyler Bissett on for Brian. Thanks for taking our questions. ASPs declined pretty meaningfully sequentially, so I'm curious how you're viewing ASPs so far in Q3, and how much of an impact you could see from greater shipment of Tiger Neo 3.0 model modules.

Tyler Bisagno: Hey, guys. This is Tyler Bisagno for Brian. Thanks for taking our questions. ASPs declined pretty meaningfully sequentially. So curious how you are viewing ASPs so far in Q3, and how much of an impact you could see from greater shipments of Tiger Neo 3.0 modules.

Tyler Bisagno: Hey, guys. This is Tyler Bisagno for Brian. Thanks for taking our questions. ASPs declined pretty meaningfully sequentially. So curious how you are viewing ASPs so far in Q3, and how much of an impact you could see from greater shipments of Tiger Neo 3.0 modules.

Gener Miao: For the ASP side, firstly, apple to apple, we are expecting the price goes up a little bit in Q3. If we look into the average prices, it will go up as well. The first reason is because from the current market situations, the price is going up because of different reasons. The spot market goes up, so most of the DG prices are following the spot market. We are expecting the price of Q2 goes up. The second reason is because the mix of different products. Our TOPCon 3.0 product, which is a premium product, the ratio in Q3 will be definitely higher than Q2, which will be helpful to lift up the ASP in Q3 as well.

Speaker #1: Yeah. For the ASP side, we expect, firstly, on an apple-to-apple basis, the price to go up a little bit in Q3. And if we're looking at the average prices, they will go up as well. Firstly, the main reason is that, from the current market situation, the price is going up for different reasons, but in small markets, the price goes up.

Gener Miao: For the ASP side, firstly, apple to apple, we are expecting the price goes up a little bit in Q3. If we look into the average prices, it will go up as well. The first reason is because from the current market situations, the price is going up because of different reasons. The spot market goes up, so most of the DG prices are following the spot market. We are expecting the price of Q2 goes up. The second reason is because the mix of different products. Our TOPCon 3.0 product, which is a premium product, the ratio in Q3 will be definitely higher than Q2, which will be helpful to lift up the ASP in Q3 as well.

Speaker #1: So most of the DG prices are following the small market, so we are expecting the price in Q2 to go up. The second reason is because of the mix of different products.

Speaker #1: Our 3.0 product, which is a premium product, the ratio in Q3 will definitely be higher than in Q2, which will help lift up the ASP in Q3 as well.

Speaker #4: Super helpful. And we've seen pricing for wafers and cells increase pretty meaningfully over the past month. We've also seen futures prices for poly increasing, following some industry self-regulation.

Tyler Bisagno: Super helpful. We have seen pricing for wafers and cells increase pretty meaningfully over the past month. We have also seen futures prices for poly also increasing following some industry self-regulation. I wanted to see how you are thinking about your input costs over the near term and whether you are expecting any impacts from some of these recent moves in input costs.

Tyler Bisagno: Super helpful. We have seen pricing for wafers and cells increase pretty meaningfully over the past month. We have also seen futures prices for poly also increasing following some industry self-regulation. I wanted to see how you are thinking about your input costs over the near term and whether you are expecting any impacts from some of these recent moves in input costs.

Speaker #4: So, I wanted to see how you're thinking about your input costs over the near term, and whether you're expecting any impacts from some of these recent moves in input costs.

Gener Miao: You are talking about the increase of cost, right?

Speaker #1: So, you are talking about the increase in costs, right? So, what is the impact? We believe it's a kind of healthy rebound, including polysilicon, glass, and a couple of other materials.

Gener Miao: You are talking about the increase of cost, right?

Tyler Bisagno: Yeah.

Tyler Bisagno: Yeah.

Gener Miao: What is the impact? We believe it is a kind of healthy rebound, including poly, silicon, glasses, and a couple of materials. That is why I think the industrial pair and the increased module price, we do not believe this is going to have negative impact on the customer side. If you look at landscape, solar is the cheapest energy sources. Now there is a huge demand for storage. Solar plus storage will be the dominator of the energy diversifications for most of the regions.

Gener Miao: What is the impact? We believe it is a kind of healthy rebound, including poly, silicon, glasses, and a couple of materials. That is why I think the industrial pair and the increased module price, we do not believe this is going to have negative impact on the customer side. If you look at landscape, solar is the cheapest energy sources. Now there is a huge demand for storage. Solar plus storage will be the dominator of the energy diversifications for most of the regions.

Speaker #1: And that is why I think we, the industry pair, and the increased module price—we don't believe this is going to have a negative impact on the customer side.

Speaker #1: And if you look at the landscape, solar is the cheapest energy source, and now there's a huge demand for storage. Solar plus storage will be the dominator of energy diversification for most of the regions.

Speaker #4: Okay, and just one more from us. Can you provide any more details on volumes and profitability, and how that weighed on your shipment volume guidance for the year?

Tyler Bisagno: Okay, just one more from us. Can you provide any more details on how you are balancing shipment volumes and profitability and how that weighed on your shipment volume guidance for the year? Are there certain markets that you are prioritizing or de-emphasizing?

Tyler Bisagno: Okay, just one more from us. Can you provide any more details on how you are balancing shipment volumes and profitability and how that weighed on your shipment volume guidance for the year? Are there certain markets that you are prioritizing or de-emphasizing?

Speaker #4: Are there certain markets that you are prioritizing or de-emphasizing?

Gener Miao: We guided down the shipments, right? To 60 to 70. That is very clear message. We do not believe it is the right time to focus on the scale and the profitabilities and the operating cash flow is the key. We do a lot of optimization of the structures, not only the markets as well as the products and the efficiencies, even our employee resources. Particularly if you look at 2026, the demand in China is 30% to 40% lower than last year. So definitely, we have less and less exposure in China. China is still relatively competitive and the price is one of the lowest in the markets. What we are doing is not only the country by country, as well as the customer by customer.

Gener Miao: We guided down the shipments, right? To 60 to 70. That is very clear message. We do not believe it is the right time to focus on the scale and the profitabilities and the operating cash flow is the key. We do a lot of optimization of the structures, not only the markets as well as the products and the efficiencies, even our employee resources. Particularly if you look at 2026, the demand in China is 30% to 40% lower than last year. So definitely, we have less and less exposure in China. China is still relatively competitive and the price is one of the lowest in the markets. What we are doing is not only the country by country, as well as the customer by customer.

Speaker #1: We guided down the shipments, right, to 60 to 70. That's a very clear message. And we don't believe it's the right time to focus on scale.

Speaker #1: And the profitability and the operating cash flow are key. So, we do a lot of optimization of the structures—not only the markets, but also the products—and increasing seeds, even our employees and resources.

Speaker #1: And particularly, if you look at 2026 and the demand in China, it is 30% to 40% lower than last year. So definitely, we have less and less exposure in China.

Speaker #1: And China is still relatively competitive, and prices are one of the lowest in the market. But what we are doing is not only looking at it country by country, but also customer by customer.

Speaker #1: And on top of that, because we are zoning out the Tiger Neo 3, that is one of the key markets and targeting the essential markets, and particularly for the premium markets, including the United States and Europe.

Gener Miao: On top of that, because we are rolling out the Tiger Neo 3, that is one of the key markets and targeting the essential markets, particularly for the premium markets, including United, including Europe. So that is one of the area we would like to penetrate more market share and to get relatively good profitabilities.

Gener Miao: On top of that, because we are rolling out the Tiger Neo 3, that is one of the key markets and targeting the essential markets, particularly for the premium markets, including United, including Europe. So that is one of the area we would like to penetrate more market share and to get relatively good profitabilities.

Speaker #1: So that is one of the areas we would like to penetrate for more market share and to achieve relatively good profitability.

Speaker #4: All right. Thank you very much.

Tyler Bisagno: All right. Thank you very much.

Tyler Bisagno: All right. Thank you very much.

Speaker #1: Yes. So I’d just like to take it up to, I think, the investor on the call and the one this quarter meeting—early release of a relatively different—and if you look at the GKS and the U.S. companies, we like the requisition, the companies' new strategies. And firstly, GKS is kind of the controlling shareholder.

Gener Miao: Yeah. I would just like to take the opportunity to, I think, the investor in on a call, and this quarter meeting, earnings data are relatively different. If you look at the JKS and the US companies, we like to reposition the company's long strategies. Firstly, JKS is the controlling shareholder of JinkoSolar China, with the company, which is the focus on integration of the

Gener Miao: Yeah. I would just like to take the opportunity to, I think, the investor in on a call, and this quarter meeting, earnings data are relatively different. If you look at the JKS and the US companies, we like to reposition the company's long strategies. Firstly, JKS is the controlling shareholder of JinkoSolar China, with the company, which is the focus on integration of the

Speaker #1: So, Jinko China, the company, is focused on integration of the solar process and storage, but now GKS has more capabilities in the last five years.

Haiyun Cao: across storage. Now JKS has more capabilities. In the last five years, we built up very strong strategic investment teams and dozens of investments. A lot of investments are very successful. In the last five years, we focus on solar storage related upstream, downstream, kind of the very high-growth potential companies to make the financial investment and to get the investment returns, as well as get some synergies for JinkoSolar China. On top of that, because China is more competitive on the new technology, like the AI content and computing, robotics, the team is shifting the focus to more strategic and broad industries, particularly the next generation. We think the JKS is shifting to both. One is the controlling of the JinkoSolar China and the focus on renewable energy.

Haiyun Cao: across storage. Now JKS has more capabilities. In the last five years, we built up very strong strategic investment teams and dozens of investments. A lot of investments are very successful. In the last five years, we focus on solar storage related upstream, downstream, kind of the very high-growth potential companies to make the financial investment and to get the investment returns, as well as get some synergies for JinkoSolar China. On top of that, because China is more competitive on the new technology, like the AI content and computing, robotics, the team is shifting the focus to more strategic and broad industries, particularly the next generation. We think the JKS is shifting to both. One is the controlling of the JinkoSolar China and the focus on renewable energy.

Speaker #1: We built up a very, very strong strategic investment team and invested in dozens of investments. A lot of these investments are very, very successful. And in the last five years, we focused on solar storage-related options, downstream, kind of the very high growth potential companies, to make the financial investments and to get the investment returns and, as well, to get some synergies for Jinko China.

Speaker #1: On top of that, because China is more kind of the more competitive on the new technology like the AI, quantum computing, robotics, and the teams is shifting the focus to more kind of strategic board industries, particularly the next generation.

Speaker #1: So, we think the GKS is kind of shifting to both: one is the controlling of the Jinko China, and the focus on renewable energy.

Speaker #1: And on top of that, the GKS and the US companies were shifting more capabilities to invest in the high-growth opportunities. China is the second most powerful country.

Haiyun Cao: On top of that, the JKS and the US companies were shifting more capabilities to invest on the high-growth opportunities. China is the second most powerful country. There is a lot of massive opportunities, and our teams are able to take the advantage. We would like the investor gradually to have the communication with our IR teams and to understand what is the progress, particularly for the strategic investment we are planning and we have made, which we believe will get a very strong return for the JKS in the next two or three years. Again, we think it is good for the valuation of JKS. If you look at purely the China versus US, there is a very big valuation gap. The US is just 20%, 30% valuations. Plus, we have a lot of portfolios investment and unique investment, which we are able to monetize.

Haiyun Cao: On top of that, the JKS and the US companies were shifting more capabilities to invest on the high-growth opportunities. China is the second most powerful country. There is a lot of massive opportunities, and our teams are able to take the advantage. We would like the investor gradually to have the communication with our IR teams and to understand what is the progress, particularly for the strategic investment we are planning and we have made, which we believe will get a very strong return for the JKS in the next two or three years. Again, we think it is good for the valuation of JKS. If you look at purely the China versus US, there is a very big valuation gap. The US is just 20%, 30% valuations. Plus, we have a lot of portfolios investment and unique investment, which we are able to monetize.

Speaker #1: There's a lot of massive opportunities. And we are able to our teams are able to take the advantage so we would like to investor gradually to have the communication with our IR teams and to understand what is the progress, particularly for the strategic investment we are.

Speaker #1: Planning and we have made which we believe will be get a very strong return for the GKS in the next two or three years.

Speaker #1: And again, we think it's good for the valuation of GKS. If you look purely at China versus the US, there is a very big valuation gap.

Speaker #1: The US is just 20 to 30 percent of valuations. Plus, we have a lot of portfolio investments and unique investments which we are able to monetize. So, I would like to take the opportunity to bring up this key topic and help investors understand what we are going to do in the future.

Haiyun Cao: I would like to take the opportunity to bring this key topic and have the investor understand what we are going to do in the future. Thank you.

Haiyun Cao: I would like to take the opportunity to bring this key topic and have the investor understand what we are going to do in the future. Thank you.

Speaker #1: Thank you.

Speaker #2: Your next question comes from Phil Shen with Roth Capital Partners. Please go ahead.

Operator 2: Your next question comes from Phil Shen with Roth Capital Partners. Please go ahead.

Operator: Your next question comes from Phil Shen with Roth Capital Partners. Please go ahead.

Speaker #3: Hey guys, thanks for taking my questions. Demi, nice to meet you. Congratulations on the new position. I wanted to check in with you guys on the Section 232.

Phil Shen: Hey, guys. Thanks for taking my questions. Dimi, nice to meet you. Congratulations on the new position. Wanted to check in with you guys on the Section 232. Specifically, given your recent transition and sale of your US assets to FH Capital, can you talk about the impacts of the 232 on that JV? How do you expect module pricing to be impacted? How do you expect the landscape of manufacturers to shift as a result of the Section 232? Thanks.

Phil Shen: Hey, guys. Thanks for taking my questions. Dimi, nice to meet you. Congratulations on the new position. Wanted to check in with you guys on the Section 232. Specifically, given your recent transition and sale of your US assets to FH Capital, can you talk about the impacts of the 232 on that JV? How do you expect module pricing to be impacted? How do you expect the landscape of manufacturers to shift as a result of the Section 232? Thanks.

Speaker #3: Specifically, given your recent transition and sale of your U.S. assets to FH Capital, can you talk about the impacts of the 232 on that JV?

Speaker #3: What kind of impact do you expect on module pricing? And then ultimately, how do you expect the landscape of manufacturers to shift as a result of Section 232?

Speaker #3: Thanks.

Haiyun Cao: In general, we believe it is very good for JinkoSolar's strategy to divest our manufacturing shifting to long-term entities in the United States. Specifically, I think JV, because we are the financial minority investors, we are not in a position to discuss the plan for the joint ventures because the majority shareholder take the leadership, and we are not involved in any operations. For the 232, in general, we believe that it is consistent with Trump administration to bring manufacturing back to the United States, not only the module capacity as well as the wafer, polysilicon, and the solar cell capabilities. We have expectation, anticipation, the 232 will be coming in the early year. It is come a little bit late, but we have some kind of diversified the potential supply chain to minimize the impact.

Haiyun Cao: In general, we believe it is very good for JinkoSolar's strategy to divest our manufacturing shifting to long-term entities in the United States. Specifically, I think JV, because we are the financial minority investors, we are not in a position to discuss the plan for the joint ventures because the majority shareholder take the leadership, and we are not involved in any operations. For the 232, in general, we believe that it is consistent with Trump administration to bring manufacturing back to the United States, not only the module capacity as well as the wafer, polysilicon, and the solar cell capabilities. We have expectation, anticipation, the 232 will be coming in the early year. It is come a little bit late, but we have some kind of diversified the potential supply chain to minimize the impact.

Speaker #1: In general, we believe it's kind of the very good for Jinko strategy to die invest our manufacturing shifting to long failed entities in the United States.

Speaker #1: And specifically, I think, JV, because we are the financial minority investors, we are not in a position to discuss the plan for the joint ventures. The majority shareholder takes the leadership, and we are not involved in any operations.

Speaker #1: But for the two, three, two in general we believe that is consistent with Trump administration to bring manufacturing back to the United States not only the module capacity as well as the wafer polysilicon and the solar cell capabilities and we have expectation anticipation the two, three, two will become will be coming in the early year as it's come a little bit late but we have some kind of diversified the potential supply chain to minimize the impact but anyway we believe that is going to be increase the cost of the solar modules that is going to have the impact to the solar development cost but we believe because of the it's a little bit significant increase for the potential solar module price but it's not have a significant impact for the solar farm investment returns given the US PPA prices is in recent years gradually increase to a relative competitive but a little bit higher level.

Haiyun Cao: Anyway, we believe that is going to increase the cost of the solar modules. That is going to have the impact to the solar development cost. We believe because it is a little bit significant increase for the potential solar module price, but it does not have a significant impact for the solar farm investment returns, given the US PPA prices in recent years gradually increase to a relatively competitive but a little bit higher level. Back to your question, we think it is anticipated, but it is a little bit exceeding expectation because the input price and the tax rate is a little bit higher, but it is not so high to make the industry demand dramatically go down. We still believe US is a good market in the next few years.

Haiyun Cao: Anyway, we believe that is going to increase the cost of the solar modules. That is going to have the impact to the solar development cost. We believe because it is a little bit significant increase for the potential solar module price, but it does not have a significant impact for the solar farm investment returns, given the US PPA prices in recent years gradually increase to a relatively competitive but a little bit higher level. Back to your question, we think it is anticipated, but it is a little bit exceeding expectation because the input price and the tax rate is a little bit higher, but it is not so high to make the industry demand dramatically go down. We still believe US is a good market in the next few years.

Speaker #1: So back to your question, we think it's anticipated, but it's a little bit exceeding expectations because the input price tax rate is a little bit higher. But it's not so high as to make the industry demand dramatically go down.

Speaker #1: We still believe the US is a good market in the next few years, and Jinko's minority interest and the joint venture will penetrate the US market to take advantage of the opportunity there.

Haiyun Cao: JinkoSolar's minority interest in the joint venture will penetrate the US market to take the opportunity in the US market.

Haiyun Cao: JinkoSolar's minority interest in the joint venture will penetrate the US market to take the opportunity in the US market.

Speaker #3: Okay, thanks, Charlie. So, would you expect pricing to kind of go to 42 cents, 44 cents in the U.S.? You guys are a JV minority owner now, but I have to imagine you have some views on pricing.

Phil Shen: Okay. Thanks, Charlie. Would you expect pricing to go to $0.42, $0.44 in the US? You guys are a JV minority owner now, but I have to imagine you have some views on pricing. What is your sense of where module pricing goes in the US? Thanks.

Phil Shen: Okay. Thanks, Charlie. Would you expect pricing to go to $0.42, $0.44 in the US? You guys are a JV minority owner now, but I have to imagine you have some views on pricing. What is your sense of where module pricing goes in the US? Thanks.

Speaker #3: So, what's your sense of where module pricing goes in the US? Thanks.

Speaker #1: If you look at the minimum price 38, right, 38 cents, 15% tariff, it's I think the market is evaluating the potential impact and customer is evaluating how they are going to risk proceed their project plan and I think we don't have definitive answer from customers but the initial feedback is the most project will continue even under the kind of two, three, two policy disruptions.

Haiyun Cao: If you look at the minimum price, $0.38, 15% tariff. I think the market is evaluating the potential impact and customer is evaluating how they are going to proceed their project plan. I think we do not have definitive answer from customers, but the initial feedback is that most projects will continue even under the kind of 232 policy disruptions. That is my initial preliminary information.

Haiyun Cao: If you look at the minimum price, $0.38, 15% tariff. I think the market is evaluating the potential impact and customer is evaluating how they are going to proceed their project plan. I think we do not have definitive answer from customers, but the initial feedback is that most projects will continue even under the kind of 232 policy disruptions. That is my initial preliminary information.

Speaker #1: That is my initial preliminary information.

Speaker #3: Okay, great. That's very helpful, thanks, Charlie. And then, as it relates to—you just mentioned two elements of the 232: the minimum import price and then the 15% ad valorem tariff.

Phil Shen: Okay, great. That is very helpful. Thanks, Charlie. You just mentioned two elements of the 232, the minimum import price and the 15% ad valorem tariff. There is also a third part, which is the tariff rebate program that is based on US CapEx. Would you expect your JV to qualify for that tariff rebate program?

Phil Shen: Okay, great. That is very helpful. Thanks, Charlie. You just mentioned two elements of the 232, the minimum import price and the 15% ad valorem tariff. There is also a third part, which is the tariff rebate program that is based on US CapEx. Would you expect your JV to qualify for that tariff rebate program?

Speaker #3: There's also a third part, which is the tariff rebate program that is based on U.S. capex. Would you expect your JV to qualify for that tariff rebate program?

Haiyun Cao: It's still the JV question. I'm not in position. But based on interpretation of policy, my understanding is firstly, it's a kind of new capacity expansion. Secondly, it should include wafer, cell, and maybe polysilicon, right? It's a new capacity addition. The solar module is not included, and it looks like it's targeting for the wafer, cell, and as well as polysilicon.

Haiyun Cao: It's still the JV question. I'm not in position. But based on interpretation of policy, my understanding is firstly, it's a kind of new capacity expansion. Secondly, it should include wafer, cell, and maybe polysilicon, right? It's a new capacity addition. The solar module is not included, and it looks like it's targeting for the wafer, cell, and as well as polysilicon.

Speaker #1: It's still the JV question. I'm not in position, but based on interpretation of policy, my understanding is, first, it's a kind of new capacity expansion.

Speaker #1: Secondly, it should include wafer sales and maybe polysilicon, right? It's a new capacity addition. It's not included in the solar module. It is not included, and it looks like it's targeting wafer, cell, and also polysilicon.

Speaker #3: Right, that's true. It's based on new capacity, but it can support manufacturers to expand capacity. So, okay, I'll pass it on from here. Thank you very much.

Phil Shen: Right. That's true. It's based on new capacity, but it can support manufacturers to expand capacity. Okay. I'll pass it on from here. Thank you very much.

Phil Shen: Right. That's true. It's based on new capacity, but it can support manufacturers to expand capacity. Okay. I'll pass it on from here. Thank you very much.

Speaker #1: Welcome.

Haiyun Cao: Welcome.

Haiyun Cao: Welcome.

Speaker #4: Your next question comes from Rajiv Chowdhury with Sunsera Capital. Please go ahead.

Operator 2: Your next question comes from Rajiv Chaudhary with Sunsera Capital. Please go ahead.

Operator: Your next question comes from Rajiv Chaudhary with Sunsera Capital. Please go ahead.

Speaker #5: Good morning, everybody. I have a few questions. Starting with, can you calibrate for us the size of the market that you expect globally this year and in 2026, and then break it down between the total size in China and internationally?

Rajiv Chaudhary: Good morning, everybody. I have a few questions, starting with, can you calibrate for us the size of the market that you expect globally this year in 2026, and then break it down between the total size in China and international?

Rajiv Chaudhary: Good morning, everybody. I have a few questions, starting with, can you calibrate for us the size of the market that you expect globally this year in 2026, and then break it down between the total size in China and international?

Haiyun Cao: You mean the 2026 total demand, right?

Speaker #1: So, you mean the 2026 total demand, right?

Haiyun Cao: You mean the 2026 total demand, right?

Speaker #5: Yes.

Rajiv Chaudhary: Yes.

Rajiv Chaudhary: Yes.

Speaker #1: Yeah. So, I think in 2026 we are expecting a low year because of the sharp drop in China’s domestic demand. If you are looking at it number-wise, we are thinking on the module side it will be roughly 600 gigawatts.

Haiyun Cao: Yeah. I think 2026 we are expecting a low year because of the sharp drop of the China domestic demand. If you are looking number-wise, we are thinking module side, it will be roughly 600 gigawatts or slightly below that. That will be our expectation. If you break them into different categories, you will find out, for example, in China, you will find out is mainly the demand disappear from the utility market. But the distribution market are still strong or robust during the H1.

Haiyun Cao: Yeah. I think 2026 we are expecting a low year because of the sharp drop of the China domestic demand. If you are looking number-wise, we are thinking module side, it will be roughly 600 gigawatts or slightly below that. That will be our expectation. If you break them into different categories, you will find out, for example, in China, you will find out is mainly the demand disappear from the utility market. But the distribution market are still strong or robust during the H1.

Speaker #1: Or slightly below that. That will be our expectations. And if you break them into different categories, you will find out, for example, in China, you will find that it is mainly the demand that disappeared from the utility market, but the distribution market was still strong or robust during the first half.

Speaker #1: And if you look at the non-China market demand, you will find that the European market had some ups and downs during the first half. But if we look at the total numbers, because of the first quarter rush due to the VAT policy change in China, most of the non-China demand is almost in line with expectations, even slightly higher than last year.

Haiyun Cao: But if we look into the total numbers because of the Q1 rush of the VAT policy change in China, most of the non-China demand is almost in line with the expectations, even slightly higher than last year. So that's what we had for the H1 and our expectation for this year. For next year, we believe there will be some recovery in the utility market in China. So we are expecting a better 2027 demand than 2026. If you want to quantify that, we will look at roughly something between 600 to 650 gigawatts in 2027 versus around 600 gigawatt or slightly below 600 gigawatt in 2026.

Haiyun Cao: But if we look into the total numbers because of the Q1 rush of the VAT policy change in China, most of the non-China demand is almost in line with the expectations, even slightly higher than last year. So that's what we had for the H1 and our expectation for this year. For next year, we believe there will be some recovery in the utility market in China. So we are expecting a better 2027 demand than 2026. If you want to quantify that, we will look at roughly something between 600 to 650 gigawatts in 2027 versus around 600 gigawatt or slightly below 600 gigawatt in 2026.

Speaker #1: So that's what we had for the first half and our expectation for this year. And for next year, we believe there will be some recovery in the utility market in China.

Speaker #1: So we are expecting better demand in 2027 compared to 2026. If you want to quantify that, we're looking at roughly 600 to 650 gigawatts in 2027, versus around 600 gigawatts or slightly below 600 gigawatts in 2026.

Speaker #5: Okay. So, if 2026 is around 600, that means you're now looking at your market share globally going down from last year, because your market share would be about 11%, right?

Rajiv Chaudhary: Okay. If the 2026 is around 600, that means that you're now looking at your market share globally going down from last year, because your market share would be about 11%, right?

Rajiv Chaudhary: Okay. If the 2026 is around 600, that means that you're now looking at your market share globally going down from last year, because your market share would be about 11%, right?

Speaker #1: Yes, there are some reasons behind it, right? The first one is, what we call the accessible market—it's reducing, right? So, there are certain sizable markets introducing more and more strict barriers, trade barriers, or policy barriers, which are not easy to access.

Gener Miao: Yes. There are some reasons behind it. First one is, we call it accessible market is reducing. There are certain sizable market is introducing more and more strict trade barriers or policy barriers, which is not easy to access. The second reason is because the competitions across the manufacturers, where some of the tier 3, tier 2 players, they are playing low price strategy, sacrificing the quality, et cetera, to attack the market or even protect their own cash flow, which is not what JinkoSolar can do. JinkoSolar is still taking care of the long-term reputation and the qualities. That is why we have to give up some of the low price deal and protect our own interests.

Gener Miao: Yes. There are some reasons behind it. First one is, we call it accessible market is reducing. There are certain sizable market is introducing more and more strict trade barriers or policy barriers, which is not easy to access. The second reason is because the competitions across the manufacturers, where some of the tier 3, tier 2 players, they are playing low price strategy, sacrificing the quality, et cetera, to attack the market or even protect their own cash flow, which is not what JinkoSolar can do. JinkoSolar is still taking care of the long-term reputation and the qualities. That is why we have to give up some of the low price deal and protect our own interests.

Speaker #1: Right? So the second reason is because of the competition across manufacturers, where some of the tier three and tier two players are pursuing low-price strategies, sacrificing quality, etc.

Speaker #1: to attack the market or even protect their own cash flow, which is not what Jinko can do. So, Jinko is still taking care of the long-term reputation and the quality.

Speaker #1: So that's why we have to give up some of the low-price deals and protect our own interests.

Speaker #5: So, breaking it down, when you said about some markets becoming less easy to access, I assume you're talking primarily about the United States. Can you give us a sense of what you expect out of that 65 gigawatts that you expect this year—roughly what percentage will be the US, and what you think going forward, longer term, your US sales will be or the percent of?

Rajiv Chaudhary: Breaking it down, when you said about some markets becoming less easy to access, I assume you are talking primarily about the United States. Can you give us a sense of what you expect out of that 65 million gigawatts that you expect this year? Roughly what percentage will be the US, and what you think going forward, longer term, your US sales will be as a percentage?

Rajiv Chaudhary: Breaking it down, when you said about some markets becoming less easy to access, I assume you are talking primarily about the United States. Can you give us a sense of what you expect out of that 65 million gigawatts that you expect this year? Roughly what percentage will be the US, and what you think going forward, longer term, your US sales will be as a percentage?

Speaker #1: Yeah. Sorry to jump in, but not only the US. Even, for example, Europe has these kinds of rules, asking that all EU-funded or financed projects cannot use China-based or Chinese factor factories.

Gener Miao: Yeah, sorry to jump in, but not only US. Even, for example, Europe, they have this kind of rules, asking for all the EU-funded projects or financed projects cannot use China-based or Chinese factories. For India, it is a kind of technical barrier, but for a China-based manufacturing, it is not accessible at all as well. Together with some other mid or small size of the market as well, like Turkey, other markets. I will not name all of them, but definitely US is one of them or one of the big ones. But it is not the only one. There is many more because of different reasons, geopolitical or securities, I mean.

Gener Miao: Yeah, sorry to jump in, but not only US. Even, for example, Europe, they have this kind of rules, asking for all the EU-funded projects or financed projects cannot use China-based or Chinese factories. For India, it is a kind of technical barrier, but for a China-based manufacturing, it is not accessible at all as well. Together with some other mid or small size of the market as well, like Turkey, other markets. I will not name all of them, but definitely US is one of them or one of the big ones. But it is not the only one. There is many more because of different reasons, geopolitical or securities, I mean.

Speaker #1: So for India, it's a kind of technical barrier, but for a Chinese China-based manufacturing is not accessible at all as well. Together with some other mid or small size of the market as well like Turkey, like other markets.

Speaker #1: So I won't name all of them, but definitely, the US is one of them, or one of the big ones. But it's not the only one.

Speaker #1: Just many more because of different reasons—geopolitical or securities.

Speaker #5: I see. Okay, moving on to another question about credit losses. Can you elaborate on what you mean by that, and what actually happened in the second quarter?

Rajiv Chaudhary: I see. Okay. Moving on to another question about credit losses. Can you elaborate on what you mean by that and what happened actually in the Q2?

Rajiv Chaudhary: I see. Okay. Moving on to another question about credit losses. Can you elaborate on what you mean by that and what happened actually in the Q2?

Pan Li: Credit loss. Rajiv, what are you talking about? The credit loss for accounts receivable. Are you talking about that?

Pan Li: Credit loss. Rajiv, what are you talking about? The credit loss for accounts receivable. Are you talking about that?

Speaker #1: Credit loss.

Speaker #3: Why are you talking about the credit loss for accounts receivable? Are you referring to that?

Speaker #5: Yes, can you give us more details on that?

Rajiv Chaudhary: Yes.

Rajiv Chaudhary: Yes.

Pan Li: Hello?

Pan Li: Can you just give us more details on that?

Pan Li: Hello?

Rajiv Chaudhary: Can you just give us more details on that?

Speaker #3: So you mean some kind of probation, impairment, or whatever you are looking at, right?

Pan Li: You mean kind of provision impairment or whatever you are looking at, right?

Pan Li: You mean kind of provision impairment or whatever you are looking at, right?

Speaker #5: Yes. You mentioned in your comments that one of the reasons for higher operating expenses in the second quarter was that you experienced some credit losses.

Rajiv Chaudhary: Yes. You mentioned in your comments that one of the reasons for higher operating expenses in Q2 was that you experienced some credit losses, and I was just looking for some elaboration. Was it some particular customers who went delinquent?

Rajiv Chaudhary: Yes. You mentioned in your comments that one of the reasons for higher operating expenses in Q2 was that you experienced some credit losses, and I was just looking for some elaboration. Was it some particular customers who went delinquent?

Speaker #5: And I was just looking for some elaboration. Was it some particular customers who went delinquent?

Haiyun Cao: Rajeev, let us check. Based on my understanding, we did not have any kind of deteriorated credit from customers, and it is accounting perspective based on the agings. Actually, if you look at the operating cash flow, we delivered +600 million RMB in the H1 of the year. The healthy operating cash flow is one of the key focus from management perspective. We do not see any significant bad debits or whatever from customer perspective.

Speaker #3: So Rajiv, let us check, but based on my understanding, it's kind of—we didn't have any kind of deteriorated credit from customers, and it's kind of accounting perspective based on the aging.

Haiyun Cao: Rajiv, let us check. Based on my understanding, we did not have any kind of deteriorated credit from customers, and it is accounting perspective based on the agings. Actually, if you look at the operating cash flow, we delivered +600 million RMB in the H1 of the year. The healthy operating cash flow is one of the key focus from management perspective. We do not see any significant bad debits or whatever from customer perspective.

Speaker #3: And actually, if you look at the operating cash flow, we delivered positive RMB 600 million in the first half of the year. And healthy operating cash flow is one of the key focuses from a management perspective.

Speaker #3: And we don't see any significant bad debt or anything like that from the customer perspective.

Speaker #5: Okay, another question is, you mentioned that the cost of production of the newer product line, the 3.0, remained elevated. Can you explain some of the reasons why?

Rajiv Chaudhary: Okay. Another question is on, you mentioned that the cost of production of the newer product line, the 3.0, remained elevated. Can you explain some of the reasons why? We were expecting actually the cost to start to come down as you ramped up. What happened?

Rajiv Chaudhary: Okay. Another question is on, you mentioned that the cost of production of the newer product line, the 3.0, remained elevated. Can you explain some of the reasons why? We were expecting actually the cost to start to come down as you ramped up. What happened?

Speaker #5: Because we were actually expecting the cost to start coming down as you ramped up. What happened?

Gener Miao: Q2, we ramped up the new facility, the Taicang Phase 3, and in the ramping up stage, typically the cost is relatively higher. On top of that, Q2, because Q1, the raw material cost, the silicon cost is relatively higher. So carry forward to Q2, the cost is relatively higher. It is a kind of combination of the two factors together to result in the relatively higher cost.

Gener Miao: Q2, we ramped up the new facility, the Taicang Phase 3, and in the ramping up stage, typically the cost is relatively higher. On top of that, Q2, because Q1, the raw material cost, the silicon cost is relatively higher. So carry forward to Q2, the cost is relatively higher. It is a kind of combination of the two factors together to result in the relatively higher cost.

Speaker #1: In the second quarter, we ramp up the new facility in the second year, year three. And in the ramping-up stage, typically, the cost is relatively higher.

Speaker #1: On top of that, in the second quarter, because in the first quarter the raw material cost, the silicon cost, was relatively higher, this carried forward to the second quarter, so the cost is relatively higher.

Speaker #1: But it's a kind of combination of the two factors together that caused the relatively higher cost. However, we expect the cost will be lower in the third quarter, with the capacity reaching four operational standards.

Haiyun Cao: We expect the cost will be lower in Q3 with the capacity reaching to full operational standards, as well as the input cost is relatively lower compared to Q2.

Haiyun Cao: We expect the cost will be lower in Q3 with the capacity reaching to full operational standards, as well as the input cost is relatively lower compared to Q2.

Speaker #1: Additionally, the input cost is relatively lower compared to the second quarter.

Speaker #5: So, and given that you're expecting the ASPs also to be up in the third quarter, are you suggesting that gross margin could bounce up quite nicely in the third quarter?

Rajiv Chaudhary: So, given that you are expecting the ASPs also to be up in Q3, are you suggesting that gross margin could bounce up quite nicely in Q3?

Rajiv Chaudhary: So, given that you are expecting the ASPs also to be up in Q3, are you suggesting that gross margin could bounce up quite nicely in Q3?

Speaker #1: Yeah, we did expect a moderate improvement in gross margin in the third quarter.

Haiyun Cao: Yeah. We did expect gross margin moderate improvement in Q3.

Haiyun Cao: Yeah. We did expect gross margin moderate improvement in Q3.

Speaker #5: Okay. And can you also talk a little bit about Mr. Zandy Lee stepping down from the CEO position? This is obviously a tough time for the company.

Rajiv Chaudhary: Okay. Can you also talk a little bit about Mr. Xiande Li stepping down from the CEO's position? This is obviously a tough time for the company. Can you just elaborate on why he has chosen to do it at this time?

Rajiv Chaudhary: Okay. Can you also talk a little bit about Mr. Xiande Li stepping down from the CEO's position? This is obviously a tough time for the company. Can you just elaborate on why he has chosen to do it at this time?

Speaker #5: Can you elaborate on why he's chosen to do it at this time?

Speaker #1: I think David Lee, our chairman, is the founder. He is always focused on the strategic long-term visions, and I don't believe there's any change because of the change of the chief executive officer.

Haiyun Cao: I think David Li, our Chairman, is the founder. He is always focused on the strategic long-term visions. I do not believe there is any change because of the change of the Chief Executive Officer. Because JKS is the controlling shareholder of JinkoSolar China. So the key business of JKS is on top of the controlling shareholder of JinkoSolar China. That is the primary entities to operate the business. The Chairman believes this is the right time. JKS, on top of the controlling shareholder business and doing the strategic investment because our Chairman built up the teams, the strategic investment teams, five years ago. There is some track record in the last five years, and it is the right time to catch up the massive opportunities in China. Not only in the last five years, there is solar and storage investment opportunity, as well as AI, robotics, quantum computing.

Haiyun Cao: I think David Li, our Chairman, is the founder. He is always focused on the strategic long-term visions. I do not believe there is any change because of the change of the Chief Executive Officer. Because JKS is the controlling shareholder of JinkoSolar China. So the key business of JKS is on top of the controlling shareholder of JinkoSolar China. That is the primary entities to operate the business. The Chairman believes this is the right time. JKS, on top of the controlling shareholder business and doing the strategic investment because our Chairman built up the teams, the strategic investment teams, five years ago. There is some track record in the last five years, and it is the right time to catch up the massive opportunities in China. Not only in the last five years, there is solar and storage investment opportunity, as well as AI, robotics, quantum computing.

Speaker #1: Because JKS has its controlling shareholder, Jinko China. And so the key business of JKS, on top of the controlling shareholder Jinko China, is that the primary entities operate the business.

Speaker #1: And the chairman believes this is the right time. JKS is on top of the controlling shareholder business and doing the strategic investment, because our chairman built up the teams and the strategic investment teams five years ago. There is a strong track record in the last five years.

Speaker #1: And it is the right time to catch up on the massive opportunities in China. Not only in the last five years, there's a solar and storage investment opportunity, as well as AI, robotics, quantum computing—a lot of investment opportunities.

Haiyun Cao: A lot of investment opportunities. That is why I think I talked about in the beginning of the conference call and we like doing investments to have take the times to understand, okay, what we have done in the last five years for strategic investment, overturn the investment cash out maybe 60%. There is a very good investment opportunity. The team have invested, including the recent large model, the AI model, K1, K3, maybe you heard from the news. We believe there will be a good opportunity to make investment return through the JKS strategic investment and the team platform.

Haiyun Cao: A lot of investment opportunities. That is why I think I talked about in the beginning of the conference call and we like doing investments to have take the times to understand, okay, what we have done in the last five years for strategic investment, overturn the investment cash out maybe 60%. There is a very good investment opportunity. The team have invested, including the recent large model, the AI model, K1, K3, maybe you heard from the news. We believe there will be a good opportunity to make investment return through the JKS strategic investment and the team platform.

Speaker #1: So that is why I think I just like I think I talked about in the beginning of the conference call and we like to investment to have take the times to understand, okay, what we have done in the last five years for strategic investment over 10 investment cash out, maybe 60%.

Speaker #1: And there is a very good investment opportunity. The team have invested, including the recent large model—the AI model can be K3, maybe you heard from the news.

Speaker #1: And we believe there will be a good opportunity to make investment returns through the JKS strategic investment team platform.

Speaker #5: Okay. Moving on to capital spending, can you tell us what the capital spending plan is for this year, and how you're thinking about 2027?

Rajiv Chaudhary: Okay. Moving on to capital spending. Can you tell us what the capital spending plan is for this year and how you are thinking about 2027? Obviously you are running well below the 100 gigawatt capacity that you have. Should we expect basically very little capital spending in the next two years?

Rajiv Chaudhary: Okay. Moving on to capital spending. Can you tell us what the capital spending plan is for this year and how you are thinking about 2027? Obviously you are running well below the 100 gigawatt capacity that you have. Should we expect basically very little capital spending in the next two years?

Speaker #5: Obviously, you are running well below the 100-gigawatt capacity that you have. Should we expect basically very little capital spending in the next two years?

Speaker #1: Yeah, correct. There will be very, very small, minimal and minor upgrades, and we don't expect any significant investment. Even if we want to do some in the future, for the local manufacturing in key countries outside of China for the local market, we will do it through joint venture structures that will minimize our capex as well.

Haiyun Cao: Yeah, correct. There will be very small minimum and minor upgrades. We don't expect any significant investment. Even if we want to do some in the future. We do the local manufacturing in the key countries other China for the local market. We will do through the joint venture structures. That will be minimize our CapEx as well. But that is depending on if the market is getting rebound. Back to your question, I don't believe is significant and should be very small on the maintenance CapEx in the next two years.

Haiyun Cao: Yeah, correct. There will be very small minimum and minor upgrades. We don't expect any significant investment. Even if we want to do some in the future. We do the local manufacturing in the key countries other China for the local market. We will do through the joint venture structures. That will be minimize our CapEx as well. But that is depending on if the market is getting rebound. Back to your question, I don't believe is significant and should be very small on the maintenance CapEx in the next two years.

Speaker #1: But that is depending on if the market is going to rebound. And so, back to your question, I don't believe it's significant. And verbally, it should be very, very small in the maintenance CapEx in the next two years.

Speaker #5: So, is the $5 billion number a maintenance capex, or is it even less than that?

Rajiv Chaudhary: Is the 5 billion number a maintenance CapEx or even less than that?

Rajiv Chaudhary: Is the 5 billion number a maintenance CapEx or even less than that?

Speaker #1: No, it should be significantly lower—maybe it should be very, very small.

Haiyun Cao: No. It should be significant lower, maybe RMB 500 million or maybe RMB 1 billion, and there should be very small.

Haiyun Cao: No. It should be significant lower, maybe RMB 500 million or maybe RMB 1 billion, and there should be very small.

Speaker #5: I see. Okay. And how much CapEx is required in the storage business?

Rajiv Chaudhary: I see. Okay. How much CapEx is required in the storage business?

Rajiv Chaudhary: I see. Okay. How much CapEx is required in the storage business?

Haiyun Cao: The storage business. What?

Haiyun Cao: The storage business. What?

Speaker #1: The storage business—what is storage? Oh, storage, we don't have a capacity plan. Currently, we have roughly 5 gigawatts battery cell and 20 gigawatts battery pack.

Gener Miao: Storage.

Gener Miao: Storage.

Haiyun Cao: Oh, storage. Oh, storage we don't have capacity plan. Currently we have roughly 5 gigawatts battery cell and 20 gigawatts battery pack. We don't have plan to do the capacity expansion. We would like to take a lighter approach and partner with different suppliers. The key element part, key part is the solution. The solution for AIDC, solution for different case, different projects, and the technical branding and marketing capability and the technical services. That will be the key investment. But the investment is on the, I think the teams is not the equipment.

Haiyun Cao: Oh, storage. Oh, storage we don't have capacity plan. Currently we have roughly 5 gigawatts battery cell and 20 gigawatts battery pack. We don't have plan to do the capacity expansion. We would like to take a lighter approach and partner with different suppliers. The key element part, key part is the solution. The solution for AIDC, solution for different case, different projects, and the technical branding and marketing capability and the technical services. That will be the key investment. But the investment is on the, I think the teams is not the equipment.

Speaker #1: We don't have plans to do the capacity expansion. And we would like to take the line approach and partner with different suppliers. And the key element, the key part, is the solution.

Speaker #1: The solution for AIDC for solution for different case different projects. And the technical branding and marketing capability and the technical services that will be the that will be the key investment but the investment is on the I think the teams is not the equipment.

Speaker #5: I see. Okay, so your business model in storage is basically an asset-light model.

Rajiv Chaudhary: I see. Okay. Your business model in storage is basically an asset-light model.

Rajiv Chaudhary: I see. Okay. Your business model in storage is basically an asset-light model.

Speaker #1: Yes, yes.

Haiyun Cao: Yes.

Haiyun Cao: Yes.

Rajiv Chaudhary: Yeah. Going back to module market share, do you think that in Q2 also, you were number one in the world?

Rajiv Chaudhary: Yeah. Going back to module market share, do you think that in Q2 also, you were number one in the world?

Speaker #5: Yeah. Now, going back to module market share, do you think that in the second quarter you were also number one in the world?

Speaker #1: Yes, yeah, in the first half-year. And, well, I think we are still the number one, but that is not our target. The key is we need to get through the cycles, and we need to develop our capabilities. The volume does not show any capabilities.

Haiyun Cao: Yeah, in the H1. I think we are still-

Haiyun Cao: Yeah, in the H1. I think we are still-

Rajiv Chaudhary: H1

Rajiv Chaudhary: H1

Haiyun Cao: the number one. That is not our target. The key is, we need to get through the cycles and we develop our capabilities. The volume does not show any capabilities. Capabilities shows we are able to have more good planning, and we make sure we have more capabilities to select different customers and different markets and branding and marketing activities. We do not believe the volume says something.

Haiyun Cao: the number one. That is not our target. The key is, we need to get through the cycles and we develop our capabilities. The volume does not show any capabilities. Capabilities shows we are able to have more good planning, and we make sure we have more capabilities to select different customers and different markets and branding and marketing activities. We do not believe the volume says something.

Speaker #1: Capability shows we are able to have better planning, and we have to make sure we have more capabilities to select different customers and different markets, as well as branding and marketing activities.

Speaker #1: And it's not that we don't believe the volume says something.

Speaker #5: Okay. So, at what level do you think your, given that some markets are becoming more difficult as Jenner mentioned, at what level do you think your market share globally bottoms out?

Rajiv Chaudhary: Okay. At what level do you think your Given that some markets are becoming more difficult, as Gener mentioned, at what level do you think your market share globally bottoms out? At the peak it was around 15%, roughly a couple of years ago, and now you are heading towards 11% to 12%. Where do you think that number bottoms out?

Rajiv Chaudhary: Okay. At what level do you think your Given that some markets are becoming more difficult, as Gener mentioned, at what level do you think your market share globally bottoms out? At the peak it was around 15%, roughly a couple of years ago, and now you are heading towards 11% to 12%. Where do you think that number bottoms out?

Speaker #5: At the peak, it was around 15% roughly, the last couple of years ago. And now you're heading towards 11 to 12%. Where do you think that number bottoms out?

Haiyun Cao: Bottom out. Frankly, I do not have a target number, but a fair estimate, I think 10% is a reasonable number for current stage. The market still picks up. We think we should be ready to get more market share.

Haiyun Cao: Bottom out. Frankly, I do not have a target number, but a fair estimate, I think 10% is a reasonable number for current stage. The market still picks up. We think we should be ready to get more market share.

Speaker #1: Bottom out, frankly, I don't have a target number, but a fair risk being, I think 10% is a reasonable number for the current stage. But if the markets pick up, we think we should be ready to get more market share.

Speaker #5: Okay. Thank you very much.

Rajiv Chaudhary: Okay. Thank you very much.

Rajiv Chaudhary: Okay. Thank you very much.

Speaker #1: Thank you.

Haiyun Cao: Thank you.

Haiyun Cao: Thank you.

Speaker #3: The next question comes from Alan Lowe with Jefferies. Please go ahead.

Operator 2: The next question comes from Alan Lau with Jefferies. Please go ahead.

Operator: The next question comes from Alan Lau with Jefferies. Please go ahead.

Speaker #5: Thanks, Madison. Thanks, Madison, for taking my question. Also, congratulations, Jimmy, on becoming the CEO of the company. I would like to follow up on a couple of items.

Alan Lau: Thanks very much for taking my question. Also, congratulations to Yi to become the CEO of the company. I would like to follow up on a couple of stuff. First of all, the Section 232, I heard there are already quite significant inventory in the US. BloombergNEF is quoting close to 100 gigawatt. I am not sure if you are aware of it, and I would like to know how much inventory we have to get prepared for the policy change.

Alan Lau: Thanks very much for taking my question. Also, congratulations to Yi to become the CEO of the company. I would like to follow up on a couple of stuff. First of all, the Section 232, I heard there are already quite significant inventory in the US. BloombergNEF is quoting close to 100 gigawatt. I am not sure if you are aware of it, and I would like to know how much inventory we have to get prepared for the policy change.

Speaker #5: First of all, regarding Section 232, I heard there is already quite significant inventory in the US. BNEF is quoting close to 100 gigawatts. Not sure if you are aware of it.

Speaker #5: And I would like to know how much inventory we have to get prepared for the policy change.

Speaker #1: We did have preparations, but it's based on the short-term sales contract, right, in the next two or three months. And typically, we will arrange some kind of purchase agreement.

Haiyun Cao: We did have preparations. It is based on the short-term sales contract, right, in the next two or three months. Typically, we will arrange some kind of purchase agreement. There is still sufficient time, right, two or three months.

Haiyun Cao: We did have preparations. It is based on the short-term sales contract, right, in the next two or three months. Typically, we will arrange some kind of purchase agreement. There is still sufficient time, right, two or three months.

Speaker #1: And, but because there's still sufficient time, right, two or three months, and we will purchase on a regular basis. And we believe that, because the cost factor is a little bit higher.

Alan Lau: Yeah.

Alan Lau: Yeah.

Haiyun Cao: And we will purchase on regular basis. We believe because the cost structure is a little bit high, and we believe the market are able to absorb the potential cost increase.

Haiyun Cao: And we will purchase on regular basis. We believe because the cost structure is a little bit high, and we believe the market are able to absorb the potential cost increase.

Speaker #1: And we believe the market is able to absorb the potential cost increase.

Speaker #5: Understood. So, how much inventory do you see in the market?

Alan Lau: Understood. How much inventory in the market do you see?

Alan Lau: Understood. How much inventory in the market do you see?

Speaker #1: We don't have that information. You mean the module, right?

Haiyun Cao: We don't have that information. You mean in module, right?

Haiyun Cao: We don't have that information. You mean in module, right?

Speaker #5: Yes, yes, yes.

Alan Lau: Yes.

Alan Lau: Yes.

Haiyun Cao: I think you can check the customer data. Maybe two, three months later, you will see the US customer data, so it will have a better understanding about how many or how much megawatt has been imported.

Haiyun Cao: I think you can check the customer data. Maybe two, three months later, you will see the US customer data, so it will have a better understanding about how many or how much megawatt has been imported.

Speaker #1: I think you can check the customer data maybe two or three months later. You will see the US customer data, so you will have a better understanding about how many megawatts have been imported.

Speaker #5: Understood. Understood. Thanks. I also heard some feedback on the Section 337 investigation. Regarding the TOPCon patent, I wonder, how do you see it, and is it affecting any of the TOPCon sales in the US?

Alan Lau: Understood. Thanks. I also heard some feedbacks on the Section 337 investigation regarding to the TOPCon patent. I wonder how do you see it, and is it affecting any of the TOPCon sales in the US?

Alan Lau: Understood. Thanks. I also heard some feedbacks on the Section 337 investigation regarding to the TOPCon patent. I wonder how do you see it, and is it affecting any of the TOPCon sales in the US?

Haiyun Cao: Is that the First Solar patent?

Haiyun Cao: Is that the First Solar patent?

Speaker #1: Is that the first solar patent case?

Speaker #5: Yeah, patent. They have a patent case, and also there's a Section 337 investigation, and yeah, there's some feedback suggesting that, yeah, this might impact or this might create some problems for selling TOPCon into the US market.

Alan Lau: Yeah. They have a patent case, and also there is a Section 337 investigation. There is some feedback suggesting that this might impact, or this might create some problems for selling TOPCon into the US market.

Alan Lau: Yeah. They have a patent case, and also there is a Section 337 investigation. There is some feedback suggesting that this might impact, or this might create some problems for selling TOPCon into the US market.

Haiyun Cao: I did not hear the information update. But again, based on our internal, external teams, we are quite confident in our patent capabilities. We do not see any disruption for JinkoSolar so far.

Speaker #1: I didn't hear the information or any updates, but again, based on our internal and external teams, we are quite confident in our patent capabilities, and we don't see any disruption for Jinko so far.

Haiyun Cao: I did not hear the information update. But again, based on our internal, external teams, we are quite confident in our patent capabilities. We do not see any disruption for JinkoSolar so far.

Speaker #5: Understood. And regarding the strategic cooperation with one of the U.S. major players, I wonder if you might share the progress on that front.

Alan Lau: Understood. Regarding the strategic cooperation with one of the US major players, I wonder if you might share the progress on that front. Are there updates? Because there is a recent announcement of a $10 billion investment into building solar capacities by that largest player in ESS. So I wonder what is the progress of our discussion with that player?

Alan Lau: Understood. Regarding the strategic cooperation with one of the US major players, I wonder if you might share the progress on that front. Are there updates? Because there is a recent announcement of a $10 billion investment into building solar capacities by that largest player in ESS. So I wonder what is the progress of our discussion with that player?

Speaker #5: Like is there updates or because there's a recent announcement of a 10 billion dollars of investment into building solar capacities by that largest player in the ESS.

Speaker #5: So, I wonder, what's the progress of our discussion with that player?

Haiyun Cao: We did not have any progress so far. If any significant improvement, any progress, I think we may take the list on the news. But globalization is our strategy. It is cooperation with different partners, not only in United States, in different countries. It is one of the key areas we like to take and explore the different opportunities. If we reach significant progress, we definitely will share the news.

Haiyun Cao: We did not have any progress so far. If any significant improvement, any progress, I think we may take the list on the news. But globalization is our strategy. It is cooperation with different partners, not only in United States, in different countries. It is one of the key areas we like to take and explore the different opportunities. If we reach significant progress, we definitely will share the news.

Speaker #1: We haven't had any progress so far. If there is any significant improvement, we will have some progress. I think we may then consider releasing the news.

Speaker #1: And— but globalization is our strategy; it is cooperation with different partners, not only in the United States, but in different countries. It's what our— the key area we like to take, to explore the different opportunities.

Speaker #1: And if we reach significant progress, we definitely will share the news.

Speaker #5: Understood. So, my last question is on the ESS business. I think in the last quarter, in the PowerPoint, it showed around 1.42 gigawatt-hours of ESS shipment POD.

Alan Lau: Understood. My last question is on the ESS business. I think in the last quarter, in the PowerPoint, it showed around 1.42 gigawatt hour of ESS shipment, POD. While, in this quarter, it seems the number is revised, or I am not sure if the way of calculating the shipments is different, but it seems that Q1 has a lower number of shipment, whereas Q2, there is 1 gigawatt hour plus shipment. It seems the company is reiterating its annual target. So does it mean that in H2 there will be close to 8 gigawatt hour of shipment?

Alan Lau: Understood. My last question is on the ESS business. I think in the last quarter, in the PowerPoint, it showed around 1.42 gigawatt hour of ESS shipment, POD. While, in this quarter, it seems the number is revised, or I am not sure if the way of calculating the shipments is different, but it seems that Q1 has a lower number of shipment, whereas Q2, there is 1 gigawatt hour plus shipment. It seems the company is reiterating its annual target. So does it mean that in H2 there will be close to 8 gigawatt hour of shipment?

Speaker #5: While in this quarter, it seems the number has been revised, or I'm not sure if the way of calculating the shipments is different, but it seems that Q1 has a lower number of shipments than Q2.

Speaker #5: There's one gigawatt-hour plus shipment, and it seems the company is reiterating its annual target. So, does it mean that in the second half there will be close to 8 gigawatt-hours of shipment?

Haiyun Cao: It is H2 loaded. Because a lot of projects we shift, but we need to go through different stages, including testing, commissioning. Particularly for the large scale ESS project. We have the confidence that we are able to achieve our guidance by the end of the year. If you are looking to next year, Q2, Q3 should be, we are able to recognize maybe 3 to 4 gigawatt hours a quarter next quarter.

Haiyun Cao: It is H2 loaded. Because a lot of projects we shift, but we need to go through different stages, including testing, commissioning. Particularly for the large scale ESS project. We have the confidence that we are able to achieve our guidance by the end of the year. If you are looking to next year, Q2, Q3 should be, we are able to recognize maybe 3 to 4 gigawatt hours a quarter next quarter.

Speaker #1: It's the second half of the year, and because of the large number of projects we've shipped, we need to go through different stages, including testing, commissioning, and particularly for the large-scale ESS project.

Speaker #1: And we have the confidence that we are able to achieve our guidance by the end of the year. And if you're looking to next year and the second or third quarter, it could be that we are able to recognize maybe three to four gigawatt hours a quarter next quarter.

Speaker #5: Understood, understood. So, how much was shipped in the first quarter? Because it seems there's a change in the method of calculation, or what?

Alan Lau: Understood. How much was shipped in the Q1? Because it seems there is a change in the method of calculation or what?

Alan Lau: Understood. How much was shipped in the Q1? Because it seems there is a change in the method of calculation or what?

Haiyun Cao: H1, we shipped, I think, 3 gigawatt hours. Again, last year we shipped, I think, over 5 gigawatt hours. But last year we recognized just 1 gigawatt hour. So there is a gap, 4 gigawatts, carry forward into this year. Anyway, it is a-

Haiyun Cao: H1, we shipped, I think, 3 gigawatt hours. Again, last year we shipped, I think, over 5 gigawatt hours. But last year we recognized just 1 gigawatt hour. So there is a gap, 4 gigawatts, carry forward into this year. Anyway, it is a-

Speaker #1: In the first half, we shipped, I think, three gigawatt-hours. And again, last year we shipped, I think, over five gigawatt-hours, but last year we recognized just one gigawatt-hour.

Speaker #1: So there's a gap. Four gigawatts carry forward into this year. Anyway, it's a...

Speaker #5: Understood.

Alan Lau: Understood

Alan Lau: Understood.

Haiyun Cao: commitment here. Yeah.

Haiyun Cao: commitment here. Yeah.

Speaker #1: Yeah.

Speaker #5: Understood. Thank you. Thanks, Charlie, for taking my question. Thank you. So, yeah, thank you.

Alan Lau: Understood. Thank you. Thanks, Charlie, for taking my question. Thanks, Jimmy and Dana. Yeah, thank you.

Alan Lau: Understood. Thank you. Thanks, Charlie, for taking my question. Thanks, Jimmy and Dana. Yeah, thank you.

Speaker #1: Thank you. Thank you.

Haiyun Cao: Thank you.

Haiyun Cao: Thank you.

Dimmy Du: Thank you.

Dimmy Du: Thank you.

Operator 2: That does conclude our conference for today. Thank you for participating. You may now disconnect.

Operator: That does conclude our conference for today. Thank you for participating. You may now disconnect.

Browse all earnings call transcripts

Q2 2026 JinkoSolar Co Ltd Earnings Call

Demo
688223

JinkoSolar

Earnings

Q2 2026 JinkoSolar Co Ltd Earnings Call

688223

Wednesday, August 26th, 2026 at 12:30 PM

Transcript

No Transcript Available

No transcript data is available for this event yet. Transcripts typically become available shortly after an earnings call ends.

Want AI-powered analysis? Try AllMind →

Earnings analysis guides

Methods for extracting KPIs and checking source support when reviewing an earnings call.

Browse all earnings calls