Q2 2026 Riot Platforms Inc Earnings Call

Operator: Thank you for standing by, and welcome to the Riot Platforms Q2 2026 earnings conference call. All lines have been placed on mute to prevent any background noise. After the speaker's remarks, there will be a question and answer session. If you would like to ask a question during that time, simply press star, then the number 1 on your telephone keypad. I would now like to turn the call over to Josh Kane, Head of Investor Relations. Sir, please go ahead.

Speaker #1: 3. Thank you for standing by. And welcome to the Riot Platforms, Q2, 2026 earnings conference call. All lines have been placed on mute to prevent any background noise.

Operator: Thank you for standing by, and welcome to the Riot Platforms Q2 2026 earnings conference call. All lines have been placed on mute to prevent any background noise. After the speaker's remarks, there will be a question and answer session. If you would like to ask a question during that time, simply press star, then the number one on your telephone keypad. I would now like to turn the call over to Josh Kane, Head of Investor Relations. Sir, please go ahead.

Speaker #1: After the speakers' remarks, there will be a question-and-answer session. If you would like to ask a question during that time, simply press * then the number 1 on your telephone keypad.

Speaker #1: I would now like to turn the call over to Joshua Kane, Head of Investor Relations. Sir, please go ahead.

Speaker #2: Thank you, operator. Good afternoon, and welcome to Riot Platforms, Q2, 2026 earnings conference call. My name is Josh Kane. Head of Investor Relations. And joining me on today's call from Riot are Jason Les, Chief Executive Officer; and Jason Chung, Chief Financial Officer.

Josh Kane: Thank you, operator. Good afternoon, and welcome to Riot Platforms Q2 2026 earnings conference call. My name is Josh Kane, Head of Investor Relations. Joining me on today's call from Riot are Jason Les, Chief Executive Officer, and Jason Chung, Chief Financial Officer. On the Riot Investor Relations website, you can find our Q2 2026 earnings press release and accompanying earnings presentation, which are intended to supplement today's prepared remarks and which include a discussion of certain non-GAAP items. Non-GAAP financial measures provided should not be considered as a substitute for or superior to the measures of financial performance prepared in accordance with GAAP and are included as additional clarifying items to aid investors in further understanding the company's Q2 2026 performance. During today's call, we will make forward-looking statements regarding potential future events.

Joshua Kane: Thank you, operator. Good afternoon, and welcome to Riot Platforms Q2 2026 earnings conference call. My name is Josh Kane, Head of Investor Relations. Joining me on today's call from Riot are Jason Les, Chief Executive Officer, and Jason Chung, Chief Financial Officer. On the Riot Investor Relations website, you can find our Q2 2026 earnings press release and accompanying earnings presentation, which are intended to supplement today's prepared remarks and which include a discussion of certain non-GAAP items.

Speaker #2: On the Riot Investor Relations website, you can find our Q2 2026 earnings press release and accompanying earnings presentation, which are intended to supplement today's prepared remarks and include a discussion of certain non-GAAP items.

Speaker #2: Non-GAAP financial measures provided should not be considered as a substitute for, or superior to, the measures of financial performance prepared in accordance with GAAP. These measures are included as additional clarifying items to aid investors in further understanding the company's Q2 2026 performance.

Joshua Kane: Non-GAAP financial measures provided should not be considered as a substitute for or superior to the measures of financial performance prepared in accordance with GAAP and are included as additional clarifying items to aid investors in further understanding the company's Q2 2026 performance. During today's call, we will make forward-looking statements regarding potential future events.

Speaker #2: During today's call, we will make forward-looking statements regarding potential future events. These statements are based on management's current expectations and assumptions, and are subject to risks and uncertainties.

Josh Kane: These statements are based on management's current expectations and assumptions and are subject to risks and uncertainties. Actual results could materially differ due to factors discussed in today's earnings press release, our comments and responses made during today's call, the Risk Factors section of our Form 10-K and Forms 10-Q, including for the 3 months ending 30 June 2026, which we expect to file later today, and our other filings with the Securities and Exchange Commission. With that, I will turn the call over to Jason Les, CEO of Riot Platforms.

Joshua Kane: These statements are based on management's current expectations and assumptions and are subject to risks and uncertainties. Actual results could materially differ due to factors discussed in today's earnings press release, our comments and responses made during today's call, the Risk Factors section of our Form 10-K and Forms 10-Q, including for the three months ending 30 June 2026, which we expect to file later today, and our other filings with the Securities and Exchange Commission. With that, I will turn the call over to Jason Les, CEO of Riot Platforms.

Speaker #2: Actual results could materially differ due to factors discussed in today's earnings press release, our comments and responses made during today's call, and the risk factors section of our Form 10-K and Forms 10-Q, including for the three months ended June 30, 2026.

Speaker #2: which we expect to file later today, and our other filings with the Securities and Exchange Commission. With that, I will turn the call over to Jason Les, CEO of Riot Platforms.

Speaker #3: Thank you, Josh. And good afternoon, everyone. The AI era has two binding constraints: power and execution. This quarter demonstrated Riot's answer to both. Q2 2026 marked a decisive step forward in Riot's data center business and represents a clear validation of the assets, team, and strategy we have assembled.

Jason Les: Thank you, Josh, and good afternoon, everyone. The AI era has 2 binding constraints, power and execution. This quarter demonstrated Riot's answer to both. The Q2 2026 marked a decisive step forward in Riot's data center business and represents a clear validation of the assets, team, and strategy we have assembled. Following our first data center lease with AMD earlier this year, demand for large-scale power data center capacity has continued to accelerate, and we have taken a disciplined approach in response. The right transactions with the right partners on the right terms. I am pleased to share our progress with you today. 4 key accomplishments define this progress. First, at Rockdale, subsequent to quarter end, we executed a data center lease with one of the world's leading frontier AI labs for 191 megawatts of critical IT capacity. This is our second data center lease at Rockdale.

Jason Les: Thank you, Josh, and good afternoon, everyone. The AI era has two binding constraints, power and execution. This quarter demonstrated Riot's answer to both. The Q2 2026 marked a decisive step forward in Riot's data center business and represents a clear validation of the assets, team, and strategy we have assembled. Following our first data center lease with AMD earlier this year, demand for large-scale power data center capacity has continued to accelerate, and we have taken a disciplined approach in response.

Speaker #3: Following our first data center lease with AMD earlier this year, demand for large-scale, powered data center capacity has continued to accelerate, and we have taken a disciplined approach in response.

Speaker #3: The right transactions with the right partners, on the right terms. I'm pleased to share our progress with you today. Four key accomplishments define this progress.

Jason Les: The right transactions with the right partners on the right terms. I am pleased to share our progress with you today. Four key accomplishments define this progress. First, at Rockdale, subsequent to quarter end, we executed a data center lease with one of the world's leading frontier AI labs for 191 megawatts of critical IT capacity. This is our second data center lease at Rockdale.

Speaker #3: First, at Rockdale, subsequent to Q2 end, we executed a data center lease with one of the world's leading frontier AI labs for 191 megawatts of critical IT capacity.

Speaker #3: This is our second data center lease at Rockdale. Our lease with the AI lab has a 20-year term and is expected to generate approximately $9.1 billion in total contract revenue.

Jason Les: Our lease with the AI lab has a 20-year term and is expected to generate approximately $9.1 billion in total contract revenue, with 2 five-year extension options that, if exercised, would bring total contracted value to approximately $16.1 billion. Together with the AMD lease, Riot has now secured approximately $9.8 billion of contracted data center revenue with 2 leading companies in the AI ecosystem. Second, at Corsicana, interest in our 1 gigawatt of fully approved utility power has been substantial. From a broad field of prospective tenants, we have narrowed our focus and entered into a non-binding letter of intent with a single tenant for the entirety of the site, a transaction which we are engaged in advanced commercial and design discussions. A potential deal of this scale demands deep collaboration across design, commercial, and legal work streams, and that work is well underway.

Jason Les: Our lease with the AI lab has a 20-year term and is expected to generate approximately $9.1 billion in total contract revenue, with two five-year extension options that, if exercised, would bring total contracted value to approximately $16.1 billion. Together with the AMD lease, Riot has now secured approximately $9.8 billion of contracted data center revenue with two leading companies in the AI ecosystem. Second, at Corsicana, interest in our one gigawatt of fully approved utility power has been substantial.

Speaker #3: With two 5-year extension options that, if exercised, would bring total contracted value to approximately $16.1 billion. Together with the AMD lease, Riot has now secured approximately $9.8 billion of contracted data center revenue with two leading companies in the AI ecosystem.

Speaker #3: Second, at Corsicana, interest in our 1-gigawatt of fully approved utility power has been substantial. From a broad field of prospective tenants, we have narrowed our focus and entered into a non-binding letter of intent with a single tenant for the entirety of the site, a transaction for which we are engaged in advanced commercial and design discussions.

Jason Les: From a broad field of prospective tenants, we have narrowed our focus and entered into a non-binding letter of intent with a single tenant for the entirety of the site, a transaction which we are engaged in advanced commercial and design discussions. A potential deal of this scale demands deep collaboration across design, commercial, and legal work streams, and that work is well underway.

Speaker #3: A potential deal of this scale demands deep collaboration across design, commercial, and legal workstreams, and that work is well underway. In parallel, we continue to progress data center development at the site and critical path procurement of long lead-time items to ensure delivery timelines and de-risk execution.

Jason Les: In parallel, we continue to progress data center development at the site and critical path procurement of long lead time items to ensure delivery timelines and de-risk execution. Third, we continue to deliver on time for AMD as part of our growing partnership. We commissioned and delivered the final phase of the first 25 megawatts of capacity in May to AMD on time and on budget, with AMD operating on the site since January. Following AMD's exercise of its expansion option in April, its contracted capacity now stands at 50 megawatts of critical IT capacity at our Rockdale site, with the 25 megawatt expansion under construction, with first phase delivery later this year and full delivery scheduled for May 2027. Fourth, we secured the funding required for this growth. We continued the sale of Bitcoin from our balance sheet and our mining operations.

Jason Les: In parallel, we continue to progress data center development at the site and critical path procurement of long lead time items to ensure delivery timelines and de-risk execution. Third, we continue to deliver on time for AMD as part of our growing partnership. We commissioned and delivered the final phase of the first 25 mw of capacity in May to AMD on time and on budget, with AMD operating on the site since January.

Speaker #3: Third, we continue to deliver on time for AMD as part of our growing partnership. We commissioned and delivered the final phase of the first 25 megawatts of capacity in May to AMD, on time and on budget.

Speaker #3: With AMD operating on the site since January, and following AMD's exercise of its expansion option in April, its contracted capacity now stands at 50 megawatts of critical IT capacity at our Rockdale site.

Jason Les: Following AMD's exercise of its expansion option in April, its contracted capacity now stands at 50 mw of critical IT capacity at our Rockdale site, with the 25 mw expansion under construction, with first phase delivery later this year and full delivery scheduled for May 2027. Fourth, we secured the funding required for this growth. We continued the sale of Bitcoin from our balance sheet and our mining operations.

Speaker #3: With the 25-megawatt expansion under construction, with first phase delivery later this year and full delivery scheduled for May 2027. And fourth, we secured the funding required for this growth.

Speaker #3: We continue the sale of Bitcoin from our balance sheet and our mining operations. These proceeds remain our primary source of funding for operations and the equity component of our data center capital expenditures.

Jason Les: These proceeds remain our primary source of funding for operations and the equity component of our data center capital expenditures. We ended the quarter with $1.2 billion in total liquidity, consisting of $666 million in Bitcoin and $549 million in cash, giving our partners, tenants, lenders, and shareholders confidence in our ability to execute. If 2025 was the year of preparation, 2026 is the year of execution. In the last seven months, Riot has gone from zero contracted data center revenue to 241 megawatts of executed capacity with two of the highest quality counterparties in the AI ecosystem, AMD and now a leading frontier AI lab. Beyond that, the entire Corsicana campus is now under a non-binding LOI to a single tenant.

Jason Les: These proceeds remain our primary source of funding for operations and the equity component of our data center capital expenditures. We ended the quarter with $1.2 billion in total liquidity, consisting of $666 million in Bitcoin and $549 million in cash, giving our partners, tenants, lenders, and shareholders confidence in our ability to execute. If 2025 was the year of preparation, 2026 is the year of execution. In the last seven months, Riot has gone from zero contracted data center revenue to 241 megawatts of executed capacity with two of the highest quality counterparties in the AI ecosystem, AMD and now a leading frontier AI lab. Beyond that, the entire Corsicana campus is now under a non-binding LOI to a single tenant.

Speaker #3: We ended the quarter with $1.2 billion in total liquidity, consisting of $666 million in Bitcoin and $549 giving our partners tenants, lenders, and shareholders confidence in our ability to execute.

Speaker #3: If 2025 was the year of preparation, 2026 is the year of execution. In the last seven months, Riot has gone from zero contracted data center revenue to 241 megawatts of executed capacity with two of the highest-quality counterparties in the AI ecosystem.

Speaker #3: AMD and now a leading frontier AI lab. Beyond that, the entire Corsicana campus is now under a non-binding LOI to a single tenant. This pace of execution is a direct result of the strategy, the assets, and the team we have spent the last 2 years putting in place.

Jason Les: This pace of execution is a direct result of the strategy, the assets, and the team we have spent the last two years putting in place. The lease we are announcing today is contracted directly with one of the world's leading frontier AI labs for 191 megawatts of critical IT capacity at our Rockdale campus and marks the beginning of what we expect to be a long and significant partnership. Under the lease, Riot is constructing a custom-built Tier 3 data center based on the tenant's latest design specifications, which has now been finalized. It will be built on land we announced the acquisition of earlier this year, which has already been cleared and graded using in-place power capacity under our active interconnection. Development work is already underway, and we are currently targeting delivery for the first 96 megawatts, with rent commencing in December 2027.

Jason Les: This pace of execution is a direct result of the strategy, the assets, and the team we have spent the last two years putting in place. The lease we are announcing today is contracted directly with one of the world's leading frontier AI labs for 191 megawatts of critical IT capacity at our Rockdale campus and marks the beginning of what we expect to be a long and significant partnership. Under the lease, Riot is constructing a custom-built Tier 3 data center based on the tenant's latest design specifications, which has now been finalized. It will be built on land we announced the acquisition of earlier this year, which has already been cleared and graded using in-place power capacity under our active interconnection. Development work is already underway, and we are currently targeting delivery for the first 96 megawatts, with rent commencing in December 2027.

Speaker #3: The lease we are announcing today is contracted directly with one of the world's leading frontier AI labs for 191 megawatts of critical IT capacity at our Rockdale campus, and marks the beginning of what we expect to be a long and significant partnership.

Speaker #3: Under the lease, Riot is constructing a custom-built Tier 3 data center based on the tenant's latest design specifications, which have now been finalized. It will be built on land we announced the acquisition of earlier this year, which has already been cleared and graded, using in-place power capacity under our active interconnection.

Speaker #3: Development work is already underway, and we are currently targeting delivery of the first 96 megawatts, with rent commencing in December 2027. The 20-year initial term runs from full deployment in June 2028, with annual escalations in base rent.

Jason Les: The 20-year initial term runs from full deployment in June 2028, with annual escalations in base rent. Beyond the initial term, the AI lab holds two five-year extension options, which, if exercised, would bring total contract revenue to approximately $16.1 billion. Over the initial term, the lease is expected to generate approximately $9.1 billion in total contract revenue and an estimated $7.3 billion to $8.2 billion in net operating income, based on an estimated NOI margin range of 80% to 90%. Illustrative capital expenditures are between $11 million and $12 million per IT megawatt. On financing, we have secured a $573 million interim financing facility from Morgan Stanley, which will cover initial development CapEx while the investment grade backstop is finalized.

Jason Les: The 20-year initial term runs from full deployment in June 2028, with annual escalations in base rent. Beyond the initial term, the AI lab holds two five-year extension options, which, if exercised, would bring total contract revenue to approximately $16.1 billion. Over the initial term, the lease is expected to generate approximately $9.1 billion in total contract revenue and an estimated $7.3 billion to $8.2 billion in net operating income, based on an estimated NOI margin range of 80% to 90%. Illustrative capital expenditures are between $11 million and $12 million per IT megawatt. On financing, we have secured a $573 million interim financing facility from Morgan Stanley, which will cover initial development CapEx while the investment grade backstop is finalized.

Speaker #3: Beyond the initial term, the AI lab holds 2 5-year extension options which, if exercised, would bring total contract revenue to approximately $16.1 billion. Over the initial term, the lease is expected to generate approximately $9.1 billion in total contract revenue, and an estimated $7.3 to $8.2 billion in net operating income, based on an estimated NOI margin range of 80 to 90 percent.

Speaker #3: Illustrative capital expenditures are between $11 million and $12 million per IT megawatt. On financing, we have secured a $573 million interim financing facility from Morgan Stanley, which will cover initial development capex while the investment-grade backstop is finalized.

Speaker #3: Jason Chung will discuss what this means for our financing strategy later on today's call. Having a frontier partner of this caliber and trusting Riot with 191 megawatts of mission-critical infrastructure on a 20-year commitment is a definitive validation of our team, our sites, and our ability to execute at the highest level.

Jason Les: Jason Chung will discuss what this means for our financing strategy later on today's call. Having a frontier partner of this caliber entrusting Riot with 191 megawatts of mission critical infrastructure on a 20-year commitment is a definitive validation of our team, our sites, and our ability to execute at the highest level. This is precisely the type of durable, high-quality contracted cash flow which we are building this platform to capture for our shareholders. Now, let's turn to slide eight and our delivery schedule. Capacity under the AI lab lease will be delivered in two phases. Phase one delivers the first 96 megawatts of critical IT capacity in December 2027, a rapid timeline from signing to initial delivery. Phase two delivers the remaining capacity in June 2028, completing the full 191 megawatt deployment.

Jason Les: Jason Chung will discuss what this means for our financing strategy later on today's call. Having a frontier partner of this caliber entrusting Riot with 191 megawatts of mission critical infrastructure on a 20-year commitment is a definitive validation of our team, our sites, and our ability to execute at the highest level. This is precisely the type of durable, high-quality contracted cash flow which we are building this platform to capture for our shareholders. Now, let's turn to slide eight and our delivery schedule. Capacity under the AI lab lease will be delivered in two phases. Phase one delivers the first 96 megawatts of critical IT capacity in December 2027, a rapid timeline from signing to initial delivery. Phase two delivers the remaining capacity in June 2028, completing the full 191 megawatt deployment.

Speaker #3: This is precisely the type of durable, high-quality contracted cash flow which we are building this platform to capture for our shareholders. Now, let's turn to Slide 8 and our delivery schedule.

Speaker #3: Capacity under the AI lab lease will be delivered in two phases. Phase one delivers the first 96 megawatts of critical IT capacity in December 2027.

Speaker #3: A rapid timeline from signing to initial delivery. Phase 2 delivers the remaining capacity in June 2028, completing the full 191-megawatt deployment. We are on schedule for that initial delivery, and execution has been meaningfully de-risked across several design.

Jason Les: We are on schedule for that initial delivery, and execution has been meaningfully de-risked across several fronts. First, design. Our accelerated design strategy incorporates the tenant's basis of design, and the complete design and internal architecture have now been finalized, enabling procurement to have already begun. Second, delivery partners. We have selected Yates Construction as our general contractor, a partner with direct development experience with this tenant, giving us increased visibility into cost and schedule. Third, vertical integration. ESS Metron and E4A Solutions are integrated into the delivery plan, accelerating substation development and reducing long lead equipment risk. Fourth, power. The required capacity is secured under our active interconnection and aligned with project milestones. Fifth, financing. The $573 million interim facility from Morgan Stanley allows us to fund long lead procurement immediately, protecting the delivery schedule while credit support is finalized.

Jason Les: We are on schedule for that initial delivery, and execution has been meaningfully de-risked across several fronts. First, design. Our accelerated design strategy incorporates the tenant's basis of design, and the complete design and internal architecture have now been finalized, enabling procurement to have already begun. Second, delivery partners. We have selected Yates Construction as our general contractor, a partner with direct development experience with this tenant, giving us increased visibility into cost and schedule. Third, vertical integration. ESS Metron and E4A Solutions are integrated into the delivery plan, accelerating substation development and reducing long lead equipment risk. Fourth, power. The required capacity is secured under our active interconnection and aligned with project milestones. Fifth, financing. The $573 million interim facility from Morgan Stanley allows us to fund long lead procurement immediately, protecting the delivery schedule while credit support is finalized.

Speaker #3: Our accelerated design strategy incorporates the tenant's basis of design, and the complete design and internal architecture have now been finalized, enabling procurement to have already begun.

Speaker #3: Second, delivery partners. We have selected Yates Construction as our general contractor, a partner with direct development experience with this tenant. Giving us increased visibility into cost and schedule.

Speaker #3: Third, vertical integration: ESS Metron and E4A are integrated into the delivery plan, accelerating substation development and reducing long-lead equipment risk. Fourth, power: the required capacity is secured under our active interconnection and aligned with project milestones.

Speaker #3: And fifth, financing. The $573 million interim facility from Morgan Stanley allows us to fund long-lead procurement immediately, protecting the delivery schedule while credit support is finalized.

Speaker #3: Taken together, the combination of in-place power, advanced procurement, coordinated design, our in-house capabilities, and financing allows us to deliver at speed and with a high degree of certainty.

Jason Les: Taken together, the combination of in-place power, advanced procurement, coordinated design, our in-house capabilities, and financing allows us to deliver at speed and with a high degree of certainty. That de-risked rapid execution is precisely what attracted this tenant to Riot Platforms and to Rockdale. Now let me turn to AMD, where our deployment progress remains on track. During the quarter, we completed delivery of the initial 25 megawatts of capacity on budget and on schedule. AMD has now commenced operations across this initial footprint, and Riot Platforms is generating recurring high margin operating lease revenue from an investment-grade tenant. On the second 25 megawatts, design is nearly complete and construction is underway, with the initial 10 megawatts expected this November and the remaining 15 megawatts expected in May 2027.

Jason Les: Taken together, the combination of in-place power, advanced procurement, coordinated design, our in-house capabilities, and financing allows us to deliver at speed and with a high degree of certainty. That de-risked rapid execution is precisely what attracted this tenant to Riot Platforms and to Rockdale. Now let me turn to AMD, where our deployment progress remains on track. During the quarter, we completed delivery of the initial 25 megawatts of capacity on budget and on schedule. AMD has now commenced operations across this initial footprint, and Riot Platforms is generating recurring high margin operating lease revenue from an investment-grade tenant. On the second 25 megawatts, design is nearly complete and construction is underway, with the initial 10 megawatts expected this November and the remaining 15 megawatts expected in May 2027.

Speaker #3: That de-risked, rapid execution is precisely what attracted this tenant to Riot and to Rockdale. Now, let me turn to AMD, where our deployment progress remains on track.

Speaker #3: During the quarter, we completed delivery of the initial 25 megawatts of capacity—on budget and on schedule. AMD has now commenced operations across this initial footprint, and Riot is generating recurring, high-margin operating lease revenue from an investment-grade tenant.

Speaker #3: On the second 25 megawatts, design is nearly complete and construction is underway, with the initial 10 megawatts expected this November and the remaining 15 megawatts expected in May 2027.

Speaker #3: As with the initial 25-megawatt deployment, ESS Metron's engineering and manufacturing capabilities are embedded in our delivery plan, supporting both schedule certainty and cost discipline.

Jason Les: As with the initial 25 megawatt deployment, ESS Metron's engineering and manufacturing capabilities are embedded in our delivery plan, supporting both schedule certainty and cost discipline. Beyond the contracted 50 megawatts, AMD retains expansion options for up to an additional 150 megawatts at Rockdale, providing a pathway to scaling this relationship to 200 megawatts over time. Slide 10 shows what Rockdale looks like today on a pro forma basis. In 2026, Riot Platforms has secured $9.8 billion of contracted data center revenue. With the leading Frontier AI labs 191 megawatts contracted alongside AMD's 50 megawatts, Rockdale has evolved from a single use Bitcoin mining site into a diversified data center campus, leased to two of the highest quality tenants in the AI ecosystem on long-term, high margin contracts.

Jason Les: As with the initial 25 megawatt deployment, ESS Metron's engineering and manufacturing capabilities are embedded in our delivery plan, supporting both schedule certainty and cost discipline. Beyond the contracted 50 megawatts, AMD retains expansion options for up to an additional 150 megawatts at Rockdale, providing a pathway to scaling this relationship to 200 megawatts over time. Slide 10 shows what Rockdale looks like today on a pro forma basis. In 2026, Riot Platforms has secured $9.8 billion of contracted data center revenue. With the leading Frontier AI labs 191 megawatts contracted alongside AMD's 50 megawatts, Rockdale has evolved from a single use Bitcoin mining site into a diversified data center campus, leased to two of the highest quality tenants in the AI ecosystem on long-term, high margin contracts.

Speaker #3: Beyond the contracted 50 megawatts, AMD retains expansion options for up to an additional 150 megawatts at Rockdale, providing a pathway to scaling this relationship to 200 megawatts over time.

Speaker #3: Slide 10 shows what Rockdale looks like today on a pro forma basis. In 2026, Riot has secured $9.8 billion of contracted data center revenue.

Speaker #3: With the leading frontier AI lab's 191 megawatts contracted alongside AMD's 50 megawatts, Rockdale has evolved from a single-use Bitcoin mining site into a diversified data center campus.

Speaker #3: Leased to two of the highest-quality tenants in the AI ecosystem, on long-term, high-margin contracts. Looking at each lease at Rockdale in more detail, AMD will contribute approximately $63.6 million in average annual revenue and $51 million in average annual NOI on 50 megawatts, with total capital expenditures of $170.2 million and reaching full deployment in May 2027.

Jason Les: Looking at each lease at Rockdale in more detail, AMD will contribute approximately $63.6 million in average annual revenue and $51 million in average annual NOI on 50 megawatts, with total capital expenditures of $170.2 million and reaching full deployment in May 2027. The Frontier AI lab lease will contribute approximately $457 million in average annual revenue and $365 to $411 million in average annual NOI on illustrative capital expenditures of $2.1 to $2.3 billion, reaching full deployment in June 2028. Combined, the two executed leases represent $520 million in average annual revenue and $416 to $462 million in average annual NOI across 241 megawatts.

Jason Les: Looking at each lease at Rockdale in more detail, AMD will contribute approximately $63.6 million in average annual revenue and $51 million in average annual NOI on 50 megawatts, with total capital expenditures of $170.2 million and reaching full deployment in May 2027. The Frontier AI lab lease will contribute approximately $457 million in average annual revenue and $365 to $411 million in average annual NOI on illustrative capital expenditures of $2.1 to $2.3 billion, reaching full deployment in June 2028. Combined, the two executed leases represent $520 million in average annual revenue and $416 to $462 million in average annual NOI across 241 megawatts.

Speaker #3: The frontier AI lab lease will contribute approximately $457 million in average annual revenue and $365 to $411 million in average annual NOI on Illustrative capital expenditures of $2.1 to $2.3 billion.

Speaker #3: Reaching full deployment in June 2028. Combined, the two executed leases represent $520 million in average annual revenue and $416 to $462 million in average annual NOI across 241 megawatts.

Speaker #3: When we acquired the land, underlying the Rockdale facility, we had a vision that it could become one of the country's pioneer data center development campuses.

Jason Les: When we acquired the land underlying the Rockdale facility, we had a vision that it could become one of the country's premier data center development campuses. That vision is now being realized. The tenant that chose Rockdale shared a common set of requirements: certainty of power at scale, access to hundreds of megawatts in a single location, and a developer who executes on mission-critical timelines. Riot delivered on all three. In institutional real estate, the assets that command premium valuation share the same characteristics our portfolio now has: extended lease terms, investment grade or equivalent tenant credit quality, and mission-critical infrastructure. Importantly, we have also diversified our tenant base across two independent, high quality counterparties, which meaningfully improves the overall quality of our portfolio. This is the asset profile we are building at Rockdale.

Jason Les: When we acquired the land underlying the Rockdale facility, we had a vision that it could become one of the country's premier data center development campuses. That vision is now being realized. The tenant that chose Rockdale shared a common set of requirements: certainty of power at scale, access to hundreds of megawatts in a single location, and a developer who executes on mission-critical timelines. Riot delivered on all three. In institutional real estate, the assets that command premium valuation share the same characteristics our portfolio now has: extended lease terms, investment grade or equivalent tenant credit quality, and mission-critical infrastructure. Importantly, we have also diversified our tenant base across two independent, high quality counterparties, which meaningfully improves the overall quality of our portfolio. This is the asset profile we are building at Rockdale.

Speaker #3: That vision is now being realized. The tenant that chose Rockdale shared a common set of requirements: certainty of power at scale, access to hundreds of megawatts in a single location, and a developer who executes on mission-critical timelines.

Speaker #3: Riot delivered on all three. In institutional real estate, the assets that command premium valuation share the same characteristics our portfolio now has: extended lease terms, investment-grade or equivalent tenant credit quality, and mission-critical infrastructure.

Speaker #3: Importantly, we have also diversified our tenant base across 2 independent, high-quality counterparties. Which meaningfully improves the overall quality of our portfolio. This is the asset profile we are building at Rockdale.

Speaker #3: Before I hand the call over, I want to talk about Corsicana, because the commercial momentum at that campus is significant. We are engaged in advanced commercial and design discussions, and the full site is now under LOI to a single tenant.

Jason Les: Before I hand the call over, I want to talk about Corsicana because the commercial momentum at that campus is significant. We are engaged in advanced commercial and design discussions, and the full site is now under LOI to a single tenant. In parallel, we are continuing our development and procurement processes to de-risk execution timelines. Development of our first core and shell building remains underway, and we continue to secure long lead items so that we can deliver full built to suit capacity on an accelerated basis once the lease is executed. Corsicana represents 1 gigawatt of fully approved power on Riot owned land, supporting a potential 756 megawatts of critical IT capacity. We look forward to sharing more on our leasing progress there in the near future.

Jason Les: Before I hand the call over, I want to talk about Corsicana because the commercial momentum at that campus is significant. We are engaged in advanced commercial and design discussions, and the full site is now under LOI to a single tenant. In parallel, we are continuing our development and procurement processes to de-risk execution timelines. Development of our first core and shell building remains underway, and we continue to secure long lead items so that we can deliver full built to suit capacity on an accelerated basis once the lease is executed. Corsicana represents 1 gigawatt of fully approved power on Riot owned land, supporting a potential 756 megawatts of critical IT capacity. We look forward to sharing more on our leasing progress there in the near future.

Speaker #3: In parallel, we are continuing our development and procurement processes to de-risk execution timelines. Development of our first corn shell building remains underway, and we continue to secure long lead items so that we can deliver full build-to-suit capacity on an accelerated basis once the lease is executed.

Speaker #3: Corsicana represents 1 gigawatt of fully approved power on Riot-owned land, supporting a potential 756 megawatts of critical IT capacity. We look forward to sharing more on our leasing progress there in the near future.

Speaker #3: While an LOI is not a signed lease, this milestone reflects the depth of demand for large-scale, fully approved power in today's market and the confidence prospective tenants have in Riot's ability to deliver.

Jason Les: While an LOI is not a signed lease, this milestone reflects the depth of demand for large scale, fully approved power in today's market and the confidence prospective tenants have in Riot's ability to deliver. Taken together, Riot now has approximately 1 gigawatt of capacity across our portfolio that is contracted or in advanced commercial discussions. Now, I'd like to turn the call over to Jason Chung to review our financing strategy and the quarterly financial results.

Jason Les: While an LOI is not a signed lease, this milestone reflects the depth of demand for large scale, fully approved power in today's market and the confidence prospective tenants have in Riot's ability to deliver. Taken together, Riot now has approximately 1 gigawatt of capacity across our portfolio that is contracted or in advanced commercial discussions. Now, I'd like to turn the call over to Jason Chung to review our financing strategy and the quarterly financial results.

Speaker #3: Taken together, Riot now has approximately 1 gigawatt of capacity across our portfolio that is contracted or in advanced commercial discussions. Now, I'd like to turn the call over to Jason Chung to review our financing strategy and the quarterly financial results.

Speaker #1: Thank you, Jason. Our financing strategy remains anchored in the framework we've laid out on prior calls: lease to high-quality, credit-worthy tenants, allocate capital efficiently through the development and execution of our sites, and recycle capital into the next wave of development.

Jason Chung: Thank you, Jason. Our financing strategy remains anchored in the framework we've laid out on prior calls. Lease to high-quality, credit-worthy tenants, allocate capital efficiently through the development and execution of our sites, and recycle capital into the next wave of development. We match each asset to the right financing at each stage of its life cycle, from land and greenfield development through lease-up and pre-lease construction, to fully contracted, stabilized assets that command the lowest cost of capital. This quarter, that strategy moved from framework to execution, and it rests on three pillars. First, a strong balance sheet. We ended the quarter with over $1.2 billion in total liquidity, $666 million in Bitcoin, and $549 million in cash, which includes $77.5 million in restricted cash and 5,821 Bitcoin securing our $200 million credit facility, collateral that will be released as we repay.

Jason Chung: Thank you, Jason. Our financing strategy remains anchored in the framework we've laid out on prior calls. Lease to high-quality, credit-worthy tenants, allocate capital efficiently through the development and execution of our sites, and recycle capital into the next wave of development. We match each asset to the right financing at each stage of its life cycle, from land and greenfield development through lease-up and pre-lease construction, to fully contracted, stabilized assets that command the lowest cost of capital. This quarter, that strategy moved from framework to execution, and it rests on three pillars. First, a strong balance sheet. We ended the quarter with over $1.2 billion in total liquidity, $666 million in Bitcoin, and $549 million in cash, which includes $77.5 million in restricted cash and 5,821 Bitcoin securing our $200 million credit facility, collateral that will be released as we repay.

Speaker #1: We match each asset to the right financing at each stage of its lifecycle—from land and greenfield development, through lease-up and pre-lease construction, to fully contracted, stabilized assets that command the lowest cost of capital.

Speaker #1: This quarter, that strategy moved from framework to execution, and it rests on three pillars. First, a strong balance sheet: we ended the quarter with over $1.2 billion in total liquidity — $666 million in Bitcoin and $549 million in cash.

Speaker #1: This includes $77.5 million in restricted cash and 5,821 Bitcoin securing our $200 million credit facility. Collateral that will be released, as we've talked about. We continue to utilize our Bitcoin as the primary source of funding for the equity component of our data center capital expenditures.

Jason Chung: As we've talked about, we continue to utilize our Bitcoin as the primary source of funding for the equity component of our data center capital expenditures. We continue to sell all of our monthly Bitcoin production and have meaningfully sold down our Bitcoin inventory while increasing our cash on hand. The shift to a larger cash position on hand has given us an even greater degree of visibility and certainty in our liquidity position and future equity funding requirements. This strategy also reinforces our alignment with shareholders as we have not issued any common equity during the quarter. Second, capital recycling. Last quarter, we discussed the opportunity to extract significant value from the first 25 megawatts of AMD capacity. With that capacity delivered in May, the financing process has advanced to late-stage discussions with multiple banks, and we expect to close before the end of Q3.

Jason Chung: As we've talked about, we continue to utilize our Bitcoin as the primary source of funding for the equity component of our data center capital expenditures. We continue to sell all of our monthly Bitcoin production and have meaningfully sold down our Bitcoin inventory while increasing our cash on hand. The shift to a larger cash position on hand has given us an even greater degree of visibility and certainty in our liquidity position and future equity funding requirements. This strategy also reinforces our alignment with shareholders as we have not issued any common equity during the quarter. Second, capital recycling. Last quarter, we discussed the opportunity to extract significant value from the first 25 megawatts of AMD capacity. With that capacity delivered in May, the financing process has advanced to late-stage discussions with multiple banks, and we expect to close before the end of Q3.

Speaker #1: We continue to sell all of our monthly Bitcoin production and have meaningfully sold down our Bitcoin inventory while increasing our cash on hand. The shift to a larger cash position on hand has given us an even greater degree of visibility and certainty in our liquidity position, and future equity funding requirements.

Speaker #1: This strategy also reinforces our alignment with shareholders as we have not issued any common equity during the quarter. Second, capital recycling. Last quarter, we discussed the opportunity to extract significant value from the first 25 megawatts of AMD capacity.

Speaker #1: With that capacity delivered in May, the financing process has advanced to late-stage discussions with multiple banks, and we expect to close before the end of the third quarter.

Speaker #1: We anticipate debt proceeds to be nearly double our initial equity position, highlighting our disciplined underwriting and value creation. The facility will also include delayed draw capacity for AMD’s second 25 megawatts and future expansion, further diversifying our capital sources while preserving liquidity for additional new investments.

Jason Chung: We anticipate debt proceeds to be nearly double our initial equity position, highlighting our disciplined underwriting and value creation. The facility will also include delayed draw capacity for AMD's second 25 megawatts and future expansion, further diversifying our capital sources while preserving liquidity for additional new investments. Third, capital redeployment. The initial 25-megawatt loan proceeds will be redeployed to fund the equity requirements of the Frontier AI Lab lease at Rockdale, recycling lower cost capital to higher return projects while extending the runway of our balance sheet and reducing reliance on external equity financing. Slide 13 lays out exactly how this disciplined capital allocation works in practice, and the key message is that Riot's financing strategy drives development growth and creates new funding sources for Riot, reducing the need for external equity financing for current projects. The table on the left illustrates our approach to the AMD financing.

Jason Chung: We anticipate debt proceeds to be nearly double our initial equity position, highlighting our disciplined underwriting and value creation. The facility will also include delayed draw capacity for AMD's second 25 megawatts and future expansion, further diversifying our capital sources while preserving liquidity for additional new investments. Third, capital redeployment. The initial 25-megawatt loan proceeds will be redeployed to fund the equity requirements of the Frontier AI Lab lease at Rockdale, recycling lower cost capital to higher return projects while extending the runway of our balance sheet and reducing reliance on external equity financing. Slide 13 lays out exactly how this disciplined capital allocation works in practice, and the key message is that Riot's financing strategy drives development growth and creates new funding sources for Riot, reducing the need for external equity financing for current projects. The table on the left illustrates our approach to the AMD financing.

Speaker #1: And third, capital redeployment. The initial 25 megawatt loan proceeds will be redeployed to fund the equity requirements of the frontier AI lab lease at Rockdale.

Speaker #1: Recycling lower-cost capital to higher-return projects, while extending the runway of our balance sheet and reducing reliance on external equity financing. Slide 13 lays out exactly how this disciplined capital allocation works in practice.

Speaker #1: And the key message is that Riot's financing strategy drives development growth and creates new funding sources for Riot, reducing the need for external equity financing for current projects.

Speaker #1: The table on the left illustrates our approach to the AMD financing. On the initial 25 megawatts delivered to AMD, we are nearing finalization of a term loan of approximately $180 million.

Jason Chung: On the initial 25 megawatts delivered to AMD, we are nearing finalization of a term loan of approximately $180 million, sized against the stabilized value of the contracted asset. Against our initial $90 million CapEx budget, which we financed entirely with cash on hand, this new facility will generate approximately $90 million in net new capital for Riot, recapitalizing the deployment at approximately twice our initial equity contribution. On the second 25 megawatts, a $70 million delayed draw term loan at 85% loan to cost will fund $69 million of the expected $81 million in total CapEx, leaving a net equity requirement of only $12 million. This will enable Riot to shift a large majority of CapEx funding towards new sources while preserving our balance sheet liquidity for new projects.

Jason Chung: On the initial 25 megawatts delivered to AMD, we are nearing finalization of a term loan of approximately $180 million, sized against the stabilized value of the contracted asset. Against our initial $90 million CapEx budget, which we financed entirely with cash on hand, this new facility will generate approximately $90 million in net new capital for Riot, recapitalizing the deployment at approximately twice our initial equity contribution. On the second 25 megawatts, a $70 million delayed draw term loan at 85% loan to cost will fund $69 million of the expected $81 million in total CapEx, leaving a net equity requirement of only $12 million. This will enable Riot to shift a large majority of CapEx funding towards new sources while preserving our balance sheet liquidity for new projects.

Speaker #1: Sized against the stabilized value of the contracted asset. Against our initial $90 million capex budget, which we financed entirely with cash on hand, this new facility will generate approximately $90 million in net new capital for Riot.

Speaker #1: Recapitalizing the deployment at approximately twice our initial equity contribution. On the second 25 megawatts, a $70 million delayed draw term loan at 85% loan-to-cost will fund $69 million of the expected $81 million in total capex.

Speaker #1: Leaving a net equity requirement of only $12 million. This will enable Riot to shift a large majority of CapEx funding towards new sources, while preserving our balance sheet liquidity for new projects.

Speaker #1: Moving over to the table on the right-hand side of the slide, we intend to recycle and redeploy this funding into our frontier AI lab build-out, where illustrative capital expenditures range between $2.1 to $2.3 billion.

Jason Chung: Moving over to the table on the right-hand side of the slide, we intend to recycle and redeploy this funding into our Frontier AI Lab build-out, where illustrative capital expenditures range between $2.1 to $2.3 billion. Anticipated debt financing in the 80% to 90% loan-to-cost range, or $1.7 to $2.1 billion, implies an equity requirement of between $210 and $460 million. Net of the expected $180 million term loan proceeds from the AMD financing process, net equity required will be reduced to between $30 and $280 million. That's against $1.2 billion of total liquidity on our balance sheet. While we finalize this financing process, we have also secured a $573 million interim financing facility from Morgan Stanley, which will be used to fund development costs for the project in the near term.

Jason Chung: Moving over to the table on the right-hand side of the slide, we intend to recycle and redeploy this funding into our Frontier AI Lab build-out, where illustrative capital expenditures range between $2.1 to $2.3 billion. Anticipated debt financing in the 80% to 90% loan-to-cost range, or $1.7 to $2.1 billion, implies an equity requirement of between $210 and $460 million. Net of the expected $180 million term loan proceeds from the AMD financing process, net equity required will be reduced to between $30 and $280 million. That's against $1.2 billion of total liquidity on our balance sheet. While we finalize this financing process, we have also secured a $573 million interim financing facility from Morgan Stanley, which will be used to fund development costs for the project in the near term.

Speaker #1: Anticipated debt financing in the 80% to 90% loan-to-cost range, or $1.7 to $2.1 billion, implies an equity requirement of between $210 and $460 million.

Speaker #1: Net of the expected $180 million term loan proceeds from the AMD financing process, net equity required will be reduced to between $30 million and $280 million.

Speaker #1: That's against $1.2 billion of total liquidity on our balance sheet. While we finalize this financing process, we have also secured a $573 million interim financing facility from Morgan Stanley.

Speaker #1: This facility will be used to fund development costs for the project in the near term. It allows Riot to immediately advance the procurement of long-lead equipment and fund other initial development costs without added delay or risk to our delivery timelines, while also preserving our liquidity.

Jason Chung: This facility allows Riot to immediately advance the procurement of long lead equipment and fund other initial development costs without added delay or risk to our delivery timelines and while preserving our liquidity. These projects reflect our disciplined capital allocation. By utilizing our existing balance sheet and anticipated AMD financing process proceeds, we expect to fund the vast majority of our net project equity. As we compound through this cycle, we will retain ownership of high-quality cash flowing assets while continuously redeploying capital to fund additional growth and minimizing future external equity needs. Let's move to the Q2 financial update, key figures for which are outlined on slide 15. For the Q2 2026, Riot reported total revenue of $174 million, a 14% increase year-over-year, driven by growth across our data center and engineering segments.

Jason Chung: This facility allows Riot to immediately advance the procurement of long lead equipment and fund other initial development costs without added delay or risk to our delivery timelines and while preserving our liquidity. These projects reflect our disciplined capital allocation. By utilizing our existing balance sheet and anticipated AMD financing process proceeds, we expect to fund the vast majority of our net project equity. As we compound through this cycle, we will retain ownership of high-quality cash flowing assets while continuously redeploying capital to fund additional growth and minimizing future external equity needs. Let's move to the Q2 financial update, key figures for which are outlined on slide 15. For the Q2 2026, Riot reported total revenue of $174 million, a 14% increase year-over-year, driven by growth across our data center and engineering segments.

Speaker #1: These projects reflect our disciplined capital allocation. By utilizing our existing balance sheet and anticipated AMD financing process proceeds, we expect to fund the vast majority of our net project equity.

Speaker #1: As we compound through this cycle, we will retain ownership of high-quality cash-flowing assets, while continuously redeploying capital to fund additional growth and minimizing future external equity needs.

Speaker #1: Let's move to the second quarter financial update. Key figures for which are outlined on Slide 15. For the second quarter of 2026, Riot reported total revenue of $174 million.

Speaker #1: We saw a 14% increase year over year, driven by growth across our data center and engineering segments. We recorded a GAAP net loss of $237 million, or $0.68 per diluted share, and an adjusted EBITDA loss of $70 million.

Jason Chung: We recorded a GAAP net loss of $237 million, or $0.68 per diluted share, and an adjusted EBITDA loss of $70 million. As in prior quarters, these results reflect over $240 million in non-cash items. Chief among them, a $75 million mark-to-market loss on our Bitcoin holdings, $98 million of depreciation and amortization, and a $28 million impairment of mining-related construction items at Rockdale, a direct consequence of our decision to repurpose that capacity for data center development. In aggregate, these non-cash items exceeded the entire net loss for the quarter and do not reflect the underlying economics of our operations.

Jason Chung: We recorded a GAAP net loss of $237 million, or $0.68 per diluted share, and an adjusted EBITDA loss of $70 million. As in prior quarters, these results reflect over $240 million in non-cash items. Chief among them, a $75 million mark-to-market loss on our Bitcoin holdings, $98 million of depreciation and amortization, and a $28 million impairment of mining-related construction items at Rockdale, a direct consequence of our decision to repurpose that capacity for data center development. In aggregate, these non-cash items exceeded the entire net loss for the quarter and do not reflect the underlying economics of our operations.

Speaker #1: As in prior quarters, these results reflect over 240 million dollars in non-cash items. Chief among them, a 75 million dollar mark-to-market loss on our Bitcoin holdings, a 98 million dollars of depreciation and amortization, and a 28 million dollar impairment of mining-related construction items at Rockdale.

Speaker #1: A direct consequence of our decision to repurpose that capacity for data center development. In aggregate, these non-cash items exceeded the entire net loss for the quarter and do not reflect the underlying economics of our operations.

Speaker #1: In our data center segment, we exited the quarter with 25 megawatts of critical IT capacity online and generated $23 million in total segment revenue, including $4.9 million in operating lease revenue. This reflects the delivery of the full 25-megawatt AMD deployment in mid-May, at an 84% operating lease gross margin.

Jason Chung: In our data center segment, we exited the quarter with 25 megawatts of critical IT capacity online and generated $23 million in total segment revenue, including $4.9 million in operating lease revenue, reflecting delivery of the full 25 megawatt AMD deployment in mid-May at an 84% operating lease gross margin. In line with what we've discussed with the market upon announcement of the deal. From signing in January to fully commissioned revenue-generating capacity in under 5 months represents the execution pace that our platform has been built to achieve. In our Bitcoin mining segment, Riot produced 1,587 Bitcoin in the Q2, equivalent to production of 17.4 Bitcoin per day, and ended the quarter with a deployed hash rate of 44.4 exahash per second, accounting for approximately 4.6% of the global network.

Jason Chung: In our data center segment, we exited the quarter with 25 megawatts of critical IT capacity online and generated $23 million in total segment revenue, including $4.9 million in operating lease revenue, reflecting delivery of the full 25 megawatt AMD deployment in mid-May at an 84% operating lease gross margin. In line with what we've discussed with the market upon announcement of the deal. From signing in January to fully commissioned revenue-generating capacity in under 5 months represents the execution pace that our platform has been built to achieve. In our Bitcoin mining segment, Riot produced 1,587 Bitcoin in the Q2, equivalent to production of 17.4 Bitcoin per day, and ended the quarter with a deployed hash rate of 44.4 exahash per second, accounting for approximately 4.6% of the global network.

Speaker #1: In line with what we've discussed with the market upon announcement of the deal, from signing in January to fully commissioned, revenue-generating capacity in under five months represents the execution pace that our platform has been built to achieve.

Speaker #1: In our Bitcoin mining segment, Riot produced 1,587 Bitcoin in the second quarter, equivalent to production of 17.4 Bitcoin per day, and ended the quarter with a deployed hash rate of 44.4 exahash per second, accounting for approximately 4.6% of the global network.

Speaker #1: Bitcoin mining revenue was $113.7 million, with hash rate utilization averaging 87%, partially impacted by minor downtime in Kentucky during the month of May. Our power strategy generated $10 million in power curtailment credits, equivalent to $6,335 per Bitcoin mined, resulting in a net cost of power of 3.6 cents per kilowatt-hour, which remains one of the lowest in the industry.

Jason Chung: Bitcoin mining revenue was $113.7 million with hash rate utilization averaging 87%, partially impacted by minor downtime in Kentucky during the month of May. Our power strategy generated $10 million in power curtailment credits, equivalent of $6,335 per Bitcoin mined, resulting in a net cost of power of $0.036 per kilowatt hour, which remains one of the lowest in the industry. Our direct cost to mine was $49,912 per Bitcoin this quarter, which continues to represent industry-leading efficiency despite a 9% year-over-year increase in the average global network hash rate. Our power portfolio and power management capabilities remain a fundamental part of the Riot story. We have always said that Riot is a power-first company, and our net cost of power, as well as our ability to manage our power trading, reflect that industry-leading expertise.

Jason Chung: Bitcoin mining revenue was $113.7 million with hash rate utilization averaging 87%, partially impacted by minor downtime in Kentucky during the month of May. Our power strategy generated $10 million in power curtailment credits, equivalent of $6,335 per Bitcoin mined, resulting in a net cost of power of $0.036 per kilowatt hour, which remains one of the lowest in the industry. Our direct cost to mine was $49,912 per Bitcoin this quarter, which continues to represent industry-leading efficiency despite a 9% year-over-year increase in the average global network hash rate. Our power portfolio and power management capabilities remain a fundamental part of the Riot story. We have always said that Riot is a power-first company, and our net cost of power, as well as our ability to manage our power trading, reflect that industry-leading expertise.

Speaker #1: Our direct cost to mine was $49,912 per Bitcoin this quarter, which continues to represent industry-leading efficiency despite a 9% year-over-year increase in the average global network hash rate.

Speaker #1: Our power portfolio and power management capabilities remain a fundamental part of the Riot story. We have always said that Riot is a power-first company, and our net cost of power, as well as our ability to manage our power trading, reflect that industry-leading expertise.

Speaker #1: Finally, we ended the quarter holding 11,380 Bitcoin on our balance sheet, with a quarter-end value of $666 million, based on a closing price of $58,527 on June 30th.

Jason Chung: Finally, we ended the quarter holding 11,380 Bitcoin on our balance sheet with a quarter-end value of $666 million based on a closing price of $58,527 on 30 June. This represents a significant reduction in our Bitcoin holdings as we continue to utilize that inventory for our data center development. As talked about in our financing strategy, our Bitcoin treasury is a key financial asset that we have continued to leverage in order to fund the development of our data center platform. On slide 16, we turn to our data center segment results in more detail and present the Q2 results against the Q1. Even in these early stages of our build-out, we see the beginning of the high margin recurring revenue ramp that we have been pointing to. We delivered an 84% operating lease gross margin and grew AMD contracted capacity to 50 megawatts in the quarter.

Jason Chung: Finally, we ended the quarter holding 11,380 Bitcoin on our balance sheet with a quarter-end value of $666 million based on a closing price of $58,527 on 30 June. This represents a significant reduction in our Bitcoin holdings as we continue to utilize that inventory for our data center development. As talked about in our financing strategy, our Bitcoin treasury is a key financial asset that we have continued to leverage in order to fund the development of our data center platform. On slide 16, we turn to our data center segment results in more detail and present the Q2 results against the Q1. Even in these early stages of our build-out, we see the beginning of the high margin recurring revenue ramp that we have been pointing to. We delivered an 84% operating lease gross margin and grew AMD contracted capacity to 50 megawatts in the quarter.

Speaker #1: This represents a significant reduction in our Bitcoin holdings, as we continue to utilize that inventory for our data center development. As discussed in our financing strategy, our Bitcoin treasury is a key financial asset that we have continued to leverage in order to fund the development of our data center platform.

Speaker #1: On slide 16, we turn to our data center segment results in more detail, and present the second quarter results against the first quarter. Even in these early stages of our build-out, we see the beginning of the high-margin recurring revenue ramp that we have been pointing to.

Speaker #1: We delivered an 84% operating lease gross margin and grew AMD contracted capacity to 50 megawatts in the quarter. Recurring operating lease revenue grew to $4.9 million in the second quarter, up over 400% from $900,000 in the first quarter, driven by the delivery of the full 25 megawatts to AMD in May.

Jason Chung: Recurring operating lease revenue grew to $4.9 million in the Q2, up over 400% from $900,000 in the Q1, driven by the delivery of the full 25 megawatts to AMD in May. That revenue generated $4.1 million in gross profit at an 84% gross margin. Tenant fit out services revenue was $18.3 million, down from $32.2 million in the Q1, generating $2.4 million in gross profit. As a reminder, fit out revenue represents the procurement and installation of customer-specific equipment reimbursed by tenants on a cost-plus basis, and it will naturally fluctuate with the development cycle. In total, the data center segment generated $23.2 million of revenue and $6.5 million of gross profit in the quarter. While total segment revenue was lower quarter-over-quarter on reduced tenant fit out activity, gross profit grew 174% on the strength of the recurring lease revenue mix.

Jason Chung: Recurring operating lease revenue grew to $4.9 million in the Q2, up over 400% from $900,000 in the Q1, driven by the delivery of the full 25 megawatts to AMD in May. That revenue generated $4.1 million in gross profit at an 84% gross margin. Tenant fit out services revenue was $18.3 million, down from $32.2 million in the Q1, generating $2.4 million in gross profit. As a reminder, fit out revenue represents the procurement and installation of customer-specific equipment reimbursed by tenants on a cost-plus basis, and it will naturally fluctuate with the development cycle. In total, the data center segment generated $23.2 million of revenue and $6.5 million of gross profit in the quarter. While total segment revenue was lower quarter-over-quarter on reduced tenant fit out activity, gross profit grew 174% on the strength of the recurring lease revenue mix.

Speaker #1: That revenue generated $4.1 million in gross profit at an 84% gross margin. Tenant-fit-out services revenue was $18.3 million, down from $32.2 million in the first quarter, generating $2.4 million in gross profit.

Speaker #1: Now, as a reminder, fit-out revenue represents the procurement and installation of customer-specific equipment, reimbursed by tenants on a cost-plus basis. And it will naturally fluctuate with the development cycle.

Speaker #1: In total, the data center segment generated $23.2 million of revenue, and $6.5 million of gross profit in the quarter. And while total segment revenue was lower quarter over quarter on reduced tenant-fit-out activity, gross profit grew $174% on the strength of the recurring lease revenue mix.

Speaker #1: This is exactly the evolution we've outlined. To put this trajectory in perspective, recurring lease revenue of $4.9 million this quarter builds towards approximately $64 million in average annual revenue, and to approximately $520 million in combined average annual revenue after the frontier AI lab development reaches full deployment.

Jason Chung: This is exactly the evolution we have outlined. To put this trajectory in perspective, recurring lease revenue of $4.9 million this quarter builds towards approximately $64 million in average annual revenue and to approximately $520 million in combined average annual revenue after the Frontier AI Lab development reaches full deployment, layering highly predictable infrastructure-grade cash flows into our consolidated P&L. Our engineering segment, ESS Metron and E4A Solutions, continues to serve as a key competitive advantage driving our ability to deliver critical data center components and on a timely basis. Engineering revenue was $37.3 million in the quarter, more than triple the $10.6 million from a year ago, while gross margin expanded from approximately 7% to over 27%. The data center sector representing approximately 90% of our $177.1 million backlog.

Jason Chung: This is exactly the evolution we have outlined. To put this trajectory in perspective, recurring lease revenue of $4.9 million this quarter builds towards approximately $64 million in average annual revenue and to approximately $520 million in combined average annual revenue after the Frontier AI Lab development reaches full deployment, layering highly predictable infrastructure-grade cash flows into our consolidated P&L. Our engineering segment, ESS Metron and E4A Solutions, continues to serve as a key competitive advantage driving our ability to deliver critical data center components and on a timely basis. Engineering revenue was $37.3 million in the quarter, more than triple the $10.6 million from a year ago, while gross margin expanded from approximately 7% to over 27%. The data center sector representing approximately 90% of our $177.1 million backlog.

Speaker #1: Layering highly predictable, infrastructure-grade cash flows into our consolidated P&L. Our engineering segment, ESS Metron and E4A Solutions, continues to serve as a key competitive advantage, driving our ability to deliver critical data center components on a timely basis.

Speaker #1: Engineering revenue was $37.3 million in the quarter, more than triple the $10.6 million from a year ago, while gross margin expanded from approximately 7% to over $27%, with the data center sector representing approximately 90% of our $177.1 million backlog.

Speaker #1: Importantly, the conversion cycle of backlog into revenue has significantly accelerated as a result of the 25% increase in manufacturing capacity we brought online in 2026.

Jason Chung: Importantly, the conversion cycle of backlog into revenue has significantly accelerated as a result of the 25% increase in manufacturing capacity we brought online in 2026. We are also continuing to strategically hold back capacity to Riot's own data center growth. As a reminder, within our engineering business, ESS Metron manufactures low and medium voltage switchgear and power distribution units, among the most severely constrained long lead components in the data center supply chain. While we are extremely pleased with the continued improvement in the financial results at ESS, the story has never been one of standalone profits. ESS and E4A are key elements of Riot's vertically integrated approach. With the execution of our data center deals, Riot engineering is playing a key supporting role in the procurement process for our data center strategy.

Jason Chung: Importantly, the conversion cycle of backlog into revenue has significantly accelerated as a result of the 25% increase in manufacturing capacity we brought online in 2026. We are also continuing to strategically hold back capacity to Riot's own data center growth. As a reminder, within our engineering business, ESS Metron manufactures low and medium voltage switchgear and power distribution units, among the most severely constrained long lead components in the data center supply chain. While we are extremely pleased with the continued improvement in the financial results at ESS, the story has never been one of standalone profits. ESS and E4A are key elements of Riot's vertically integrated approach. With the execution of our data center deals, Riot engineering is playing a key supporting role in the procurement process for our data center strategy.

Speaker #1: We are also continuing to strategically hold back capacity for Riot's own data center growth. As a reminder, within our engineering business, ESS Metron manufactures low and medium voltage switchgear and power distribution units.

Speaker #1: Among the most severely constrained long lead components in the data center supply chain. And while we are extremely pleased with the continued improvement in the financial results at ESS, the story has never been one of standalone profits.

Speaker #1: ESS and E4A are key elements of Riot's vertically integrated approach. With the execution of our data center deals, Riot Engineering is playing a key supporting role in the procurement process for our data center strategy.

Speaker #1: Through this process, we gain greater control over the supply chain, de-risk delivery of scheduled critical equipment, and generate meaningful CapEx savings. Approximately 23.8 million cumulatively since our acquisition of ESS Metron in December 2021 alone.

Jason Chung: Through this process, we gain greater control over the supply chain, de-risk delivery of schedule critical equipment, and generate meaningful CapEx savings, approximately $23.8 million cumulatively since our acquisition of ESS Metron in December 2021 alone. This vertical integration was a key factor in our on-schedule delivery of the initial AMD capacity, and it is now fully integrated into the delivery plan for the Frontier AI Lab build-out. Now, I'd like to turn it back over to Jason Les for closing remarks.

Jason Chung: Through this process, we gain greater control over the supply chain, de-risk delivery of schedule critical equipment, and generate meaningful CapEx savings, approximately $23.8 million cumulatively since our acquisition of ESS Metron in December 2021 alone. This vertical integration was a key factor in our on-schedule delivery of the initial AMD capacity, and it is now fully integrated into the delivery plan for the Frontier AI Lab build-out. Now, I'd like to turn it back over to Jason Les for closing remarks.

Speaker #1: This vertical integration was a key factor in our on-schedule delivery of the initial AMD capacity, and it is now fully integrated into the delivery plan for the frontier AI lab build-out.

Speaker #1: Now, I'd like to turn it back over to Jason Les for closing remarks.

Speaker #2: Thank you, Jason. I want to close by putting the pace of our execution into perspective. In January, we announced the Rockdale Land acquisition, and the execution of our first data center lease with AMD.

Jason Les: Thank you, Jason. I want to close by putting the pace of our execution into perspective. In January, we announced the Rockdale land acquisition and the execution of our first data center lease with AMD. In May, we completed AMD's initial 25 megawatts. Today, we announced a 191 megawatt, $9.1 billion lease with another one of the most consequential AI companies in the world. Looking ahead, AMD's expansion completes in May 2027, and the leading Frontier AI Lab's phased deployment begins with 96 megawatts in December 2027 and completes in June 2028, bringing us to 241 megawatts of delivered contracted capacity. Layer in the LOI now signed for the full Corsicana campus, and we align the site to approximately one gigawatt of leased critical IT capacity across a total power portfolio of more than two gigawatts of utility power.

Jason Les: Thank you, Jason. I want to close by putting the pace of our execution into perspective. In January, we announced the Rockdale land acquisition and the execution of our first data center lease with AMD. In May, we completed AMD's initial 25 megawatts. Today, we announced a 191 megawatt, $9.1 billion lease with another one of the most consequential AI companies in the world. Looking ahead, AMD's expansion completes in May 2027, and the leading Frontier AI Lab's phased deployment begins with 96 megawatts in December 2027 and completes in June 2028, bringing us to 241 megawatts of delivered contracted capacity. Layer in the LOI now signed for the full Corsicana campus, and we align the site to approximately one gigawatt of leased critical IT capacity across a total power portfolio of more than two gigawatts of utility power.

Speaker #2: In May, we completed AMD's initial 25 megawatts. Today, we announced a $191 megawatt, $9.1 billion lease with another one of the most consequential AI companies in the world.

Speaker #2: Looking ahead, AMD's expansion completes in May 2027, and the leading frontier AI labs phase deployment begins with 96 megawatts in December 2027, and completes in June 2028.

Speaker #2: Bringing us to $241 megawatts of delivered contracted capacity. Layer in the LOI now signed for the full Corsicana campus, and we have line of sight to approximately 1 gigawatt of lease critical IT capacity across a total power portfolio of more than 2 gigawatts of utility power.

Speaker #2: With the AMD and Frontier AI lab lease executed, we have contracted approximately $416 million to $462 million in estimated average annual NOI. The four themes that define this quarter are the ones that will define Riot going forward: rapid delivery, de-risk execution, a strong balance sheet, and disciplined capital allocation.

Jason Les: With the AMD and Frontier AI Lab lease executed, we have contracted approximately $416 to $462 million in estimated average annual NOI. The four themes that define this quarter are the ones that will define Riot going forward: rapid delivery, de-risked execution, and a strong balance sheet and disciplined capital allocation. Our priorities for the balance of 2026 directly follow. Deliver contracted megawatts to AMD and advance the AI lab build-out on schedule and on budget. Convert our Corsicana LOI into an executed lease. Close low cost project financing that reflects the quality of our tenants and our sites. Beyond that, we remain active in pursuing growth of our power pipeline and will look to make accretive additions that compound value in our portfolio. Riot sits at the intersection of two defining constraints of the AI era, power and execution.

Jason Les: With the AMD and Frontier AI Lab lease executed, we have contracted approximately $416 to $462 million in estimated average annual NOI. The four themes that define this quarter are the ones that will define Riot going forward: rapid delivery, de-risked execution, and a strong balance sheet and disciplined capital allocation. Our priorities for the balance of 2026 directly follow. Deliver contracted megawatts to AMD and advance the AI lab build-out on schedule and on budget. Convert our Corsicana LOI into an executed lease. Close low cost project financing that reflects the quality of our tenants and our sites. Beyond that, we remain active in pursuing growth of our power pipeline and will look to make accretive additions that compound value in our portfolio. Riot sits at the intersection of two defining constraints of the AI era, power and execution.

Speaker #2: Our priorities for the balance of 2026 are as follows: deliver contracted megawatts to AMD, and advance the AI lab build-out on schedule and on budget.

Speaker #2: Convert our Corsicana LOI into an executed lease. Close low-cost project financing that reflects the quality of our tenants and our sites. Beyond that, we remain active in pursuing growth of our power pipeline and will look to make creative additions that compound value in our portfolio.

Speaker #2: Riot sits at the intersection of two defining constraints of the AI era: power and execution. As we continue converting our power portfolio into contracted data center leases with the highest quality counterparties in the world, we believe the quality scale and cash flow visibility of our platform will become increasingly evident.

Jason Les: As we continue converting our power portfolio into contracted data center leases with the highest quality counterparties in the world, we believe the quality, scale, and cash flow visibility of our platform will become increasingly evident. We have the assets, over two gigawatts of utility power, and two of the most attractive data center development sites in the United States. We have the balance sheet to fund development on value accretive terms, supported by our financial strength, our operating cash flows, and access to institutional capital markets. We have the team, a world-class data center organization that is delivering for AMD, building for the leading Frontier AI Lab, and advancing our next wave of leasing discussions. We have a repeatable approach: lease to creditworthy tenants, finance efficiently, build with discipline, and recycle capital, an approach that is designed to compound through multiple deals and multiple sites.

Jason Les: As we continue converting our power portfolio into contracted data center leases with the highest quality counterparties in the world, we believe the quality, scale, and cash flow visibility of our platform will become increasingly evident. We have the assets, over two gigawatts of utility power, and two of the most attractive data center development sites in the United States. We have the balance sheet to fund development on value accretive terms, supported by our financial strength, our operating cash flows, and access to institutional capital markets. We have the team, a world-class data center organization that is delivering for AMD, building for the leading Frontier AI Lab, and advancing our next wave of leasing discussions. We have a repeatable approach: lease to creditworthy tenants, finance efficiently, build with discipline, and recycle capital, an approach that is designed to compound through multiple deals and multiple sites.

Speaker #2: We have the assets, over 2 gigawatts of utility power, and two of the most attractive data center development sites in the United States. We have the balance sheet to fund development on value creative terms, supported by our financial strengths, our operating cash flows, and access to institutional capital markets.

Speaker #2: We have the team, a world-class data center organization that is delivering for AMD, building for the leading frontier AI lab, and advancing our next wave of leasing discussions.

Speaker #2: And we have a repeatable approach, lease the creditworthy tenants, finance efficiently, build with discipline, and recycle capital, an approach that is designed to compound through multiple deals and multiple sites.

Speaker #2: On behalf of our entire management team, I want to thank our shareholders, our partners, and our employees for their continued support as we execute on this exciting opportunity.

Jason Les: On behalf of our entire management team, I want to thank our shareholders, our partners, and our employees for their continued support as we execute on this exciting opportunity. With that, we will now open the call up for questions. Operator.

Jason Les: On behalf of our entire management team, I want to thank our shareholders, our partners, and our employees for their continued support as we execute on this exciting opportunity. With that, we will now open the call up for questions. Operator.

Speaker #2: With that, we will now open the call up for questions. Operator.

Speaker #3: As a reminder, if you would like to ask a question, please press star, then the number 1 on your telephone keypad. To withdraw your question, simply press star 1 again.

Operator: As a reminder, if you would like to ask a question, press star, then the number 1 on your telephone keypad. To withdraw your question, simply press star 1 again. We will pause for just a moment to compile the Q&A roster. Your first question comes from the line of Steven Burd with Morgan Stanley. Please go ahead.

Operator: As a reminder, if you would like to ask a question, press star, then the number 1 on your telephone keypad. To withdraw your question, simply press star 1 again. We will pause for just a moment to compile the Q&A roster. Your first question comes from the line of Steven Burd with Morgan Stanley. Please go ahead.

Speaker #3: We will pause for just a moment to compile the Q&A roster. Your first question comes from the line of Stephen Bird with Morgan Stanley.

Speaker #3: Please go ahead.

Speaker #4: Hey, guys. Congratulations on the deal and the LOI. It's very exciting. I want to yeah, that's great news. I wanted to just start on the economics of the deal, and I wondered if you could just maybe speak to the CapEx range, sort of how you arrived at that range for CapEx.

Steven Burd: Hey, guys. Congratulations on the deal and the LOI. It is very exciting. I wanted to-

Stephen Byrd: Hey, guys. Congratulations on the deal and the LOI. It is very exciting. I wanted to-

Jason Les: Thank you, Steven.

Jason Les: Thank you, Steven.

Steven Burd: Yeah, that is great news. I wanted to just start on the economics of the deal. I wondered if you could just maybe speak to the CapEx range, sort of how you arrived at that range for CapEx.

Stephen Byrd: Yeah, that is great news. I wanted to just start on the economics of the deal. I wondered if you could just maybe speak to the CapEx range, sort of how you arrived at that range for CapEx.

Speaker #2: Sure. Thanks for the question, Stephen. So the new lease at Rockdale has a total initial base contract value of $9.1 billion in revenue over the term, which is a little longer than 20 years following the initial deployment, and this lease, like most other leases we have seen, carries annual escalators.

Jason Les: Sure. Thanks for the question, Steven. The new lease at Rockdale has a total initial base contract value of $9.1 billion in revenue over the term, which is a little longer than 20 years following the initial deployment. This lease, like most of the leases we have seen, carries annual escalators that are in line with the market precedents out there. Our NOI margin is expected to be between 80% to 90% over the term of the lease. We have some good experience already operating at Rockdale for AMD, and we have spent a lot of time assembling a very strong operations team that helps formulate this guidance. We have really invested a lot in building out this operations team over the past year or so. To your question on the CapEx side, the illustrative range that we shared benefits from three elements.

Jason Les: Sure. Thanks for the question, Steven. The new lease at Rockdale has a total initial base contract value of $9.1 billion in revenue over the term, which is a little longer than 20 years following the initial deployment. This lease, like most of the leases we have seen, carries annual escalators that are in line with the market precedents out there. Our NOI margin is expected to be between 80% to 90% over the term of the lease. We have some good experience already operating at Rockdale for AMD, and we have spent a lot of time assembling a very strong operations team that helps formulate this guidance. We have really invested a lot in building out this operations team over the past year or so. To your question on the CapEx side, the illustrative range that we shared benefits from three elements.

Speaker #2: That are in line with the market precedence out there. Our NOI margin is expected to be between 80 to 90 percent over the term of the lease.

Speaker #2: We have some good experience already operating at Rockdale for AMD, and we have spent a lot of time assembling a very strong operations team.

Speaker #2: That helps formulate this guidance. We have really invested a lot in building out this operations team over the past year or so. Now, to your question on the CapEx side, the illustrative range that we shared benefits from three elements.

Speaker #2: One, we have spent quite a bit of time between our teams as well as the tenants on design work to know exactly what we're building and how what we're building is going to meet the tenant specifications.

Jason Les: One, we have spent quite a bit of time between our teams as well as the tenants on design work to know exactly what we are building and how what we are building is going to meet the tenant's specifications. Two, we have done a fair amount of work on procurement of long lead items. Because we already have this design outlined, we have been able to make progress on that. So we have strong visibility on what pricing will look like for all of the individual components. Finally, we have been working collaboratively with a general contractor who has worked on projects for this tenant before and has given us visibility to help firm up these figures. So this has allowed us to have really good clarity on labor availability and pricing to fully deliver this project.

Jason Les: One, we have spent quite a bit of time between our teams as well as the tenants on design work to know exactly what we are building and how what we are building is going to meet the tenant's specifications. Two, we have done a fair amount of work on procurement of long lead items. Because we already have this design outlined, we have been able to make progress on that. So we have strong visibility on what pricing will look like for all of the individual components. Finally, we have been working collaboratively with a general contractor who has worked on projects for this tenant before and has given us visibility to help firm up these figures. So this has allowed us to have really good clarity on labor availability and pricing to fully deliver this project.

Speaker #2: Second, we've done a fair amount of work on procurement of long-needed items, because we already have this design outlined. We've been able to make progress on that.

Speaker #2: So, we have strong visibility on what pricing will look like for all of the individual components. And then, finally, we have been working collaboratively with a general contractor who has worked on projects for this tenant before and has given us visibility to help firm up these figures.

Speaker #2: So this has allowed us to have really good clarity on labor availability and pricing to fully deliver this project. So when you take all of these factors together, it allows us to have a really good sense of CapEx, which I'll add, includes a healthy contingency reserve.

Jason Les: When you take all of these factors together, it allows us to have a really good sense of CapEx, which I will add, includes a healthy contingency reserve, because there has already been a good amount of effort on the planning and preparation of this deal over the preceding months by both of our teams. Where all of these combine out on a return on cost perspective is very strong, especially for a customer with both the profile and the trajectory of a leading frontier AI lab. It is also, I think, a reflection of the continued and ever-improving strength of the market and demand for this type of large-scale infrastructure that comes with the level of certainty in power delivery that Riot is able to offer.

Jason Les: When you take all of these factors together, it allows us to have a really good sense of CapEx, which I will add, includes a healthy contingency reserve, because there has already been a good amount of effort on the planning and preparation of this deal over the preceding months by both of our teams. Where all of these combine out on a return on cost perspective is very strong, especially for a customer with both the profile and the trajectory of a leading frontier AI lab. It is also, I think, a reflection of the continued and ever-improving strength of the market and demand for this type of large-scale infrastructure that comes with the level of certainty in power delivery that Riot is able to offer.

Speaker #2: Because there's already been a good amount of effort on the planning and preparation of this deal over the preceding months by both of our teams.

Speaker #2: Where all of these combine out on a return on cost perspective, is very strong, especially for customer with both the profile and the trajectory of a leading frontier AI lab.

Speaker #2: It's also I think a reflection of the continued and ever-improving strength of the market and demand for this type of large-scale infrastructure that comes with the level of certainty in power delivery that Riot's able to offer.

Speaker #4: That's fantastic. That really helpful. And I wonder if we could just talk about the bridge financing. That you've arranged. And I just wanted to confirm, will that be sufficient to cover sort of the near-term build cost that you're going to be incurring here?

Steven Burd: That is fantastic. That is really helpful. I wonder if you could just talk about the bridge financing that you have arranged. I just wanted to confirm, will that be sufficient to cover the near-term build cost that you are going to be incurring here?

Stephen Byrd: That is fantastic. That is really helpful. I wonder if you could just talk about the bridge financing that you have arranged. I just wanted to confirm, will that be sufficient to cover the near-term build cost that you are going to be incurring here?

Speaker #2: Jason Chung, do you want to take that?

Jason Les: Jason Chung, do you want to take that?

Jason Les: Jason Chung, do you want to take that?

Speaker #4: Sure. Thanks, Stephen. On financing, the structure we put in place has deliberately been set up in stages. So the Morgan Stanley interim financing facility immediately funds long lead equipment procurement and other development costs related to this tenant lease.

Jason Chung: Sure. Thanks, Steven. On financing, the structure we put in place has deliberately been set up in stages. The Morgan Stanley interim financing facility immediately funds long lead equipment procurement and other development costs related to this tenant lease. Interestingly, it is fully secured by the tenant, so that near-term build costs come with that tenant credit support from day one. From there, we plan to execute the takeout financing of this interim facility in the coming months as the investment grade backstop is completed. There we anticipate pricing consistent with the growing number of backstop AI infrastructure deals we have seen in the market. This lease has been structured with financing in mind from day one, and we have multiple paths to attractive long-term financing regardless of how the credit support process concludes.

Jason Chung: Sure. Thanks, Steven. On financing, the structure we put in place has deliberately been set up in stages. The Morgan Stanley interim financing facility immediately funds long lead equipment procurement and other development costs related to this tenant lease. Interestingly, it is fully secured by the tenant, so that near-term build costs come with that tenant credit support from day one. From there, we plan to execute the takeout financing of this interim facility in the coming months as the investment grade backstop is completed. There we anticipate pricing consistent with the growing number of backstop AI infrastructure deals we have seen in the market. This lease has been structured with financing in mind from day one, and we have multiple paths to attractive long-term financing regardless of how the credit support process concludes.

Speaker #4: And interestingly, it is fully secured by the tenant, so that near-term build costs come with that tenant credit support from day one. Then, from there, we plan to execute the takeout financing of this interim facility in the coming months.

Speaker #4: As the investment-grade backstop is completed, we anticipate pricing consistent with the growing number of backstop AI infrastructure deals we've seen in the market.

Speaker #4: This lease has been structured with financing in mind from day one, and we have multiple paths to attractive long-term financing, regardless of how the credit support process concludes.

Speaker #4: That said, we do expect it to conclude in the near term, and diligence is well advanced. So I don't want to get ahead of that process by discussing parties or terms just yet.

Jason Chung: That said, we do expect it to conclude in the near term, and diligence is well advanced. I do not want to get ahead of that process by discussing parties or terms just yet. What I would point to you to is the outcome, which is we are confident in achieving investment-grade level financing economics for this project.

Jason Chung: That said, we do expect it to conclude in the near term, and diligence is well advanced. I do not want to get ahead of that process by discussing parties or terms just yet. What I would point to you to is the outcome, which is we are confident in achieving investment-grade level financing economics for this project.

Speaker #4: What I'd point to you two is the outcome, which is we are confident in achieving investment-grade level financing economics for this project. Great. Thank you so much.

Steven Burd: Great. Thank you so much.

Stephen Byrd: Great. Thank you so much.

Speaker #3: Your next question comes from the line of John Tadaro with NAEDEM. Please go ahead.

Operator: Your next question comes from the line of John Todaro with Needham. Please go ahead.

Operator: Your next question comes from the line of John Todaro with Needham. Please go ahead.

Speaker #4: Hey, guys. Congrats on the lease there. Looks like a pretty good economics per megawatt. Wanted to ask on Corsicana. Nice to see the LOIs for the full site and it's going to be with one tenant.

Jason Les: Hey, guys. Congrats on the lease there. Looks like pretty good economics per megawatt. I wanted to ask on Corsicana, nice to see the LOIs for the full site, and it is going to be with one tenant. That is something you guys have talked quite a bit about in the past, that the full site would go to potentially one tenant. I would think that suggests hyperscaler, but any additional color on that? And then also how the discussions on Corsicana have evolved over time.

John Todaro: Hey, guys. Congrats on the lease there. Looks like pretty good economics per megawatt. I wanted to ask on Corsicana, nice to see the LOIs for the full site, and it is going to be with one tenant. That is something you guys have talked quite a bit about in the past, that the full site would go to potentially one tenant. I would think that suggests hyperscaler, but any additional color on that? And then also how the discussions on Corsicana have evolved over time.

Speaker #4: That is something you guys have talked quite a bit about in the past, that the full site would potentially go to one tenant. I would think that suggests a hyperscaler, but any additional color on that? And then also, how have the discussions on Corsicana evolved over time?

Speaker #2: Sure. First off, John, it's funny to think back on previous earning calls. Or I've been asked, and we've been reticent in disclosing LOIs historically.

Jason Les: Sure. First off, John, it is funny to think back on previous earning calls. I have been asking that we have been reticent in disclosing LOIs historically, but I will add that every deal that we have announced previously had an LOI at some point before progressing to a lease, and we chose not to disclose that. As everyone knows, LOIs are subject to uncertainty, but we feel very strongly about our progress here. In this case, we wanted to share with the market that we are under LOI for the entire site with a single tenant to try and give transparency about the process. I think it is a testament to our progress with the counterparty on working towards signing the completed deal. Riot has taken a very calculated approach when marketing this asset because it is our most valuable and in-demand asset.

Jason Les: Sure. First off, John, it is funny to think back on previous earning calls. I have been asking that we have been reticent in disclosing LOIs historically, but I will add that every deal that we have announced previously had an LOI at some point before progressing to a lease, and we chose not to disclose that. As everyone knows, LOIs are subject to uncertainty, but we feel very strongly about our progress here. In this case, we wanted to share with the market that we are under LOI for the entire site with a single tenant to try and give transparency about the process. I think it is a testament to our progress with the counterparty on working towards signing the completed deal. Riot has taken a very calculated approach when marketing this asset because it is our most valuable and in-demand asset.

Speaker #2: But I will add that every deal that we've announced previously had an LOI at some point before progressing to a lease, and we chose not to disclose that.

Speaker #2: As everyone knows, LOIs are subject to uncertainty. But we feel very strongly about our progress here. In this case, we wanted to share with the market that we are under LOI for the entire site with a single tenant, to try and give transparency about the process.

Speaker #2: And I think it's a testament to our progress with the counterparty on working towards a signed and completed deal. Riot has taken a very calculated approach when marketing this asset, because it is our most valuable and in-demand asset.

Speaker #2: I'll remind everyone that it wasn't until the end of 2025 that we had really acquired all the necessary acreage to have the physical footprint in order to build a full, cohesive tier three data center campus that utilizes all of the one gigawatt power at Corsicana, and met the design requirements of today's market.

Jason Les: I'll remind everyone that it wasn't until the end of 2025 that we had really acquired all the necessary acreage to have the physical footprint in order to build a full cohesive Tier 3 data center campus that utilizes all of the 1 gigawatt power at Corsicana and met the design requirements of today's market. Because of this, we didn't begin fully marketing the site with a comprehensive plan in place until the beginning of this year. We wanted to be sure before getting in front of prospective tenants, and we've spoken about this, that we had a well-thought-out plan in place that could withstand the most rigorous diligence processes that you'll find from the highest high-quality counterparties out there. This has led to a number of conversations with a variety of parties, and we've been very intentional about focusing our efforts on the right counterparties.

Jason Les: I'll remind everyone that it wasn't until the end of 2025 that we had really acquired all the necessary acreage to have the physical footprint in order to build a full cohesive Tier 3 data center campus that utilizes all of the 1 gigawatt power at Corsicana and met the design requirements of today's market. Because of this, we didn't begin fully marketing the site with a comprehensive plan in place until the beginning of this year. We wanted to be sure before getting in front of prospective tenants, and we've spoken about this, that we had a well-thought-out plan in place that could withstand the most rigorous diligence processes that you'll find from the highest high-quality counterparties out there. This has led to a number of conversations with a variety of parties, and we've been very intentional about focusing our efforts on the right counterparties.

Speaker #2: So because of this, we didn't begin fully marketing the site with a comprehensive plan in place until the beginning of this year. We want it to be sure before getting in front of prospective tenants.

Speaker #2: And we've spoken about this—that we had a well-thought-out plan in place that could withstand the most rigorous diligence processes you'll find from the highest-quality counterparties out there.

Speaker #2: This has led to a number of conversations with a variety of parties, and we've been very intentional about focusing our efforts on the right counterparties.

Speaker #2: When you're working with a site the scale of Corsicana, it is extremely in-depth, and it's not a small undertaking for any potential tenant.

Jason Les: When you're working with a site that is the scale of Corsicana, it is extremely in-depth, and it's not a small undertaking for any potential tenant. When you look at what a lease signed for Corsicana could look like for the entire site, you're looking at in excess of USD 1 billion in annual rent upon full deployment. You can appreciate that no matter how well-positioned the site is, both parties need to be absolutely careful of what the ultimate deal looks like, in order to receive the best possible outcomes. That's a two-way street there. It's a tremendous investment from both sides, and that process requires an immense amount of technical development, construction, operational, legal, and commercial-related discussions, even much more than our previously announced deals at Rockdale. We've been deeply engaged in this process.

Jason Les: When you're working with a site that is the scale of Corsicana, it is extremely in-depth, and it's not a small undertaking for any potential tenant. When you look at what a lease signed for Corsicana could look like for the entire site, you're looking at in excess of USD 1 billion in annual rent upon full deployment. You can appreciate that no matter how well-positioned the site is, both parties need to be absolutely careful of what the ultimate deal looks like, in order to receive the best possible outcomes. That's a two-way street there. It's a tremendous investment from both sides, and that process requires an immense amount of technical development, construction, operational, legal, and commercial-related discussions, even much more than our previously announced deals at Rockdale. We've been deeply engaged in this process.

Speaker #2: When you look at what a lease signed for Corsicana could look like for the entire site, you're looking at in excess of $1 billion in annual rent upon full deployment.

Speaker #2: So you can appreciate that no matter how well positioned the site is, both parties need to be absolutely careful of what the ultimate deal looks like in order to receive the best possible outcomes.

Speaker #2: That's a two-way street there, so it's a tremendous investment from both sides. That process requires an immense amount of technical development, construction, operational, legal, and commercial-related discussions.

Speaker #2: Even more so than our previously announced deals or our Rock deal. So we've been deeply engaged in this process. We have a target tenant that we've committed to in the process, and we've executed an LOI with them.

Jason Les: We have a target tenant that we've committed to in the process, that we've executed an LOI with. We caution and we're well aware that this process can still take a number of twists and turns, and it's subject to uncertainty. We wanted to be transparent about our progress, and we will update the market in the coming months when there's more to share about this process.

Jason Les: We have a target tenant that we've committed to in the process, that we've executed an LOI with. We caution and we're well aware that this process can still take a number of twists and turns, and it's subject to uncertainty. We wanted to be transparent about our progress, and we will update the market in the coming months when there's more to share about this process.

Speaker #2: We caution and we're well aware that this process can still take a number of twists and turns, and it's subject to uncertainty. But we wanted to be transparent about our progress, and we will update the market in the coming months when there's more to share about this process.

Speaker #4: That's great. Very helpful in a lot of color there. And then just as a follow-up on the same site, can you go a little bit more into the current state of development?

Jason Les: That's great. Very helpful and a lot of color there. Just as a follow-up on the same site, can you just go a little bit more into the current state of development, if there's really kind of anything at the base level that still needs to be done to support the full gigawatt and how that phasing of capacity would look?

John Todaro: That's great. Very helpful and a lot of color there. Just as a follow-up on the same site, can you just go a little bit more into the current state of development, if there's really kind of anything at the base level that still needs to be done to support the full gigawatt and how that phasing of capacity would look?

Speaker #4: Is there really anything at the base level that still needs to be done to support the full gigawatt, and how would that phasing of capacity look?

Speaker #2: Yeah. So we are while we're in the deep active discussions that we have, we've continued on the development of the site in Corsicana. That's been important in order to advance progress that ultimately results in delivering tier three capacity.

Jason Les: Yeah. While we are in the deep active discussions that we have, we have continued on the development of the site in Corsicana. That has been important in order to advance progress that ultimately results in delivering a Tier 3 capacity. We are not committing ourselves to designs, or decisions or spends that are going to box us into a certain tenant's specifications or design. We are proceeding with horizontal work and long lead equipment procurement for items that we are confident will support any eventual tenant's requirements, whether it is for our current LOI or otherwise. I think as far as RFPs go, I think it is probably too early to comment on that specifically because everything is subject to final design choices, specifications, and the negotiations that come with that.

Jason Les: Yeah. While we are in the deep active discussions that we have, we have continued on the development of the site in Corsicana. That has been important in order to advance progress that ultimately results in delivering a Tier 3 capacity. We are not committing ourselves to designs, or decisions or spends that are going to box us into a certain tenant's specifications or design. We are proceeding with horizontal work and long lead equipment procurement for items that we are confident will support any eventual tenant's requirements, whether it is for our current LOI or otherwise. I think as far as RFPs go, I think it is probably too early to comment on that specifically because everything is subject to final design choices, specifications, and the negotiations that come with that.

Speaker #2: Now, we're not committing ourselves to designs, decisions, or expenditures that are going to box us into a certain tenant specification or design. We are proceeding with horizontal work and long-lead equipment procurement for items that we're confident will support any eventual tenant's requirements, whether it is for our current LOI or otherwise.

Speaker #2: As far as RFS states go, I think it's probably too early to comment on that specifically, because everything is subject to final design choices, specifications, and the negotiations that come with that.

Speaker #2: And as you go through this process and you go through various revisions of a tenant's design, you make trade-off choices between delivery dates and certain features or requirements that may take a little longer to deliver.

Jason Les: As you go through this process and you go through various revisions of a tenant's design, you make trade-off choices between delivery dates and certain features or requirements that may take a little longer to deliver. So there is always this push and pull discussion that we have with our customers, that will meet what they need from a timeline and technical perspective. These are active discussions. They are happening on a regular basis, and look forward to continuing progressing them to a lease.

Jason Les: As you go through this process and you go through various revisions of a tenant's design, you make trade-off choices between delivery dates and certain features or requirements that may take a little longer to deliver. So there is always this push and pull discussion that we have with our customers, that will meet what they need from a timeline and technical perspective. These are active discussions. They are happening on a regular basis, and look forward to continuing progressing them to a lease.

Speaker #2: So there's always this push-and-pull discussion that we have with our customers. That will meet what they need from a timeline and technical perspective.

Speaker #2: These are active discussions. They're happening on a regular basis. And, yeah, we look forward to continuing to progress them to a lease.

Speaker #4: Great. Thank you for that. And congrats again on all the progress, guys. Really nice to see.

Jason Les: Great. Thank you for that, and congrats again on all the progress, guys. Really nice to see.

John Todaro: Great. Thank you for that, and congrats again on all the progress, guys. Really nice to see.

Speaker #2: Thank you, John.

Jason Les: Thank you, John.

Jason Les: Thank you, John.

Speaker #1: Your next question comes from the line of Paul Golding with Macquarie Group. Please go ahead.

Operator: Your next question comes from the line of Paul Golding with Macquarie Group. Please go ahead.

Operator: Your next question comes from the line of Paul Golding with Macquarie Group. Please go ahead.

Speaker #2: Thanks so much, and echoing the congrats on all the progress. I wanted to ask maybe around Rockdale—could you remind us of the structure of the remaining AMD options?

Paul Golding: Thanks so much, and echoing the congrats on all the progress. I wanted to ask maybe around Rockdale, could you remind us of the structure of the remaining AMD options? I know you mentioned, Jason, that you still have 150 megawatts of options outstanding. But maybe, in addition to talking through how those are structured, if you could also give some color around whether this incremental AI Frontier lab lease for 191 megawatts impacts those options or the dynamics with AMD at all. Obviously, the pricing is quite strong with this recent announcement and just looking to see how that might impact the AMD options or not. Thanks so much.

Paul Golding: Thanks so much, and echoing the congrats on all the progress. I wanted to ask maybe around Rockdale, could you remind us of the structure of the remaining AMD options? I know you mentioned, Jason, that you still have 150 megawatts of options outstanding. But maybe, in addition to talking through how those are structured, if you could also give some color around whether this incremental AI Frontier lab lease for 191 megawatts impacts those options or the dynamics with AMD at all. Obviously, the pricing is quite strong with this recent announcement and just looking to see how that might impact the AMD options or not. Thanks so much.

Speaker #2: I know you mentioned, Jason, that you still have 150 megawatts of options outstanding. But maybe, in addition to sort of talking through how those are structured, if you could also give some color around whether this incremental AI Frontier Lab lease for 191 megawatts impacts those options or the dynamics with AMD at all.

Speaker #2: Obviously, the pricing is quite strong with this recent announcement, and just looking to see how that might impact the AMD options or not. Thanks so much.

Speaker #3: Thanks, Paul. So first, on AMD options. They have two options in their lease, the first of which is an expansion option for an additional 50 megawatts.

Jason Les: Thanks, Paul. First on AMD options. They have two options on their lease, the first of which is an expansion option for an additional 50 megawatts, and that would bring, if exercised, their total IT capacity at Rockdale to 100 megawatts. We signed an initial 25-megawatt lease with them in January. They executed a 25-megawatt amendment to that in April, and now there is 50 megawatts remaining on that original 100-megawatt option. This additional 50 megawatts would largely be the same type and build out and economics as their existing 50 megawatts. AMD's second option is for an additional 100 megawatts of capacity that can be leased only if they fully lease the first 100 megawatts of the lease. This second 100 megawatts in capacity is subject to a few different restrictions and guardrails that are important for maintaining flexibility for Riot.

Jason Les: Thanks, Paul. First on AMD options. They have two options on their lease, the first of which is an expansion option for an additional 50 megawatts, and that would bring, if exercised, their total IT capacity at Rockdale to 100 megawatts. We signed an initial 25-megawatt lease with them in January. They executed a 25-megawatt amendment to that in April, and now there is 50 megawatts remaining on that original 100-megawatt option. This additional 50 megawatts would largely be the same type and build out and economics as their existing 50 megawatts. AMD's second option is for an additional 100 megawatts of capacity that can be leased only if they fully lease the first 100 megawatts of the lease. This second 100 megawatts in capacity is subject to a few different restrictions and guardrails that are important for maintaining flexibility for Riot.

Speaker #3: And that would bring if exercised, their total IT capacity at Rockdale to 100 megawatts. We signed an initial 25 megawatt lease with them in January.

Speaker #3: They executed a 25-megawatt amendment to that in April. And now there's 50 megawatts remaining on that original 100-megawatt option. This additional 50 megawatts would largely be the same type and build-out and economics as their existing 50 megawatts.

Speaker #3: AMD's second option is for an additional 100 megawatts of capacity that can be leased only if they fully lease the first 100 megawatts of the lease.

Speaker #3: And this second 100 megawatts of capacity is subject to a few different restrictions and guardrails that are important for maintaining flexibility for Ryan. While on AMD, one thing I do want to highlight is that AMD had a really interesting feature on CNBC recently of all the advancements that they're making in their AI hardware business.

Jason Les: While on AMD, one thing I do want to highlight is that AMD had a really interesting feature on CNBC recently of all the advancements that they are making in their AI hardware business, and a lot of that interview was done at our Rockdale campus, and what they are now referring to as their Mega Lab. What is really exciting for us is that they say in this interview that they are using this Mega Lab to test and commission their brand-new Helios Rack AI platform. If anyone is interested, we have a slide in our appendix of our presentation that has a few interesting screenshots from that piece and a link to the interview that shares a lot of good information about what they are doing. But I think the second part of your question was, does this new deal at all impact AMD's position on its expansion options?

Jason Les: While on AMD, one thing I do want to highlight is that AMD had a really interesting feature on CNBC recently of all the advancements that they are making in their AI hardware business, and a lot of that interview was done at our Rockdale campus, and what they are now referring to as their Mega Lab. What is really exciting for us is that they say in this interview that they are using this Mega Lab to test and commission their brand-new Helios Rack AI platform. If anyone is interested, we have a slide in our appendix of our presentation that has a few interesting screenshots from that piece and a link to the interview that shares a lot of good information about what they are doing. But I think the second part of your question was, does this new deal at all impact AMD's position on its expansion options?

Speaker #3: And a lot of that interview was done at our Rockdale campus. And what they are now referring to as their mega lab. And what's really exciting for us is that they say in this interview that they are using this mega lab to test and commission their brand new Helios rack AI platform.

Speaker #3: If anyone's interested, we have a slide in our appendix of our presentation that has a few interesting screenshots from that piece and a link to the interview that shares a lot of good information about what they're doing.

Speaker #3: But I think the second part of your question was, does this new deal at all impact AMD's position on these expansion options? We can't comment on or speculate on the motivations of our tenants.

Jason Les: We can't comment on or speculate on the motivations of our tenants. However, if you look at what AMD has stated publicly, even if the entire expansion option went to AMD, based on public statements, it would still not be enough to fulfill their power demands. We have 700 megawatts of capacity out at Rockdale, and we are progressing with commercial discussions across that site and at Corsicana, and our primary strategic objective is to lease up this full portfolio.

Jason Les: We can't comment on or speculate on the motivations of our tenants. However, if you look at what AMD has stated publicly, even if the entire expansion option went to AMD, based on public statements, it would still not be enough to fulfill their power demands. We have 700 megawatts of capacity out at Rockdale, and we are progressing with commercial discussions across that site and at Corsicana, and our primary strategic objective is to lease up this full portfolio.

Speaker #3: However, if you look at what AMD has stated publicly, even if the entire expansion option went to AMD, based on public statements, it would still not be enough to fulfill their power demand.

Speaker #3: So we have 700 megawatts of capacity out at Rockdale. And we are progressing with commercial discussions across that site and at Corsicana. And our primary strategic objective is to lease up this full portfolio.

Speaker #2: Thanks, Jason. And maybe just a quick follow-up to that with the 25 megawatts, where the design is nearly complete for AMD at Rockdale. Just on that phrasing of the design still being nearly complete, are there different terms or, I guess, incremental economics from a design being any different than the preceding 50 megawatts?

Paul Golding: Thanks, Jason, and maybe just a quick follow-on to that. With the 25 megawatts where the design is nearly complete for AMD at Rockdale, just on that phrasing of the design still being nearly complete, are there different terms or I guess incremental economics from a design being any different than the preceding 50 megawatts? How should we think about that? Thanks.

Paul Golding: Thanks, Jason, and maybe just a quick follow-on to that. With the 25 megawatts where the design is nearly complete for AMD at Rockdale, just on that phrasing of the design still being nearly complete, are there different terms or I guess incremental economics from a design being any different than the preceding 50 megawatts? How should we think about that? Thanks.

Speaker #2: How should we think about that? Thanks.

Jason Les: I'm not sure the exact comments that you're referring to. What I meant to clarify is that the first 100 megawatts are for a certain type of design that we've executed on with them. The one with the lower CapEx, quicker timeline deployment. That covers the whole 100 megawatts. The second 100 megawatts has a bit more flexibility to build a new type of capacity, whatever they would be looking for their specifications. If we get to the point where they fully exercise their first 100-megawatt option, then they want to be talking about the 100 megawatts, part of that then would be engaging with them on the design that they're looking for.

Jason Les: I'm not sure the exact comments that you're referring to. What I meant to clarify is that the first 100 megawatts are for a certain type of design that we've executed on with them. The one with the lower CapEx, quicker timeline deployment. That covers the whole 100 megawatts. The second 100 megawatts has a bit more flexibility to build a new type of capacity, whatever they would be looking for their specifications. If we get to the point where they fully exercise their first 100-megawatt option, then they want to be talking about the 100 megawatts, part of that then would be engaging with them on the design that they're looking for.

Speaker #3: I'm not sure the exact comments that you're referring to. What I meant to clarify is that the first 100 megawatts are for a certain type of design that we've executed on with them, the one it was the lower capex quicker timeline deployment.

Speaker #3: That covers the full 100 megawatts. The second 100 megawatts has a bit more flexibility to build a new type of capacity—whatever they would be looking for, for their specifications.

Speaker #3: So, if we were—when we get to the point when they fully execute their—I should say, if we get to the point where they fully exercise their first 100 megawatt option, and then they want to be talking about the next 100 megawatts, part of that then would be engaging with them on the design that they're looking for.

Speaker #2: Understood. Thank you so much.

Paul Golding: Understood. Thank you so much.

Paul Golding: Understood. Thank you so much.

Speaker #3: Yeah, thank you, Paul.

Jason Les: Yeah. Thank you, Paul.

Jason Les: Yeah. Thank you, Paul.

Speaker #1: Your next question comes from the line of Mike Grondahl with Northland Capital Markets. Please go ahead.

Operator: Your next question comes from the line of Mike Grondahl with Northland Capital Markets. Please go ahead.

Operator: Your next question comes from the line of Mike Grondahl with Northland Capital Markets. Please go ahead.

Speaker #4: Hey, this is Logan on for Mike. Thanks for taking our question. Congrats on all the progress here. First one from us: With the two leases now signed, can you just clarify what is the remaining capacity at Rockdale that can be leased?

[Company Representative] (Northland Capital Markets): Hey, this is Logan on for Mike. Thanks for taking our question. Congrats on all the progress here. First one from us. With the two leases now signed, can you just clarify what is the remaining capacity at Rockdale that can be leased, and if there is any preference for the existing tenants or new tenants to take down that capacity? Thank you.

Logan Hennen: Hey, this is Logan on for Mike. Thanks for taking our question. Congrats on all the progress here. First one from us. With the two leases now signed, can you just clarify what is the remaining capacity at Rockdale that can be leased, and if there is any preference for the existing tenants or new tenants to take down that capacity? Thank you.

Speaker #4: And is there any preference for the existing tenants or new tenants to take down that capacity? Thank you.

Speaker #2: Yeah, Logan, thanks for the question. Yes, there's still additional capacity at Rockdale. Right now, we have Bitcoin mining and AMD on that site, and now we're going to be building out development for our new tenant here.

Jason Les: Yeah, Logan, thanks for the question. Yes, there is still additional capacity to Rockdale. Right now, we have Bitcoin mining and AMD on that site, and now we are going to be building development for a new tenant here. We are going to continue to utilize Bitcoin mining to monetize that available capacity until we have the right lease or set of leases to take the balance of that capacity there. As far as preference for tenant goes, we only have a preference to a tenant or tenants that are going to pay the best economics and that have the requisite credit rating or the backstop that allows us to achieve the best possible financing outcome. Because that is ultimately what is going to translate into delivering the best returns for our shareholders. So we like the relationships that we have. We hope to grow both of those relationships significantly.

Jason Les: Yeah, Logan, thanks for the question. Yes, there is still additional capacity to Rockdale. Right now, we have Bitcoin mining and AMD on that site, and now we are going to be building development for a new tenant here. We are going to continue to utilize Bitcoin mining to monetize that available capacity until we have the right lease or set of leases to take the balance of that capacity there. As far as preference for tenant goes, we only have a preference to a tenant or tenants that are going to pay the best economics and that have the requisite credit rating or the backstop that allows us to achieve the best possible financing outcome. Because that is ultimately what is going to translate into delivering the best returns for our shareholders. So we like the relationships that we have. We hope to grow both of those relationships significantly.

Speaker #2: We're going to continue to utilize Bitcoin mining to monetize that available capacity until we have the right lease or set of leases to take the balance of that capacity there.

Speaker #2: As far as preference for tenant goes, we only have a preference for a tenant or tenants that are going to pay the best economics and that have the requisite credit rating or the backstop that allows us to achieve the best possible financing outcome.

Speaker #2: Because that is ultimately what's going to translate into delivering the best returns for our shareholders. So we like the relationships that we have. We hope to grow both of those relationships significantly.

Speaker #2: But if the right counterparty comes along and wants to move on capacity, and the terms are right, then we'd be looking very seriously at that as well.

Jason Les: But if the right counterparty comes along and wants to move on capacity and the terms are right, then we'd be looking very seriously at that as well.

Jason Les: But if the right counterparty comes along and wants to move on capacity and the terms are right, then we'd be looking very seriously at that as well.

Speaker #4: Great. Then as a follow-up to that, is there potential to expand capacity at Rockdale past the current 700 megawatts? And would you need additional land if you could secure that power?

[Company Representative] (Northland Capital Markets): Great. Then as a follow-up to that, is there potential to expand capacity at Rockdale past the current 700 megawatts? Would you need additional land if you could secure that power? Thank you.

Logan Hennen: Great. Then as a follow-up to that, is there potential to expand capacity at Rockdale past the current 700 megawatts? Would you need additional land if you could secure that power? Thank you.

Speaker #4: Thank you.

Speaker #3: Yes, Logan. We believe there is potential at Rockdale for at Rockdale and actually all of our sites to expand the power that's available. And it's something that we keep a close eye on.

Jason Les: Yes, Logan, we believe there is potential at Rockdale, and actually all of our sites, to expand the power that's available, and it's something that we keep a close eye on, and to be clear, we are actively pursuing. But it is obviously too early to commit on if this is possible, especially with everything that's going on and what extent we may be able to in the future. At Rockdale, our site has 200 buildable acres, and we've been very intentional and thoughtful about how we build out this site in order to maximize the availability of the campus as part of a broader strategic plan for the campus. So, we are in a great position, I believe, to have the opportunity to get more power at that site and execute on that if we get that approved.

Jason Les: Yes, Logan, we believe there is potential at Rockdale, and actually all of our sites, to expand the power that's available, and it's something that we keep a close eye on, and to be clear, we are actively pursuing. But it is obviously too early to commit on if this is possible, especially with everything that's going on and what extent we may be able to in the future. At Rockdale, our site has 200 buildable acres, and we've been very intentional and thoughtful about how we build out this site in order to maximize the availability of the campus as part of a broader strategic plan for the campus. So, we are in a great position, I believe, to have the opportunity to get more power at that site and execute on that if we get that approved.

Speaker #3: And to be clear, we are actively pursuing this. But it is obviously too early to commit to whether this is possible, especially with everything that's going on and to what extent we may be able to in the future.

Speaker #3: At Rockdale, our site has 200 buildable acres, and we've been very intentional and thoughtful about how we build out this site in order to maximize the availability of the campus.

Speaker #3: As part of a broader strategic plan for the campus, we are in a great position, I believe, to have the opportunity to get more power at that site.

Speaker #3: And execute it on that if we get that approved.

Speaker #4: Thank you. Congrats on the corner.

[Company Representative] (Northland Capital Markets): Thank you. Congrats on the quarter.

Logan Hennen: Thank you. Congrats on the quarter.

Speaker #3: Thank you.

Speaker #1: Your next question comes from the line of Brett Neblock with Cantor Fitzgerald. Please go ahead.

Jason Les: Thank you.

Jason Les: Thank you.

Operator: Your next question comes from the line of Brett Knoblauch with Cantor Fitzgerald. Please go ahead.

Operator: Your next question comes from the line of Brett Knoblauch with Cantor Fitzgerald. Please go ahead.

Speaker #5: Hey guys, thank you for taking my question. Congrats on both delivering AMD and the new lease. On the course of the LOI, I guess, how would you describe the gating items on your end, or what you and your prospective tenant need to do to convert it from LOI to a definitive lease?

Brett Knoblauch: Hey, guys. Thank you for taking my question. Congrats on both delivering AMD and the new lease. On the Corsicana LOI, I guess, how would you describe the gating items on your end or what you and your prospective tenant need to do to convert it from LOI to kind of definitive lease? If you had to kind of bullet two or three items, what would they be?

Brett Knoblauch: Hey, guys. Thank you for taking my question. Congrats on both delivering AMD and the new lease. On the Corsicana LOI, I guess, how would you describe the gating items on your end or what you and your prospective tenant need to do to convert it from LOI to kind of definitive lease? If you had to kind of bullet two or three items, what would they be?

Speaker #5: If you had to kind of bullet two or three items, what would they be?

Speaker #2: Yeah, thanks for the question, Brett. Obviously, I don't want to get into too many specifics here, but like I kind of mentioned in the remarks, executing on a build of this size is substantial.

Jason Les: Yeah. Thanks for the question, Brett. Obviously, I do not want to get into too many specifics here, but like I kind of mentioned in the remarks, executing on a build of this size is substantial. There is a lot of design and legal and commercial work that goes into that. I think the level of intensity from both sides scales with the amount of megawatts that you are executing on. So this is, when you look at Corsicana, it is a multi-year development. It is up to 756 megawatts of development across the acreage that we have acquired there. And that requires us to plan carefully, and that requires the tenant to be planning their own capacity carefully and making sure that what we are building can meet the timelines that they are looking for.

Jason Les: Yeah. Thanks for the question, Brett. Obviously, I do not want to get into too many specifics here, but like I kind of mentioned in the remarks, executing on a build of this size is substantial. There is a lot of design and legal and commercial work that goes into that. I think the level of intensity from both sides scales with the amount of megawatts that you are executing on. So this is, when you look at Corsicana, it is a multi-year development. It is up to 756 megawatts of development across the acreage that we have acquired there. And that requires us to plan carefully, and that requires the tenant to be planning their own capacity carefully and making sure that what we are building can meet the timelines that they are looking for.

Speaker #2: There's a lot of design and legal and commercial work that goes into that. I think the level of intensity from both sides scales with the amount of megawatts that you're executing on.

Speaker #2: So this is when you look at Corsicana, it's a multi-year development. It's 700 up to 756 megawatts of development across the acreage that we've acquired there.

Speaker #2: And that requires us to plan carefully. And that requires the tenant to be planning their own capacity carefully and making sure that what we are building us making sure that what we're building can meet the timelines that they're looking for.

Speaker #2: And they want to make sure that what we're building is going to be the type of design both now, on the first phase of delivery, and the final phase of delivery.

Jason Les: They want to make sure that what we are building is going to be the type of design, both now and on the first phase of delivery and the final phase of delivery. So it is a big lift, but this is a substantial part of the power assets that we have. This is an agreement that we are going to be living with and performing over 15, 20 years, whatever the ultimate term of that lease is. Our management team, we are significant shareholders of this company, and we think about how we build out this portfolio over a very long timeframe because of that. So it is putting in good work and moving through a process as quickly as we can, but being diligent to make sure that we are delivering what our tenant looks for and making sure we can deliver for what our tenant wants.

Jason Les: They want to make sure that what we are building is going to be the type of design, both now and on the first phase of delivery and the final phase of delivery. So it is a big lift, but this is a substantial part of the power assets that we have. This is an agreement that we are going to be living with and performing over 15, 20 years, whatever the ultimate term of that lease is. Our management team, we are significant shareholders of this company, and we think about how we build out this portfolio over a very long timeframe because of that. So it is putting in good work and moving through a process as quickly as we can, but being diligent to make sure that we are delivering what our tenant looks for and making sure we can deliver for what our tenant wants.

Speaker #2: So it's a big lift. But this is a substantial part of the power assets that we have. This is an agreement that we are going to be living with and performing over 15, 20 years, whatever the ultimate term of that lease is.

Speaker #2: And our management team—we're significant shareholders of this company. And we think about how we build out this portfolio over a very long time frame because of that.

Speaker #2: So it's putting it in good work. And moving through a process as quickly as we can, but being diligent to make sure that we're delivering what our tenant looks for and making sure we can deliver for what our tenant wants.

Speaker #5: Thanks, Jason. And then on the de-risk, it feels like quite de-risked build for the AI lab lease. You talked a bit about how kind of the SS Metron is going to play a role there on some of the electrical equipment.

Brett Knoblauch: Thanks, Jason. Then on the de-risk, it feels like quite de-risked build for the AI lab lease. You talked a bit about how ESS Metron is going to play a role there on some of the electrical equipment. I think you mentioned substation equipment. I guess, what electrical work is needed given that site was already live and pulling power for mining?

Brett Knoblauch: Thanks, Jason. Then on the de-risk, it feels like quite de-risked build for the AI lab lease. You talked a bit about how ESS Metron is going to play a role there on some of the electrical equipment. I think you mentioned substation equipment. I guess, what electrical work is needed given that site was already live and pulling power for mining?

Speaker #5: I think you mentioned kind of substation equipment. I guess what electrical work is needed given kind of that site was already kind of live and pulling power for mining?

Speaker #3: Good question. So first, with any new development, you’re building at the very least new low-voltage and medium-voltage, all in a building. So you’re procuring a ton of equipment.

Jason Les: Good question. First, with any new development, you are building, at the very least, new low voltage, medium voltage, all in the building. So you are procuring a ton of equipment that is a supply chain bottleneck right now, which is why our advantage, having ESS Metron in-house really de-risks this. There is also high voltage work needed for this new building as well. We have already secured the transformers for that as part of our ongoing long-term campus planning strategy. So we have put ourselves in a very good position because of the decisions that we have made in the past as far as procurement goes, and it is why we are able to sign a lease right now in the summer of 2026 and be able to deliver 96 megawatts in a little over one year from now.

Jason Les: Good question. First, with any new development, you are building, at the very least, new low voltage, medium voltage, all in the building. So you are procuring a ton of equipment that is a supply chain bottleneck right now, which is why our advantage, having ESS Metron in-house really de-risks this. There is also high voltage work needed for this new building as well. We have already secured the transformers for that as part of our ongoing long-term campus planning strategy. So we have put ourselves in a very good position because of the decisions that we have made in the past as far as procurement goes, and it is why we are able to sign a lease right now in the summer of 2026 and be able to deliver 96 megawatts in a little over one year from now.

Speaker #3: Equipment that is supply chain bottleneck right now, which is wire advantage having ESS Metron in-house. Really de-risk this. There's also high-voltage work needed for this new building as well.

Speaker #3: We've already secured the transformers for that as part of our ongoing, long-term campus planning strategy. So we've put ourselves in a very good position because of the decisions that we made in the past as far as procurement goes, and it's why we're able to sign a lease right now, in the summer of 2026, and be able to deliver 96 megawatts in a little over one year from now.

Speaker #5: Awesome. Thank you, Jason. I really appreciate it. Congrats again.

Brett Knoblauch: Awesome. Thank you, Jason. Really appreciate it, and congrats again.

Brett Knoblauch: Awesome. Thank you, Jason. Really appreciate it, and congrats again.

Speaker #3: Thanks, Brett.

Jason Les: Thanks, Brett.

Jason Les: Thanks, Brett.

Speaker #1: Your next question comes from the line of Brian Dobson with Clear Street. Please go ahead.

Operator: Your next question comes from the line of Brian Dobson with Clear Street. Please go ahead.

Operator: Your next question comes from the line of Brian Dobson with Clear Street. Please go ahead.

Speaker #4: Hey, thanks so much, and congrats on the new deal. I'll add my congratulations, I guess. So, do you think you can give us a little bit more color on your pipeline and how you see that developing, and do you have a preference between, call it, grid connectivity or behind the meter?

Brian Dobson: Hey, thanks so much, and congrats on the new deal. I will add my congratulations, I guess. Do you think you can give us a little bit more color on your pipeline and how you see that developing? Do you have a preference between, call it grid connectivity or behind the meter?

Brian Dobson: Hey, thanks so much, and congrats on the new deal. I will add my congratulations, I guess. Do you think you can give us a little bit more color on your pipeline and how you see that developing? Do you have a preference between, call it grid connectivity or behind the meter?

Speaker #3: Yes, that is a great question, Brian, because it is an area that Riot is really invested in. While we have data center teams devoted to design, development, and leasing and construction—which results in the lease that we're announcing today—we have a separate team devoted to finding the right future assets in order to continue replicating our successful data center strategy.

Jason Les: Well, that is a great question, Bryan, because it is an area that Riot is really invested in. While we have data center teams devoted to design, development, and leasing, and construction that results in the lease that we are announcing today, we have a separate team devoted to finding the right future assets in order to continue replicating our successful data center strategy. I have said before, what we are building here at Riot, it is not just a Rockdale and Corsicana project. It is about building a long-term, durable data center platforms. So Corsicana and Rockdale are just the beginning. From the start, our management team and board at Riot made the conscious decision that to deliver the best returns to our shareholders, we needed to have in-house capabilities for data center design, construction, and operations.

Jason Les: Well, that is a great question, Bryan, because it is an area that Riot is really invested in. While we have data center teams devoted to design, development, and leasing, and construction that results in the lease that we are announcing today, we have a separate team devoted to finding the right future assets in order to continue replicating our successful data center strategy. I have said before, what we are building here at Riot, it is not just a Rockdale and Corsicana project. It is about building a long-term, durable data center platforms. So Corsicana and Rockdale are just the beginning. From the start, our management team and board at Riot made the conscious decision that to deliver the best returns to our shareholders, we needed to have in-house capabilities for data center design, construction, and operations.

Speaker #3: I've said before, what we are building here at Riot—it's not just a Rockdale and Corsicana project. It is about building long-term, durable data center platforms.

Speaker #3: So, Corsicana and Rockdale are just the beginning. From the start, our management team and board at Riot made the conscious decision that, to deliver the best returns to our shareholders, we needed to have in-house capabilities.

Speaker #3: For data center design, construction, and operations, we have those teams in place now. And they're hard at work delivering data centers and Rockdale, Corsicana, and Kentucky however, we made this tremendous investment in order to grow our existing tenant relationships and forge new ones that replicate this business model at new sites that we're able to add to our power portfolio.

Jason Les: We have those teams in place now, and they're hard at work delivering data centers at Rockdale, Corsicana, and Kentucky. However, we made this tremendous investment in order to grow our existing tenant relationships and forge new ones that replicate this business model at new sites that we're able to add to our power portfolio. In order to support that, we're building durable, repeatable business with teams that are highly specialized in delivering data center to demanding tenants. Every week we evaluate at least 10 new sites, and our team spends an incredible amount of time doing that, taking a critical look at what would make strong additions to our power portfolio. We are very careful not to add assets that just create a strong headline number of a theoretical portfolio.

Jason Les: We have those teams in place now, and they're hard at work delivering data centers at Rockdale, Corsicana, and Kentucky. However, we made this tremendous investment in order to grow our existing tenant relationships and forge new ones that replicate this business model at new sites that we're able to add to our power portfolio. In order to support that, we're building durable, repeatable business with teams that are highly specialized in delivering data center to demanding tenants. Every week we evaluate at least 10 new sites, and our team spends an incredible amount of time doing that, taking a critical look at what would make strong additions to our power portfolio. We are very careful not to add assets that just create a strong headline number of a theoretical portfolio.

Speaker #3: So, in order to support that, we're building a durable, repeatable business with teams that are highly specialized in delivering data centers to demanding tenants. Every week, we evaluate at least 10 new sites, and our team spends an incredible amount of time doing that—taking a critical look at what would make strong additions to our power portfolio.

Speaker #3: But we are very careful not to add assets that just create a strong headline number of a theoretical portfolio. We are looking to commit capital to sites that we believe have a strong ability to become premier data center sites that would stand up to the scrutiny of hyperscaler and enterprise tenants, and the rigorous diligence process that they have.

Jason Les: We are looking to commit capital to sites that we believe have a strong ability to become premier data center sites that would stand the scrutiny of hyperscaler and enterprise tenants, the rigorous diligence process that they have. We have a number of very exciting initiatives underway. And to your question, Bryan, that includes both grid and behind the meter projects. We look forward to sharing more about this growth power portfolio at the right time. It's something we're absolutely involved in, and we fully intend to be delivering on as we execute on our strategic plan.

Jason Les: We are looking to commit capital to sites that we believe have a strong ability to become premier data center sites that would stand the scrutiny of hyperscaler and enterprise tenants, the rigorous diligence process that they have. We have a number of very exciting initiatives underway. And to your question, Bryan, that includes both grid and behind the meter projects. We look forward to sharing more about this growth power portfolio at the right time. It's something we're absolutely involved in, and we fully intend to be delivering on as we execute on our strategic plan.

Speaker #3: So, we have a number of very exciting initiatives underway. And to your question, Brian, that includes both grid and behind-the-meter projects. We look forward to sharing more about this growth power portfolio at the right time.

Speaker #3: But it's something we're absolutely involved in, and we fully intend to be delivering on as we execute on our strategic plan.

Speaker #4: Yeah, great. Thanks. That's helpful. And then, just one follow-up if I may: are you involved in the batch process in Texas?

Brian Dobson: Yeah, great. Thanks. That's helpful. Just one follow-up, if I may. Are you involved in the batch process in Texas?

Brian Dobson: Yeah, great. Thanks. That's helpful. Just one follow-up, if I may. Are you involved in the batch process in Texas?

Speaker #3: First, thank you for asking that. I want to clarify for everyone: Riot's existing sites in Texas, in Rockdale and Corsicana, are not subject to the batch process.

Jason Les: First, thank you for asking that, because first, I want to clarify for everyone, Riot's existing sites in Texas, in Rockdale and Corsicana, are not subject to the batch process. That's because their existing power allocations are already under existing interconnection agreements for many years. They've been operating for several years now, and we want to make sure that's absolutely clear upfront. In Texas, in ERCOT, this batch process is an evolving process, and we remain highly engaged with that, with our power teams, our corporate development teams, our public policy teams. ERCOT has really found itself in an unprecedented position with the amount of data center requests for interconnection. We often like to remind investors that ERCOT's priority, first and foremost, is to ensure reliability for existing customers. We feel like this is an advantage for sites like our own.

Jason Les: First, thank you for asking that, because first, I want to clarify for everyone, Riot's existing sites in Texas, in Rockdale and Corsicana, are not subject to the batch process. That's because their existing power allocations are already under existing interconnection agreements for many years. They've been operating for several years now, and we want to make sure that's absolutely clear upfront. In Texas, in ERCOT, this batch process is an evolving process, and we remain highly engaged with that, with our power teams, our corporate development teams, our public policy teams. ERCOT has really found itself in an unprecedented position with the amount of data center requests for interconnection. We often like to remind investors that ERCOT's priority, first and foremost, is to ensure reliability for existing customers. We feel like this is an advantage for sites like our own.

Speaker #3: That's because their existing power allocations are already under existing interconnection agreements. For many years, they've been operating for several years now. And we want to make sure that's absolutely clear up front.

Speaker #3: In Texas, in ERCOT, this batch process isn't an evolving process. And we remain highly engaged with that, with our power teams, our corporate development teams, and our public policy teams.

Speaker #3: ERCOT is really found itself in an unprecedented position with the amount of data center requests for interconnection. And we often like to remind investors that ERCOT's priority first and foremost is to ensure reliability for existing customers.

Speaker #3: And we feel like this is an advantage for sites like our own. Sites like Rockdale and Corsicana that already have the in-place power that provides certainty to tenants is not subject to future studies or approvals.

Jason Les: Sites like Rockdale and Corsicana that already have the in-place power that provides certainty to tenants is not subject to future studies or approvals. We do think that over the next year, there will be new opportunities for either acquisition or expansion from sites that do end up with new allocation from the ERCOT batch process. Like I said, it is an area we are actively monitoring and performing diligence on. To provide some more broad commentary on the process and, more recently, Governor Abbott's letter, we think all in all that this is a positive thing for Riot. Yes, the batch process has made it more challenging to get new power, and that is what makes our current sites even more valuable. ERCOT is navigating a difficult situation. They have to deal with a lot of phantom interconnect requests and less reputable developers.

Jason Les: Sites like Rockdale and Corsicana that already have the in-place power that provides certainty to tenants is not subject to future studies or approvals. We do think that over the next year, there will be new opportunities for either acquisition or expansion from sites that do end up with new allocation from the ERCOT batch process. Like I said, it is an area we are actively monitoring and performing diligence on. To provide some more broad commentary on the process and, more recently, Governor Abbott's letter, we think all in all that this is a positive thing for Riot. Yes, the batch process has made it more challenging to get new power, and that is what makes our current sites even more valuable. ERCOT is navigating a difficult situation. They have to deal with a lot of phantom interconnect requests and less reputable developers.

Speaker #3: We do think that over the next year, there will be new opportunities for either acquisition or expansion from sites that do end up with new allocation from the ERCOT batch process.

Speaker #3: And like I said, it’s an area we are actively monitoring and performing diligence on. And to provide some more broad commentary on the process and, more recently, Governor Abbott’s letter, we think, all in all, this is a positive thing for Riot.

Speaker #3: Yes, the batch process has made it more challenging to get new power and that's what makes our current sites even more valuable. ERCOT is navigating a difficult situation or they have to deal with a lot of phantom interconnect requests and less reputable developers.

Speaker #3: And as ERCOT is really trying to set and establish the rules that are going to get rid of that. Now, if you look at the comments that Governor Abbott is asking data centers to implement for new data centers, this is in line with what Riot is already doing.

Jason Les: ERCOT is really trying to set and establish the rules that are going to get rid of that. Now, if you look at the comments that Governor Abbott is asking data centers to implement for new data centers, this is in line with what Riot is already doing. We are supportive of being good members of the community, whether that is paying for your own infrastructure, paying for transmission upgrades, utilizing closed water cooling, bringing our own water. These are all areas we have been very focused on implementing at our current sites. Anyone who has been to our sites have actually seen this in action. We want to make sure that we are building projects in a responsible way.

Jason Les: ERCOT is really trying to set and establish the rules that are going to get rid of that. Now, if you look at the comments that Governor Abbott is asking data centers to implement for new data centers, this is in line with what Riot is already doing. We are supportive of being good members of the community, whether that is paying for your own infrastructure, paying for transmission upgrades, utilizing closed water cooling, bringing our own water. These are all areas we have been very focused on implementing at our current sites. Anyone who has been to our sites have actually seen this in action. We want to make sure that we are building projects in a responsible way.

Speaker #3: We're supportive of being good members of the community. Whether that's paying for your own infrastructure, paying for transmission upgrades, utilizing closer water cooling, or bringing your own water, these are all areas we've been very focused on implementing.

Speaker #3: At our current sites, anyone who has been to our sites—I've actually seen this in action. So we want to make sure that we are building projects in a responsible way.

Speaker #3: So, to sum it up, I think this has positioned us to take advantage of new opportunities and continue to be good partners with ERCOT and our surrounding communities.

Jason Les: To sum it up, I think this has positioned us to take advantage of new opportunities, continue to be good partners with ERCOT and our surrounding communities, and further enhances the value of the sites that we have.

Jason Les: To sum it up, I think this has positioned us to take advantage of new opportunities, continue to be good partners with ERCOT and our surrounding communities, and further enhances the value of the sites that we have.

Speaker #3: And further enhances the value of the sites that we have.

Speaker #4: Great. Thanks very much.

Brian Dobson: Great. Thanks very much.

Brian Dobson: Great. Thanks very much.

Speaker #1: Your next question comes from the line of Martin Turner with RBC Capital Markets. Please go ahead.

Operator: Your next question comes from the line of Martin Toner with RBC Capital Markets. Please go ahead.

Operator: Your next question comes from the line of Martin Toner with RBC Capital Markets. Please go ahead.

Speaker #4: Whoops. Hey, guys. Thanks so much for taking my question; I really appreciate it. And it's wonderful to see these two—well, this great deal and then another potential one in the hopper.

Martin Toner: Whoops. Hey, guys. Thanks so much for taking my question. I really appreciate it and wonderful to see these two. Well, this great deal and then another potential one in the hopper. I think it might be useful for you guys to reiterate how you take this deal with the AI lab, the bridge financing, and then turn it into an investment-grade backstop. Can you kind of just walk us through why you're confident that that's effectively a certainty?

Martin Toner: Whoops. Hey, guys. Thanks so much for taking my question. I really appreciate it and wonderful to see these two. Well, this great deal and then another potential one in the hopper. I think it might be useful for you guys to reiterate how you take this deal with the AI lab, the bridge financing, and then turn it into an investment-grade backstop. Can you kind of just walk us through why you're confident that that's effectively a certainty?

Speaker #4: I think it might be useful for you guys to reiterate how you're going to how you take this deal with the AI lab, the bridge financing, and then turn it into an investment-grade backstop.

Speaker #4: Can you kind of just walk us through why you're confident that that will—that that's effectively a certainty?

Speaker #3: Thanks for that question, Martin. Let me turn that over to Jason Chung.

Jason Les: Thanks for that question, Martin. Let me turn that over to Jason Chung.

Jason Les: Thanks for that question, Martin. Let me turn that over to Jason Chung.

Speaker #5: Hey, Martin. So, we talked a little bit earlier about the facility itself and how it allows us to fund some of our immediate long-lead equipment procurement, as well as additional development costs.

Jason Chung: Hey, Martin. So we talked a little bit earlier about the facility itself and how it allows us to fund some of our immediate long lead equipment procurement, as well as additional development costs. That's been a really great tool in making sure that we both have the financial resources today to begin procurement immediately and not put our timelines at risk, while also maintaining the liquidity on our balance sheet as we await the investment in great backstop. Without getting too much into it at this point, as I mentioned earlier, I don't want to necessarily say too much. We've spoken across the board with both the tenants and the potential backstop provider. Those negotiations we expect to conclude fairly quickly. We feel confident given the level of diligence that both parties on the other side have put into this.

Jason Chung: Hey, Martin. So we talked a little bit earlier about the facility itself and how it allows us to fund some of our immediate long lead equipment procurement, as well as additional development costs. That's been a really great tool in making sure that we both have the financial resources today to begin procurement immediately and not put our timelines at risk, while also maintaining the liquidity on our balance sheet as we await the investment in great backstop. Without getting too much into it at this point, as I mentioned earlier, I don't want to necessarily say too much. We've spoken across the board with both the tenants and the potential backstop provider. Those negotiations we expect to conclude fairly quickly. We feel confident given the level of diligence that both parties on the other side have put into this.

Speaker #5: And so that's been a really great tool in making sure that we both have the financial resources today to begin procurement immediately and not put our timelines at risk, while also maintaining the liquidity on our balance sheet as we await the investment-grade backstop.

Speaker #5: And so, without getting too much into it at this point, as I mentioned earlier, I don't want to necessarily say too much. We've spoken across the board with both the tenants and the potential backstop provider. Those negotiations we expect to conclude fairly quickly.

Speaker #5: And we feel confident, given the level of diligence that both parties on the other side have put into this. And so, that's intentionally what the bridge or the sort of interim facility is intended to support.

Jason Chung: That is intentionally what the bridge or this sort of interim facility is intended to support. That being said, I mentioned as well earlier, there are additional sort of contractual protections we put in place to make sure that regardless of the outcome, we will be protected, and we have secured investment grade or investment-grade equivalent economics in terms of how that take out financing is going to look like.

Jason Chung: That is intentionally what the bridge or this sort of interim facility is intended to support. That being said, I mentioned as well earlier, there are additional sort of contractual protections we put in place to make sure that regardless of the outcome, we will be protected, and we have secured investment grade or investment-grade equivalent economics in terms of how that take out financing is going to look like.

Speaker #5: That being said, I mentioned as well earlier, there are additional, sort of, contractual protections we’ve put in place to make sure that, regardless of the outcome, we will be protected and we have secured investment-grade or investment-grade equivalent economics in terms of how that takeout financing is going to look.

Speaker #4: That's great. Thanks very much. Real quick, what will the cadence of CapEx be for the $2 billion for this 200 megawatt deal?

Martin Toner: That is great. Thanks very much. Real quick, what would the cadence of CapEx be for the $2 billion for this 200 MW deal?

Martin Toner: That is great. Thanks very much. Real quick, what would the cadence of CapEx be for the $2 billion for this 200 MW deal?

Speaker #5: Sure. So, on this particular deal, as we discussed, phase one is a 96-megawatt initial phase. It's going to be delivered in December 2027.

Jason Chung: Sure. On this particular deal, as we have discussed, phase one is that 96 initial megawatts is going to be delivered in December 2027. We have got all the long lead equipment procurement, the transformers, chillers, switch gears, et cetera, underway now. That is supported by the Morgan Stanley interim financing facility that we have put in place. So we expect that CapEx will really ramp up through the back half of 2026, probably peak in the first half of 2027, and then continue on into early 2028 when that phase two delivery in June 2028 kind of comes in. So when we pair that alongside the AMD build-out for this additional 25 megawatts, in combination, that sort of peak combined project level CapEx is

Jason Chung: Sure. On this particular deal, as we have discussed, phase one is that 96 initial megawatts is going to be delivered in December 2027. We have got all the long lead equipment procurement, the transformers, chillers, switch gears, et cetera, underway now. That is supported by the Morgan Stanley interim financing facility that we have put in place. So we expect that CapEx will really ramp up through the back half of 2026, probably peak in the first half of 2027, and then continue on into early 2028 when that phase two delivery in June 2028 kind of comes in. So when we pair that alongside the AMD build-out for this additional 25 megawatts, in combination, that sort of peak combined project level CapEx is

Speaker #5: And so we've got all the long-lead equipment procurement—the transformers, chillers, switchgears, etc.—underway now. And that's supported by the Morgan Stanley interim financing facility that we have put in place.

Speaker #5: So, we expect that CapEx will really ramp up through the back half of 2026, probably peaking in the first half of 2027, and then continue on into early 2028, when that Phase Two delivery in June 2028 comes in.

Speaker #5: So when we pair that alongside the AMD build-out for this additional 25 megawatts, in combination that sort of peak combined project-level CapEx is probably going to be around Q2, between Q2 and Q3 of 2027.

Jason Chung: Probably going to be around between Q2 and Q3 of 2027. Now, that being said, it is important to remember that the substantial majority of the CapEx spend across both of these is going to be funded at the project level. So we will have the AMD financing facility in place, which will include a delayed draw mechanism to fund additional AMD options as we exercise them. Then the Morgan Stanley interim financing facility, plus the eventual takeout of that. So we feel really good about the financing model that we have put in place, and how that positions us to make sure we can hit delivery milestones on time.

Jason Chung: Probably going to be around between Q2 and Q3 of 2027. Now, that being said, it is important to remember that the substantial majority of the CapEx spend across both of these is going to be funded at the project level. So we will have the AMD financing facility in place, which will include a delayed draw mechanism to fund additional AMD options as we exercise them. Then the Morgan Stanley interim financing facility, plus the eventual takeout of that. So we feel really good about the financing model that we have put in place, and how that positions us to make sure we can hit delivery milestones on time.

Speaker #5: Now, that being said, it's important to remember that the substantial majority of the CapEx spend across both of these is going to be funded at the project level.

Speaker #5: So we'll have the AMD financing facility in place, which will include the delayed draw mechanism to fund additional AMD options as they exercise them.

Speaker #5: And then the Morgan Stanley interim financing facility, plus the eventual takeout of that. So we feel really good about the financing model that we've put in place.

Speaker #5: And how that positions us to make sure we can hit delivery milestones on time.

Speaker #4: Very helpful. Thank you very much, Jensen.

Martin Toner: Very helpful. Thank you very much, gents.

Martin Toner: Very helpful. Thank you very much, gents.

Speaker #5: Thank you.

Jason Les: Thank you.

Jason Les: Thank you.

Speaker #1: That will now conclude the Q&A portion of the call. We'll turn the call back over to Jason Les for final remarks.

Operator: That will now conclude the Q&A portion of the call. We will turn the call back to Jason Les for final remarks.

Operator: That will now conclude the Q&A portion of the call. We will turn the call back to Jason Les for final remarks.

Speaker #3: Thank you, operator. And thank you, everyone, for joining us on our call today. We're very proud to announce this landmark new deal, and we're very excited about the progress that we're making.

Jason Les: Thank you, operator, and thank you everyone for joining us on our call today. We are very proud to announce this landmark new deal. We are very excited about the progress that we are making. We look forward to sharing as we continue to hit new milestones on our strategic growth plan. We will see you all next quarter. Thank you.

Jason Les: Thank you, operator, and thank you everyone for joining us on our call today. We are very proud to announce this landmark new deal. We are very excited about the progress that we are making. We look forward to sharing as we continue to hit new milestones on our strategic growth plan. We will see you all next quarter. Thank you.

Speaker #3: And we look forward to sharing as we continue to hit new milestones on our strategic growth plan. So, we will see you all next quarter.

Speaker #3: Thank you.

Operator: Ladies and gentlemen, this concludes today's call. Thank you all for joining. You may now disconnect.

Operator: Ladies and gentlemen, this concludes today's call. Thank you all for joining. You may now disconnect.

Q2 2026 Riot Platforms Inc Earnings Call

Demo
RIOT

Riot Platforms

Earnings

Q2 2026 Riot Platforms Inc Earnings Call

RIOT

Monday, August 10th, 2026 at 8:30 PM

Transcript

No Transcript Available

No transcript data is available for this event yet. Transcripts typically become available shortly after an earnings call ends.

Want AI-powered analysis? Try AllMind AI →