Why the COP31 Presidency’s 35% Pledge Matters for Power Demand
The COP31 presidency’s pledge requires twice the gain in electricity’s share of energy use that the IEA models under stated policies. What that means for grid investors.
In this article
COP31 ended in Antalya on November 22 without an overarching pact, though negotiators reached agreement on other issues including a just transition. The presidency’s separate pledge calls for electricity to supply 35% of global final energy consumption by 2035. From 23% in 2025, that would take roughly twice the gain in share that the International Energy Agency models under stated policies. For a grid investor, the case for replacing aging lines already exists at the lower figure. The case for faster growth in power sales depends on where customers actually switch to electricity. UN climate chief’s closing remarks · Presidency’s electrification pledge · IEA World Energy Outlook 2026, pp. 48–49
How much more electricity does each path require?
The pledge measures the share of energy that reaches end users as electricity. When a household replaces a gas boiler with an electric heat pump, it starts buying electricity for heating. The heat pump can also deliver the same warmth using less purchased energy, shrinking the denominator. That second effect makes it risky to translate a percentage-point gain directly into utility sales. The IEA excludes non-energy uses such as fuels used as chemical feedstocks from the denominator. IEA, World Energy Outlook, section 4.3
| IEA global scenario | Electricity share in 2035 | Gain from 23% in 2025 | Increase in annual electricity demand, 2025 to 2035 |
|---|---|---|---|
| Current Policies | 28% | 5 percentage points | 10,600 TWh |
| Stated Policies | 29% | 6 percentage points | 10,500 TWh |
| Net Zero Emissions by 2050 | 35% | 12 percentage points | 15,500 TWh |
We paired the demand figures with the electrification shares in the IEA’s November 19 outlook and subtracted the rounded 2025 share. The Net Zero scenario reaches the presidency’s target. Its 12-point gain is twice the 6-point gain under Stated Policies. Yet the increase in annual electricity demand is about 48% larger, using the extra 5,000 terawatt-hours divided by 10,500. That difference reflects all the assumptions in the two scenarios. The presidency’s pledge specifies a share and leaves the volume open. IEA World Energy Outlook 2026 · Figures 1.12 and 1.13, PDF pp. 48–49
The first two rows show why that matters. In Current Policies, electricity takes a smaller share but annual demand grows by roughly 100 TWh more than in Stated Policies. The IEA attributes the similar totals partly to less efficient appliances, cooling equipment and industrial motors in Current Policies. A utility can sell more power even when customers electrify more slowly. IEA, World Energy Outlook, pp. 48–49
Grid replacement under stated policies
Under Stated Policies, the IEA models 26 million kilometers of new power lines worldwide by 2035 and around 16 million kilometers of existing lines that need replacement or refurbishment. That puts about 38% of the combined line work on existing lines, using 16 million divided by 42 million kilometers. It is a share of kilometers. Replacement can create orders for grid equipment even where local electricity sales grow slowly. IEA Stated Policies Scenario, electricity grids
The summit produced a check on what utilities themselves have delivered. In the separate electrification package presented November 19, members of the Utilities for Net Zero Alliance reported building more than 21,000 kilometers of new grid in 2025. Their forward investment plans total at least $156 billion a year across grids, renewables and storage combined. Only a portion of that budget can flow to cable suppliers. UN climate secretariat’s electrification delivery package
A change in a local load forecast would carry more weight for a utility’s sales estimate if customers had signed grid connections and given energization dates. For a cable supplier, the first evidence of additional orders may come from a utility’s replacement tender. Its voltage class and route length identify the equipment needed. A contract award and delivery schedule put that work in a particular supplier’s forecast. How to read a utility’s customer connection pipeline